589A5-21-700_TOPEKA_EHRM_SURVEY LOCATIONS-Markup.pdf
PDF 17 MB Posted
- Solicitation number
- 36C77624B0026_1
About this file
This file contains architectural markup drawings showing telecommunications room locations and hazardous materials survey information for an EHRM (Electronic Health Record Modernization) infrastructure upgrade project at the VA Medical Center in Topeka, KS. The drawings identify areas within multiple buildings (Buildings 1, 2, 3, 4, 5, 6, 9, 20, 21, 22, 23, 24, 25, 40, 41, 42, 43, and 273) where telecommunications rooms (TR) will be installed or modified.
The drawings include floor plans with detailed locations of TRs, demolition notes, construction notes, and hazardous materials survey information indicating areas containing asbestos-containing materials (ACM) and lead-based paint (LBP). The markups use color coding to indicate different conditions: green for areas where ACM/LBP testing is complete, blue for areas not in scope but tested, and red for areas requiring testing. Each building's drawings include specific room numbers, dimensions, and technical requirements for TR installations. The drawings also contain general demolition notes, ceiling removal scopes, floor plan legends, and rated partition legends to guide construction work.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T101 T102
GENERAL - SITE ORIENTATION AND STAGING
PLAN
DA JM
GI-201
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\G I2
.d w g
/7
/2
4:
:3
PM
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% FINAL BID DOCUMENT SUBMISSION
11/28/2023
12-19-23
Bancroft Project No: 21-116
VA REVIEW ONLY - NOT FOR CONSTRUCTION
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
AREAS OF NEW WORK FOR EHRM - HAZORDOUS MATERIALS MARKUP 11.15.2024
ITEMS IN RED: AREAS WITHIN SCOPE OF WORK WHERE ACM & LBP SURVEY AND TESTING YET TO BE PROVIDED AND ASSUMED TO HAVE ASBESTOS CONTAINING MATERIALS (ACM) AND/OR LEAD BASED PAINT (LBP) SIMILIAR TO THE ADJACENT ROOMS ALREADY SURVEYED AND TESTED
ITEMS IN GREEN: AREAS WITHIN SCOPE OF WORK WHERE ACM & LBP SURVEY AND TESTING COMPLETED PER SURVEY REPORT 8/16/2022
ITEMS IN BLUE: AREAS NOT IN SCOPE OF WORK BUT ACM & LBP SURVEY AND TESTING COMPLETED PER SURVEY REPORT 8/16/2022
NEW BUILDING
PLAN MARKUP NOT PROVIDED
FOR THESE BUILDINGS / ROOM
LOCATIONS - SEE ACM/LBM
SURVEY REPORT 8/16/2022
STEAM TUNNEL
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
DN
A
B
C
D
E
F
1 3 4 5 11 13 16 18 19 21 23 25 26 27 286 8 9
11.1
14 15 17
K
L
M
29 30
G
O
Q
S
T
U
V
P
S.2
S.1
Q.1
U.1
V.1
V.2
W.1
X
Y
8.26.36.2 10.19.3 12.111.23.8
Z.4
4.7 6.1 8.1 11.7
Z.3
Z.2
24 31 32
N
7 222010 12
18B 20B 22B 24B 24C
H
I
J
R
W
Z.1
22D
UPUP
UP
B23
B23G
B23A B23B
B23E B23D B23C
C03A
A9E
A9C A9D
B5
C3
A17
A12
A30
A21
A21E
A21A
A13A A13B
A1
A10F
A3B
A3
A3A
A13
A20E
A20
A17F
C7
C7B
C4EC3EC3F
A19D
C7A
C7G
C7C
C7D
A19
C5
C7H
C7I
C6A19B
C1A18
A18A C2
A17A
A5
B1E
A7A8A9
A10E
A10
A4
A7E
A9A
A11
A14
A15
B4
B3
B13E
B22
B14A
B14
A2
A2A
A2B
A2C A2D
A19DC0-1
C8A
C20
C23
C24 C25
C28
C27
C26
C22 C21
C18C19
C17
C8
C9
C12
C14
C8B
C10 C11
C13
C15 C14A
C14B C14C
C16 C16A
C04
A16D
B2 B2B
B2A
B15B16 B17
B1
A16
A16C
A16A
A16E A16B
B22E
B1B
C0-2
C1A
B21
A19C
B1C
B6C
A16G
A9B
B43M B42
B42A B39
B38
C0-5B
C0-5A
C0-3
A9C
C114C
C11A
CB-8
B6D
A0-E3
A0-E1
A0-E2
A0-E4
B42B
B41
B40
B6P
B6 B8A
B7
B13CB13
B12
B9
B10
B11
B11A
B6M
B7M
B8 C0-3E
C0-3C
C0-3B B8C
B13B
B13A
A10G
A10B
A10A
A10C A10D
B20
B23F
C20A A19A
1,2,3&4 A-01-402
1&2
FP-01-401
1,2,3&4 A-01-401
5,6,7&8 A-01-401
3&4 M-01-401
1&2 M-01-402
1&2
FP-01-402
1&2 M-01-401
1&2
FP-01-403
RATED PARTITION LEGEND
CONTRACTOR IS REQUIRED TO MAINTAIN ALL RATED PARTITIONS.
1 HR FIRE BARRIER
2 HR FIRE BARRIER
SMOKE BARRIER
1 HR FIRE BARRIER (EXISTING)
2 HR FIRE BARRIER (EXISTING)
SMOKE BARRIER (EXISTING)
1. REMOVE AND STORE CEILING TILES IN THIS AREA AS REQUIRED FOR MECHANICAL
DUCTWORK, PIPING, ELECTRICAL CONDUIT, TECHNOLOGY EQUIPMENT AND/OR
SECURITY INSTALLATION. REINSTALL TILES AND GRID WHEN WORK IS COMPLETED.
REPLACE ANY DAMAGED TILES AND GRIDS TO MATCH EXISTING. G.C. SHALL
TEMPORARILY ERECT A SUSPENDED PLASTIC BARRIER 6 MIL AROUND AREA OF
CEILING WORK TO BE PERFORMED DURING ONE SHIFT AND G.C. SHALL REMOVE
SUSPENDED PLASTIC BARRIER AT THE END OF SHIFT. G.C. SHALL MOP CLEAN THIS
AREA OF WORK. PRIOR TO TURNING OVER AREA TO VA. AFTER WORK HOURS WILL
REQUIRE ADDITIONAL COORDINATION WITH THE VA.
A. REFER TO TECHNOLOGY AND ELECTRICAL FOR FULL REQUIRED INSTALLATION
AND DEMOLITION WORK
B. ALL EXISTING LIGHTING, CONDUIT, DUCTWORK, MECHANICAL GRILLS, &
SPRINKLER HEADS TO REMAIN IN EXISTING LOCATIONS AND PROTECTED
UNLESS OTHERWISE NOTED.
C. ANY ELECTRICAL FIXTURES AND DEVICES THAT ARE NOT IDENTIFIED ON THESE
DRAWINGS IN THE AREAS OF CEILING DEMOLITION, ARE TO BE CAREFULLY
REMOVED FROM THE CEILING, PROTECTED, TEMPORARILY HUNG AND THEN
REATTACHED IN THE SAME LOCATIONS AS WHICH THEY WERE FOUND PRIOR TO
DEMOLITION.
D. CONTRACTOR TO CAREFULLY REMOVE SECTIONS OF EXISTING CEILING TILE TO
ALLOW FOR THE INSTALLATION OF ALL REQUIRED CONDUIT AND ELECTRICAL
EQUIPMENT PER CONTRACT DRAWINGS. CONTRACTOR SHALL REINSTALL
CEILING IN EXACT LOCATION. CONTRACTOR TO REPLACE ANY CEILING
GRID/TILES DAMAGED DURING CONSTRUCTION, MATCHING EXISTING. REFER TO
ELECTRICAL SHEETS FOR ADDITIONAL INFORMATION.
E. IF A RATED ASSEMBLY IS NOT INSTALLED BY END OF SHIFT IT MUST BE
PROTECTED OVERNIGHT.
GENERAL DEMOLITION NOTES
CEILING DEMOLITION LEGEND
CEILING DEMOLITION KEY NOTESX
1. REPLACE EXISTING A,B&C TYPE FIRE EXTINGUISHER WITH CLEAN AGENT A,B&C
TYPE FIRE EXTINGUISHER.
2. INSTALL CLEAN AGENT A,B&C TYPE FIRE EXTINGUISHER IN SEMI-RECESSED
CABINET SET IN NEW GYP. BD. ON METAL STUD ASSEMBLY (1-HR RATED)
3. INSTALL CLEAN AGENT A,B&C TYPE FIRE EXTINGUISHER IN SEMI-RECESSED
CABINET IN EXISTING WALL WRAP CABINET IN TYPE 'X' GYPSUM BOARD.
FLOOR PLAN KEY NOTESX
KEYNOTE 11
A. ALL WORK ASSOCIATED WITH TEMPORARY CEILING REMOVAL AND INSTALLATION
OF CABLING SHALL BE CONSIDERED AS NO MORE HAZARDOUS THAN NORMAL
OPERATIONS. INFECTION CONTROL REQUIREMENTS FOR THIS WORK SHALL
INCLUDE "VISQUEEN" TYPE BARRIER AROUND WORK AND/OR INFECTION CONTROL
MODULES WITH VA STATION APPROVAL. CONTRACTOR SHALL ALSO ADHEAR TO
"INFECTION CONTROL REQUIREMENTS BY ALL CLASSES" ON SHEET GI101.
B. AT LOCATION OF ALL CORES THROUGH FLOORS INSTALL RE-ENTERABLE FIRESTOP
ASSEMBLIES.
C. AT LOCATION OF CORES THROUGH RATED PARTITIONS INSTALL RE-ENTERABLE
FIRESTOP ASSEMBLIES (TYP.)
D. CONTRACTOR TO LOCATE EXISTING REINFORCING PRIOR TO CORING FOR
CONDUIT. DO NOT CUT REINFORCEMENT. CORES SHALL HAVE 4" CLEAR MINIMUM
BETWEEN THEM. ADJUST CORE LOCATIONS AS NEEDED. AT LOCATIONS WITH
MORE THAN TWO (2) CORES PASSING THROUGH A C.M.U. WALL, SPACE CORES AT
16" MINIMUM.
GENERAL PLAN NOTES
CEILING LEGEND
ARCHITECTURAL - BUILDING 1 -
BASEMENT LEVEL PLAN
DA JM
A-B01-100
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\A -B
-1
.d w g
/6
/2
8:
:2
AM
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% FINAL BID DOCUMENT SUBMISSION
11/28/2023
12-19-23
Bancroft Project No: 21-116
VA REVIEW ONLY - NOT FOR CONSTRUCTION
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
B3 C20A
A19A
C7B
A13
MATERIAL DESCRIPTION MATERIAL LOCATION
9” x 9” Various Color Floor Tile
C7B, C125, C212, A233A, B325A, A554, A601, A601B, A618A
12” x 12” Brown Floor Tile and Mastic
A234, beneath raised floor
Yellow Sheet Vinyl Flooring
C302
Cement Board Radiator Cabinet Backing
A13, A127A, B119, C125, A232A, A233A, A234, A235, A328, B226A, B325A, C303, A432, B402, C402, A525, C503, A601, A601A, A604, A618
BUILDING 01: ACM & LBP SURVEY
SEE REPORT 8/16/2022 FOR DETAILS
*A19A, B3, C20A*
*ASSUME SIMILAR CONDITIONS AT THESE LOCATIONS
NOTE: FOR ROOM LOCATIONS OR SPCAES REQUIRING
ACM/LBP MITIGATION WITH DEMOLITION OF WALLS FOR
EXPANSION AND/OR A SUB-DIVISION SPACE, ASSUME
ADJACENT AREAS/ROOMS EFFECTED WILL REQUIRE
ACM/LBP MITIGATION TO THE EXTENT THE ADJACENT
ROOM IS EFFECTED BY NEW CONSTRUCTION - TYPICAL
AT ALL BUILDINGS RELATED TO THSI CONSTRUCTION
PROJECTS
Building 01 - LBP Survey
• Metal window frame in room A235 – tan paint
• Metal window sill in room A328 – brown paint
• Glazing on ceramic wall tile in rooms C208A, A601A, A604B and A618B – brown glazing
• Glazing on concrete wall blocks in room C303 – blue glazing
GENERAL NOTES
A. FOR GENERAL NOTES AND LEGENDS REFER TO SHEET A001.
B. FOR GENERAL INFECTION CONTROL NOTES AND DETAILS REFER TO SHEET GI101.
C. FOR FINISH SCHEDULE REFER TO SHEET AF-601.
D. EXISTING IT/TR/OI&T ROOMS TO REMAIN ACTIVE DURING CONSTRUCTION. G.C. TO PROTECT EQUIPMENT DURING CONSTRUCTION WITH VISQUEEN. CONTRACTOR TO ENSURE CONTINUOUS
OPERATION OF EQUIPMENT.
E. NOT ALL KEY NOTES APPLY TO ALL PLAN SHEETS. G.C. TO APPLY ONLY AS INDICATED PER EACH SHEET.
F. MAINTAIN A 4 ' - 0" CLEAR PATH OF TRAVEL IN THE CORRIDORS AT ALL TIMES.
G. ALL WORK TO BE PERFORMED AS PART OF TR MODIFICATION SHALL BE CONSIDERED AS TYPE IV AND FOLLOW "INFECTION CONTROL PRECAUTIONS FOR CLASS IV" ON SHEET GI101.
H. APPLY FIRE RATED SEALANT TO ALL EXISTING AND NEW PENETRATIONS IN EXISTING WALLS TO MAKE EXISTING WALLS A 1 HR ASSEMBLY. BASIS OF DESIGN FOR 1 HR WALL IS UL 419 ASSEMBLY.
I. ALL EXISTING WALLS WITH TR'S ARE TO BE FULLY PATCHED & PREPPED TO A LIKE NEW APPEARANCE BEFORE RECEIVING NEW PLYWOOD PANELS.
J. IN ALL EXISTING OI&T AND IRM ROOMS TO BE CONVERTED TO TR'S - ALL EXISTING PLYWOOD PANELS TO BE REMOVED A WALLS PATCHED AND PREPPED TO RECEIVE PAINT AND NEW PLYWOOD
PANELS.
CONTRACTOR IS REQUIRED TO MAINTAIN ALL RATED PARTITIONS.
RATED PARTITION LEGEND
1. INSTALL TEMPORARY FLAME RESISTANT CONSTRUCTION PANELS WITH DOOR ENTRY. BASIS
OF DESIGN IS EDGE GUARD.
2. SUPPLY AND INSTALL WALK OFF MAT(S). SEE DETAILS ON SHEET GI101.
3. EXISTING HANDRAIL, WALL BASE AND CARPET TO BE MODIFIED TO ACCEPT NEW DOOR.
4. REMOVE EXISTING DOOR, FRAME AND HARDWARE IN ITS ENTIRETY. INFILL WALL WITH
METAL STUDS AND DRYWALL. ALIGN WITH EXISTING WALLS, PATCH, LEVEL AND FINISH TO
MATCH EXISTING WALL FINISH.
5. REMOVE EXISTING DOOR, FRAME AND HARDWARE IN ITS ENTIRETY FOR INSTALLATION OF
NEW DOOR AND FRAME. PORTIONS OF EXISTING WALL TO BE DEMOLISHED TO RECEIVE NEW
LARGER SIZE DOOR AND FRAME ASSEMBLY. PATCH ADJACENT WALLS TO MATCH ADJACENT
CONDITIONS. RELOCATE ALL WALL MOUNTED ITEMS INCLUDING ROOM SIGNAGE, CHAIR
RAILS, CORNER GUARDS AND WALL MOUNTED ADJACENT TO EXISTING CORRIDOR DOOR AND
REINSTALL AT NEW DOOR LOCATION.
6. REMOVE EXISTING DOOR, FRAME AND HARDWARE. PREPARE WALL CONSTRUCTION AT
OPENING FOR NEW FRAME.
7. REMOVE GLASS FROM WINDOW SYSTEM AT THIS LOCATION. PREPARE WINDOW SYSTEM TO
RECEIVE INFILL AS NOTED IN NEW WORK SCOPE.
8. REMOVE EXISTING BASE AND/OR WALL CABINETS, COUNTERTOP, AND ASSOCIATE
COMPONENTS/EQUIPMENT COMPLETE. CAP ANY ASSOCIATED PLUMBING AT SOURCE, REFER
TO PLUMBING DRAWINGS.
9. REMOVE ALL EXISTING TELECOMMUNICATIONS AND ASSOCIATED ELECTRICAL EQUIPMENT
WITHIN EXISTING DATA CENTER UPON COMPLETION OF INFRASTRUCTURE UPGRADES
OUTLINED WITHIN THESE DOCUMENTS. RETURN ALL EQUIPMENT TO THE VA UNLESS
OTHERWISE NOTED.
10. PROTECT EXISTING EQUIPMENT CONTROLS BOX DURING CONSTRUCTION. RECONFIGURE AS
REQUIRED TO ALLOW FOR NEW WALL OPENING.
11. DEMO EXISTING WALL FOR FIRE EXTINGUISHER CABINET. REFER TO FLOOR PLAN KEYNOTE
#11. MODIFY EXISTING WALL NOUNTED ASSEMBLIES TO ALLOW FOR CABINET INSTALLATION.
12. G.C. TO CAREFULLY REMOVE EXISTING WINDOW TREATMENT AND TURN OVER TO VA.
13. REMOVE EXISTING WALL BASE AND EXISTING FLOORING (I.E. CARPET, LAMINATE FLOORING, VCT) TO EXISTING CONCRETE. SCRAPE CLEAN AND REMOVE ALL ASSOCIATED ADHESIVE.
PREP AND LEVEL EXISTING FLOORING TO RECEIVE NEW FINISH PER MANUFACURES
REQUIRMENT.
14. REMOVE ANY WALL MOUNTED ITEMS, EQUIPMENT, FURNITURE AND ASSOCIATED
COMPONENTS COMPLETE. CONTRACTOR TO ALLOW VA RIGHT OF FIRST REFUSAL OF ANY
REMOVED ITEMS.
DEMOLITION PLAN KEYNOTESX
1. FINISH WALL CORNER TO CORNER AND FLOOR TO CEILING. PRIOR TO PAINTING THE ENTIRE WALL SURFACE WITH (1) FINISH COAT OF PAINT, PROVIDE (1) PRIME COAT AND (2) FINISH
COATS OVER PATCHED/REPAIRED WALL SURFACES.
2. INSTALL NEW HANDRAIL, NEW CRASH RAIL AND WALL BASE TO CREATE LONG CONTINUOUS
RUN. EXTEND HANDRAIL, CRASH RAIL AND WALL BASE TO NEXT ASSEMBLY JOINT. FOR
DETAILS SEE SHEET A-502.
3. EXISTING GLAZING TO REMAIN. BACK-PAINT GLASS ON INSIDE OF GLAZING. PAINT BLACK
UNLESS OTHERWISE NOTED BY VA.
4. PATCH FLOOR AND PROVIDE NEW WALL BASE AS REQUIRED TO MATCH EXISTING CONDITIONS.
5. PROVIDE INSULATED ALUMINUM PANEL WITHIN WINDOW SYSTEM TO REPLACE PREVIOUS
GLASS PANEL. ALUMINUM FINISH SHALL MATCH WINDOW SYSTEM.
6. INSTALL TELECOMMUNICATIONS ENCLOSURE. SEE ELECTRICAL AND TECHNOLOGY DRAWINGS
FOR ADDITIONAL INFORMATION.
7. NEW PARTITION AS NOTED. ALIGN PARTITION WITH EXISTING WINDOW MULLION.
8. PATCH WALLS AS REQUIRED TO MATCH ADJACENT WALLS TO REMAIN AFTER DEMOLITION OF
NOTED COMPONENTS.
9. PATCH AND PAINT ALL WALLS TO LIKE NEW CONDITION. PAINT COLOR SHALL MATCH EXISTING
CONDITIONS.
10. INFILL WALL TO MATCH ADJACENT WALL CONSTRUCTION, INCLUDING FIRE RATING WHERE
REQUIRED.
11. FIRE EXTINGUISHER CABINET & CLEAN AGENT TYPE FIRE EXTINGUISHER MOUNTED 48” A.F.F.
TO CENTERLINE OF HANDLE. SEE DETAIL 1/A502. PATCH SURROUNDING WALLS.
FLOOR PLAN KEYNOTES
CEILING PLAN KEYNOTESX
X
FLOOR PLAN LEGEND
4'X8' AC GRADE 3/4" TRADE SIZE FIRE RATED PLYWOOD BACKBOARD PAINTED HIGH GLOSS WHITE WITH (2) COATS OF FIRE RESISTANT PAINT FOR SERVICE PROVIDER /SECURITY/VIDEO/ETC. AROUND PERIMETER WALLS OF TRS AND ENTRANCE ROOMS AS SHOWN. ENSURE THAT FIRE RATING STAMP IS TO REMAIN UNCOVERED BY PAINT.
DEMO CEILING KEYNOTESX
D1. REMOVE EXISTING CEILING GRID TO EXTENT REQUIRED TO COMPLETE WORK SCOPE AND
ACCOMMODATE INSTALLATION OF NEW PARTITIONS. SUPPORT EXISTING CEILING . SALVAGE
CEILING TILES FOR REINSTALLATION. RETURN UNUSED CEILING TILES TO VA FOR STORAGE.
D2. REMOVE EXISTING GYPSUM BOARD CEILING AND FRAMING ABOVE.
D3. REMOVE EXISTING LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS FOR FULL SCOPE OF
WORK RELATED TO ELECTRICAL DEMOLITION AND REWORK.
C1. INSTALL NEW CEILING GRID AND EDGE ANGLE. INSTALL SALVAGED CEILING TILES TO
MATCH EXISTING ADJACENT CONDITIONS. INSTALL NEW CEILING TILES WHERE SALVAGED
TILES DO NOT MATCH.
C2. INFILL CEILING TO MATCH ADJACENT EXISTING CEILING TO REMAIN.
C3. REPOSITION EXISTING LIGHT FIXTURES CENTERED IN ROOM AND WITHIN CEILING GRID.
C4. EXPOSED CEILING.
A
OFFICE
A19A
TR
A19A
A19D
A-19A
D1
B
B
OFFICE
A19A
TR
A19A
A19D STORAGE
B3
STORAGE
B3A
STORAGE
B20
CORRIDOR
C02
TR
B3
STORAGE
B3A
STORAGE
B20
CORRIDOR
C02
B
B
B
B3
D A
STORAGE
B3
STORAGE
B3A
STORAGE
B20
CORRIDOR
C02
TR
B3
STORAGE
B3A
STORAGE
B20
CORRIDOR
C02
ARCHITECTURAL - BUILDING 1 -
BASEMENT LEVEL - ENLARGED PLANS
DA JM
A-B01-401
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\A -B
-4
.d w g
/7
/2
:0 3:
P
M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% FINAL BID DOCUMENT SUBMISSION
11/28/2023
12-19-23
Bancroft Project No: 21-116
VA REVIEW ONLY - NOT FOR CONSTRUCTION
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
B. FOR GENERAL INFECTION CONTROL NOTES AND DETAILS REFER TO SHEET GI101.
C. FOR FINISH SCHEDULE REFER TO SHEET AF-601.
D. EXISTING IT/TR/OI&T ROOMS TO REMAIN ACTIVE DURING CONSTRUCTION. G.C. TO PROTECT EQUIPMENT DURING CONSTRUCTION WITH VISQUEEN. CONTRACTOR TO ENSURE CONTINUOUS
OPERATION OF EQUIPMENT.
E. NOT ALL KEY NOTES APPLY TO ALL PLAN SHEETS. G.C. TO APPLY ONLY AS INDICATED PER EACH SHEET.
F. MAINTAIN A 4 ' - 0" CLEAR PATH OF TRAVEL IN THE CORRIDORS AT ALL TIMES.
G. ALL WORK TO BE PERFORMED AS PART OF TR MODIFICATION SHALL BE CONSIDERED AS TYPE IV AND FOLLOW "INFECTION CONTROL PRECAUTIONS FOR CLASS IV" ON SHEET GI101.
H. APPLY FIRE RATED SEALANT TO ALL EXISTING AND NEW PENETRATIONS IN EXISTING WALLS TO MAKE EXISTING WALLS A 1 HR ASSEMBLY. BASIS OF DESIGN FOR 1 HR WALL IS UL 419 ASSEMBLY.
I. ALL EXISTING WALLS WITH TR'S ARE TO BE FULLY PATCHED & PREPPED TO A LIKE NEW APPEARANCE BEFORE RECEIVING NEW PLYWOOD PANELS.
J. IN ALL EXISTING OI&T AND IRM ROOMS TO BE CONVERTED TO TR'S - ALL EXISTING PLYWOOD PANELS TO BE REMOVED A WALLS PATCHED AND PREPPED TO RECEIVE PAINT AND NEW PLYWOOD
PANELS.
RATED PARTITION LEGEND
1. INSTALL TEMPORARY FLAME RESISTANT CONSTRUCTION PANELS WITH DOOR ENTRY. BASIS
OF DESIGN IS EDGE GUARD.
2. SUPPLY AND INSTALL WALK OFF MAT(S). SEE DETAILS ON SHEET GI101.
3. EXISTING HANDRAIL, WALL BASE AND CARPET TO BE MODIFIED TO ACCEPT NEW DOOR.
4. REMOVE EXISTING DOOR, FRAME AND HARDWARE IN ITS ENTIRETY. INFILL WALL WITH
METAL STUDS AND DRYWALL. ALIGN WITH EXISTING WALLS, PATCH, LEVEL AND FINISH TO
MATCH EXISTING WALL FINISH.
5. REMOVE EXISTING DOOR, FRAME AND HARDWARE IN ITS ENTIRETY FOR INSTALLATION OF
NEW DOOR AND FRAME. PORTIONS OF EXISTING WALL TO BE DEMOLISHED TO RECEIVE NEW
LARGER SIZE DOOR AND FRAME ASSEMBLY. PATCH ADJACENT WALLS TO MATCH ADJACENT
CONDITIONS. RELOCATE ALL WALL MOUNTED ITEMS INCLUDING ROOM SIGNAGE, CHAIR
RAILS, CORNER GUARDS AND WALL MOUNTED ADJACENT TO EXISTING CORRIDOR DOOR AND
REINSTALL AT NEW DOOR LOCATION.
6. REMOVE EXISTING DOOR, FRAME AND HARDWARE. PREPARE WALL CONSTRUCTION AT
OPENING FOR NEW FRAME.
7. REMOVE GLASS FROM WINDOW SYSTEM AT THIS LOCATION. PREPARE WINDOW SYSTEM TO
RECEIVE INFILL AS NOTED IN NEW WORK SCOPE.
8. REMOVE EXISTING BASE AND/OR WALL CABINETS, COUNTERTOP, AND ASSOCIATE
COMPONENTS/EQUIPMENT COMPLETE. CAP ANY ASSOCIATED PLUMBING AT SOURCE, REFER
TO PLUMBING DRAWINGS.
9. REMOVE ALL EXISTING TELECOMMUNICATIONS AND ASSOCIATED ELECTRICAL EQUIPMENT
WITHIN EXISTING DATA CENTER UPON COMPLETION OF INFRASTRUCTURE UPGRADES
OUTLINED WITHIN THESE DOCUMENTS. RETURN ALL EQUIPMENT TO THE VA UNLESS
OTHERWISE NOTED.
10. PROTECT EXISTING EQUIPMENT CONTROLS BOX DURING CONSTRUCTION. RECONFIGURE AS
REQUIRED TO ALLOW FOR NEW WALL OPENING.
11. DEMO EXISTING WALL FOR FIRE EXTINGUISHER CABINET. REFER TO FLOOR PLAN KEYNOTE
#11. MODIFY EXISTING WALL NOUNTED ASSEMBLIES TO ALLOW FOR CABINET INSTALLATION.
12. G.C. TO CAREFULLY REMOVE EXISTING WINDOW TREATMENT AND TURN OVER TO VA.
13. REMOVE EXISTING WALL BASE AND EXISTING FLOORING (I.E. CARPET, LAMINATE FLOORING, VCT) TO EXISTING CONCRETE. SCRAPE CLEAN AND REMOVE ALL ASSOCIATED ADHESIVE.
PREP AND LEVEL EXISTING FLOORING TO RECEIVE NEW FINISH PER MANUFACURES
REQUIRMENT.
14. REMOVE ANY WALL MOUNTED ITEMS, EQUIPMENT, FURNITURE AND ASSOCIATED
COMPONENTS COMPLETE. CONTRACTOR TO ALLOW VA RIGHT OF FIRST REFUSAL OF ANY
REMOVED ITEMS.
DEMOLITION PLAN KEYNOTESX
1. FINISH WALL CORNER TO CORNER AND FLOOR TO CEILING. PRIOR TO PAINTING THE ENTIRE WALL SURFACE WITH (1) FINISH COAT OF PAINT, PROVIDE (1) PRIME COAT AND (2) FINISH
COATS OVER PATCHED/REPAIRED WALL SURFACES.
2. INSTALL NEW HANDRAIL, NEW CRASH RAIL AND WALL BASE TO CREATE LONG CONTINUOUS
RUN. EXTEND HANDRAIL, CRASH RAIL AND WALL BASE TO NEXT ASSEMBLY JOINT. FOR
DETAILS SEE SHEET A-502.
3. EXISTING GLAZING TO REMAIN. BACK-PAINT GLASS ON INSIDE OF GLAZING. PAINT BLACK
UNLESS OTHERWISE NOTED BY VA.
4. PATCH FLOOR AND PROVIDE NEW WALL BASE AS REQUIRED TO MATCH EXISTING CONDITIONS.
5. PROVIDE INSULATED ALUMINUM PANEL WITHIN WINDOW SYSTEM TO REPLACE PREVIOUS
GLASS PANEL. ALUMINUM FINISH SHALL MATCH WINDOW SYSTEM.
6. INSTALL TELECOMMUNICATIONS ENCLOSURE. SEE ELECTRICAL AND TECHNOLOGY DRAWINGS
FOR ADDITIONAL INFORMATION.
7. NEW PARTITION AS NOTED. ALIGN PARTITION WITH EXISTING WINDOW MULLION.
8. PATCH WALLS AS REQUIRED TO MATCH ADJACENT WALLS TO REMAIN AFTER DEMOLITION OF
NOTED COMPONENTS.
9. PATCH AND PAINT ALL WALLS TO LIKE NEW CONDITION. PAINT COLOR SHALL MATCH EXISTING
CONDITIONS.
10. INFILL WALL TO MATCH ADJACENT WALL CONSTRUCTION, INCLUDING FIRE RATING WHERE
REQUIRED.
11. FIRE EXTINGUISHER CABINET & CLEAN AGENT TYPE FIRE EXTINGUISHER MOUNTED 48” A.F.F.
TO CENTERLINE OF HANDLE. SEE DETAIL 1/A502. PATCH SURROUNDING WALLS.
FLOOR PLAN KEYNOTES
CEILING PLAN KEYNOTESX
X
FLOOR PLAN LEGEND
4'X8' AC GRADE 3/4" TRADE SIZE FIRE RATED PLYWOOD BACKBOARD PAINTED HIGH GLOSS WHITE WITH (2) COATS OF FIRE RESISTANT PAINT FOR SERVICE PROVIDER /SECURITY/VIDEO/ETC. AROUND PERIMETER WALLS OF TRS AND ENTRANCE ROOMS AS SHOWN. ENSURE THAT FIRE RATING STAMP IS TO REMAIN UNCOVERED BY PAINT.
DEMO CEILING KEYNOTESX
D1. REMOVE EXISTING CEILING GRID TO EXTENT REQUIRED TO COMPLETE WORK SCOPE AND
ACCOMMODATE INSTALLATION OF NEW PARTITIONS. SUPPORT EXISTING CEILING . SALVAGE
CEILING TILES FOR REINSTALLATION. RETURN UNUSED CEILING TILES TO VA FOR STORAGE.
D2. REMOVE EXISTING GYPSUM BOARD CEILING AND FRAMING ABOVE.
D3. REMOVE EXISTING LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS FOR FULL SCOPE OF
WORK RELATED TO ELECTRICAL DEMOLITION AND REWORK.
C1. INSTALL NEW CEILING GRID AND EDGE ANGLE. INSTALL SALVAGED CEILING TILES TO
MATCH EXISTING ADJACENT CONDITIONS. INSTALL NEW CEILING TILES WHERE SALVAGED
TILES DO NOT MATCH.
C2. INFILL CEILING TO MATCH ADJACENT EXISTING CEILING TO REMAIN.
C3. REPOSITION EXISTING LIGHT FIXTURES CENTERED IN ROOM AND WITHIN CEILING GRID.
C4. EXPOSED CEILING.
A
MECHANICAL
ROOM/STORAGE
C22
ADMINISTRATIVE
OFFICE
C23
OPEN OFFICE
C20
TR
C20A
MECHANICAL
ROOM/STORAGE
C22
ADMINISTRATIVE
OFFICE
C23
C-20A
D1
B
C-2 2B
D
MECHANICAL
ADMINISTRATIVE
OFFICE
C23
OPEN OFFICE
C20
TR
C20A
MECHANICAL
ROOM/STORAGE
C23
ARCHITECTURAL - BUILDING 1 -
BASEMENT LEVEL - ENLARGED PLAN
DA JM
A-B01-402
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\A -B
-4
.d w g
/3
1/
:2 6:
A
M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% FINAL BID DOCUMENT SUBMISSION
11/28/2023
12-19-23
Bancroft Project No: 21-116
VA REVIEW ONLY - NOT FOR CONSTRUCTION
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
UP
UP
UP
UP
DN
UP
DN
UP
UPUP
UP
A
B
C
D
E
F
1 3 4 5 11 13 16 18 19 21 23 25 26 27 286 8 9
11.1
14 15
K
L
M
29 30
G
O
Q
S
T
U
V
P
S.2
S.1
Q.1
U.1
V.1
V.2
W.1
X
Y
8.26.36.2 10.19.3 12.111.2
2.1
3.1
4.1
3.8
Z.4
4.7 6.1 8.1 11.7
Z.3
Z.2
24 31 32
N
7 222010 12
18B 20B 22B 24B 24C
H
I
J
R
W
Z.1
22D
AC101A AC130
AC101B
AC101C
AC133
AC128
AC129 AC134 AC135
AC131
AC131
AC101D
AC136
B1-03C
AC119
B113
AC127A
AC127B
C100
AC100
AC101
AC104
A140
A141A128C
A1
B103 B105
C110C109C107 C108
C116F C116A
C116
C116B
C105
C104
C106
C115
A1
A143F
A121AA119A118
A117A
A116B
A116A
A120 A121 A121B
A115
A115H
A115A A115I
A115J
A115BA115C
A115G
A122
A115E
A121E A122F
A102G
A102A
A1
A102BA102C
A102D
A108
A109
AC101J
AC101I
AC101H
AC101G
A127 A127BA127A
C116C
C116D
C119
C120C124
C125
C121
C122
C123
C123BC123A
C126
C127
C1-02
A145
C117 C104F C116E C105E
A143
A102E A101E
C102C101A144 C103
A111
A112
A104A
A104
A106
A105A110
A136
B149B1
B116
B148
B147
B146
AC120A
AC120
A116HA116G
A116E A116F
A116D
A116C
A116
A107
A104B
A115D
AC119AC118AC115
AC112
AC112A
AC114
AC109
A135
B145
B133
B134
B136 B135
B131 B132B130
B138
B129
B139B140
B128
B127
B137
B126
B141
B124B119
B123E
B143 B142
B133AB120
B143E
B120F
AC135
AC110
AC111
AC121
AC116E
AC122
AC122A
AC125
AC106E
AC113
AC124
AC123
AC117
B118
A137
B117A
A134A
C113 C112C111
C114D
C114-E
C114B
C114C
C114C
C114-W
C1-03A103
B123 B125
A1-04 A1-03
A140E
A134
A128B
A128D
A128A
AC105AC106
A1
A
A129
A128H A128G
AC108
AC1-5
B114
B106B107
B108
B113
B109A B109
B111
B1
B115
B104
B116C
B116D B1-03
A1-01
A101
A138
A142A
AC101K
B1-04B1-01
B1-02
A101A
A101G A101C
A113
B101
A101D
A141E
C1-01
C114T
A114
AC147 AC148 AC149 AC150 AC151 AC152 AC153 AC154 AC155 AC156
AC158 AC157
AC165AC164AC161
AC160
AC143 AC143A
AC145AC146
AC144 AC141 AC162 AC163 AC166
AC167
AC
1-
AC
1-
AC
1-
A615P
A6
Q
AC1-2
AC159
A1-02
A1-E1
A1-E2
A1-E3 A1-E4
A101H
A101J
AC134A AC136AAC135A
AC134C B1-03D
B116A
1&2
FP-01-412
3&4 M-01-411
1,2,3&4 A-01-411
5,6,7&8 A-01-411
1,2,3&4 A-01-412
1&2 M-01-412
1&2
FP-01-413
3&4 M-01-411
1&2
FP-01-411
RATED PARTITION LEGEND
CONTRACTOR IS REQUIRED TO MAINTAIN ALL RATED PARTITIONS.
1 HR FIRE BARRIER
2 HR FIRE BARRIER
SMOKE BARRIER
1 HR FIRE BARRIER (EXISTING)
2 HR FIRE BARRIER (EXISTING)
SMOKE BARRIER (EXISTING)
1. REMOVE AND STORE CEILING TILES IN THIS AREA AS REQUIRED FOR MECHANICAL
DUCTWORK, PIPING, ELECTRICAL CONDUIT, TECHNOLOGY EQUIPMENT AND/OR
SECURITY INSTALLATION. REINSTALL TILES AND GRID WHEN WORK IS COMPLETED.
REPLACE ANY DAMAGED TILES AND GRIDS TO MATCH EXISTING. G.C. SHALL
TEMPORARILY ERECT A SUSPENDED PLASTIC BARRIER 6 MIL AROUND AREA OF
CEILING WORK TO BE PERFORMED DURING ONE SHIFT AND G.C. SHALL REMOVE
SUSPENDED PLASTIC BARRIER AT THE END OF SHIFT. G.C. SHALL MOP CLEAN THIS
AREA OF WORK. PRIOR TO TURNING OVER AREA TO VA. AFTER WORK HOURS WILL
REQUIRE ADDITIONAL COORDINATION WITH THE VA.
A. REFER TO TECHNOLOGY AND ELECTRICAL FOR FULL REQUIRED INSTALLATION
AND DEMOLITION WORK
B. ALL EXISTING LIGHTING, CONDUIT, DUCTWORK, MECHANICAL GRILLS, &
SPRINKLER HEADS TO REMAIN IN EXISTING LOCATIONS AND PROTECTED
UNLESS OTHERWISE NOTED.
C. ANY ELECTRICAL FIXTURES AND DEVICES THAT ARE NOT IDENTIFIED ON THESE
DRAWINGS IN THE AREAS OF CEILING DEMOLITION, ARE TO BE CAREFULLY
REMOVED FROM THE CEILING, PROTECTED, TEMPORARILY HUNG AND THEN
REATTACHED IN THE SAME LOCATIONS AS WHICH THEY WERE FOUND PRIOR TO
DEMOLITION.
D. CONTRACTOR TO CAREFULLY REMOVE SECTIONS OF EXISTING CEILING TILE TO
ALLOW FOR THE INSTALLATION OF ALL REQUIRED CONDUIT AND ELECTRICAL
EQUIPMENT PER CONTRACT DRAWINGS. CONTRACTOR SHALL REINSTALL
CEILING IN EXACT LOCATION. CONTRACTOR TO REPLACE ANY CEILING
GRID/TILES DAMAGED DURING CONSTRUCTION, MATCHING EXISTING. REFER TO
ELECTRICAL SHEETS FOR ADDITIONAL INFORMATION.
E. IF A RATED ASSEMBLY IS NOT INSTALLED BY END OF SHIFT IT MUST BE
PROTECTED OVERNIGHT.
GENERAL DEMOLITION NOTES
CEILING DEMOLITION LEGEND
CEILING DEMOLITION KEY NOTESX
1. REPLACE EXISTING A,B&C TYPE FIRE EXTINGUISHER WITH CLEAN AGENT A,B&C
TYPE FIRE EXTINGUISHER.
2. INSTALL CLEAN AGENT A,B&C TYPE FIRE EXTINGUISHER IN SEMI-RECESSED
CABINET SET IN NEW GYP. BD. ON METAL STUD ASSEMBLY (1-HR RATED)
3. INSTALL CLEAN AGENT A,B&C TYPE FIRE EXTINGUISHER IN SEMI-RECESSED
CABINET IN EXISTING WALL WRAP CABINET IN TYPE 'X' GYPSUM BOARD.
FLOOR PLAN KEY NOTESX
KEYNOTE 11
A. ALL WORK ASSOCIATED WITH TEMPORARY CEILING REMOVAL AND INSTALLATION
OF CABLING SHALL BE CONSIDERED AS NO MORE HAZARDOUS THAN NORMAL
OPERATIONS. INFECTION CONTROL REQUIREMENTS FOR THIS WORK SHALL
INCLUDE "VISQUEEN" TYPE BARRIER AROUND WORK AND/OR INFECTION CONTROL
MODULES WITH VA STATION APPROVAL. CONTRACTOR SHALL ALSO ADHEAR TO
"INFECTION CONTROL REQUIREMENTS BY ALL CLASSES" ON SHEET GI101.
B. AT LOCATION OF ALL CORES THROUGH FLOORS INSTALL RE-ENTERABLE FIRESTOP
ASSEMBLIES.
C. AT LOCATION OF CORES THROUGH RATED PARTITIONS INSTALL RE-ENTERABLE
FIRESTOP ASSEMBLIES (TYP.)
D. CONTRACTOR TO LOCATE EXISTING REINFORCING PRIOR TO CORING FOR
CONDUIT. DO NOT CUT REINFORCEMENT. CORES SHALL HAVE 4" CLEAR MINIMUM
BETWEEN THEM. ADJUST CORE LOCATIONS AS NEEDED. AT LOCATIONS WITH
MORE THAN TWO (2) CORES PASSING THROUGH A C.M.U. WALL, SPACE CORES AT
16" MINIMUM.
GENERAL PLAN NOTES
CEILING LEGEND
ARCHITECTURAL - BUILDING 1 - LEVEL 1
PLAN
DA JM
A-B01-101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\A -B
-1
.d w g
/6
/2
9:
:0
AM
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% FINAL BID DOCUMENT SUBMISSION
11/28/2023
12-19-23
Bancroft Project No: 21-116
VA REVIEW ONLY - NOT FOR CONSTRUCTION
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
AC160
B116A A144
C125
B119
A127A
MATERIAL DESCRIPTION MATERIAL LOCATION
9” x 9” Various Color Floor Tile
C7B, C125, C212, A233A, B325A, A554, A601, A601B, A618A
12” x 12” Brown Floor Tile and Mastic
A234, beneath raised floor
Yellow Sheet Vinyl Flooring
C302
Cement Board Radiator Cabinet Backing
A13, A127A, B119, C125, A232A, A233A, A234, A235, A328, B226A, B325A, C303, A432, B402, C402, A525, C503, A601, A601A, A604, A618
BUILDING 01: ACM & LBP SURVEY
SEE REPORT 8/16/2022 FOR DETAILS
*A144, B116A, AC160*
*ASSUME SIMILAR CONDITIONS AT THESE LOCATIONS
*A144*
Building 01 - LBP Survey
• Metal window frame in room A235 – tan paint
• Metal window sill in room A328 – brown paint
• Glazing on ceramic wall tile in rooms C208A, A601A, A604B
B. FOR GENERAL INFECTION CONTROL NOTES AND DETAILS REFER TO SHEET GI101.
C. FOR FINISH SCHEDULE REFER TO SHEET AF-601.
D. EXISTING IT/TR/OI&T ROOMS TO REMAIN ACTIVE DURING CONSTRUCTION. G.C. TO PROTECT EQUIPMENT DURING CONSTRUCTION WITH VISQUEEN. CONTRACTOR TO ENSURE CONTINUOUS
OPERATION OF EQUIPMENT.
E. NOT ALL KEY NOTES APPLY TO ALL PLAN SHEETS. G.C. TO APPLY ONLY AS INDICATED PER EACH SHEET.
F. MAINTAIN A 4 ' - 0" CLEAR PATH OF TRAVEL IN THE CORRIDORS AT ALL TIMES.
G. ALL WORK TO BE PERFORMED AS PART OF TR MODIFICATION SHALL BE CONSIDERED AS TYPE IV AND FOLLOW "INFECTION CONTROL PRECAUTIONS FOR CLASS IV" ON SHEET GI101.
H. APPLY FIRE RATED SEALANT TO ALL EXISTING AND NEW PENETRATIONS IN EXISTING WALLS TO MAKE EXISTING WALLS A 1 HR ASSEMBLY. BASIS OF DESIGN FOR 1 HR WALL IS UL 419 ASSEMBLY.
I. ALL EXISTING WALLS WITH TR'S ARE TO BE FULLY PATCHED & PREPPED TO A LIKE NEW APPEARANCE BEFORE RECEIVING NEW PLYWOOD PANELS.
J. IN ALL EXISTING OI&T AND IRM ROOMS TO BE CONVERTED TO TR'S - ALL EXISTING PLYWOOD PANELS TO BE REMOVED A WALLS PATCHED AND PREPPED TO RECEIVE PAINT AND NEW PLYWOOD
PANELS.
1. INSTALL TEMPORARY FLAME RESISTANT CONSTRUCTION PANELS WITH DOOR ENTRY. BASIS
OF DESIGN IS EDGE GUARD.
2. SUPPLY AND INSTALL WALK OFF MAT(S). SEE DETAILS ON SHEET GI101.
3. EXISTING HANDRAIL, WALL BASE AND CARPET TO BE MODIFIED TO ACCEPT NEW DOOR.
4. REMOVE EXISTING DOOR, FRAME AND HARDWARE IN ITS ENTIRETY. INFILL WALL WITH
METAL STUDS AND DRYWALL. ALIGN WITH EXISTING WALLS, PATCH, LEVEL AND FINISH TO
MATCH EXISTING WALL FINISH.
5. REMOVE EXISTING DOOR, FRAME AND HARDWARE IN ITS ENTIRETY FOR INSTALLATION OF
NEW DOOR AND FRAME. PORTIONS OF EXISTING WALL TO BE DEMOLISHED TO RECEIVE NEW
LARGER SIZE DOOR AND FRAME ASSEMBLY. PATCH ADJACENT WALLS TO MATCH ADJACENT
CONDITIONS. RELOCATE ALL WALL MOUNTED ITEMS INCLUDING ROOM SIGNAGE, CHAIR
RAILS, CORNER GUARDS AND WALL MOUNTED ADJACENT TO EXISTING CORRIDOR DOOR AND
REINSTALL AT NEW DOOR LOCATION.
6. REMOVE EXISTING DOOR, FRAME AND HARDWARE. PREPARE WALL CONSTRUCTION AT
OPENING FOR NEW FRAME.
7. REMOVE GLASS FROM WINDOW SYSTEM AT THIS LOCATION. PREPARE WINDOW SYSTEM TO
RECEIVE INFILL AS NOTED IN NEW WORK SCOPE.
8. REMOVE EXISTING BASE AND/OR WALL CABINETS, COUNTERTOP, AND ASSOCIATE
COMPONENTS/EQUIPMENT COMPLETE. CAP ANY ASSOCIATED PLUMBING AT SOURCE, REFER
TO PLUMBING DRAWINGS.
9. REMOVE ALL EXISTING TELECOMMUNICATIONS AND ASSOCIATED ELECTRICAL EQUIPMENT
WITHIN EXISTING DATA CENTER UPON COMPLETION OF INFRASTRUCTURE UPGRADES
OUTLINED WITHIN THESE DOCUMENTS. RETURN ALL EQUIPMENT TO THE VA UNLESS
OTHERWISE NOTED.
10. PROTECT EXISTING EQUIPMENT CONTROLS BOX DURING CONSTRUCTION. RECONFIGURE AS
REQUIRED TO ALLOW FOR NEW WALL OPENING.
11. DEMO EXISTING WALL FOR FIRE EXTINGUISHER CABINET. REFER TO FLOOR PLAN KEYNOTE
#11. MODIFY EXISTING WALL NOUNTED ASSEMBLIES TO ALLOW FOR CABINET INSTALLATION.
12. G.C. TO CAREFULLY REMOVE EXISTING WINDOW TREATMENT AND TURN OVER TO VA.
13. REMOVE EXISTING WALL BASE AND EXISTING FLOORING (I.E. CARPET, LAMINATE FLOORING, VCT) TO EXISTING CONCRETE. SCRAPE CLEAN AND REMOVE ALL ASSOCIATED ADHESIVE.
PREP AND LEVEL EXISTING FLOORING TO RECEIVE NEW FINISH PER MANUFACURES
REQUIRMENT.
14. REMOVE ANY WALL MOUNTED ITEMS, EQUIPMENT, FURNITURE AND ASSOCIATED
COMPONENTS COMPLETE. CONTRACTOR TO ALLOW VA RIGHT OF FIRST REFUSAL OF ANY
REMOVED ITEMS.
DEMOLITION PLAN KEYNOTESX
1. FINISH WALL CORNER TO CORNER AND FLOOR TO CEILING. PRIOR TO PAINTING THE ENTIRE WALL SURFACE WITH (1) FINISH COAT OF PAINT, PROVIDE (1) PRIME COAT AND (2) FINISH
COATS OVER PATCHED/REPAIRED WALL SURFACES.
2. INSTALL NEW HANDRAIL, NEW CRASH RAIL AND WALL BASE TO CREATE LONG CONTINUOUS
RUN. EXTEND HANDRAIL, CRASH RAIL AND WALL BASE TO NEXT ASSEMBLY JOINT. FOR
DETAILS SEE SHEET A-502.
3. EXISTING GLAZING TO REMAIN. BACK-PAINT GLASS ON INSIDE OF GLAZING. PAINT BLACK
UNLESS OTHERWISE NOTED BY VA.
4. PATCH FLOOR AND PROVIDE NEW WALL BASE AS REQUIRED TO MATCH EXISTING CONDITIONS.
5. PROVIDE INSULATED ALUMINUM PANEL WITHIN WINDOW SYSTEM TO REPLACE PREVIOUS
GLASS PANEL. ALUMINUM FINISH SHALL MATCH WINDOW SYSTEM.
6. INSTALL TELECOMMUNICATIONS ENCLOSURE. SEE ELECTRICAL AND TECHNOLOGY DRAWINGS
FOR ADDITIONAL INFORMATION.
7. NEW PARTITION AS NOTED. ALIGN PARTITION WITH EXISTING WINDOW MULLION.
8. PATCH WALLS AS REQUIRED TO MATCH ADJACENT WALLS TO REMAIN AFTER DEMOLITION OF
NOTED COMPONENTS.
9. PATCH AND PAINT ALL WALLS TO LIKE NEW CONDITION. PAINT COLOR SHALL MATCH EXISTING
CONDITIONS.
10. INFILL WALL TO MATCH ADJACENT WALL CONSTRUCTION, INCLUDING FIRE RATING WHERE
REQUIRED.
11. FIRE EXTINGUISHER CABINET & CLEAN AGENT TYPE FIRE EXTINGUISHER MOUNTED 48” A.F.F.
TO CENTERLINE OF HANDLE. SEE DETAIL 1/A502. PATCH SURROUNDING WALLS.
FLOOR PLAN KEYNOTES
CEILING PLAN KEYNOTESX
X
FLOOR PLAN LEGEND
4'X8' AC GRADE 3/4" TRADE SIZE FIRE RATED PLYWOOD BACKBOARD PAINTED HIGH GLOSS WHITE WITH (2) COATS OF FIRE RESISTANT PAINT FOR SERVICE PROVIDER /SECURITY/VIDEO/ETC. AROUND PERIMETER WALLS OF TRS AND ENTRANCE ROOMS AS SHOWN. ENSURE THAT FIRE RATING STAMP IS TO REMAIN UNCOVERED BY PAINT.
DEMO CEILING KEYNOTESX
D1. REMOVE EXISTING CEILING GRID TO EXTENT REQUIRED TO COMPLETE WORK SCOPE AND
ACCOMMODATE INSTALLATION OF NEW PARTITIONS. SUPPORT EXISTING CEILING . SALVAGE
CEILING TILES FOR REINSTALLATION. RETURN UNUSED CEILING TILES TO VA FOR STORAGE.
D2. REMOVE EXISTING GYPSUM BOARD CEILING AND FRAMING ABOVE.
D3. REMOVE EXISTING LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS FOR FULL SCOPE OF
WORK RELATED TO ELECTRICAL DEMOLITION AND REWORK.
C1. INSTALL NEW CEILING GRID AND EDGE ANGLE. INSTALL SALVAGED CEILING TILES TO
MATCH EXISTING ADJACENT CONDITIONS. INSTALL NEW CEILING TILES WHERE SALVAGED
TILES DO NOT MATCH.
C2. INFILL CEILING TO MATCH ADJACENT EXISTING CEILING TO REMAIN.
C3. REPOSITION EXISTING LIGHT FIXTURES CENTERED IN ROOM AND WITHIN CEILING GRID.
C4. EXPOSED CEILING.
A
TELE/DATA
AC160
EXAM
AC162
EXAM
AC141
STATION
AC159
TR
AC160
EXAM
AC162
EXAM
AC141
STATION
AC159
AC-160
B
D1
B
D1
D
TELE/DATA
AC160
EXAMEXAM
STATION
AC159
TR
AC160
EXAM
AC162
EXAM
AC141
NURSE
STATION
AC159
CORRIDOR
B103
AC131
EXAM # 19
AC119
CLEAN
UTILITY
B116C CORRIDOR
B103
EXAM # 19
TR
B116A
CLEAN
UTILITY
B116C
B
B
D1
TR
B116A
CLEAN
UTILITY
B116C
CLEAN
UTILITY
B116C
ARCHITECTURAL - BUILDING 1 - LEVEL 1
- ENLARGED PLANS
DA JM
A-B01-411
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\A -B
-4
.d w g
/3
1/
:3 9:
A
M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% FINAL BID DOCUMENT SUBMISSION
11/28/2023
12-19-23
Bancroft Project No: 21-116
VA REVIEW ONLY - NOT FOR CONSTRUCTION
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
B. FOR GENERAL INFECTION CONTROL NOTES AND DETAILS REFER TO SHEET GI101.
C. FOR FINISH SCHEDULE REFER TO SHEET AF-601.
D. EXISTING IT/TR/OI&T ROOMS TO REMAIN ACTIVE DURING CONSTRUCTION. G.C. TO PROTECT EQUIPMENT DURING CONSTRUCTION WITH VISQUEEN. CONTRACTOR TO ENSURE CONTINUOUS
OPERATION OF EQUIPMENT.
E. NOT ALL KEY NOTES APPLY TO ALL PLAN SHEETS. G.C. TO APPLY ONLY AS INDICATED PER EACH SHEET.
F. MAINTAIN A 4 ' - 0" CLEAR PATH OF TRAVEL IN THE CORRIDORS AT ALL TIMES.
G. ALL WORK TO BE PERFORMED AS PART OF TR MODIFICATION SHALL BE CONSIDERED AS TYPE IV AND FOLLOW "INFECTION CONTROL PRECAUTIONS FOR CLASS IV" ON SHEET GI101.
H. APPLY FIRE RATED SEALANT TO ALL EXISTING AND NEW PENETRATIONS IN EXISTING WALLS TO MAKE EXISTING WALLS A 1 HR ASSEMBLY. BASIS OF DESIGN FOR 1 HR WALL IS UL 419 ASSEMBLY.
I. ALL EXISTING WALLS WITH TR'S ARE TO BE FULLY PATCHED & PREPPED TO A LIKE NEW APPEARANCE BEFORE RECEIVING NEW PLYWOOD PANELS.
J. IN ALL EXISTING OI&T AND IRM ROOMS TO BE CONVERTED TO TR'S - ALL EXISTING PLYWOOD PANELS TO BE REMOVED A WALLS PATCHED AND PREPPED TO RECEIVE PAINT AND NEW PLYWOOD
PANELS.
1. INSTALL TEMPORARY FLAME RESISTANT CONSTRUCTION PANELS WITH DOOR ENTRY. BASIS
OF DESIGN IS EDGE GUARD.
2. SUPPLY AND INSTALL WALK OFF MAT(S). SEE DETAILS ON SHEET GI101.
3. EXISTING HANDRAIL, WALL BASE AND CARPET TO BE MODIFIED TO ACCEPT NEW DOOR.
4. REMOVE EXISTING DOOR, FRAME AND HARDWARE IN ITS ENTIRETY. INFILL WALL WITH
METAL STUDS AND DRYWALL. ALIGN WITH EXISTING WALLS, PATCH, LEVEL AND FINISH TO
MATCH EXISTING WALL FINISH.
5. REMOVE EXISTING DOOR, FRAME AND HARDWARE IN ITS ENTIRETY FOR INSTALLATION OF
NEW DOOR AND FRAME. PORTIONS OF EXISTING WALL TO BE DEMOLISHED TO RECEIVE NEW
LARGER SIZE DOOR AND FRAME ASSEMBLY. PATCH ADJACENT WALLS TO MATCH ADJACENT
CONDITIONS. RELOCATE ALL WALL MOUNTED ITEMS INCLUDING ROOM SIGNAGE, CHAIR
RAILS, CORNER GUARDS AND WALL MOUNTED ADJACENT TO EXISTING CORRIDOR DOOR AND
REINSTALL AT NEW DOOR LOCATION.
6. REMOVE EXISTING DOOR, FRAME AND HARDWARE. PREPARE WALL CONSTRUCTION AT
OPENING FOR NEW FRAME.
7. REMOVE GLASS FROM WINDOW SYSTEM AT THIS LOCATION. PREPARE WINDOW SYSTEM TO
RECEIVE INFILL AS NOTED IN NEW WORK SCOPE.
8. REMOVE EXISTING BASE AND/OR WALL CABINETS, COUNTERTOP, AND ASSOCIATE
COMPONENTS/EQUIPMENT COMPLETE. CAP ANY ASSOCIATED PLUMBING AT SOURCE, REFER
TO PLUMBING DRAWINGS.
9. REMOVE ALL EXISTING TELECOMMUNICATIONS AND ASSOCIATED ELECTRICAL EQUIPMENT
WITHIN EXISTING DATA CENTER UPON COMPLETION OF INFRASTRUCTURE UPGRADES
OUTLINED WITHIN THESE DOCUMENTS. RETURN ALL EQUIPMENT TO THE VA UNLESS
OTHERWISE NOTED.
10. PROTECT EXISTING EQUIPMENT CONTROLS BOX DURING CONSTRUCTION. RECONFIGURE AS
REQUIRED TO ALLOW FOR NEW WALL OPENING.
11. DEMO EXISTING WALL FOR FIRE EXTINGUISHER CABINET. REFER TO FLOOR PLAN KEYNOTE
#11. MODIFY EXISTING WALL NOUNTED ASSEMBLIES TO ALLOW FOR CABINET INSTALLATION.
12. G.C. TO CAREFULLY REMOVE EXISTING WINDOW TREATMENT AND TURN OVER TO VA.
13. REMOVE EXISTING WALL BASE AND EXISTING FLOORING (I.E. CARPET, LAMINATE FLOORING, VCT) TO EXISTING CONCRETE. SCRAPE CLEAN AND REMOVE ALL ASSOCIATED ADHESIVE.
PREP AND LEVEL EXISTING FLOORING TO RECEIVE NEW FINISH PER MANUFACURES
REQUIRMENT.
14. REMOVE ANY WALL MOUNTED ITEMS, EQUIPMENT, FURNITURE AND ASSOCIATED
COMPONENTS COMPLETE. CONTRACTOR TO ALLOW VA RIGHT OF FIRST REFUSAL OF ANY
REMOVED ITEMS.
DEMOLITION PLAN KEYNOTESX
1. FINISH WALL CORNER TO CORNER AND FLOOR TO CEILING. PRIOR TO PAINTING THE ENTIRE WALL SURFACE WITH (1) FINISH COAT OF PAINT, PROVIDE (1) PRIME COAT AND (2) FINISH
COATS OVER PATCHED/REPAIRED WALL SURFACES.
2. INSTALL NEW HANDRAIL, NEW CRASH RAIL AND WALL BASE TO CREATE LONG CONTINUOUS
RUN. EXTEND HANDRAIL, CRASH RAIL AND WALL BASE TO NEXT ASSEMBLY JOINT. FOR
DETAILS SEE SHEET A-502.
3. EXISTING GLAZING TO REMAIN. BACK-PAINT GLASS ON INSIDE OF GLAZING. PAINT BLACK
UNLESS OTHERWISE NOTED BY VA.
4. PATCH FLOOR AND PROVIDE NEW WALL BASE AS REQUIRED TO MATCH EXISTING CONDITIONS.
5. PROVIDE INSULATED ALUMINUM PANEL WITHIN WINDOW SYSTEM TO REPLACE PREVIOUS
GLASS PANEL. ALUMINUM FINISH SHALL MATCH WINDOW SYSTEM.
6. INSTALL TELECOMMUNICATIONS ENCLOSURE. SEE ELECTRICAL AND TECHNOLOGY DRAWINGS
FOR ADDITIONAL INFORMATION.
7. NEW PARTITION AS NOTED. ALIGN PARTITION WITH EXISTING WINDOW MULLION.
8. PATCH WALLS AS REQUIRED TO MATCH ADJACENT WALLS TO REMAIN AFTER DEMOLITION OF
NOTED COMPONENTS.
9. PATCH AND PAINT ALL WALLS TO LIKE NEW CONDITION. PAINT COLOR SHALL MATCH EXISTING
CONDITIONS.
10. INFILL WALL TO MATCH ADJACENT WALL CONSTRUCTION, INCLUDING FIRE RATING WHERE
REQUIRED.
11. FIRE EXTINGUISHER CABINET & CLEAN AGENT TYPE FIRE EXTINGUISHER MOUNTED 48” A.F.F.
TO CENTERLINE OF HANDLE. SEE DETAIL 1/A502. PATCH SURROUNDING WALLS.
FLOOR PLAN KEYNOTES
CEILING PLAN KEYNOTESX
X
FLOOR PLAN LEGEND
4'X8' AC GRADE 3/4" TRADE SIZE FIRE RATED PLYWOOD BACKBOARD PAINTED HIGH GLOSS WHITE WITH (2) COATS OF FIRE RESISTANT PAINT FOR SERVICE PROVIDER /SECURITY/VIDEO/ETC. AROUND PERIMETER WALLS OF TRS AND ENTRANCE ROOMS AS SHOWN. ENSURE THAT FIRE RATING STAMP IS TO REMAIN UNCOVERED BY PAINT.
DEMO CEILING KEYNOTESX
D1. REMOVE EXISTING CEILING GRID TO EXTENT REQUIRED TO COMPLETE WORK SCOPE AND
ACCOMMODATE INSTALLATION OF NEW PARTITIONS. SUPPORT EXISTING CEILING . SALVAGE
CEILING TILES FOR REINSTALLATION. RETURN UNUSED CEILING TILES TO VA FOR STORAGE.
D2. REMOVE EXISTING GYPSUM BOARD CEILING AND FRAMING ABOVE.
D3. REMOVE EXISTING LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS FOR FULL SCOPE OF
WORK RELATED TO ELECTRICAL DEMOLITION AND REWORK.
C1. INSTALL NEW CEILING GRID AND EDGE ANGLE. INSTALL SALVAGED CEILING TILES TO
MATCH EXISTING ADJACENT CONDITIONS. INSTALL NEW CEILING TILES WHERE SALVAGED
TILES DO NOT MATCH.
C2. INFILL CEILING TO MATCH ADJACENT EXISTING CEILING TO REMAIN.
C3. REPOSITION EXISTING LIGHT FIXTURES CENTERED IN ROOM AND WITHIN CEILING GRID.
C4. EXPOSED CEILING.
A
OFFICE
A143
OFFICE
C101
OFFICE
A144
OFFICE
A143
OFFICE
C101
TR
A144
D1 B
D
OFFICE
A143
TR
A144
OFFICE
A143
OFFICE
A144
ARCHITECTURAL - BUILDING 1 - LEVEL 1
- ENLARGED PLANS
DA JM
A-B01-412
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\A -B
-4
.d w g
/3
1/
:3 9:
A
M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% FINAL BID DOCUMENT SUBMISSION
11/28/2023
12-19-23
Bancroft Project No: 21-116
VA REVIEW ONLY - NOT FOR CONSTRUCTION
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
A213 A212
A221A A220
A214
A219
A217 A215
A2-03 A221E A212EA216A A218
A218A A218B A221 DNDN DN
DN UPDNUP
UP
UP UP
A
B
C
D
E
F
1 2 3 4 5 11 13 16 18 19 21 23 25 26 27 286 8 9
11.1
14 15 17
K
L
M
29 30
G
O
Q
S
T
U
V
P
S.2
S.1
Q.1
U.1
V.1
V.2
W.1
X
Y
8.26.36.2 10.19.3 12.111.2
2.1
3.1
4.1
3.8
Z.4
4.7 6.1 8.1 11.7
Z.3
Z.2
24 31 32
N
7 222010 12
18B 20B 22B 24B 24C
H
I
J
R
W
Z.1
A229C
A226
A222FA212A
A222
A211
A203E
A204
A202E
A202A A202A203
A223
A229B
A229E
A225
A226E
A227
B201
A230A A230F
A2
B202
B226E
B211M B230
A2-04
A2-01
A2-05
A2-02
B2-01
B2-02
B211
A228
B216E
B223A B223
B223B
B220B
B2
B218A
B217
B224A
B224
B219
B225
B221A B222
B226
B221B
B221
B231
B231C
B2
A
B231B
B230A
B213
B214
B231D
B2
G
A229
A229A
B212
B215
B210
B210A
B204 B204C
B205
B206 B206F
B208A
B208
B2
B
B208C B209AB209
B2
B
B2
B2
B B204A
B203
C208A
C208B
C208M
C208
C203E
C211E C201F
C204 C207C206
C210 C210A
C211
C203
C212
C213
C214
C202
C2-01 C209
C215
C201A
C201
C201B A232A231 A233
C2-02
A234
A235A
A236
A201
A201A
B216
B2-04
B2-03 B218B215F
A2-E1
A2-E2
A2-E3 A2-E4
A223
A206F
A207 A206D
A206E A206C
A208
A209A
A209
A210
A210A A2-04
A206 A206B
A206A
B226A
A223A
5,6,7&8 A-B01-421
3&4 M-B01-421
1&2
FP-B01-422
A-01-422
1,2,3&4 A-B01-421
1&2
FP-B01-421
1&2 M-B01-421
RATED PARTITION LEGEND
CONTRACTOR IS REQUIRED TO MAINTAIN ALL RATED PARTITIONS.
1 HR FIRE BARRIER
2 HR FIRE BARRIER
SMOKE BARRIER
1 HR FIRE BARRIER (EXISTING)
2 HR FIRE BARRIER (EXISTING)
SMOKE BARRIER (EXISTING)
1. REMOVE AND STORE CEILING TILES IN THIS AREA AS REQUIRED FOR MECHANICAL
DUCTWORK, PIPING, ELECTRICAL CONDUIT, TECHNOLOGY EQUIPMENT AND/OR
SECURITY INSTALLATION. REINSTALL TILES AND GRID WHEN WORK IS COMPLETED.
REPLACE ANY DAMAGED TILES AND GRIDS TO MATCH EXISTING. G.C. SHALL
TEMPORARILY ERECT A SUSPENDED PLASTIC BARRIER 6 MIL AROUND AREA OF
CEILING WORK TO BE PERFORMED DURING ONE SHIFT AND G.C. SHALL REMOVE
SUSPENDED PLASTIC BARRIER AT THE END OF SHIFT. G.C. SHALL MOP CLEAN THIS
AREA OF WORK. PRIOR TO TURNING OVER AREA TO VA. AFTER WORK HOURS WILL
REQUIRE ADDITIONAL COORDINATION WITH THE VA.
A. REFER TO TECHNOLOGY AND ELECTRICAL FOR FULL REQUIRED INSTALLATION
AND DEMOLITION WORK
B. ALL EXISTING LIGHTING, CONDUIT, DUCTWORK, MECHANICAL GRILLS, &
SPRINKLER HEADS TO REMAIN IN EXISTING LOCATIONS AND PROTECTED
UNLESS OTHERWISE NOTED.
C. ANY ELECTRICAL FIXTURES AND DEVICES THAT ARE NOT IDENTIFIED ON THESE
DRAWINGS IN THE AREAS OF CEILING DEMOLITION, ARE TO BE CAREFULLY
REMOVED FROM THE CEILING, PROTECTED, TEMPORARILY HUNG AND THEN
REATTACHED IN THE SAME LOCATIONS AS WHICH THEY WERE FOUND PRIOR TO
DEMOLITION.
D. CONTRACTOR TO CAREFULLY REMOVE SECTIONS OF EXISTING CEILING TILE TO
ALLOW FOR THE INSTALLATION OF ALL REQUIRED CONDUIT AND ELECTRICAL
EQUIPMENT PER CONTRACT DRAWINGS. CONTRACTOR SHALL REINSTALL
CEILING IN EXACT LOCATION. CONTRACTOR TO REPLACE ANY CEILING
GRID/TILES DAMAGED DURING CONSTRUCTION, MATCHING EXISTING. REFER TO
ELECTRICAL SHEETS FOR ADDITIONAL INFORMATION.
E. IF A RATED ASSEMBLY IS NOT INSTALLED BY END OF SHIFT IT MUST BE
PROTECTED OVERNIGHT.
GENERAL DEMOLITION NOTES
CEILING DEMOLITION LEGEND
CEILING DEMOLITION KEY NOTESX
1. REPLACE EXISTING A,B&C TYPE FIRE EXTINGUISHER WITH CLEAN AGENT A,B&C
TYPE FIRE EXTINGUISHER.
2. INSTALL CLEAN AGENT A,B&C TYPE FIRE EXTINGUISHER IN SEMI-RECESSED
CABINET SET IN NEW GYP. BD. ON METAL STUD ASSEMBLY (1-HR RATED)
3. INSTALL CLEAN AGENT A,B&C TYPE FIRE EXTINGUISHER IN SEMI-RECESSED
CABINET IN EXISTING WALL WRAP CABINET IN TYPE 'X' GYPSUM BOARD.
FLOOR PLAN KEY NOTESX
KEYNOTE 11
A. ALL WORK ASSOCIATED WITH TEMPORARY CEILING REMOVAL AND INSTALLATION
OF CABLING SHALL BE CONSIDERED AS NO MORE HAZARDOUS THAN NORMAL
OPERATIONS. INFECTION CONTROL REQUIREMENTS FOR THIS WORK SHALL
INCLUDE "VISQUEEN" TYPE BARRIER AROUND WORK AND/OR INFECTION CONTROL
MODULES WITH VA STATION APPROVAL. CONTRACTOR SHALL ALSO ADHEAR TO
"INFECTION CONTROL REQUIREMENTS BY ALL CLASSES" ON SHEET GI101.
B. AT LOCATION OF ALL CORES THROUGH FLOORS INSTALL RE-ENTERABLE FIRESTOP
ASSEMBLIES.
C. AT LOCATION OF CORES THROUGH RATED PARTITIONS INSTALL RE-ENTERABLE
FIRESTOP ASSEMBLIES (TYP.)
D. CONTRACTOR TO LOCATE EXISTING REINFORCING PRIOR TO CORING FOR
CONDUIT. DO NOT CUT REINFORCEMENT. CORES SHALL HAVE 4" CLEAR MINIMUM
BETWEEN THEM. ADJUST CORE LOCATIONS AS NEEDED. AT LOCATIONS WITH
MORE THAN TWO (2) CORES PASSING THROUGH A C.M.U. WALL, SPACE CORES AT
16" MINIMUM.
GENERAL PLAN NOTES
CEILING LEGEND
ARCHITECTURAL - BUILDING 1 - LEVEL 2
PLAN
DA JM
A-B01-102
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\A -B
-1
.d w g
/6
/2
9:
:1
AM
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% FINAL BID DOCUMENT SUBMISSION
11/28/2023
12-19-23
Bancroft Project No: 21-116
VA REVIEW ONLY - NOT FOR CONSTRUCTION
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
A223A A233
C212
A234
B226A
A235
C208A
MATERIAL DESCRIPTION MATERIAL LOCATION
9” x 9” Various Color Floor Tile
C7B, C125, C212, A233A, B325A, A554, A601, A601B, A618A
12” x 12” Brown Floor Tile and Mastic
A234, beneath raised floor
Yellow Sheet Vinyl Flooring
C302
Cement Board Radiator Cabinet Backing
A13, A127A, B119, C125, A232A, A233A, A234, A235, A328, B226A, B325A, C303, A432, B402, C402, A525, C503, A601, A601A, A604, A618
BUILDING 01: ACM & LBP SURVEY
SEE REPORT 8/16/2022 FOR DETAILS
*A233*
*ASSUME SIMILAR CONDITIONS AT THESE LOCATIONS
*A233*
Building 01 - LBP Survey
• Metal window frame in room A235 – tan paint
• Metal window sill in room A328 – brown paint
• Glazing on ceramic wall tile in rooms C208A, A601A, A604B
B. FOR GENERAL INFECTION CONTROL NOTES AND DETAILS REFER TO SHEET GI101.
C. FOR FINISH SCHEDULE REFER TO SHEET AF-601.
D. EXISTING IT/TR/OI&T ROOMS TO REMAIN ACTIVE DURING CONSTRUCTION. G.C. TO PROTECT EQUIPMENT DURING CONSTRUCTION WITH VISQUEEN. CONTRACTOR TO ENSURE CONTINUOUS
OPERATION OF EQUIPMENT.
E. NOT ALL KEY NOTES APPLY TO ALL PLAN SHEETS. G.C. TO APPLY ONLY AS INDICATED PER EACH SHEET.
F. MAINTAIN A 4 ' - 0" CLEAR PATH OF TRAVEL IN THE CORRIDORS AT ALL TIMES.
G. ALL WORK TO BE PERFORMED AS PART OF TR MODIFICATION SHALL BE CONSIDERED AS TYPE IV AND FOLLOW "INFECTION CONTROL PRECAUTIONS FOR CLASS IV" ON SHEET GI101.
H. APPLY FIRE RATED SEALANT TO ALL EXISTING AND NEW PENETRATIONS IN EXISTING WALLS TO MAKE EXISTING WALLS A 1 HR ASSEMBLY. BASIS OF DESIGN FOR 1 HR WALL IS UL 419 ASSEMBLY.
I. ALL EXISTING WALLS WITH TR'S ARE TO BE FULLY PATCHED & PREPPED TO A LIKE NEW APPEARANCE BEFORE RECEIVING NEW PLYWOOD PANELS.
J. IN ALL EXISTING OI&T AND IRM ROOMS TO BE CONVERTED TO TR'S - ALL EXISTING PLYWOOD PANELS TO BE REMOVED A WALLS PATCHED AND PREPPED TO RECEIVE PAINT AND NEW PLYWOOD
PANELS.
RATED PARTITION LEGEND
1. INSTALL TEMPORARY FLAME RESISTANT CONSTRUCTION PANELS WITH DOOR ENTRY. BASIS
OF DESIGN IS EDGE GUARD.
2. SUPPLY AND INSTALL WALK OFF MAT(S). SEE DETAILS ON SHEET GI101.
3. EXISTING HANDRAIL, WALL BASE AND CARPET TO BE MODIFIED TO ACCEPT NEW DOOR.
4. REMOVE EXISTING DOOR, FRAME AND HARDWARE IN ITS ENTIRETY. INFILL WALL WITH
METAL STUDS AND DRYWALL. ALIGN WITH EXISTING WALLS, PATCH, LEVEL AND FINISH TO
MATCH EXISTING WALL FINISH.
5. REMOVE EXISTING DOOR, FRAME AND HARDWARE IN ITS ENTIRETY FOR INSTALLATION OF
NEW DOOR AND FRAME. PORTIONS OF EXISTING WALL TO BE DEMOLISHED TO RECEIVE NEW
LARGER SIZE DOOR AND FRAME ASSEMBLY. PATCH ADJACENT WALLS TO MATCH ADJACENT
CONDITIONS. RELOCATE ALL WALL MOUNTED ITEMS INCLUDING ROOM SIGNAGE, CHAIR
RAILS, CORNER GUARDS AND WALL MOUNTED ADJACENT TO EXISTING CORRIDOR DOOR AND
REINSTALL AT NEW DOOR LOCATION.
6. REMOVE EXISTING DOOR, FRAME AND HARDWARE. PREPARE WALL CONSTRUCTION AT
OPENING FOR NEW FRAME.
7. REMOVE GLASS FROM WINDOW SYSTEM AT THIS LOCATION. PREPARE WINDOW SYSTEM TO
RECEIVE INFILL AS NOTED IN NEW WORK SCOPE.
8. REMOVE EXISTING BASE AND/OR WALL CABINETS, COUNTERTOP, AND…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .