Attachment 10 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 91-129.pdf

PDF 39 MB Posted

Attached to
Y1DA--589A5-21-700 EHRM INFRASTRUCTURE UPGRADES (VA-24-00076324) Topeka, KS
Solicitation number
36C77624B0026_1
Issued by

About this file

This document appears to be Attachment 10 containing drawings related to Solicitation Number 36C77624B0026_1, which is for the Y1DA--589A5-21-700 EHRM INFRASTRUCTURE UPGRADES project in Topeka, KS. The solicitation is being issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The drawings appear to provide technical details and specifications for the infrastructure upgrades required under this contract. No additional performance-related details or response information is included in this specific attachment.

View the file

Other files

File Type Posted
36C77624B0026 0007.docx DOCX document
36C77624B0026 0006.docx DOCX document
Government Answers to Contractor questions.docx DOCX document
Add Spec Section 23 21 13 Attachment A.pdf PDF
Revised Vol3 Drawing_M503.pdf PDF
Revised Spec Section 23 21 13.pdf PDF
36C77624B0026 0005.docx DOCX document
Pages from Addendum1_Vol2_2of2__20241209.pdf PDF
Colmery-ONeil VA Medical Center - Asbestos and Lead Survey Report signed.pdf PDF
Submittal 024 Pipe - Valve- Fittings 8-8-17.pdf PDF
589A5-21-700_TOPEKA_EHRM_SURVEY LOCATIONS-Markup.pdf PDF
Pages from Addendum1_Vol2_1of2__20241209.pdf PDF
EHRM Contractor Parking and Laydown.pdf PDF
Addendum1_Specifications_20241209.pdf PDF
Addendum1_Vol3_2of3_20241209.pdf PDF
230415-000 Topeka VA Geotech Final Report_S.pdf PDF
Addendum1_Vol3_1of3_20241209.pdf PDF
Addendum1_Vol3_3of3_20241209.pdf PDF
36C77624B0026 0004.docx DOCX document
589A5-21-700_Topeka KS_EHRM_Tech Q1_20241210.docx DOCX document
589A5-21-700_Topeka EHRM_IFB_BOD_Blast.pdf PDF
589A5-21-700_19550421_Steam Distro Plot Plan.pdf PDF
Submittal 023B Perma Pipe Fittings 8-21-17.pdf PDF
589A5-21-700_Topeka KS_EHRM_Tech Q2_20241210.docx DOCX document
Addendum1_Vol1_20241209.pdf PDF
36C77624B0026 0003.docx DOCX document
36C77624B0026 0002.docx DOCX document
S04_Site Visit Sign-in Sheet_Topeka KS.pdf PDF
S06- 36C77624B0026 0001.docx DOCX document
Attachment 1 - 589A5-21-700_Topeka EHRM__SOWV3.docx DOCX document
Attachment 16 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 3_1.pdf PDF
Attachment 15 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2-8.pdf PDF
Attachment 3 - DB Wage Determination Topeka-KS.pdf PDF
Attachment 8 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 3_1-90.pdf PDF
Attachment 4 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_118-180.pdf PDF
Attachment 11 -589A5-21-700_Topeka EHRM_IFBR2_Spec-VOL1_032224.pdf PDF
Attachment 5 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_181-240.pdf PDF
Attachment 14 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 1_134-204.pdf PDF
Attachment 13 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 1_1-18.pdf PDF
Attachment 9 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 3-2.pdf PDF
Attachment 12 -589A5-21-700_Topeka EHRM_IFBR2_Spec-VOL2_032224.pdf PDF
Attachment 20 -Site Visit Instructions.docx DOCX document
Attachment 19 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_111-117.pdf PDF
Attachment 6 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_241-281.pdf PDF
Attachment 18 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_1-110.pdf PDF
36C77624B0026_1.docx DOCX document
Attachment 2- Limitations on Subcontracting - Construction.docx DOCX document
Attachment 7 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2-7.pdf PDF
Attachment 17 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 1_19-133.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TYPICAL NAMEPLATE DETAIL

PANEL

L41A

BREAKER FEED NAMEPLATE SHALL INDICATE WHAT IT

IS SERVING AND SIZE OF CIRCUIT BREAKER.

TYPICAL NAMEPLATE

DETAIL

DISTRIBUTION PANEL TRANSFORMER PANEL DISCONNECT VFD

PANEL

PANEL

PANEL

PANEL

PANEL

PANEL

PANEL

PANEL

PANEL

PANEL

PANEL

PANEL

PANEL

480Y/277V 3P 4W 200A L41A

L41A

L41A

L41A

L41A

L41A

L41A

L41A

L41A

L41A

L41A

L41A

L41A

L41A

DETAIL NOTES:

1. TAGS SHALL BE LAMINATED RESIN. TAG THICKNESS TO BE 1/16" FOR UNITS UP TO 20 SQUARE INCHES OR 8" IN LENGTH AND 1/8" FOR

LARGER TAGS.

2. SECURE TAGS TO EQUIPMENT WITH SELF-TAPPING STAINLESS STEEL SCREWS, .

3. COLOR CODES:

A. NORMAL POWER SYSTEM: LAMINATED BLACK WITH A WHITE CORE WITH ENGRAVED LETTERING.

B. ESSENTIAL ELECTRICAL SYSTEM (EES): LAMINATED RED WITH A WHITE CORE WITH ENGRAVED LETTERING.

4. IDENTIFICATION SIGNS SHALL INDICATE EQUIPMENT DESIGNATION, RATED BUS AMPERAGE OR MCB RATING, VOLTAGE, NUMBER OF

PHASES, NUMBER OF WIRES, AND TYPE OF EES POWER BRANCH AS APPLICABLE.

5. REFER TO SPECIFICATION SECTION 260511.

FED FROM D41A

480Y/277V 3P 4W

L41A

M

IN

" 1/ 2" 200A

CRITICAL

FED FROM D41A

CRITICAL

4#3/0 & 1#6

4#3/0 & 1#6

480Y/277V 3P 4W 200A L41A

FED FROM D41A

CRITICAL

4#3/0 & 1#6

480Y/277V 3P 4W 200A L41A

FED FROM D41A

CRITICAL

4#3/0 & 1#6

480Y/277V 3P 4W 200A L41A

FED FROM D41A

CRITICAL

4#3/0 & 1#6

480Y/277V 3P 4W 200A L41A

FED FROM D41A

CRITICAL

4#3/0 & 1#6

LENGTH AS REQUIRED

CONDUIT

CLAMP.

SIZE AS

REQUIRED

INTEGRAL

GALVANIZED

LIPPED STEEL

MOUNTING

CHANNEL

REFER TO

PLANS

FOR QUANTITY

SIZE OF

CONDUITS

LOCKING

SQUARE

WASHER &

LOCKNUT

3/8" MIN

GALVANIZED

THREADED ROD,

TYP.

WASHER & LOCKNUT

INTEGRAL

GALVANIZED

LIPPED STEEL

MOUNTING

CHANNEL

NOTES

1. METAL CHANNEL STRUT SUPPORT LONGER THAN

36" SHALL BE INSTALLED WITH A CENTER SUPPORT ROD.

2. FASTEN THREADED ROD TO STRUCTURE BY APPROVED

METHOD PER SPECIFICATION 26 05 33, RACEWAYS AND

BOXES FOR ELECTRICAL SYSTEMS. FIELD VERIFY EXACT

CONDITIONS.

3. IF APPLICABLE FOR TRAPEZE INSTALLATIONS IN SEISMIC

AREAS REFER TO SPECIFICATION SECTION 10 05 41,

SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS.

REFER TO PLAN

DRAWINGS FOR

TRAY SIZE

MINERAL WOOL

(FIRMLY

PACKED)FIRESTOP SEALANT

PER SECTION 07 84

00, FIRESTOPPING

JUNCTION BOX OR

PULL BOX

(SIZE AS REQUIRED)

CONDUIT FITTING

SPRING

NUT, TYP

INTEGRAL GALVANIZED

LIPPED STEEL

MOUNTING CHANNEL,

TYP.CONCRETE FLOOR

SLAB, TYP.

STEEL EXPANSION

ANCHOR, TYP

CONDUIT, TYP.

3/8" MAX

15mm (1/2") MINIMUM

NON-SHRINK OR

EPOXY GROUT

PACK BOTH ENDS OF SLEEVE

WITH 3M FIRE DAM 150 3 HOUR

RATED CAULK OR APPROVED

EQUAL, MINIMUM 25mm (1") DEEP

EXTEND CNDUIT 150mm

(6") BEYONDWALL

GALVANIZED RIGID

STEEL CONDUIT

4mm THICK STEEL ANCHOR PLATE WELDED TO SLEEVE, MINIMUM 75mm

(3") LARGER THAN SLEEVE OUTSIDE DIAMETER

SCHEDULE 40 BLACK

STEEL PIPE SLEEVE

CORE DRILL

HOLE AS

REQUIRED

PACK WITH OAKUM

WALL

3'-0"

MAX

15" FLEXIBLE GALVANIZED STEEL

CONDUIT WITH CONDUCTORS &

GREEN INSULATED EQUIPMENT

GROUNDING CONDUCTOR

WITH FLEXIBLE CONDUIT.

FLOOR OR ROOF STRUCTURE.

FIELD VERIFY ACTUAL

CONDITIONS, TYP.

SEISMIC OR EXPANSION

JOINT. FIELD VERIFY

ACTUAL CONDITIONS &

LOCATIONS.

STRUCTURAL MEMBER

(BEAM, JOIST, ETC.), TYP.

STEEL EXPANSION

ANCHOR

BEAM

CLAMP

TYP.

SPRING NUT

JUNCTION BOX, TYP

(SIZE AS REQUIRED)

INTEGRAL GALVANIZED

LIPPED STEEL

MOUNTING CHANNEL

JUNCTION BOX

(SIZE AS REQUIRED)

CONDUIT COMPRESSION

FITTING

CONDUIT

TRAPEZE PER

SD260533-03,

TYP.

CONDUIT

TYP.

PROVIDE EXTRA CABLE TO

MAKE COMPLETE LOOP

AROUND BOX PERIMETER

CHROME PLATED

ESCUTCHEON OR

FLANGE (WHERE

EXPOSED TO VIEW)

PIPE OUTSIDE

DIAMETER

(INCLUDING

INSULATION)

REFER TO

GENERAL TRADES

FOR WALL

CONSTRUCTION

TYPE(S)

SIZE PER

SLEEVE SEAL

MANUFACTURER

REQUIREMENTS

SCHEDULE 40

GALVANIZED

STEEL SLEEVE

WITH 1/8"x1"

CENTER STOP

NOTE 1

MODULAR

SLEEVE SEAL

NOTE:

1. PIPE INSULATION SHALL BE CONTINUOUS THROUGH

PENETRATIONS. PROVIDE RIGID THERMAL HANGAR SHIELD

INSERT AT MODULAR SLEEVE SEALS.

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

Bancroft Project No. VA CONTRACT NO.

ELECTRICAL - DETAILS EHRM INFRASTRUCTURE

UPGRADES

COLMERY O'NEIL VA HEALTH CARE

02/28/2024 WG BX

589A5-21-700

E-B19-502

ISSUE FOR BID

21-116367C77622C0043

NOT TO

SCALE

TYPICAL EQUIPMENT NAMEPLATE LOCATIONS

NOT TO

SCALE

CONDUIT AND TRAY TRAPEZE MOUNTING DETAIL

NOT TO

SCALE

FLOOR SLAB PENETRATION DETAIL

NOT TO

SCALE

PIPE SLEEVE THRU WALL DETAIL

NOT TO

SCALE

CONDUIT JOINT CROSSING DETAIL

NOT TO

SCALE

PIPE PENETRATION EXTERIOR WALL

Revisions: Date:

95% CONSTRUCTION DOCUMENTS SUBMISSION 10/31/2023

100% CONSTRUCTION DOCUMENTS SUBMISSION 12/19/2023

ISSUE FOR BID 12/28/2023

ISSUE FOR BID R1 02/28/2024

ISSUE FOR BID R2 03/22/2024

AIR TERMINAL PLACEMENT AT OUTSIDE CORNERS

NTS 6

EQUIPMENT AIR TERMINALS

NTS

ROOF PIPE BONDING CLAMP

NTS

CABLE BEND REQUIREMENTS

NTS

6-

IN

CH

T

O P

O F

DO

O

R

LESS 4-INCH

DOOR WIDTH

60" MAX

6" M

IN

LINE OF CEILING

FIRE ALARM

CONTROL PANEL

SPEAKER/VISUAL

& VISUAL-ONLY

MANUAL PULL STATION &

FIRE PHONE JACK

MAGNETIC DOOR

HOLDER

6' A

FF

NOTE:

1. PROVIDE MINIMUM 3/4" EMT CONDUIT FOR ALL FIRE ALARM WIRING.

PROVIDE BUSHINGS FOR ALL WIRING ENTRIES INTO JUNCTION BOXES.

2. PROVIDE DUCT SMOKE DETECTOR REMOTE INDICATOR TEST SWITCH AT 6 FEET

ABOVE THE FINISH FLOOR INSIDE MECHANICAL ROOM ADJACENT TO DOOR.

PROVIDE SMOKE DETECTOR FOR UNITS

15,000 CFM OR ABOVE (RETURN)

FAN SHUTDOWN

FIRE ALARM CONTROL

PANEL (FACP)

RETURN AIR

FAN SHUTDOWN

TO FACP

SUPPLY AIR

PROVIDE SMOKE DETECTOR FOR UNITS

2,000 CFM OR ABOVE (SUPPLY)

SAF

OUTSIDE AIR

EXHAUST AIR

SD

SD

FA

CONDUIT SUPPORT 12" (MAX)

3/4" CONDUIT (MIN.) W/ MAX

40% FILL

FLEXIBLE CONDUIT

SUSPENDED CEILING BRACE WITH ELECTRICAL BOX

LAY-IN CEILING

DETECTOR

FA

3'-0" MIN

SMOKE DETECTOR AIR DIFFUSER (SUPPLY OR RETURN)

FINISHED CEILING

FA

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

Bancroft Project No. VA CONTRACT NO.

ELECTRICAL - DETAILS EHRM INFRASTRUCTURE

UPGRADES

COLMERY O'NEIL VA HEALTH CARE

02/28/2024 WG BX

589A5-21-700

E-B19-503

ISSUE FOR BID

21-116367C77622C0043

NOT TO

SCALE

FIRE ALARM DEVICES MOUNTING HEIGHTS

NOT TO

SCALE

DUCT SMOKE DETECTOR DETAIL

NOT TO

SCALE

TYPICAL SMOKE DETECTOR MOUNTING DETAIL

NOT TO

SCALE

SMOKE DETECTOR/AIR DIFFUSER MINIMUM DISTANCE DETAIL

Revisions: Date:

95% CONSTRUCTION DOCUMENTS SUBMISSION 10/31/2023

100% CONSTRUCTION DOCUMENTS SUBMISSION 12/19/2023

ISSUE FOR BID 12/28/2023

ISSUE FOR BID R1 02/28/2024

ISSUE FOR BID R2 03/22/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

K:

\C

C G

_P R

O

JE

C

TS

\2

1\

-1

T op ek a

EH

R M

C

1R

\4

- D es

D oc s\

2- D ra w in gs

\W O

R

KI

N G

\A ut oC

AD

\E le ct ric al \E

-B

-6

.d w g 3/

/2

4:

:0

PM

ISSUE FOR BIDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

COLMERY O'NEIL VA HEALTH CARE

21-116

Revisions: Date:

www. bancroft-ae.com

3300 Dundee RD.

Northbrook, IL 60062

T: 847.952.9362

35% SCHEMATIC DESIGN SUBMISSION 07-12-22

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23

100% CONSTRUCTION DOCUMENTS SUBMISSION

03/22/2024

12-19-23

Bancroft Project No: 21-116

35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22

35% SUBMITTAL II 06-13-23

65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23

ISSUED FOR BID 12-28-23

ISSUE FOR BID R1 02-28-24

ISSUE FOR BID R2 03-22-24

ELECTRICAL - BLDG 19 ELECTRICAL

SCHEDULES

WG BX

E-B19-600

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

K:

\C

C G

_P R

O

JE

C

TS

\2

1\

-1

T op ek a

EH

R M

C

1R

\4

- D es

D oc s\

2- D ra w in gs

\W O

R

KI

N G

\A ut oC

AD

\E le ct ric al \E

-B

-6

.d w g 3/

/2

4:

:4

PM

ISSUE FOR BIDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

COLMERY O'NEIL VA HEALTH CARE

21-116

Revisions: Date:

www. bancroft-ae.com

3300 Dundee RD.

Northbrook, IL 60062

T: 847.952.9362

35% SCHEMATIC DESIGN SUBMISSION 07-12-22

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23

100% CONSTRUCTION DOCUMENTS SUBMISSION

03/22/2024

12-19-23

Bancroft Project No: 21-116

35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22

35% SUBMITTAL II 06-13-23

65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23

ISSUED FOR BID 12-28-23

ISSUE FOR BID R1 02-28-24

ISSUE FOR BID R2 03-22-24

ELECTRICAL - BLDG 19 ELECTRICAL

EQUIPMENT SCHEDULES

WG BX

E-B19-601

A. WHEN ORDERING SWITCHBOARDS, PROVIDE THE SINGLE LINE AND

PLAN DRAWINGS TO MANUFACTURER. MANUFACTURER WILL REQUIRE

THIS TO PROPERLY MANUFACTURE THE SWITCHBOARDS, BASED ON

HOW CABLING WILL ENTER THE SWITCHBOARDS AND THE

CONFIGURATION OF THE INDIVIDUAL STRUCTURES WITHIN THE

SWITCHBOARD.

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

K:

\C

C G

_P R

O

JE

C

TS

\2

1\

-1

T op ek a

EH

R M

C

1R

\4

- D es

D oc s\

2- D ra w in gs

\W O

R

KI

N G

\A ut oC

AD

\E le ct ric al \E

-B

-6

.d w g 3/

/2

4:

:3

PM

ISSUE FOR BIDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

COLMERY O'NEIL VA HEALTH CARE

21-116

Revisions: Date:

www. bancroft-ae.com

3300 Dundee RD.

Northbrook, IL 60062

T: 847.952.9362

35% SCHEMATIC DESIGN SUBMISSION 07-12-22

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23

100% CONSTRUCTION DOCUMENTS SUBMISSION

03/22/2024

12-19-23

Bancroft Project No: 21-116

35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22

35% SUBMITTAL II 06-13-23

65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23

ISSUED FOR BID 12-28-23

ISSUE FOR BID R1 02-28-24

ISSUE FOR BID R2 03-22-24

ELECTRICAL - BLDG 19 ELECTRICAL

EQUIPMENT SCHEDULES

WG BX

E-B19-602

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

K:

\C

C G

_P R

O

JE

C

TS

\2

1\

-1

T op ek a

EH

R M

C

1R

\4

- D es

D oc s\

2- D ra w in gs

\W O

R

KI

N G

\A ut oC

AD

\E le ct ric al \E

-B

-6

.d w g 3/

/2

9:

:2

AM

ISSUE FOR BIDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

COLMERY O'NEIL VA HEALTH CARE

21-116

Revisions: Date:

www. bancroft-ae.com

3300 Dundee RD.

Northbrook, IL 60062

T: 847.952.9362

35% SCHEMATIC DESIGN SUBMISSION 07-12-22

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23

100% CONSTRUCTION DOCUMENTS SUBMISSION

03/22/2024

12-19-23

Bancroft Project No: 21-116

35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22

35% SUBMITTAL II 06-13-23

65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23

ISSUED FOR BID 12-28-23

ISSUE FOR BID R1 02-28-24

ISSUE FOR BID R2 03-22-24

ELECTRICAL - BLDG 19 PANEL

SCHEDULES

WG BX

E-B19-603

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

K:

\C

C G

_P R

O

JE

C

TS

\2

1\

-1

T op ek a

EH

R M

C

1R

\4

- D es

D oc s\

2- D ra w in gs

\W O

R

KI

N G

\A ut oC

AD

\E le ct ric al \E

-B

-7

.d w g 3/

/2

8:

:0

AM

ISSUE FOR BIDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

COLMERY O'NEIL VA HEALTH CARE

21-116

Revisions: Date:

www. bancroft-ae.com

3300 Dundee RD.

Northbrook, IL 60062

T: 847.952.9362

35% SCHEMATIC DESIGN SUBMISSION 07-12-22

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23

100% CONSTRUCTION DOCUMENTS SUBMISSION

03/22/2024

12-19-23

Bancroft Project No: 21-116

35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22

35% SUBMITTAL II 06-13-23

65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23

ISSUED FOR BID 12-28-23

ISSUE FOR BID R1 02-28-24

ISSUE FOR BID R2 03-22-24

ELECTRICAL - BLDG 19 MCR SINGLE

LINE

WG BX

E-B19-701

FOR ROLL UP GEN

TO BLDG 1, MRI EQUIPMENT

BLDG 19 MCR

CONTROL

UPS B DISTRIBUTION

CABINET

ATS

UPS A

DISTRIBUTION

CABINET

UPS A DISTRIBUTION

SOUTH

Isc 3P 6388.0 Amps Isc SLG 4873.0 Amps

CBL-0001

CableSize 4/0 AWG

GEN-BLDG 24

1563 kVA X"d 0.2 pu

PD-0005

Type JCN, 15.5kV E-Rated Sensor/Trip 65.0 A

SWBD EM GEN 480.0 V

BusLibDesc APCB 800-4000APD-BLDG 19

Type Magnum DS, DT 1150/1150i Sensor/Trip 1200.0 A

NORTH

Isc 3P 6388.0 Amps Isc SLG 4833.0 Amps PD-MAIN EM GEN

Type Magnum DS, DT 1150/1150i Sensor/Trip 1600.0 A

PD-ROLL UP

Type Magnum DS, DT 1150/1150i Sensor/Trip 1600.0 A

PD-BLDG 24

Type Magnum DS, DT 1150/1150i Sensor/Trip 1200.0 A

EXISTING CBL-MRI

CableSize 600 kcmil

CBL-CRAC2

CableSize 1/0 AWG

CRAC B19 102

84 Amps

CBL-CRAC3

CableSize 1/0 AWG

CRAC B19 103

84 Amps

CBL-CRAC4

CableSize 1/0 AWG

CRAC B19 104

84 Amps

CBL-ACCU1

CableSize 10 AWG

ACCU B19 101

6 Amps

CBL-ACCU2

CableSize 10 AWG

ACCU B19 102

6 Amps

CBL-ACCU3

CableSize 10 AWG

ACCU B19 103

6 Amps

CBL-ACCU4

CableSize 10 AWG

ACCU B19 104

6 Amps

CBL-ACCU5

CableSize 2 AWG

AHU B19 101

90 Amps

CBL-0064

CableSize 2 AWG

WATER HEATER

80 Amps

CBL-ACCU6

CableSize 8 AWG

ACCU B19 105

30 Amps

CBL-0066

CableSize 400 kcmil

ROLL UP GENERATOR DISC

Type DH Heavy Duty

CBL-0067

CableSize 6 AWG

VAV B19 101

20 kW (Input)

CBL-0068

CableSize 10 AWG

VAV B19 102

5 kW (Input)

CBL-0069

CableSize 6 AWG

VAV B19 103

15 kW (Input)

CBL-0070

CableSize 8 AWG

VAV B19 104

10 kW (Input)

CBL-0065

CableSize 10 AWG

EF B19 101

0.1 hp Load Factor 1.00 X"d 0.15 pu

CBL-0072

CableSize 4/0 AWG S

P

XF3-

Pri RatedVoltage 480 V Sec RatedVoltage 208 V Size 75 kVA Pri Delta Sec Wye-Ground %Z 3.2041 % X/R 0.9

CBL-0073

CableSize 3/0 AWG

19 EL PNL1

208.0 V

BusLibDesc 100-225A

PD-0076

Type EDH Sensor/Trip 200.0 A

CBL-0003

CableSize 4/0 AWG

PD-0080

Type Sensor/Trip 0.0 A

BUS-0089

13800.0 V

BusLibDesc

PD-0081

Type Sensor/Trip 0.0 A

CBL-0078

CableSize 4 AWG

ZONE PDU SERV ENT A

48 Amps

ZONE PDU SERV ENT B

48 Amps

10 SWBD MSB ATS

480.0 V

BusLibDesc APCB 800-4000A

UPS-A

BUS-0118

480.0 V

BusLibDesc 100-600ABYPASS INPUT A

Type KD Sensor/Trip 250.0 A

PD-UPS A

Type HLD Sensor/Trip 400.0 A

CBL-0095

CableSize 3/0 AWG

MAINT ISOLATION

Type KD Sensor/Trip 250.0 A

PD-0110

Type HKD Sensor/Trip 400.0 A

BUS-0119

480.0 V

BusLibDesc 250-1200A

CBL-0096

CableSize 3/0 AWG

S

P

XF2-UPS A1

Pri RatedVoltage 480 V Sec RatedVoltage 208 V Size 225 kVA Pri Delta Sec Wye-Ground %Z 5.1810 % X/R 2.5

PD-0111

Type KD Sensor/Trip 300.0 A

UPS BUS A

208.0 V

BusLibDesc

BUSWAY-A2

208.0 V

BusLibDesc

PD-A4

Type FG Sensor/Trip 250 A

CBL-0014

CableSize 250 AWG

BUSWAY A1

208.0 V

BusLibDesc

PD-A5

Type FG Sensor/Trip 250 A

CBL-0023

CableSize 250 AWG

UPS-A0

BUS-0120

480.0 V

BusLibDesc 100-600ABYPASS INPUT B

Type KD Sensor/Trip 250.0 A

PD-UPS B

Type HLD Sensor/Trip 400.0 A

CBL-0097

CableSize 3/0 AWG

MAINT ISOLATION.

Type KD Sensor/Trip 250.0 A

PD-0112

Type HKD Sensor/Trip 400.0 A

BUS-0121

480.0 V

BusLibDesc 250-1200A

CBL-0098

CableSize 3/0 AWG

S

P

XF2-UPS A2

Pri RatedVoltage 480 V Sec RatedVoltage 208 V Size 225 kVA Pri Delta Sec Wye-Ground %Z 5.1810 % X/R 2.5

PD-0113

Type KD Sensor/Trip 300.0 A

UPS BUS B

208.0 V

BusLibDesc

BUSWAY-B2

208.0 V

BusLibDesc

PD-A6

Type FG Sensor/Trip 250 A

CBL-0022

CableSize 250 AWG

BUSWAY B1

208.0 V

BusLibDesc

PD-A7

Type FG Sensor/Trip 250 A

CBL-0024

CableSize 250 AWG

BUSWAY-B3

208.0 V

BusLibDesc

PD-A8

Type FG

Sensor/Trip 100 A

CBL-0025

CableSize 1/0 AWG

PD-0084

Type HFD, 2-4 Pole

Sensor/Trip 60.0 A

CBL-0079

CableSize 4 AWG

BUSWAY-A3

208.0 V

BusLibDesc

PD-A9

Type FG Sensor/Trip 100 A

CBL-0026

CableSize 1/0 AWG

19 N PNL1

208.0 V

BusLibDesc 100-600A

PD-0051

Type Magnum DS, DT 1150/1150i Sensor/Trip 800.0 A

PD-0052

Type Magnum DS, DT 1150/1150i Sensor/Trip 800.0 A

CBL-0109

CableSize 350 kcmil

CBL-0110

CableSize 2/0 AWG

S

P

XF1

Pri RatedVoltage 13800 V Sec RatedVoltage 480 V Size 750 kVA Pri Delta Sec Wye-Ground %Z 4.9999 % X/R 4.9

CBL-0111

CableSize 400 kcmil

PD-CRAC5

Type EGH, 3-4 Poles Sensor/Trip 110.0 A

PD-CRAC6

Type EGH, 3-4 Poles Sensor/Trip 110.0 A

PD-CRAC7

Type EGH, 3-4 Poles Sensor/Trip 110.0 A

PD-ACCU5

Type EGH, 3-4 Poles Sensor/Trip 15.0 A

PD-ACCU6

Type EGH, 3-4 Poles Sensor/Trip 15.0 A

PD-ACCU7

Type EGH, 3-4 Poles Sensor/Trip 15.0 A

PD-ACCU8

Type EGH, 3-4 Poles Sensor/Trip 15.0 A

PD-0139

Type EDH Sensor/Trip 200.0 A

CBL-CRAC1.

CableSize 1/0 AWG

CRAC B19 101

84 Amps

PD-CRAC8

Type EGH, 3-4 Poles Sensor/Trip 110.0 A

CBL-0113

CableSize 1 AWG

19 H SWBD1

480.0 V

BusLibDesc 250-1200A

PD-0141

Type Magnum DS, DT 1150/1150i Sensor/Trip 1000.0 A

CBL-0114

CableSize 400 kcmil

PD-0142

Type Magnum DS, DT 1150/1150i Sensor/Trip 1000.0 A

S

P

XF2

Pri RatedVoltage 480 V Sec RatedVoltage 208 V Size 150 kVA Pri Delta Sec Wye-Ground %Z 4.5087 % X/R 2.1

CBL-0115

CableSize 4/0 AWG

PD-0144

Type KD Sensor/Trip 225.0 A

PD-AHU1

Type EGH, 3-4 Poles Sensor/Trip 90.0 A

PD-AHU2

Type EGH, 3-4 Poles Sensor/Trip 45.0 A

PD-0077

Type KD Sensor/Trip 400.0 A

PD-0069

Type BR/BRH, 1-Pole Sensor/Trip 15.0 A

19 L PNL2

Type BR/BRH, 1-Pole Sensor/Trip 80.0 A

PD-0074

Type HFD, 2-4 Pole Sensor/Trip 60.0 A

PD-0075

Type HFD, 2-4 Pole Sensor/Trip 20.0 A

PD-0078

Type HFD, 2-4 Pole Sensor/Trip 45.0 A

PD-0079

Type HFD, 2-4 Pole Sensor/Trip 30.0 A

PD-0085

Type HFD, 2-4 Pole Sensor/Trip 60.0 A

BUS-0145

480.0 V

BusLibDesc 2500A

BUS-0146

480.0 V

BusLibDesc

LOAD-0025

169 Amps

LOAD-0026

169 Amps LOAD-0027

76 Amps

LOAD-0028

169 Amps

LOAD-0029

169 Amps

LOAD-0030

76 Amps

200A/3P

SERVICE #1 OF 4 (RM A14)

MSG-A

120/208, 3P, 4W

2000A, 50K AIC

(6) SETS OF 4#400 KCM

200A/3P

SERVICE #1 OF 4 (RM A14)

MSG-B

120/208, 3P, 4W

2000A, 50K AIC

(6) SETS OF 4#400 KCM

X-RAY

480, 3P, 4W

600A, 35K AIC

SERVICE #2 OF 4 (RM B224)

MH 33

MH 32

800A/3P

SERVICE #4 OF 4 (RM B22E)

(3) SETS OF 4#350 KCM

DP1-B

120/208, 3P, 4W

1600A, 125K AIC

1-T3

1-T1 1-T2 1-T5

1-S1 1-S2

12.47KV

120/208V 750 KVA

12.47KV

120/208V 750 KVA

12.47KV

120/208V 300 KVA

12.47KV

480V 500 KVA

(2) SETS OF 3#3/0

(2) SETS OF 3#350 KCM

800A/3P

100A/3P

200A/3P

E

EXISTING

MODULAR MRI

CONNECTION

X-RAY

DISCONNECT

PANEL MP

DISCONNECT

SWITCH

TO EXISTING

PANEL MP

SCOPE OF WORK

200A/3P

SERVICE #1 OF 4 (RM A14)

MSG-A

120/208, 3P, 4W

2000A, 50K AIC

(6) SETS OF 4#400 KCM

200A/3P

SERVICE #1 OF 4 (RM A14)

MSG-B

120/208, 3P, 4W

2000A, 50K AIC

(6) SETS OF 4#400 KCM

MH 33

MH 32

800A/3P

SERVICE #4 OF 4 (RM B22E)

(3) SETS OF 4#350 KCM

DP1-B

120/208, 3P, 4W

1600A, 125K AIC

1-T3

1-T1 1-T2 1-T5

1-S1 1-S2

12.47KV

120/208V 750 KVA

12.47KV

120/208V 750 KVA

12.47KV

120/208V 300 KVA

12.47KV

480/277V 1500 KVA

(3) 70A/3P

GF2000AF

2000AT

DPM

C.T.'S

N

EU

TR

AL

A M

P

BU

S

GROUND

480/277V, 3-PHASE, 4W

2000A

42,000 SCCR

(5) SETS OF 4#600 KCM

EACH IN 4"C.

SB-RAD

24,741 ISC AVAILABLE FAULT CURRENT. 6/11/2018

#4 INSULATED COPPER GROUNDING CONDUCTOR.

PER NEC 250.94. MAXIMUM 20'-0" LENGTH.

#3/0 GROUNDING ELECTRODE

CONDUCTOR

EFFECTIVELY GROUNDED

BUILDING STEEL

CONNECT TO METALLIC

WATER MAIN, WITHIN 5'-0" OF

WM WATER SERVICE ENTRANCE.

PROVIDE JUMPER ACROSS

WATER METER

INTERSYSTEM BONDING

TERMINATION, REFER TO

MATERIAL LIST (IBT).

REMOVABLE LINK

#4 GROUNDING

ELECTRODE CONDUCTOR

CONCRETE ENCASED

ELECTRODE. NEC 250.52

BOND TO MINIMUM OF 20'

OF 1/2" REINFORCING

BAR.

3/4" DIA. x 10'-0" COPPER

GROUND ROD. TOP OF

ROD SHALL BE 12" BELOW

GRADE. (TYP.)

20'-0"

IBT

1200A/3P

(3) SETS OF 4#600 KCM & 1#600KCM GND

EACH IN 4"C.

225A/3P

200A/3P

(2)250A/3P

PREPARED

SPACE

N E

L

(3) SETS OF 4#600 KCM & 1#600KCM GND

EACH IN 4"C.

ATS-1200A

E

3#4/0 & 1#4/0 GND

IN 2-1/2" C. MRI SYSTEM

E

3#250 KCM & 1#4 GND

IN 2-1/2" C.

MRI BUILDING

N

EU

TR

AL

A M

P

BU

S

GROUND

480/277V, 3-PHASE, 4W

1200A/MLO

42,000 SCCR

DPEM-RAD

21,804 ISC AVAILABLE FAULT CURRENT. 6/11/2018

600A/3P

100A/3P

J

J

EXISTING SECOND FLOOR

RADIOLOGY PANEL

EXISTING SECOND FLOOR

NUC MED PANEL

SCOPE OF WORK

START WIRING FOR GENERATOR.

ROUTE (2) 1"CONDUITS FROM

ATS TO GENERATOR CONTROL

PANEL

(2) SETS OF 3#350KCM & 1#

350KCM GND EACH IN 3"C

4#1 & 1#1 GND

IN 2"C.

UPS

UPS PROVIDED BY MODULAR

MRI UNIT MANUFACTURER

[LSI]

[LSI]

[LSI]

600A

PREPARED

SPACE

200A

PREPARED

SPACE

[LSI]

[LSI]

(3) SETS OF 4#600 KCM & 1#600KCM GND

EACH IN 4"C.

NEW JUNCTION

BOX FOR SPLICING

EXISTING WIRING

NEW JUNCTION

BOX FOR SPLICING

EXISTING WIRING

GROUND

BOND TO BUILDING

GROUNDING ELECTRODE

#3/0 GROUNDING

ELECTRODE CONDUCTOR

2000A/3P

GEN-1

480/277V

1250KW

TO ATS-1200

TO EPO

3#250 KCM & 1#4 GND

IN 2-1/2" C.

100% RATED

100% RATED

NO SCALE1 DEMOLITION ONE LINE DIAGRAM

NO SCALE2 ONE LINE DIAGRAM

SEE DRAWING

E-B19-701

FOR DETAILS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

K:

\C

C G

_P R

O

JE

C

TS

\2

1\

-1

T op ek a

EH

R M

C

1R

\4

- D es

D oc s\

2- D ra w in gs

\W O

R

KI

N G

\A ut oC

AD

\E le ct ric al \E

-B

-7

.d w g

/2 7/

:5

1:

A M

ISSUE FOR BIDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

COLMERY O'NEIL VA HEALTH CARE

21-116

Revisions: Date:

www. bancroft-ae.com

3300 Dundee RD.

Northbrook, IL 60062

T: 847.952.9362

35% SCHEMATIC DESIGN SUBMISSION 07-12-22

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23

100% CONSTRUCTION DOCUMENTS SUBMISSION

03/22/2024

12-19-23

Bancroft Project No: 21-116

35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22

35% SUBMITTAL II 06-13-23

65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23

ISSUED FOR BID 12-28-23

ISSUE FOR BID R1 02-28-24

ISSUE FOR BID R2 03-22-24

ELECTRICAL - BLDG-19 GEN-1 SINGLE

LINE DIAGRAM

WG BX

E-B19-702

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

TELECOMMUNICATIONS LEGEND EHRM INFRASTRUCTURE

UPGRADES

COLMERY-O'NEIL VA MEDICAL CENTER

C.C. J.C.G.

589A5-21-700

TT-B19-001

ISSUE FOR BID

21-116367C77622C0043

Revisions: Date:

ISSUE FOR BID R2 03-22-24

03/22/2024

DN

TOILET

A102

HAC

A103

CORRIDOR

(LINK)

B1-01

CORRIDOR

A1-01

BREAKDOWN

ROOM

A104

WORK ROOM

A106

MCR

A107

MCR SUPPR.

TANKS

A111

FIRE WATER

RISER ROOM

A110

MECHANICAL

A101

CORRIDOR

A1-02

ELECTRICAL

ROOM

A108

ENTRANCE

ROOM A

A109

ENTRANCE

ROOM B

A105

IT EQUIPMENT

STORAGE

A106A

E R

-B .0

C ar rie r R ac k

A T

T

E R

-B .0

E R

-B .0

R es er ve d

E X

P A

N S

IO

N

R2.02

R2.03

MDA - Side A

Optical Fiber Backbone

Connectivity to TR's

R3.05

Bldg 1, Rack F04 / F05

VistA Imaging

38U

R3.04

R3.10

R2.01

HDA 2.A

R2.04

Bldg 3, Rm A231

Audio\Phone

11U

R2.05

Bldg 9, Rm A019

HRC-13U

Avaya-1U

14U

R2.06

Bldg 9, Rm B009

6 Storage

18U

R2.07

Bldg 9, Rm B009

1 Server-2U, 2 Controllers-2U

5 Storage-10U

14U

R2.08

Bldg 9, Rm B009

IaaMS Rack (HD Cabinet)

5 Servers-10U, 3 Servers-6U

16U

R2.09

Bldg 1

IaaMS Rack-16U (HD Cabinet)

16U

R2.10

R2.12

HDA 2.B

Bldg 9, Rm B009

9 Switches-11U

6 IaaMS Switches-6U

R3.01

HDA 3.A

R3.02

R3.06

Bldg 1, Rack C04 / C05

ZingBox

16U

R3.08

HDA 3.B

Bldg 1, HTM Switches-5U

OI&T Switch-1U

R3.12

Bldg 1, HTM (BioMed)-Philips PiiCiX

VxRails-4U, Servers-4U, Philips-5U, ComVault -3U

25U

R3.09

Bldg 1, HTM (BioMed)

Servers-32U, Tower Servers-2 {shelf mounted?}

41U

U P

S

S id e B

(R e fe r to

E le c tr ic a l)

TT-B19-304

TT-B19-301

U P

S

S id e A

(R e fe r to

E le c tr ic a l)

CRAC Unit (Refer to Mechanical)

CRAC Unit (Refer to Mechanical)

CRAC Unit (Refer to Mechanical)

CRAC Unit (Refer to Mechanical)

DCBA

B.9 C.3

TT-B19-401

R3.03

Bldg 1, Rack O15 / M15

8 Server-17U, Misc-1U

18U

R3.07

Bldg 1, Rack D14 / L15 / N15

8 Servers-16U, Misc-5U, DomCont-2U, VPS Server-4U, 27U

Bldg 1

Paging

12U

MCR Network Cabinets (MDA & HDA)

- 45U

- connectivity\cross-connects

- 32" (800mm) wide

- 48" (1200mm) deep

MCR Server Cabinets

- 45U

- active equipment\servers

- 24" (600mm) wide

- 48" (1200mm) deep

R1.A1

R1.A2

R1.A3

R1.B4

R1.B6

R1.B7

R1.B8

MDA - Side B

Optical Fiber Backbone

Connectivity to TR's

R3.11 R2.11 Future BioMed SPARE

CERNER

EXPANSION Rack (HD Cabinet)

Bldg 1, Rack P15

CERNER/FDSS (HD Cabinet)

Bldg 1

PBX - Rack 1

26U

Bldg 1

PBX - Rack 2

26U

TT-B19-301

TT-B19-306

ER-A.01

Carrier Rack

AT&T

ER-A.02

ER-A.03

Reserved EXPANSION

TT-B19-305

TT-B19-306

TT-B19-302

TT-B19-402

R1.B5

MDA - Side A

Space reserved for Core, WAN and Security Equipment

MDA - Side B

Copper Backbone

Connectivity to TR's

Bldg 1, Rack D11

Core 1 / WLAN-19U

Bldg 9, Rm B009 _ CORE-8U

Fiber Panel-10U, Fiber Switch-1U

4 Switches-4U, 23U {combined (2) half racks}

42U

Bldg 1, HTM Routers-2U

Bldg 1, Rack D13

CORE 2 \ Gigamon-22U

Bldg 1, Rack L15

JSA-1U

25U

R es er ve d E

X P

A N

S

IO

N

Reserved EXPANSION

Bldg 1, Rack O15 / M15

4 Switches-4U

VistA Imaging

EXPANSION Rack

TT-B19-303

MDA - Side B

Space reserved for Core, WAN and Security Equipment

MDA - Side A

Space reserved for Switches and LAN Equipment

MDA - Side B

Space reserved for Switches and LAN Equipment

TT-B19-303

MDA - Side B

Copper Backbone

Connectivity to TR's

TT-B19-307

Keypad/Card Reader for A109 Entrance Room A

Keypad/Card Reader for A107 MCR

Keypad/Card Reader for A107 MCR

Keypad/Card Reader for A105 Entrance Room B

20" x 4" Copper Main Telecommunications Grounding Bus Bar provided by Electrical.

Mounted at 4'-0" AFF

20" x 4" Copper Telecommunications Grounding Bus Bar provided by Electrical.

Mounted at 4'-0" AFF

20" x 4" Copper Telecommunications Grounding Bus Bar provided by Electrical.

Mounted at 4'-0" AFF

TT-B19-307

Keypad/Card Reader for A104 Breakdown Room

(4) 4-port data outlets located under counter

DC

ES

E S

REX

E S

R E

X

DC

DC

DC

E S

R E

X

E S

E S

R E

X

C R

/K

C R

/K

CR/K

CR/K

CR/K

C R

/K

Keypad/Card Reader for A106 Work Room

E S

E S

R E

X

ES ES

REX

DC

DC

(6) 4" Incoming Site Distribution Conduits:

(2) 4" Incoming Site Distribution Conduits to Entrance Room 'A' from the East for distribution of Side 'A' Optical Fiber to site. Provide (3) 3-Cell MaxCell Fabric Innerducts in (1) of the Entrance Conduits.

(4) 4" Incoming Site Distribution Conduits to Entrance Room 'B' from the East for distribution of Side 'B' Optical Fiber and Cat 5e Copper to site.

Provide (3) 3-Cell MaxCell Fabric Innerducts in (2) of the Entrance Conduits.

Refer to Telecommunications sheets in Volume 2 for continuation.

Refer to Telecommunications site drawings for number of conduits extending across the site to other buildings.

Refer to Civil site drawings for trenching/routing plan.

Coordinate with all other displines concerning Grade Beams, electrical conduits, plumbing, drainage, existing site utilities, etc.

Security Devices:

Install per VA Guidelines. Integrate new devices / system with exiting on-site security system. Refer to Div 28 specifiactions for additional information. (Typical)

DC

DC

DC

DC

TT-B19-310

TT-B19-311

TT-B19-312

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

12-28-23

TELECOMMUNICATIONS MCR OVERALL

FLOOR PLAN

EHRM INFRASTRUCTURE

UPGRADES

COLMERY-O'NEIL VA MEDICAL CENTER

C.C. C.C.

589A5-21-700

TT-B19-101

ISSUE FOR BID

21-116367C77622C0043

N

1/4" = 1'-0"

B19 MCR Overall Plan

Revisions: Date:

35% SCHEMATIC DESIGN SUBMISSION 07-12-22

35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22

35% SUBMITTAL II 06-13-23

65% DESIGN DEVELOPMENT SUBMISSION 09-12-23

95% CD SUBMISSION 10-31-23

100% CD SUBISSION 12-19-23

ISSUE FOR BID 12-28-23

TT-B19-304

TT-B19-301

(6) Hilti 4" Speed Sleeve or approved equivalent (typical)

TT-B19-401

TT-B19-301

TT-B19-306 1

TT-B19-305

TT-B19-306

TT-B19-302

TT-B19-402

TT-B19-303

TT-B19-303

TT-B19-307

2-Level Overhead Cable Tray System:

Level 1:

24" x 6" Wire Basket Tray for copper distribution

Level 2:

6" x 4" FiberRunner for optical fiber distribution

(2) 2" Conduits for extension of Service Providers connections from existing Demarc located in Building 1, Level 2, Rm A201, routed thru ceiling space of Backbone Connector Corridor and Bldg 24 to Entrance Room B.

Mount conduits tight to structure. Provide pullboxes per BICSI TDMM requirements.

Extension of Service Providers connection from existing Demarc in Building 3, Level 1, Rm A129A, shall be routed thru Steam Tunnel into Entrance Room B via duct bank connected to Steam Tunnel. Install in provided innerducts.

Install Hilti Speed Sleeves (or approved equivalent) at fire-rated, smoke-rated or any other partitions required by code, AHJ or VA.

TT-B19-307

(2) 2" Conduits for extension of Service Providers connections from existing Demarc located in Building 3, Level 1, Rm A129A, routed thru ceiling space of Backbone Connector Corridor and Bldg 24 to Entrance Room A.

Mount conduits tight to structure. Provide pullboxes per BICSI TDMM requirements.

Extension of Service Providers connection from existing Demarc in Building 1, Level 2, Rm A201, shall be routed thru Steam Tunnel into Entrance Room A via duct bank connected to Steam Tunnel. Install in provided innerducts.

Install Hilti Speed Sleeves (or approved equivalent) at fire-rated, smoke-rated or any other partitions required by code, AHJ or VA.

(4) 4" Conduits for Backbone Cable Distribution to TR's and TE's routed to ceiling space of Bldg 24. Conduits will extend and be routed into Steam Tunnel at closest possible entrance point. Install (2) 3-cell MaxCell Fabric Innerducts in (3) of the (4) conduits.

Mount conduits tight to structure.

Install Hilti Speed Sleeves (or approved equivalent) at fire-rated, smoke-rated or any other partitions required by code, AHJ or VA.

Security Camera - stem mounted.

Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.

Security Camera - stem mounted.

Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.

Security Camera - stem mounted.

Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.

Security Camera - stem mounted.

Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.

1' - 6"

Electrical Busway. Shown for coordination purposes only. Refer to electrcial plans and specifications.

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

12-28-23

B19 TELECOMMUNICATIONS OVERALL CABLE

PATHWAY PLAN

EHRM INFRASTRUCTURE

UPGRADES

COLMERY-O'NEIL VA MEDICAL CENTER

C.C. C.C.

589A5-21-700

TT-B19-101

CBT

ISSUE FOR BID

21-116367C77622C0043

Revisions: Date:

35% SCHEMATIC DESIGN SUBMISSION 07-12-22

35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22

35% SUBMITTAL II 06-13-23

65% DESIGN DEVELOPMENT SUBMISSION 09-12-23

95% CD SUBMISSION 10-31-23

100% CD SUBISSION 12-19-23

ISSUE FOR BID 12-28-23

N

1/4" = 1'-0"

B19 MCR Overhead Basket Tray

DCBA

B.9 C.3

TT-B19-310

TT-B19-311

TT-B19-312

(6) 4" Incoming Site Distribution Conduits:

(2) 4" Incoming Site Distribution Conduits to Entrance Room 'A' from the East for distribution of Side 'A' Optical Fiber to site. Provide (3) 3-Cell MaxCell Fabric Innerducts in (1) of the Entrance Conduits.

(4) 4" Incoming Site Distribution Conduits to Entrance Room 'B' from the East for distribution of Side 'B' Optical Fiber and Cat 5e Copper to site.

Provide (3) 3-Cell MaxCell Fabric Innerducts in (2) of the Entrance Conduits.

Refer to Telecommunications sheets in Volume 2 for continuation.

Refer to Telecommunications site drawings for number of conduits extending across the site to other buildings.

Refer to Civil site drawings for trenching/routing plan.

Coordinate with all other displines concerning Grade Beams, electrical conduits, plumbing, drainage, existing site utilities, etc.

(6) 4" Incoming Site Distribution Conduits to Entrance Room 'A' from the West for distribution of Side 'A' Optical Fiber to Steam Tunnel. Provide (3) 3-Cell MaxCell Fabric Innerducts in (3) of the Entrance Conduits. Refer to Telecommunications sheets in Volume 2 for continuation. Refer to Telecommunications site drawings for number of conduits extending across the site to other buildings. Refer to Civil site drawings for trenching/routing plan.

Coordinate with all other displines concerning Grade Beams, electrical conduits, plumbing, drainage, existing site utilities, etc.

(6) 4" Incoming Site Distribution Conduits to Entrance Room 'B' from the West for distribution of Side 'B' Optical Fiber from Steam Tunnel. Provide (3) 3-Cell MacCell Fabric Innerducts in (3) of the Entrance Conduits. Refer to Telecommunications sheets in Volume 2 for continuation. Refer to Telecommunications site drawings for number of conduits extending across the site to other buildings.

Refer to Civil site drawings for trenching/routing plan. Coordinate with all other displines concerning Grade Beams, electrical conduits, plumbing, drainage, existing site utilities, etc.

Entrance Room 'A' Room 109

Entrance Room 'B' Room 105

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

TELECOMMUNICATIONS MCR INCOMING OSP

UNDERSLAB CONDUIT PLAN

EHRM INFRASTRUCTURE

UPGRADES

COLMERY-O'NEIL VA MEDICAL CENTER

C.C. C.C.

589A5-21-700

TT-B19-102

ISSUE FOR BID

21-116367C77622C0043

Revisions: Date:

N

1/4" = 1'-0"

B19 MCR Overall Underslab Conduit Plan

C.3C.3

TT-B19-304

TT-B19-301

DCBA

B.9

TT-B19-301

TT-B19-306 1

TT-B19-305

TT-B19-306

TT-B19-302

TT-B19-3031

TT-B19-303

TT-B19-307

2-Level Overhead Cable Tray System:

Level 1:

24" x 6" Wire Basket Tray for copper distribution

Level 2:

6" x 4" FiberRunner for optical fiber distribution

TT-B19-307

Electrical Busway. Shown for coordination purposes only. Refer to electrcial plans and specifications.

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

12-28-23

B19 TELECOMMUNICATIONS OVERALL FIBER

RUNNER PATHWAY PLAN

EHRM INFRASTRUCTURE

UPGRADES

COLMERY-O'NEIL VA MEDICAL CENTER

C.C. C.C.

589A5-21-700

TT-B19-102

CBT

ISSUE FOR BID

21-116367C77622C0043

Revisions: Date:

35% SCHEMATIC DESIGN SUBMISSION 07-12-22

35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22

35% SUBMITTAL II 06-13-23

65% DESIGN DEVELOPMENT SUBMISSION 09-12-23

95% CD SUBMISSION 10-31-23

100% CD SUBISSION 12-19-23

ISSUE FOR BID 12-28-23

N

1/4" = 1'-0"

B19 MCR Overhead FiberRunner Tray

T/O STEEL (DCA)

16' - 0"

TT-B19-304

FINISH FLOOR

0' - 0"

T/O STEEL (DCA)

16' - 0"

T/O STEEL (LINK)

13' - 10"(6) Hilti 4" Speed Sleeve or approved equivalent (Typical)

MCR Cabinets - (2) models:

Network Cabinet (MDA and HDA)

- 45U

- connectivity\cross-connects

- 32" (800mm) wide

- 48" (1200mm) deep

Server Cabinets

- 45U

- active equipment\servers

- 24" (600mm) wide

- 48" (1200mm) deep

(4) 4" Conduits for Backbone Cable Distribution to TR's and TE's routed to ceiling space of Bldg 24. Conduits will extend and be routed into Steam Tunnel at closest possible entrance point. Install (2) 3-cell MaxCell Fabric Innerducts in (3) of the (4) conduits.

Mount conduits tight to structure.

Install Hilti Speed Sleeves (or approved equivalent) at fire-rated, smoke-rated or any other partitions required by code, AHJ or VA.

12" wide x 1 3/4" deep Cable Runway mounted Vertically on wall for routing and support of cabling

TT-B19-301

TT-B19-305

TT-B19-306

TT-B19-302

(6) Hilti 4" Speed Sleeve or approved equivalent (Typical)

2-Level Overhead Cable Tray System:

- Level 1 - 24" x 6" Wire Basket Tray for copper distribution

- Level 2 - 6" x 4" FiberRunner for optical fiber distribution

18" wide x 6" deep Overhead Basket Tray:

Routed above ceiling from Entrance Room to double-layer cable trays within MCR

18" wide x 6" deep Overhead Basket Tray:

Routed above ceiling from Entrance Room to double-layer cable trays within MCR

4-post , 45U Network Racks.

24" (600mm) wide x 30" (750mm) deep.

Refer to specifications and VA design guidelines for additions details.

ROW 1

MDA

ROW 2

SERVERS

ROW 3

SERVERS

ROW 4

UPS

3/4" Grade A/C Fire-Resistance Plywood Backboard mounted vertically on wall starting at 6" AFF.

Plywood shall be painted with White Fire-Retardant Paint on all 6 sides.

Fire Resistant Seal shall be mounted outward and shall not be painted over for visual inspection.

4-post , 45U Network Racks.

24" (600mm) wide x 30" (750mm) deep.

Refer to specifications and VA design guidelines for additions details.

18" wide x 6" deep Overhead Basket Tray. Bottom of Basket Tray shall be mounted at minimum of 8'-3" AFF to clear door swing.

18" wide x 6" deep Overhead Basket Tray.

Bottom of Basket Tray shall be mounted at minimum of 8'-3" AFF to clear door swing.

18" wide x 1 3/4" deep Cable Runway mounted Vertically on wall for routing and support of cabling

7' Vertical Cable Managers:

6" wide cable managers on outside of end racks.

10" wide cable manager between racks.

Entrance Room "A"

7' Vertical Cable Managers:

- 6" wide cable managers on outside of end racks.

- 10" wide cable manager between racks.

Entrance Room "B"

MCR

TT-B19-303

TT-B19-303

Electrical Busway.

Shown for coordination purposes only. Refer to electrcial plans and specifications.

Vertical Exhaust Ducts (VED)

TT-B19-307

Overhead Mechanical Exhaust Duct connected to Vertical Exhaust Ducts supplied with the specified cabinets, shown for coordination purposes. Refer to mechanical drawings and specifications.

3/4" Grade A/C Fire-Resistance Plywood Backboard mounted vertically on wall starting at 6" AFF.

Plywood shall be painted with White Fire-Retardant Paint on all 6 sides.

Fire Resistant Seal shall be mounted outward and shall not be painted over for visual inspection.

20" x 4" Copper Main Telecommunications Grounding Bus Bar provided by Electrical.

Mounted at 4'-0" AFF

(2) 2" Hilti Speed Sleeve or approved equivalent

Security Camera - stem mounted.

Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.

24" wide x 1 3/4" deep Cable Runway mounted Vertically on wall for routing and support of cabling

6' - 9" 8' - 9" 9' - 0" 9' - 0" 6' - 11 7/16"

4' - 11 15/16" 5' - 1 5/8" 4' - 8 15/16"

5' - 0 3/4"

4' - 8 13/16"

1' - 6"

(2) 2" Conduits for extension of Service Providers connections from existing Demarc located in Building 3, Level 2, Rm A229A, routed thru ceiling space of Backbone Connector Corridor and Bldg 24 to Entrance Room A.

Mount conduits tight to structure. Provide pullboxes per BICSI TDMM requirements.

Extension of Service Providers connection from existing Demarc in Building 1, Level 2, Rm A201, shall be routed thru Steam Tunnel into Entrance Room A via duct bank connected to Steam Tunnel. Install in provided innerducts.

Install Hilti Speed Sleeves (or approved equivalent) at fire-rated, smoke-rated or any other partitions required by code, AHJ or VA.

FINISH FLOOR

0"

32 32

TT-B19-301

(6) Hilti 4" Speed Sleeve or approved equivalent

UPS - Side B (Refer to Electrical)

UPS - Side A (Refer to Electrical)

Security Camera - stem mounted.

Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.

Electrical Busway. Shown for coordination purposes only.

Refer to electrcial plans and specifications.

Request to Exit sensor. Refer to security details and Div 28 specifications for additional information.

MagLocks. Refer to security details and Div 28 specifications for additional information.

(2) Hilti 2" Speed Sleeve or approved equivalent

SECOND FLOOR

ROOF T.O.S.

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

12-28-23

MCR - SECTIONS EHRM INFRASTRUCTURE

UPGRADES

COLMERY-O'NEIL VA MEDICAL CENTER

C.C. C.C.

589A5-21-700

TT-B19-301

ISSUE FOR BID

21-116367C77622C0043

Revisions: Date:

35% SCHEMATIC DESIGN SUBMISSION 07-12-22

35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22

35% SUBMITTAL II 06-13-23

65% DESIGN DEVELOPMENT SUBMISSION 09-12-23

95% CD SUBMISSION 10-31-23

100% CD SUBISSION 12-19-23

ISSUE FOR BID 12-28-23

N

3/8" = 1'-0"

B19 MCR - Overall Building Section

N

1/2" = 1'-0"

B19 MCR - UPS Elevation

FINISH FLOOR

0"

14 3 2

T/O STEEL (DCA)

16' - 0"

14 3 14 3 2

FINISH FLOOR

0' - 0"

T/O STEEL (DCA)

16' - 0"

T/O STEEL (LINK)

13' - 10"

2-Level Overhead Cable Tray System:

Level 1 - 24" x 6" Wire Basket Tray for copper distribution Level 2 - 6" x 4" FiberRunner for optical fiber distribution

MCR Cabinets:

MDA Network Cabinets

- 45U

- connectivity\cross-connects

- 32" (800mm) wide

- 48" (1200mm) deep

MDA - Side A

Optical Fiber

Backbone Connectivity to TR's

MDA - Side A

Space reserved for

Core, WAN and Security

Equipment

R1.A1 R1.A2 R1.A3 R1.B4 R1.B5 R1.B6 R1.B7 R1.B8

MDA - Side A

Space reserved for

Switches and LAN

Equipment

MDA - Side B

Space reserved for

Switches and LAN

Equipment

MDA - Side B

Space reserved for

Core, WAN and Security

Equipment

MDA - Side B

Optical Fiber

Backbone Connectivity to TR's

1U Flat 48-port Cat 5e Copper Patch Panels for termination of 25-pair ISP cabling.

Each 25-pair Cat 5e requires 1/2 U of rack mounting space.

50-pair to be terminated in 1U of rack space.

1U Flat 24-port Cat 5e Copper Patch Panels with 1U 24-port rack mounted surge protection for termination of 25-pair OSP cabling.

Each 25-pair Cat 5e OSP requires 2U of rack mounting space.

1U Flat Blanking Panels

1U 144-PORT Angled Optical Fiber Patch Panels for termination of OM4 and OS1/OS2 optical fiber cabling

(2) 1U Flat 48-port Cat 5e Copper Patch Panels in top position for termination of 100-pair cabling from Entrance Room B.

Each 25-pair Cat 5e requires 1/2 U of rack mounting space.

50-pair to be terminated in 1U of rack space.

1U horizontal Cable Manager

1U Blanking Panels shall be installed in all unused spaces. Angled shall be installed where angled patch panels are used. Blanking panels not shown for in all locations required.

Security Camera - stem mounted.

Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.

" 9

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

12-28-23

MCR ROW 1 ELEVATIONS EHRM INFRASTRUCTURE

UPGRADES

COLMERY-O'NEIL VA MEDICAL CENTER

C.C. C.C.

589A5-21-700

TT-B19-302

ISSUE FOR BID

21-116367C77622C0043

Revisions: Date:

35% SCHEMATIC DESIGN SUBMISSION 07-12-22

35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22

35% SUBMITTAL II 06-13-23

65% DESIGN DEVELOPMENT SUBMISSION 09-12-23

95% CD SUBMISSION 10-31-23

100% CD SUBISSION 12-19-23

ISSUE FOR BID 12-28-23

N

1/2" = 1'-0"

B19 MCR - MDA Row 1 Front Elevation

1 43

T/O STEEL (DCA)

16' - 0"

1 4321 43

FINISH FLOOR

0' - 0"

T/O STEEL (DCA)

16' - 0"

T/O STEEL (LINK)

13' - 10"

Zero U Rack mounted 3-phase PDU

19" 2-lug rack mounted copper busbar. Typical for Server Cabinets, HDA and MDA cabinets.

2-Level Overhead Cable Tray System:

- Level 1 - 24" x 6" Wire Basket Tray for copper distribution

- Level 2 - 6" x 4" FiberRunner for optical fiber distribution

Duel Zero U Rack mounted 3-phase PDU's installed in High-Density Server Cabinets

FINISH FLOOR

0"

14 3 2

T/O STEEL (DCA)

16' - 0"

14 3 14 3 2

FINISH FLOOR

0' - 0"

T/O STEEL (DCA)

16' - 0"

T/O STEEL (LINK)

13' - 10"

2-Level Overhead Cable Tray System:

Level 1 - 24" x 6" Wire Basket Tray for copper distribution Level 2 - 6" x 4" FiberRunner for optical fiber distribution

MCR Network Cabinets HDA Network Cabinets (2) per Row 2 and Row 3. (1) HDA at each end of each compute row.

- 45U

- connectivity\cross-connects

- 32" (800mm) wide

- 48" (1200mm) deep

MCR Server Cabinets:

(10) Cabinets per Row 2 and Row 3

- 45U

- active equipment\servers

- 24" (600mm) wide

- 48" (1200mm) deep

R3.02R3.01

(HDA 3.A)

R3.03 R3.04 R3.05 R3.06 R3.07 R3.08 R3.09 R3.10 R3.11 R3.12

(HDA 3.B)

1U Angled Optical Fiber Patch Panels with Duplex LC connectors

1U Angled 48-port Cat 6A Copper Patch Panels.

1 patch panel per server cabinet for Cat 6A copper connectivity.

1U Angled Blanking Panels

- Blanking panels to be installed in all unused Rack Units (RU's).

- Refer to specification for additional information.

Electrical Busway. Shown for coordination purposes. Refer to electrcial plans and specifications.

Vertical Exhaust Ducts (VED)

Overhead Mechanical Exhaust Duct connected to Vertical Exhaust Ducts supplied with the specified cabinets, shown for coordination purposes. Refer to mechanical drawings and specifications.

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

12-28-23

MCR ROW 3 ELEVATIONS EHRM INFRASTRUCTURE

UPGRADES

COLMERY-O'NEIL VA MEDICAL CENTER

C.C. C.C.

589A5-21-700

TT-B19-303

ISSUE FOR BID

21-116367C77622C0043

Revisions: Date:

95% CD SUBMISSION 10-31-23

100% CD SUBISSION 12-19-23

ISSUE FOR BID 12-28-23

N

1/2" = 1'-0"

B19 MCR - Server Cabinets Row 3 Rear Elevation

N

1/2" = 1'-0"

B19 MCR - Server Cabinets Row 3 Front Elevation

T/O STEEL (DCA)

16' - 0"

TT-B19-301

4-post , 45U Network Racks.

24" (600mm) wide x 30" (750mm) deep.

Refer to specifications and VA design guidelines for additions details.

7' Vertical Cable Managers:

6" wide cable managers on outside of end racks.

10" wide cable manager between racks.

3/4" Grade A/C Fire-Resistance Plywood Backboard mounted vertically on wall starting at 6" AFF.

Plywood shall be painted with White Fire-Retardant Paint on all 6 sides.

Fire Resistant Seal shall be mounted outward and shall not be painted over for visual inspection.

T/O STEEL (DCA)

16' - 0"

T/O STEEL (LINK)

13' - 10"

Hilti 4" Speed Sleeves or approved equivalent

18" wide x 1 3/4" deep Cable Runway mounted Vertically on wall for routing and support of cabling.

18" wide x 6" deep Overhead Basket Tray.

Bottom of Basket Tray shall be mounted at minimum of 8'-3" AFF to clear door swing.

18" wide x 6" deep Overhead Basket Tray:

Routed above ceiling from Entrance Facilities to double-layer cable trays within MCR.

3' - 0"

1U 144-PORT Angled Optical Fiber Patch Panels for termination of Service Providers extended connectivity from existing Demarc's.

Match terminations to existing Service Providers termination types.

1U Angled Blanking Panels

1U Flat Blanking Panels

1U Horizontal Cable Managers

(2) 1U Flat 48-port Cat 5e Copper Patch Panels for termination of 100-pair cabling. Top 100-pair from existing Demarc in Building 1. Second 100-pair to MCA 'B' in MCR.

- 50-pair to be terminated in 1U of rack space.

Security Camera - stem mounted.

Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.

Service Providers extended Copper connectivity from Building 1

Demarc

Service Providers extended

Optical Fiber connectivity from Building 3 Demarc

Service Providers extended

Optical Fiber connectivity from Building 1 Demarc

NOTE:

Mirror Entrance Room 'A' Optical Fiber connectivity, terminations and rack layouts in Entrance Room 'B'.

FINISH FLOOR

0"

T/O STEEL (DCA)

16' - 0"

FINISH FLOOR

0' - 0"

T/O STEEL (DCA)

16' - 0"

T/O STEEL (LINK)

13' - 10"

12" wide x 1 3/4" deep Cable Runway mounted Vertically on 3/4" Plywood Backboard for routing and support of Incoming Cabling

(2) 4" Incoming Site Distribution Conduits to Entrance Room 'A' from the East for distribution of Side 'A' Optical Fiber. Refer to Civil site drawings for trenching/routing plan. Refer to Telecommunications site drawings for number of conduits extending across the site to other buildings. Coordinate with all other displines concerning Grade Beams, electrical conduits, plumbing, drainage, existing site utilities, etc.

(6) Hilti 4" Speed Sleeve or approved equivalent

TT-B19-306

3/4" Grade A/C Fire-Resistance Plywood Backboard mounted vertically on wall starting at 6" AFF.

Plywood shall be painted with White Fire-Retardant Paint on all 6 sides.

Fire Resistant Seal shall be mounted outward and shall not be painted over for visual inspection.

18" wide x 1 3/4" deep Cable Runway mounted vertically on wall for routing and support of cabling.

18" wide x 6" deep Overhead Basket Tray.

Bottom of Basket Tray shall be mounted at minimum of 8'-3" AFF to clear door swing.

18" wide x 6" deep Overhead Basket Tray:

Routed above ceiling from Entrance Room A to double-layer cable trays within MCR.

6"

(6) 4" Incoming Site Distribution Conduits to Entrance Room 'A' from the West for distribution of Side 'A' Optical Fiber. Refer to Telecommunications sheets in Volume 2 for continuation.

Refer to Civil site drawings for trenching/routing plan. Refer to Telecommunications site drawings for number of conduits extending across the site to other buildings. Coordinate with all other displines concerning Grade Beams, electrical conduits, plumbing, drainage, existing site utilities, etc.

20" x 4" Copper Telecommunications Grounding Bus Bar provided by Electrical.

Mounted at 4'-0" AFF

Security Camera - stem mounted.

Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

12-28-23

ENTRANCE FACILITY "A" SECTIONS EHRM INFRASTRUCTURE

UPGRADES

COLMERY-O'NEIL VA MEDICAL CENTER

C.C. C.C.

589A5-21-700

TT-B19-304

ISSUE FOR BID

21-116367C77622C0043

Revisions: Date:

35% SCHEMATIC DESIGN SUBMISSION 07-12-22

35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22

35% SUBMITTAL II 06-13-23

65% DESIGN DEVELOPMENT SUBMISSION 09-12-23

95% CD SUBMISSION 10-31-23

100% CD SUBISSION 12-19-23

ISSUE FOR BID 12-28-23

N

3/4" = 1'-0"

B19 Entrance Facility "A" - Rack Elevation N

3/4" = 1'-0"

B19 Entrance Facility "A" - Wall Elevation

Floor 1

FINISH FLOOR

0"

T/O STEEL (DCA)

16' - 0"

Level 01 0' - 0"

32 32

FINISH FLOOR

0' - 0"

T/O STEEL (DCA)

16' - 0"

T/O STEEL (LINK)

13' - 10"

3/4" Grade A/C Fire-Resistance Plywood Backboard mounted vertically on wall starting at 6" AFF.

Plywood shall be painted with White Fire-Retardant Paint on all 6 sides.

Fire Resistant Seal shall be mounted outward…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .