This document appears to be Attachment 10 containing drawings related to Solicitation Number 36C77624B0026_1, which is for the Y1DA--589A5-21-700 EHRM INFRASTRUCTURE UPGRADES project in Topeka, KS. The solicitation is being issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The drawings appear to provide technical details and specifications for the infrastructure upgrades required under this contract. No additional performance-related details or response information is included in this specific attachment.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TYPICAL NAMEPLATE DETAIL
PANEL
L41A
BREAKER FEED NAMEPLATE SHALL INDICATE WHAT IT
IS SERVING AND SIZE OF CIRCUIT BREAKER.
TYPICAL NAMEPLATE
DETAIL
DISTRIBUTION PANEL TRANSFORMER PANEL DISCONNECT VFD
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
PANEL
480Y/277V 3P 4W 200A L41A
L41A
L41A
L41A
L41A
L41A
L41A
L41A
L41A
L41A
L41A
L41A
L41A
L41A
DETAIL NOTES:
1. TAGS SHALL BE LAMINATED RESIN. TAG THICKNESS TO BE 1/16" FOR UNITS UP TO 20 SQUARE INCHES OR 8" IN LENGTH AND 1/8" FOR
LARGER TAGS.
2. SECURE TAGS TO EQUIPMENT WITH SELF-TAPPING STAINLESS STEEL SCREWS, .
3. COLOR CODES:
A. NORMAL POWER SYSTEM: LAMINATED BLACK WITH A WHITE CORE WITH ENGRAVED LETTERING.
B. ESSENTIAL ELECTRICAL SYSTEM (EES): LAMINATED RED WITH A WHITE CORE WITH ENGRAVED LETTERING.
4. IDENTIFICATION SIGNS SHALL INDICATE EQUIPMENT DESIGNATION, RATED BUS AMPERAGE OR MCB RATING, VOLTAGE, NUMBER OF
PHASES, NUMBER OF WIRES, AND TYPE OF EES POWER BRANCH AS APPLICABLE.
5. REFER TO SPECIFICATION SECTION 260511.
FED FROM D41A
480Y/277V 3P 4W
L41A
M
IN
" 1/ 2" 200A
CRITICAL
FED FROM D41A
CRITICAL
4#3/0 & 1#6
4#3/0 & 1#6
480Y/277V 3P 4W 200A L41A
FED FROM D41A
CRITICAL
4#3/0 & 1#6
480Y/277V 3P 4W 200A L41A
FED FROM D41A
CRITICAL
4#3/0 & 1#6
480Y/277V 3P 4W 200A L41A
FED FROM D41A
CRITICAL
4#3/0 & 1#6
480Y/277V 3P 4W 200A L41A
FED FROM D41A
CRITICAL
4#3/0 & 1#6
LENGTH AS REQUIRED
CONDUIT
CLAMP.
SIZE AS
REQUIRED
INTEGRAL
GALVANIZED
LIPPED STEEL
MOUNTING
CHANNEL
REFER TO
PLANS
FOR QUANTITY
SIZE OF
CONDUITS
LOCKING
SQUARE
WASHER &
LOCKNUT
3/8" MIN
GALVANIZED
THREADED ROD,
TYP.
WASHER & LOCKNUT
INTEGRAL
GALVANIZED
LIPPED STEEL
MOUNTING
CHANNEL
NOTES
1. METAL CHANNEL STRUT SUPPORT LONGER THAN
36" SHALL BE INSTALLED WITH A CENTER SUPPORT ROD.
2. FASTEN THREADED ROD TO STRUCTURE BY APPROVED
METHOD PER SPECIFICATION 26 05 33, RACEWAYS AND
BOXES FOR ELECTRICAL SYSTEMS. FIELD VERIFY EXACT
CONDITIONS.
3. IF APPLICABLE FOR TRAPEZE INSTALLATIONS IN SEISMIC
AREAS REFER TO SPECIFICATION SECTION 10 05 41,
SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS.
REFER TO PLAN
DRAWINGS FOR
TRAY SIZE
MINERAL WOOL
(FIRMLY
PACKED)FIRESTOP SEALANT
PER SECTION 07 84
00, FIRESTOPPING
JUNCTION BOX OR
PULL BOX
(SIZE AS REQUIRED)
CONDUIT FITTING
SPRING
NUT, TYP
INTEGRAL GALVANIZED
LIPPED STEEL
MOUNTING CHANNEL,
TYP.CONCRETE FLOOR
SLAB, TYP.
STEEL EXPANSION
ANCHOR, TYP
CONDUIT, TYP.
3/8" MAX
15mm (1/2") MINIMUM
NON-SHRINK OR
EPOXY GROUT
PACK BOTH ENDS OF SLEEVE
WITH 3M FIRE DAM 150 3 HOUR
RATED CAULK OR APPROVED
EQUAL, MINIMUM 25mm (1") DEEP
EXTEND CNDUIT 150mm
(6") BEYONDWALL
GALVANIZED RIGID
STEEL CONDUIT
4mm THICK STEEL ANCHOR PLATE WELDED TO SLEEVE, MINIMUM 75mm
(3") LARGER THAN SLEEVE OUTSIDE DIAMETER
SCHEDULE 40 BLACK
STEEL PIPE SLEEVE
CORE DRILL
HOLE AS
REQUIRED
PACK WITH OAKUM
WALL
3'-0"
MAX
15" FLEXIBLE GALVANIZED STEEL
CONDUIT WITH CONDUCTORS &
GREEN INSULATED EQUIPMENT
GROUNDING CONDUCTOR
WITH FLEXIBLE CONDUIT.
FLOOR OR ROOF STRUCTURE.
FIELD VERIFY ACTUAL
CONDITIONS, TYP.
SEISMIC OR EXPANSION
JOINT. FIELD VERIFY
ACTUAL CONDITIONS &
LOCATIONS.
STRUCTURAL MEMBER
(BEAM, JOIST, ETC.), TYP.
STEEL EXPANSION
ANCHOR
BEAM
CLAMP
TYP.
SPRING NUT
JUNCTION BOX, TYP
(SIZE AS REQUIRED)
INTEGRAL GALVANIZED
LIPPED STEEL
MOUNTING CHANNEL
JUNCTION BOX
(SIZE AS REQUIRED)
CONDUIT COMPRESSION
FITTING
CONDUIT
TRAPEZE PER
SD260533-03,
TYP.
CONDUIT
TYP.
PROVIDE EXTRA CABLE TO
MAKE COMPLETE LOOP
AROUND BOX PERIMETER
CHROME PLATED
ESCUTCHEON OR
FLANGE (WHERE
EXPOSED TO VIEW)
PIPE OUTSIDE
DIAMETER
(INCLUDING
INSULATION)
REFER TO
GENERAL TRADES
FOR WALL
CONSTRUCTION
TYPE(S)
SIZE PER
SLEEVE SEAL
MANUFACTURER
REQUIREMENTS
SCHEDULE 40
GALVANIZED
STEEL SLEEVE
WITH 1/8"x1"
CENTER STOP
NOTE 1
MODULAR
SLEEVE SEAL
NOTE:
1. PIPE INSULATION SHALL BE CONTINUOUS THROUGH
PENETRATIONS. PROVIDE RIGID THERMAL HANGAR SHIELD
INSERT AT MODULAR SLEEVE SEALS.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
Bancroft Project No. VA CONTRACT NO.
ELECTRICAL - DETAILS EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
02/28/2024 WG BX
589A5-21-700
E-B19-502
ISSUE FOR BID
21-116367C77622C0043
NOT TO
SCALE
TYPICAL EQUIPMENT NAMEPLATE LOCATIONS
NOT TO
SCALE
CONDUIT AND TRAY TRAPEZE MOUNTING DETAIL
NOT TO
SCALE
FLOOR SLAB PENETRATION DETAIL
NOT TO
SCALE
PIPE SLEEVE THRU WALL DETAIL
NOT TO
SCALE
CONDUIT JOINT CROSSING DETAIL
NOT TO
SCALE
PIPE PENETRATION EXTERIOR WALL
Revisions: Date:
95% CONSTRUCTION DOCUMENTS SUBMISSION 10/31/2023
100% CONSTRUCTION DOCUMENTS SUBMISSION 12/19/2023
ISSUE FOR BID 12/28/2023
ISSUE FOR BID R1 02/28/2024
ISSUE FOR BID R2 03/22/2024
AIR TERMINAL PLACEMENT AT OUTSIDE CORNERS
NTS 6
EQUIPMENT AIR TERMINALS
NTS
ROOF PIPE BONDING CLAMP
NTS
CABLE BEND REQUIREMENTS
NTS
6-
IN
CH
T
O P
O F
DO
O
R
LESS 4-INCH
DOOR WIDTH
60" MAX
6" M
IN
LINE OF CEILING
FIRE ALARM
CONTROL PANEL
SPEAKER/VISUAL
& VISUAL-ONLY
MANUAL PULL STATION &
FIRE PHONE JACK
MAGNETIC DOOR
HOLDER
6' A
FF
NOTE:
1. PROVIDE MINIMUM 3/4" EMT CONDUIT FOR ALL FIRE ALARM WIRING.
PROVIDE BUSHINGS FOR ALL WIRING ENTRIES INTO JUNCTION BOXES.
2. PROVIDE DUCT SMOKE DETECTOR REMOTE INDICATOR TEST SWITCH AT 6 FEET
ABOVE THE FINISH FLOOR INSIDE MECHANICAL ROOM ADJACENT TO DOOR.
PROVIDE SMOKE DETECTOR FOR UNITS
15,000 CFM OR ABOVE (RETURN)
FAN SHUTDOWN
FIRE ALARM CONTROL
PANEL (FACP)
RETURN AIR
FAN SHUTDOWN
TO FACP
SUPPLY AIR
PROVIDE SMOKE DETECTOR FOR UNITS
2,000 CFM OR ABOVE (SUPPLY)
SAF
OUTSIDE AIR
EXHAUST AIR
SD
SD
FA
CONDUIT SUPPORT 12" (MAX)
3/4" CONDUIT (MIN.) W/ MAX
40% FILL
FLEXIBLE CONDUIT
SUSPENDED CEILING BRACE WITH ELECTRICAL BOX
LAY-IN CEILING
DETECTOR
FA
3'-0" MIN
SMOKE DETECTOR AIR DIFFUSER (SUPPLY OR RETURN)
FINISHED CEILING
FA
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
Bancroft Project No. VA CONTRACT NO.
ELECTRICAL - DETAILS EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
02/28/2024 WG BX
589A5-21-700
E-B19-503
ISSUE FOR BID
21-116367C77622C0043
NOT TO
SCALE
FIRE ALARM DEVICES MOUNTING HEIGHTS
NOT TO
SCALE
DUCT SMOKE DETECTOR DETAIL
NOT TO
SCALE
TYPICAL SMOKE DETECTOR MOUNTING DETAIL
NOT TO
SCALE
SMOKE DETECTOR/AIR DIFFUSER MINIMUM DISTANCE DETAIL
Revisions: Date:
95% CONSTRUCTION DOCUMENTS SUBMISSION 10/31/2023
100% CONSTRUCTION DOCUMENTS SUBMISSION 12/19/2023
ISSUE FOR BID 12/28/2023
ISSUE FOR BID R1 02/28/2024
ISSUE FOR BID R2 03/22/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\E le ct ric al \E
-B
-6
.d w g 3/
/2
4:
:0
PM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
03/22/2024
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ISSUE FOR BID R1 02-28-24
ISSUE FOR BID R2 03-22-24
ELECTRICAL - BLDG 19 ELECTRICAL
SCHEDULES
WG BX
E-B19-600
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\E le ct ric al \E
-B
-6
.d w g 3/
/2
4:
:4
PM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
03/22/2024
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ISSUE FOR BID R1 02-28-24
ISSUE FOR BID R2 03-22-24
ELECTRICAL - BLDG 19 ELECTRICAL
EQUIPMENT SCHEDULES
WG BX
E-B19-601
A. WHEN ORDERING SWITCHBOARDS, PROVIDE THE SINGLE LINE AND
PLAN DRAWINGS TO MANUFACTURER. MANUFACTURER WILL REQUIRE
THIS TO PROPERLY MANUFACTURE THE SWITCHBOARDS, BASED ON
HOW CABLING WILL ENTER THE SWITCHBOARDS AND THE
CONFIGURATION OF THE INDIVIDUAL STRUCTURES WITHIN THE
SWITCHBOARD.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\E le ct ric al \E
-B
-6
.d w g 3/
/2
4:
:3
PM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
03/22/2024
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ISSUE FOR BID R1 02-28-24
ISSUE FOR BID R2 03-22-24
ELECTRICAL - BLDG 19 ELECTRICAL
EQUIPMENT SCHEDULES
WG BX
E-B19-602
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\E le ct ric al \E
-B
-6
.d w g 3/
/2
9:
:2
AM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
03/22/2024
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ISSUE FOR BID R1 02-28-24
ISSUE FOR BID R2 03-22-24
ELECTRICAL - BLDG 19 PANEL
SCHEDULES
WG BX
E-B19-603
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\E le ct ric al \E
-B
-7
.d w g 3/
/2
8:
:0
AM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
03/22/2024
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ISSUE FOR BID R1 02-28-24
ISSUE FOR BID R2 03-22-24
ELECTRICAL - BLDG 19 MCR SINGLE
LINE
WG BX
E-B19-701
FOR ROLL UP GEN
TO BLDG 1, MRI EQUIPMENT
BLDG 19 MCR
CONTROL
UPS B DISTRIBUTION
CABINET
ATS
UPS A
DISTRIBUTION
CABINET
UPS A DISTRIBUTION
SOUTH
Isc 3P 6388.0 Amps Isc SLG 4873.0 Amps
CBL-0001
CableSize 4/0 AWG
GEN-BLDG 24
1563 kVA X"d 0.2 pu
PD-0005
Type JCN, 15.5kV E-Rated Sensor/Trip 65.0 A
SWBD EM GEN 480.0 V
BusLibDesc APCB 800-4000APD-BLDG 19
Type Magnum DS, DT 1150/1150i Sensor/Trip 1200.0 A
NORTH
Isc 3P 6388.0 Amps Isc SLG 4833.0 Amps PD-MAIN EM GEN
Type Magnum DS, DT 1150/1150i Sensor/Trip 1600.0 A
PD-ROLL UP
Type Magnum DS, DT 1150/1150i Sensor/Trip 1600.0 A
PD-BLDG 24
Type Magnum DS, DT 1150/1150i Sensor/Trip 1200.0 A
EXISTING CBL-MRI
CableSize 600 kcmil
CBL-CRAC2
CableSize 1/0 AWG
CRAC B19 102
84 Amps
CBL-CRAC3
CableSize 1/0 AWG
CRAC B19 103
84 Amps
CBL-CRAC4
CableSize 1/0 AWG
CRAC B19 104
84 Amps
CBL-ACCU1
CableSize 10 AWG
ACCU B19 101
6 Amps
CBL-ACCU2
CableSize 10 AWG
ACCU B19 102
6 Amps
CBL-ACCU3
CableSize 10 AWG
ACCU B19 103
6 Amps
CBL-ACCU4
CableSize 10 AWG
ACCU B19 104
6 Amps
CBL-ACCU5
CableSize 2 AWG
AHU B19 101
90 Amps
CBL-0064
CableSize 2 AWG
WATER HEATER
80 Amps
CBL-ACCU6
CableSize 8 AWG
ACCU B19 105
30 Amps
CBL-0066
CableSize 400 kcmil
ROLL UP GENERATOR DISC
Type DH Heavy Duty
CBL-0067
CableSize 6 AWG
VAV B19 101
20 kW (Input)
CBL-0068
CableSize 10 AWG
VAV B19 102
5 kW (Input)
CBL-0069
CableSize 6 AWG
VAV B19 103
15 kW (Input)
CBL-0070
CableSize 8 AWG
VAV B19 104
10 kW (Input)
CBL-0065
CableSize 10 AWG
EF B19 101
0.1 hp Load Factor 1.00 X"d 0.15 pu
CBL-0072
CableSize 4/0 AWG S
P
XF3-
Pri RatedVoltage 480 V Sec RatedVoltage 208 V Size 75 kVA Pri Delta Sec Wye-Ground %Z 3.2041 % X/R 0.9
CBL-0073
CableSize 3/0 AWG
19 EL PNL1
208.0 V
BusLibDesc 100-225A
PD-0076
Type EDH Sensor/Trip 200.0 A
CBL-0003
CableSize 4/0 AWG
PD-0080
Type Sensor/Trip 0.0 A
BUS-0089
13800.0 V
BusLibDesc
PD-0081
Type Sensor/Trip 0.0 A
CBL-0078
CableSize 4 AWG
ZONE PDU SERV ENT A
48 Amps
ZONE PDU SERV ENT B
48 Amps
10 SWBD MSB ATS
480.0 V
BusLibDesc APCB 800-4000A
UPS-A
BUS-0118
480.0 V
BusLibDesc 100-600ABYPASS INPUT A
Type KD Sensor/Trip 250.0 A
PD-UPS A
Type HLD Sensor/Trip 400.0 A
CBL-0095
CableSize 3/0 AWG
MAINT ISOLATION
Type KD Sensor/Trip 250.0 A
PD-0110
Type HKD Sensor/Trip 400.0 A
BUS-0119
480.0 V
BusLibDesc 250-1200A
CBL-0096
CableSize 3/0 AWG
S
P
XF2-UPS A1
Pri RatedVoltage 480 V Sec RatedVoltage 208 V Size 225 kVA Pri Delta Sec Wye-Ground %Z 5.1810 % X/R 2.5
PD-0111
Type KD Sensor/Trip 300.0 A
UPS BUS A
208.0 V
BusLibDesc
BUSWAY-A2
208.0 V
BusLibDesc
PD-A4
Type FG Sensor/Trip 250 A
CBL-0014
CableSize 250 AWG
BUSWAY A1
208.0 V
BusLibDesc
PD-A5
Type FG Sensor/Trip 250 A
CBL-0023
CableSize 250 AWG
UPS-A0
BUS-0120
480.0 V
BusLibDesc 100-600ABYPASS INPUT B
Type KD Sensor/Trip 250.0 A
PD-UPS B
Type HLD Sensor/Trip 400.0 A
CBL-0097
CableSize 3/0 AWG
MAINT ISOLATION.
Type KD Sensor/Trip 250.0 A
PD-0112
Type HKD Sensor/Trip 400.0 A
BUS-0121
480.0 V
BusLibDesc 250-1200A
CBL-0098
CableSize 3/0 AWG
S
P
XF2-UPS A2
Pri RatedVoltage 480 V Sec RatedVoltage 208 V Size 225 kVA Pri Delta Sec Wye-Ground %Z 5.1810 % X/R 2.5
PD-0113
Type KD Sensor/Trip 300.0 A
UPS BUS B
208.0 V
BusLibDesc
BUSWAY-B2
208.0 V
BusLibDesc
PD-A6
Type FG Sensor/Trip 250 A
CBL-0022
CableSize 250 AWG
BUSWAY B1
208.0 V
BusLibDesc
PD-A7
Type FG Sensor/Trip 250 A
CBL-0024
CableSize 250 AWG
BUSWAY-B3
208.0 V
BusLibDesc
PD-A8
Type FG
Sensor/Trip 100 A
CBL-0025
CableSize 1/0 AWG
PD-0084
Type HFD, 2-4 Pole
Sensor/Trip 60.0 A
CBL-0079
CableSize 4 AWG
BUSWAY-A3
208.0 V
BusLibDesc
PD-A9
Type FG Sensor/Trip 100 A
CBL-0026
CableSize 1/0 AWG
19 N PNL1
208.0 V
BusLibDesc 100-600A
PD-0051
Type Magnum DS, DT 1150/1150i Sensor/Trip 800.0 A
PD-0052
Type Magnum DS, DT 1150/1150i Sensor/Trip 800.0 A
CBL-0109
CableSize 350 kcmil
CBL-0110
CableSize 2/0 AWG
S
P
XF1
Pri RatedVoltage 13800 V Sec RatedVoltage 480 V Size 750 kVA Pri Delta Sec Wye-Ground %Z 4.9999 % X/R 4.9
CBL-0111
CableSize 400 kcmil
PD-CRAC5
Type EGH, 3-4 Poles Sensor/Trip 110.0 A
PD-CRAC6
Type EGH, 3-4 Poles Sensor/Trip 110.0 A
PD-CRAC7
Type EGH, 3-4 Poles Sensor/Trip 110.0 A
PD-ACCU5
Type EGH, 3-4 Poles Sensor/Trip 15.0 A
PD-ACCU6
Type EGH, 3-4 Poles Sensor/Trip 15.0 A
PD-ACCU7
Type EGH, 3-4 Poles Sensor/Trip 15.0 A
PD-ACCU8
Type EGH, 3-4 Poles Sensor/Trip 15.0 A
PD-0139
Type EDH Sensor/Trip 200.0 A
CBL-CRAC1.
CableSize 1/0 AWG
CRAC B19 101
84 Amps
PD-CRAC8
Type EGH, 3-4 Poles Sensor/Trip 110.0 A
CBL-0113
CableSize 1 AWG
19 H SWBD1
480.0 V
BusLibDesc 250-1200A
PD-0141
Type Magnum DS, DT 1150/1150i Sensor/Trip 1000.0 A
CBL-0114
CableSize 400 kcmil
PD-0142
Type Magnum DS, DT 1150/1150i Sensor/Trip 1000.0 A
S
P
XF2
Pri RatedVoltage 480 V Sec RatedVoltage 208 V Size 150 kVA Pri Delta Sec Wye-Ground %Z 4.5087 % X/R 2.1
CBL-0115
CableSize 4/0 AWG
PD-0144
Type KD Sensor/Trip 225.0 A
PD-AHU1
Type EGH, 3-4 Poles Sensor/Trip 90.0 A
PD-AHU2
Type EGH, 3-4 Poles Sensor/Trip 45.0 A
PD-0077
Type KD Sensor/Trip 400.0 A
PD-0069
Type BR/BRH, 1-Pole Sensor/Trip 15.0 A
19 L PNL2
Type BR/BRH, 1-Pole Sensor/Trip 80.0 A
PD-0074
Type HFD, 2-4 Pole Sensor/Trip 60.0 A
PD-0075
Type HFD, 2-4 Pole Sensor/Trip 20.0 A
PD-0078
Type HFD, 2-4 Pole Sensor/Trip 45.0 A
PD-0079
Type HFD, 2-4 Pole Sensor/Trip 30.0 A
PD-0085
Type HFD, 2-4 Pole Sensor/Trip 60.0 A
BUS-0145
480.0 V
BusLibDesc 2500A
BUS-0146
480.0 V
BusLibDesc
LOAD-0025
169 Amps
LOAD-0026
169 Amps LOAD-0027
76 Amps
LOAD-0028
169 Amps
LOAD-0029
169 Amps
LOAD-0030
76 Amps
200A/3P
SERVICE #1 OF 4 (RM A14)
MSG-A
120/208, 3P, 4W
2000A, 50K AIC
(6) SETS OF 4#400 KCM
200A/3P
SERVICE #1 OF 4 (RM A14)
MSG-B
120/208, 3P, 4W
2000A, 50K AIC
(6) SETS OF 4#400 KCM
X-RAY
480, 3P, 4W
600A, 35K AIC
SERVICE #2 OF 4 (RM B224)
MH 33
MH 32
800A/3P
SERVICE #4 OF 4 (RM B22E)
(3) SETS OF 4#350 KCM
DP1-B
120/208, 3P, 4W
1600A, 125K AIC
1-T3
1-T1 1-T2 1-T5
1-S1 1-S2
12.47KV
120/208V 750 KVA
12.47KV
120/208V 750 KVA
12.47KV
120/208V 300 KVA
12.47KV
480V 500 KVA
(2) SETS OF 3#3/0
(2) SETS OF 3#350 KCM
800A/3P
100A/3P
200A/3P
E
EXISTING
MODULAR MRI
CONNECTION
X-RAY
DISCONNECT
PANEL MP
DISCONNECT
SWITCH
TO EXISTING
PANEL MP
SCOPE OF WORK
200A/3P
SERVICE #1 OF 4 (RM A14)
MSG-A
120/208, 3P, 4W
2000A, 50K AIC
(6) SETS OF 4#400 KCM
200A/3P
SERVICE #1 OF 4 (RM A14)
MSG-B
120/208, 3P, 4W
2000A, 50K AIC
(6) SETS OF 4#400 KCM
MH 33
MH 32
800A/3P
SERVICE #4 OF 4 (RM B22E)
(3) SETS OF 4#350 KCM
DP1-B
120/208, 3P, 4W
1600A, 125K AIC
1-T3
1-T1 1-T2 1-T5
1-S1 1-S2
12.47KV
120/208V 750 KVA
12.47KV
120/208V 750 KVA
12.47KV
120/208V 300 KVA
12.47KV
480/277V 1500 KVA
(3) 70A/3P
GF2000AF
2000AT
DPM
C.T.'S
N
EU
TR
AL
A M
P
BU
S
GROUND
480/277V, 3-PHASE, 4W
2000A
42,000 SCCR
(5) SETS OF 4#600 KCM
EACH IN 4"C.
SB-RAD
24,741 ISC AVAILABLE FAULT CURRENT. 6/11/2018
#4 INSULATED COPPER GROUNDING CONDUCTOR.
PER NEC 250.94. MAXIMUM 20'-0" LENGTH.
#3/0 GROUNDING ELECTRODE
CONDUCTOR
EFFECTIVELY GROUNDED
BUILDING STEEL
CONNECT TO METALLIC
WATER MAIN, WITHIN 5'-0" OF
WM WATER SERVICE ENTRANCE.
PROVIDE JUMPER ACROSS
WATER METER
INTERSYSTEM BONDING
TERMINATION, REFER TO
MATERIAL LIST (IBT).
REMOVABLE LINK
#4 GROUNDING
ELECTRODE CONDUCTOR
CONCRETE ENCASED
ELECTRODE. NEC 250.52
BOND TO MINIMUM OF 20'
OF 1/2" REINFORCING
BAR.
3/4" DIA. x 10'-0" COPPER
GROUND ROD. TOP OF
ROD SHALL BE 12" BELOW
GRADE. (TYP.)
20'-0"
IBT
1200A/3P
(3) SETS OF 4#600 KCM & 1#600KCM GND
EACH IN 4"C.
225A/3P
200A/3P
(2)250A/3P
PREPARED
SPACE
N E
L
(3) SETS OF 4#600 KCM & 1#600KCM GND
EACH IN 4"C.
ATS-1200A
E
3#4/0 & 1#4/0 GND
IN 2-1/2" C. MRI SYSTEM
E
3#250 KCM & 1#4 GND
IN 2-1/2" C.
MRI BUILDING
N
EU
TR
AL
A M
P
BU
S
GROUND
480/277V, 3-PHASE, 4W
1200A/MLO
42,000 SCCR
DPEM-RAD
21,804 ISC AVAILABLE FAULT CURRENT. 6/11/2018
600A/3P
100A/3P
J
J
EXISTING SECOND FLOOR
RADIOLOGY PANEL
EXISTING SECOND FLOOR
NUC MED PANEL
SCOPE OF WORK
START WIRING FOR GENERATOR.
ROUTE (2) 1"CONDUITS FROM
ATS TO GENERATOR CONTROL
PANEL
(2) SETS OF 3#350KCM & 1#
350KCM GND EACH IN 3"C
4#1 & 1#1 GND
IN 2"C.
UPS
UPS PROVIDED BY MODULAR
MRI UNIT MANUFACTURER
[LSI]
[LSI]
[LSI]
600A
PREPARED
SPACE
200A
PREPARED
SPACE
[LSI]
[LSI]
(3) SETS OF 4#600 KCM & 1#600KCM GND
EACH IN 4"C.
NEW JUNCTION
BOX FOR SPLICING
EXISTING WIRING
NEW JUNCTION
BOX FOR SPLICING
EXISTING WIRING
GROUND
BOND TO BUILDING
GROUNDING ELECTRODE
#3/0 GROUNDING
ELECTRODE CONDUCTOR
2000A/3P
GEN-1
480/277V
1250KW
TO ATS-1200
TO EPO
3#250 KCM & 1#4 GND
IN 2-1/2" C.
100% RATED
100% RATED
NO SCALE1 DEMOLITION ONE LINE DIAGRAM
NO SCALE2 ONE LINE DIAGRAM
SEE DRAWING
E-B19-701
FOR DETAILS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\E le ct ric al \E
-B
-7
.d w g
/2 7/
:5
1:
A M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
03/22/2024
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ISSUE FOR BID R1 02-28-24
ISSUE FOR BID R2 03-22-24
ELECTRICAL - BLDG-19 GEN-1 SINGLE
LINE DIAGRAM
WG BX
E-B19-702
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
TELECOMMUNICATIONS LEGEND EHRM INFRASTRUCTURE
UPGRADES
COLMERY-O'NEIL VA MEDICAL CENTER
C.C. J.C.G.
589A5-21-700
TT-B19-001
ISSUE FOR BID
21-116367C77622C0043
Revisions: Date:
ISSUE FOR BID R2 03-22-24
03/22/2024
DN
TOILET
A102
HAC
A103
CORRIDOR
(LINK)
B1-01
CORRIDOR
A1-01
BREAKDOWN
ROOM
A104
WORK ROOM
A106
MCR
A107
MCR SUPPR.
TANKS
A111
FIRE WATER
RISER ROOM
A110
MECHANICAL
A101
CORRIDOR
A1-02
ELECTRICAL
ROOM
A108
ENTRANCE
ROOM A
A109
ENTRANCE
ROOM B
A105
IT EQUIPMENT
STORAGE
A106A
E R
-B .0
C ar rie r R ac k
A T
T
E R
-B .0
E R
-B .0
R es er ve d
E X
P A
N S
IO
N
R2.02
R2.03
MDA - Side A
Optical Fiber Backbone
Connectivity to TR's
R3.05
Bldg 1, Rack F04 / F05
VistA Imaging
38U
R3.04
R3.10
R2.01
HDA 2.A
R2.04
Bldg 3, Rm A231
Audio\Phone
11U
R2.05
Bldg 9, Rm A019
HRC-13U
Avaya-1U
14U
R2.06
Bldg 9, Rm B009
6 Storage
18U
R2.07
Bldg 9, Rm B009
1 Server-2U, 2 Controllers-2U
5 Storage-10U
14U
R2.08
Bldg 9, Rm B009
IaaMS Rack (HD Cabinet)
5 Servers-10U, 3 Servers-6U
16U
R2.09
Bldg 1
IaaMS Rack-16U (HD Cabinet)
16U
R2.10
R2.12
HDA 2.B
Bldg 9, Rm B009
9 Switches-11U
6 IaaMS Switches-6U
R3.01
HDA 3.A
R3.02
R3.06
Bldg 1, Rack C04 / C05
ZingBox
16U
R3.08
HDA 3.B
Bldg 1, HTM Switches-5U
OI&T Switch-1U
R3.12
Bldg 1, HTM (BioMed)-Philips PiiCiX
VxRails-4U, Servers-4U, Philips-5U, ComVault -3U
25U
R3.09
Bldg 1, HTM (BioMed)
Servers-32U, Tower Servers-2 {shelf mounted?}
41U
U P
S
S id e B
(R e fe r to
E le c tr ic a l)
TT-B19-304
TT-B19-301
U P
S
S id e A
(R e fe r to
E le c tr ic a l)
CRAC Unit (Refer to Mechanical)
CRAC Unit (Refer to Mechanical)
CRAC Unit (Refer to Mechanical)
CRAC Unit (Refer to Mechanical)
DCBA
B.9 C.3
TT-B19-401
R3.03
Bldg 1, Rack O15 / M15
8 Server-17U, Misc-1U
18U
R3.07
Bldg 1, Rack D14 / L15 / N15
8 Servers-16U, Misc-5U, DomCont-2U, VPS Server-4U, 27U
Bldg 1
Paging
12U
MCR Network Cabinets (MDA & HDA)
- 45U
- connectivity\cross-connects
- 32" (800mm) wide
- 48" (1200mm) deep
MCR Server Cabinets
- 45U
- active equipment\servers
- 24" (600mm) wide
- 48" (1200mm) deep
R1.A1
R1.A2
R1.A3
R1.B4
R1.B6
R1.B7
R1.B8
MDA - Side B
Optical Fiber Backbone
Connectivity to TR's
R3.11 R2.11 Future BioMed SPARE
CERNER
EXPANSION Rack (HD Cabinet)
Bldg 1, Rack P15
CERNER/FDSS (HD Cabinet)
Bldg 1
PBX - Rack 1
26U
Bldg 1
PBX - Rack 2
26U
TT-B19-301
TT-B19-306
ER-A.01
Carrier Rack
AT&T
ER-A.02
ER-A.03
Reserved EXPANSION
TT-B19-305
TT-B19-306
TT-B19-302
TT-B19-402
R1.B5
MDA - Side A
Space reserved for Core, WAN and Security Equipment
MDA - Side B
Copper Backbone
Connectivity to TR's
Bldg 1, Rack D11
Core 1 / WLAN-19U
Bldg 9, Rm B009 _ CORE-8U
Fiber Panel-10U, Fiber Switch-1U
4 Switches-4U, 23U {combined (2) half racks}
42U
Bldg 1, HTM Routers-2U
Bldg 1, Rack D13
CORE 2 \ Gigamon-22U
Bldg 1, Rack L15
JSA-1U
25U
R es er ve d E
X P
A N
S
IO
N
Reserved EXPANSION
Bldg 1, Rack O15 / M15
4 Switches-4U
VistA Imaging
EXPANSION Rack
TT-B19-303
MDA - Side B
Space reserved for Core, WAN and Security Equipment
MDA - Side A
Space reserved for Switches and LAN Equipment
MDA - Side B
Space reserved for Switches and LAN Equipment
TT-B19-303
MDA - Side B
Copper Backbone
Connectivity to TR's
TT-B19-307
Keypad/Card Reader for A109 Entrance Room A
Keypad/Card Reader for A107 MCR
Keypad/Card Reader for A107 MCR
Keypad/Card Reader for A105 Entrance Room B
20" x 4" Copper Main Telecommunications Grounding Bus Bar provided by Electrical.
Mounted at 4'-0" AFF
20" x 4" Copper Telecommunications Grounding Bus Bar provided by Electrical.
Mounted at 4'-0" AFF
20" x 4" Copper Telecommunications Grounding Bus Bar provided by Electrical.
Mounted at 4'-0" AFF
TT-B19-307
Keypad/Card Reader for A104 Breakdown Room
(4) 4-port data outlets located under counter
DC
ES
E S
REX
E S
R E
X
DC
DC
DC
E S
R E
X
E S
E S
R E
X
C R
/K
C R
/K
CR/K
CR/K
CR/K
C R
/K
Keypad/Card Reader for A106 Work Room
E S
E S
R E
X
ES ES
REX
DC
DC
(6) 4" Incoming Site Distribution Conduits:
(2) 4" Incoming Site Distribution Conduits to Entrance Room 'A' from the East for distribution of Side 'A' Optical Fiber to site. Provide (3) 3-Cell MaxCell Fabric Innerducts in (1) of the Entrance Conduits.
(4) 4" Incoming Site Distribution Conduits to Entrance Room 'B' from the East for distribution of Side 'B' Optical Fiber and Cat 5e Copper to site.
Provide (3) 3-Cell MaxCell Fabric Innerducts in (2) of the Entrance Conduits.
Refer to Telecommunications sheets in Volume 2 for continuation.
Refer to Telecommunications site drawings for number of conduits extending across the site to other buildings.
Refer to Civil site drawings for trenching/routing plan.
Coordinate with all other displines concerning Grade Beams, electrical conduits, plumbing, drainage, existing site utilities, etc.
Security Devices:
Install per VA Guidelines. Integrate new devices / system with exiting on-site security system. Refer to Div 28 specifiactions for additional information. (Typical)
DC
DC
DC
DC
TT-B19-310
TT-B19-311
TT-B19-312
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
12-28-23
TELECOMMUNICATIONS MCR OVERALL
FLOOR PLAN
EHRM INFRASTRUCTURE
UPGRADES
COLMERY-O'NEIL VA MEDICAL CENTER
C.C. C.C.
589A5-21-700
TT-B19-101
ISSUE FOR BID
21-116367C77622C0043
N
1/4" = 1'-0"
B19 MCR Overall Plan
Revisions: Date:
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMISSION 09-12-23
95% CD SUBMISSION 10-31-23
100% CD SUBISSION 12-19-23
ISSUE FOR BID 12-28-23
TT-B19-304
TT-B19-301
(6) Hilti 4" Speed Sleeve or approved equivalent (typical)
TT-B19-401
TT-B19-301
TT-B19-306 1
TT-B19-305
TT-B19-306
TT-B19-302
TT-B19-402
TT-B19-303
TT-B19-303
TT-B19-307
2-Level Overhead Cable Tray System:
Level 1:
24" x 6" Wire Basket Tray for copper distribution
Level 2:
6" x 4" FiberRunner for optical fiber distribution
(2) 2" Conduits for extension of Service Providers connections from existing Demarc located in Building 1, Level 2, Rm A201, routed thru ceiling space of Backbone Connector Corridor and Bldg 24 to Entrance Room B.
Mount conduits tight to structure. Provide pullboxes per BICSI TDMM requirements.
Extension of Service Providers connection from existing Demarc in Building 3, Level 1, Rm A129A, shall be routed thru Steam Tunnel into Entrance Room B via duct bank connected to Steam Tunnel. Install in provided innerducts.
Install Hilti Speed Sleeves (or approved equivalent) at fire-rated, smoke-rated or any other partitions required by code, AHJ or VA.
TT-B19-307
(2) 2" Conduits for extension of Service Providers connections from existing Demarc located in Building 3, Level 1, Rm A129A, routed thru ceiling space of Backbone Connector Corridor and Bldg 24 to Entrance Room A.
Mount conduits tight to structure. Provide pullboxes per BICSI TDMM requirements.
Extension of Service Providers connection from existing Demarc in Building 1, Level 2, Rm A201, shall be routed thru Steam Tunnel into Entrance Room A via duct bank connected to Steam Tunnel. Install in provided innerducts.
Install Hilti Speed Sleeves (or approved equivalent) at fire-rated, smoke-rated or any other partitions required by code, AHJ or VA.
(4) 4" Conduits for Backbone Cable Distribution to TR's and TE's routed to ceiling space of Bldg 24. Conduits will extend and be routed into Steam Tunnel at closest possible entrance point. Install (2) 3-cell MaxCell Fabric Innerducts in (3) of the (4) conduits.
Mount conduits tight to structure.
Install Hilti Speed Sleeves (or approved equivalent) at fire-rated, smoke-rated or any other partitions required by code, AHJ or VA.
Security Camera - stem mounted.
Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.
Security Camera - stem mounted.
Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.
Security Camera - stem mounted.
Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.
Security Camera - stem mounted.
Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.
1' - 6"
Electrical Busway. Shown for coordination purposes only. Refer to electrcial plans and specifications.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
12-28-23
B19 TELECOMMUNICATIONS OVERALL CABLE
PATHWAY PLAN
EHRM INFRASTRUCTURE
UPGRADES
COLMERY-O'NEIL VA MEDICAL CENTER
C.C. C.C.
589A5-21-700
TT-B19-101
CBT
ISSUE FOR BID
21-116367C77622C0043
Revisions: Date:
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMISSION 09-12-23
95% CD SUBMISSION 10-31-23
100% CD SUBISSION 12-19-23
ISSUE FOR BID 12-28-23
N
1/4" = 1'-0"
B19 MCR Overhead Basket Tray
DCBA
B.9 C.3
TT-B19-310
TT-B19-311
TT-B19-312
(6) 4" Incoming Site Distribution Conduits:
(2) 4" Incoming Site Distribution Conduits to Entrance Room 'A' from the East for distribution of Side 'A' Optical Fiber to site. Provide (3) 3-Cell MaxCell Fabric Innerducts in (1) of the Entrance Conduits.
(4) 4" Incoming Site Distribution Conduits to Entrance Room 'B' from the East for distribution of Side 'B' Optical Fiber and Cat 5e Copper to site.
Provide (3) 3-Cell MaxCell Fabric Innerducts in (2) of the Entrance Conduits.
Refer to Telecommunications sheets in Volume 2 for continuation.
Refer to Telecommunications site drawings for number of conduits extending across the site to other buildings.
Refer to Civil site drawings for trenching/routing plan.
Coordinate with all other displines concerning Grade Beams, electrical conduits, plumbing, drainage, existing site utilities, etc.
(6) 4" Incoming Site Distribution Conduits to Entrance Room 'A' from the West for distribution of Side 'A' Optical Fiber to Steam Tunnel. Provide (3) 3-Cell MaxCell Fabric Innerducts in (3) of the Entrance Conduits. Refer to Telecommunications sheets in Volume 2 for continuation. Refer to Telecommunications site drawings for number of conduits extending across the site to other buildings. Refer to Civil site drawings for trenching/routing plan.
Coordinate with all other displines concerning Grade Beams, electrical conduits, plumbing, drainage, existing site utilities, etc.
(6) 4" Incoming Site Distribution Conduits to Entrance Room 'B' from the West for distribution of Side 'B' Optical Fiber from Steam Tunnel. Provide (3) 3-Cell MacCell Fabric Innerducts in (3) of the Entrance Conduits. Refer to Telecommunications sheets in Volume 2 for continuation. Refer to Telecommunications site drawings for number of conduits extending across the site to other buildings.
Refer to Civil site drawings for trenching/routing plan. Coordinate with all other displines concerning Grade Beams, electrical conduits, plumbing, drainage, existing site utilities, etc.
Entrance Room 'A' Room 109
Entrance Room 'B' Room 105
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
TELECOMMUNICATIONS MCR INCOMING OSP
UNDERSLAB CONDUIT PLAN
EHRM INFRASTRUCTURE
UPGRADES
COLMERY-O'NEIL VA MEDICAL CENTER
C.C. C.C.
589A5-21-700
TT-B19-102
ISSUE FOR BID
21-116367C77622C0043
Revisions: Date:
N
1/4" = 1'-0"
B19 MCR Overall Underslab Conduit Plan
C.3C.3
TT-B19-304
TT-B19-301
DCBA
B.9
TT-B19-301
TT-B19-306 1
TT-B19-305
TT-B19-306
TT-B19-302
TT-B19-3031
TT-B19-303
TT-B19-307
2-Level Overhead Cable Tray System:
Level 1:
24" x 6" Wire Basket Tray for copper distribution
Level 2:
6" x 4" FiberRunner for optical fiber distribution
TT-B19-307
Electrical Busway. Shown for coordination purposes only. Refer to electrcial plans and specifications.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
12-28-23
B19 TELECOMMUNICATIONS OVERALL FIBER
RUNNER PATHWAY PLAN
EHRM INFRASTRUCTURE
UPGRADES
COLMERY-O'NEIL VA MEDICAL CENTER
C.C. C.C.
589A5-21-700
TT-B19-102
CBT
ISSUE FOR BID
21-116367C77622C0043
Revisions: Date:
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMISSION 09-12-23
95% CD SUBMISSION 10-31-23
100% CD SUBISSION 12-19-23
ISSUE FOR BID 12-28-23
N
1/4" = 1'-0"
B19 MCR Overhead FiberRunner Tray
T/O STEEL (DCA)
16' - 0"
TT-B19-304
FINISH FLOOR
0' - 0"
T/O STEEL (DCA)
16' - 0"
T/O STEEL (LINK)
13' - 10"(6) Hilti 4" Speed Sleeve or approved equivalent (Typical)
MCR Cabinets - (2) models:
Network Cabinet (MDA and HDA)
- 45U
- connectivity\cross-connects
- 32" (800mm) wide
- 48" (1200mm) deep
Server Cabinets
- 45U
- active equipment\servers
- 24" (600mm) wide
- 48" (1200mm) deep
(4) 4" Conduits for Backbone Cable Distribution to TR's and TE's routed to ceiling space of Bldg 24. Conduits will extend and be routed into Steam Tunnel at closest possible entrance point. Install (2) 3-cell MaxCell Fabric Innerducts in (3) of the (4) conduits.
Mount conduits tight to structure.
Install Hilti Speed Sleeves (or approved equivalent) at fire-rated, smoke-rated or any other partitions required by code, AHJ or VA.
12" wide x 1 3/4" deep Cable Runway mounted Vertically on wall for routing and support of cabling
TT-B19-301
TT-B19-305
TT-B19-306
TT-B19-302
(6) Hilti 4" Speed Sleeve or approved equivalent (Typical)
2-Level Overhead Cable Tray System:
- Level 1 - 24" x 6" Wire Basket Tray for copper distribution
- Level 2 - 6" x 4" FiberRunner for optical fiber distribution
18" wide x 6" deep Overhead Basket Tray:
Routed above ceiling from Entrance Room to double-layer cable trays within MCR
18" wide x 6" deep Overhead Basket Tray:
Routed above ceiling from Entrance Room to double-layer cable trays within MCR
4-post , 45U Network Racks.
24" (600mm) wide x 30" (750mm) deep.
Refer to specifications and VA design guidelines for additions details.
ROW 1
MDA
ROW 2
SERVERS
ROW 3
SERVERS
ROW 4
UPS
3/4" Grade A/C Fire-Resistance Plywood Backboard mounted vertically on wall starting at 6" AFF.
Plywood shall be painted with White Fire-Retardant Paint on all 6 sides.
Fire Resistant Seal shall be mounted outward and shall not be painted over for visual inspection.
4-post , 45U Network Racks.
24" (600mm) wide x 30" (750mm) deep.
Refer to specifications and VA design guidelines for additions details.
18" wide x 6" deep Overhead Basket Tray. Bottom of Basket Tray shall be mounted at minimum of 8'-3" AFF to clear door swing.
18" wide x 6" deep Overhead Basket Tray.
Bottom of Basket Tray shall be mounted at minimum of 8'-3" AFF to clear door swing.
18" wide x 1 3/4" deep Cable Runway mounted Vertically on wall for routing and support of cabling
7' Vertical Cable Managers:
6" wide cable managers on outside of end racks.
10" wide cable manager between racks.
Entrance Room "A"
7' Vertical Cable Managers:
- 6" wide cable managers on outside of end racks.
- 10" wide cable manager between racks.
Entrance Room "B"
MCR
TT-B19-303
TT-B19-303
Electrical Busway.
Shown for coordination purposes only. Refer to electrcial plans and specifications.
Vertical Exhaust Ducts (VED)
TT-B19-307
Overhead Mechanical Exhaust Duct connected to Vertical Exhaust Ducts supplied with the specified cabinets, shown for coordination purposes. Refer to mechanical drawings and specifications.
3/4" Grade A/C Fire-Resistance Plywood Backboard mounted vertically on wall starting at 6" AFF.
Plywood shall be painted with White Fire-Retardant Paint on all 6 sides.
Fire Resistant Seal shall be mounted outward and shall not be painted over for visual inspection.
20" x 4" Copper Main Telecommunications Grounding Bus Bar provided by Electrical.
Mounted at 4'-0" AFF
(2) 2" Hilti Speed Sleeve or approved equivalent
Security Camera - stem mounted.
Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.
24" wide x 1 3/4" deep Cable Runway mounted Vertically on wall for routing and support of cabling
6' - 9" 8' - 9" 9' - 0" 9' - 0" 6' - 11 7/16"
4' - 11 15/16" 5' - 1 5/8" 4' - 8 15/16"
5' - 0 3/4"
4' - 8 13/16"
1' - 6"
(2) 2" Conduits for extension of Service Providers connections from existing Demarc located in Building 3, Level 2, Rm A229A, routed thru ceiling space of Backbone Connector Corridor and Bldg 24 to Entrance Room A.
Mount conduits tight to structure. Provide pullboxes per BICSI TDMM requirements.
Extension of Service Providers connection from existing Demarc in Building 1, Level 2, Rm A201, shall be routed thru Steam Tunnel into Entrance Room A via duct bank connected to Steam Tunnel. Install in provided innerducts.
Install Hilti Speed Sleeves (or approved equivalent) at fire-rated, smoke-rated or any other partitions required by code, AHJ or VA.
FINISH FLOOR
0"
32 32
TT-B19-301
(6) Hilti 4" Speed Sleeve or approved equivalent
UPS - Side B (Refer to Electrical)
UPS - Side A (Refer to Electrical)
Security Camera - stem mounted.
Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.
Electrical Busway. Shown for coordination purposes only.
Refer to electrcial plans and specifications.
Request to Exit sensor. Refer to security details and Div 28 specifications for additional information.
MagLocks. Refer to security details and Div 28 specifications for additional information.
(2) Hilti 2" Speed Sleeve or approved equivalent
SECOND FLOOR
ROOF T.O.S.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
12-28-23
MCR - SECTIONS EHRM INFRASTRUCTURE
UPGRADES
COLMERY-O'NEIL VA MEDICAL CENTER
C.C. C.C.
589A5-21-700
TT-B19-301
ISSUE FOR BID
21-116367C77622C0043
Revisions: Date:
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMISSION 09-12-23
95% CD SUBMISSION 10-31-23
100% CD SUBISSION 12-19-23
ISSUE FOR BID 12-28-23
N
3/8" = 1'-0"
B19 MCR - Overall Building Section
N
1/2" = 1'-0"
B19 MCR - UPS Elevation
FINISH FLOOR
0"
14 3 2
T/O STEEL (DCA)
16' - 0"
14 3 14 3 2
FINISH FLOOR
0' - 0"
T/O STEEL (DCA)
16' - 0"
T/O STEEL (LINK)
13' - 10"
2-Level Overhead Cable Tray System:
Level 1 - 24" x 6" Wire Basket Tray for copper distribution Level 2 - 6" x 4" FiberRunner for optical fiber distribution
MCR Cabinets:
MDA Network Cabinets
- 45U
- connectivity\cross-connects
- 32" (800mm) wide
- 48" (1200mm) deep
MDA - Side A
Optical Fiber
Backbone Connectivity to TR's
MDA - Side A
Space reserved for
Core, WAN and Security
Equipment
R1.A1 R1.A2 R1.A3 R1.B4 R1.B5 R1.B6 R1.B7 R1.B8
MDA - Side A
Space reserved for
Switches and LAN
Equipment
MDA - Side B
Space reserved for
Switches and LAN
Equipment
MDA - Side B
Space reserved for
Core, WAN and Security
Equipment
MDA - Side B
Optical Fiber
Backbone Connectivity to TR's
1U Flat 48-port Cat 5e Copper Patch Panels for termination of 25-pair ISP cabling.
Each 25-pair Cat 5e requires 1/2 U of rack mounting space.
50-pair to be terminated in 1U of rack space.
1U Flat 24-port Cat 5e Copper Patch Panels with 1U 24-port rack mounted surge protection for termination of 25-pair OSP cabling.
Each 25-pair Cat 5e OSP requires 2U of rack mounting space.
1U Flat Blanking Panels
1U 144-PORT Angled Optical Fiber Patch Panels for termination of OM4 and OS1/OS2 optical fiber cabling
(2) 1U Flat 48-port Cat 5e Copper Patch Panels in top position for termination of 100-pair cabling from Entrance Room B.
Each 25-pair Cat 5e requires 1/2 U of rack mounting space.
50-pair to be terminated in 1U of rack space.
1U horizontal Cable Manager
1U Blanking Panels shall be installed in all unused spaces. Angled shall be installed where angled patch panels are used. Blanking panels not shown for in all locations required.
Security Camera - stem mounted.
Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.
" 9
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
12-28-23
MCR ROW 1 ELEVATIONS EHRM INFRASTRUCTURE
UPGRADES
COLMERY-O'NEIL VA MEDICAL CENTER
C.C. C.C.
589A5-21-700
TT-B19-302
ISSUE FOR BID
21-116367C77622C0043
Revisions: Date:
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMISSION 09-12-23
95% CD SUBMISSION 10-31-23
100% CD SUBISSION 12-19-23
ISSUE FOR BID 12-28-23
N
1/2" = 1'-0"
B19 MCR - MDA Row 1 Front Elevation
1 43
T/O STEEL (DCA)
16' - 0"
1 4321 43
FINISH FLOOR
0' - 0"
T/O STEEL (DCA)
16' - 0"
T/O STEEL (LINK)
13' - 10"
Zero U Rack mounted 3-phase PDU
19" 2-lug rack mounted copper busbar. Typical for Server Cabinets, HDA and MDA cabinets.
2-Level Overhead Cable Tray System:
- Level 1 - 24" x 6" Wire Basket Tray for copper distribution
- Level 2 - 6" x 4" FiberRunner for optical fiber distribution
Duel Zero U Rack mounted 3-phase PDU's installed in High-Density Server Cabinets
FINISH FLOOR
0"
14 3 2
T/O STEEL (DCA)
16' - 0"
14 3 14 3 2
FINISH FLOOR
0' - 0"
T/O STEEL (DCA)
16' - 0"
T/O STEEL (LINK)
13' - 10"
2-Level Overhead Cable Tray System:
Level 1 - 24" x 6" Wire Basket Tray for copper distribution Level 2 - 6" x 4" FiberRunner for optical fiber distribution
MCR Network Cabinets HDA Network Cabinets (2) per Row 2 and Row 3. (1) HDA at each end of each compute row.
- 45U
- connectivity\cross-connects
- 32" (800mm) wide
- 48" (1200mm) deep
MCR Server Cabinets:
(10) Cabinets per Row 2 and Row 3
- 45U
- active equipment\servers
- 24" (600mm) wide
- 48" (1200mm) deep
R3.02R3.01
(HDA 3.A)
R3.03 R3.04 R3.05 R3.06 R3.07 R3.08 R3.09 R3.10 R3.11 R3.12
(HDA 3.B)
1U Angled Optical Fiber Patch Panels with Duplex LC connectors
1U Angled 48-port Cat 6A Copper Patch Panels.
1 patch panel per server cabinet for Cat 6A copper connectivity.
1U Angled Blanking Panels
- Blanking panels to be installed in all unused Rack Units (RU's).
- Refer to specification for additional information.
Electrical Busway. Shown for coordination purposes. Refer to electrcial plans and specifications.
Vertical Exhaust Ducts (VED)
Overhead Mechanical Exhaust Duct connected to Vertical Exhaust Ducts supplied with the specified cabinets, shown for coordination purposes. Refer to mechanical drawings and specifications.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
12-28-23
MCR ROW 3 ELEVATIONS EHRM INFRASTRUCTURE
UPGRADES
COLMERY-O'NEIL VA MEDICAL CENTER
C.C. C.C.
589A5-21-700
TT-B19-303
ISSUE FOR BID
21-116367C77622C0043
Revisions: Date:
95% CD SUBMISSION 10-31-23
100% CD SUBISSION 12-19-23
ISSUE FOR BID 12-28-23
N
1/2" = 1'-0"
B19 MCR - Server Cabinets Row 3 Rear Elevation
N
1/2" = 1'-0"
B19 MCR - Server Cabinets Row 3 Front Elevation
T/O STEEL (DCA)
16' - 0"
TT-B19-301
4-post , 45U Network Racks.
24" (600mm) wide x 30" (750mm) deep.
Refer to specifications and VA design guidelines for additions details.
7' Vertical Cable Managers:
6" wide cable managers on outside of end racks.
10" wide cable manager between racks.
3/4" Grade A/C Fire-Resistance Plywood Backboard mounted vertically on wall starting at 6" AFF.
Plywood shall be painted with White Fire-Retardant Paint on all 6 sides.
Fire Resistant Seal shall be mounted outward and shall not be painted over for visual inspection.
T/O STEEL (DCA)
16' - 0"
T/O STEEL (LINK)
13' - 10"
Hilti 4" Speed Sleeves or approved equivalent
18" wide x 1 3/4" deep Cable Runway mounted Vertically on wall for routing and support of cabling.
18" wide x 6" deep Overhead Basket Tray.
Bottom of Basket Tray shall be mounted at minimum of 8'-3" AFF to clear door swing.
18" wide x 6" deep Overhead Basket Tray:
Routed above ceiling from Entrance Facilities to double-layer cable trays within MCR.
3' - 0"
1U 144-PORT Angled Optical Fiber Patch Panels for termination of Service Providers extended connectivity from existing Demarc's.
Match terminations to existing Service Providers termination types.
1U Angled Blanking Panels
1U Flat Blanking Panels
1U Horizontal Cable Managers
(2) 1U Flat 48-port Cat 5e Copper Patch Panels for termination of 100-pair cabling. Top 100-pair from existing Demarc in Building 1. Second 100-pair to MCA 'B' in MCR.
- 50-pair to be terminated in 1U of rack space.
Security Camera - stem mounted.
Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.
Service Providers extended Copper connectivity from Building 1
Demarc
Service Providers extended
Optical Fiber connectivity from Building 3 Demarc
Service Providers extended
Optical Fiber connectivity from Building 1 Demarc
NOTE:
Mirror Entrance Room 'A' Optical Fiber connectivity, terminations and rack layouts in Entrance Room 'B'.
FINISH FLOOR
0"
T/O STEEL (DCA)
16' - 0"
FINISH FLOOR
0' - 0"
T/O STEEL (DCA)
16' - 0"
T/O STEEL (LINK)
13' - 10"
12" wide x 1 3/4" deep Cable Runway mounted Vertically on 3/4" Plywood Backboard for routing and support of Incoming Cabling
(2) 4" Incoming Site Distribution Conduits to Entrance Room 'A' from the East for distribution of Side 'A' Optical Fiber. Refer to Civil site drawings for trenching/routing plan. Refer to Telecommunications site drawings for number of conduits extending across the site to other buildings. Coordinate with all other displines concerning Grade Beams, electrical conduits, plumbing, drainage, existing site utilities, etc.
(6) Hilti 4" Speed Sleeve or approved equivalent
TT-B19-306
3/4" Grade A/C Fire-Resistance Plywood Backboard mounted vertically on wall starting at 6" AFF.
Plywood shall be painted with White Fire-Retardant Paint on all 6 sides.
Fire Resistant Seal shall be mounted outward and shall not be painted over for visual inspection.
18" wide x 1 3/4" deep Cable Runway mounted vertically on wall for routing and support of cabling.
18" wide x 6" deep Overhead Basket Tray.
Bottom of Basket Tray shall be mounted at minimum of 8'-3" AFF to clear door swing.
18" wide x 6" deep Overhead Basket Tray:
Routed above ceiling from Entrance Room A to double-layer cable trays within MCR.
6"
(6) 4" Incoming Site Distribution Conduits to Entrance Room 'A' from the West for distribution of Side 'A' Optical Fiber. Refer to Telecommunications sheets in Volume 2 for continuation.
Refer to Civil site drawings for trenching/routing plan. Refer to Telecommunications site drawings for number of conduits extending across the site to other buildings. Coordinate with all other displines concerning Grade Beams, electrical conduits, plumbing, drainage, existing site utilities, etc.
20" x 4" Copper Telecommunications Grounding Bus Bar provided by Electrical.
Mounted at 4'-0" AFF
Security Camera - stem mounted.
Coordinate exact mounting height with VA OIT and to assure sight lines are not obstructured.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
12-28-23
ENTRANCE FACILITY "A" SECTIONS EHRM INFRASTRUCTURE
UPGRADES
COLMERY-O'NEIL VA MEDICAL CENTER
C.C. C.C.
589A5-21-700
TT-B19-304
ISSUE FOR BID
21-116367C77622C0043
Revisions: Date:
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMISSION 09-12-23
95% CD SUBMISSION 10-31-23
100% CD SUBISSION 12-19-23
ISSUE FOR BID 12-28-23
N
3/4" = 1'-0"
B19 Entrance Facility "A" - Rack Elevation N
3/4" = 1'-0"
B19 Entrance Facility "A" - Wall Elevation
Floor 1
FINISH FLOOR
0"
T/O STEEL (DCA)
16' - 0"
Level 01 0' - 0"
32 32
FINISH FLOOR
0' - 0"
T/O STEEL (DCA)
16' - 0"
T/O STEEL (LINK)
13' - 10"
3/4" Grade A/C Fire-Resistance Plywood Backboard mounted vertically on wall starting at 6" AFF.
Plywood shall be painted with White Fire-Retardant Paint on all 6 sides.
Fire Resistant Seal shall be mounted outward…