Attachment 1 - 589A5-21-700_Topeka EHRM__SOWV3.docx

DOCX document 17 KB Posted

Attached to
Y1DA--589A5-21-700 EHRM INFRASTRUCTURE UPGRADES (VA-24-00076324) Topeka, KS
Solicitation number
36C77624B0026_1
Issued by

About this file

This document is a Statement of Work (SOW) for a construction project to upgrade the infrastructure at the Colmery-O'Neil VA Medical Center in Topeka, Kansas. The project involves constructing a new 6,020 SF data center, renovating approximately 6,856 SF of existing space across multiple buildings, and replacing all data cables throughout the hospital campus. The work includes general construction, abatement, alterations, concrete, HVAC, electrical, and other associated tasks. The period of performance is 486 days. The contractor shall be responsible for meeting all fire, safety, and VA standards. All products, materials, and utility outages must be coordinated with the Contracting Officer's Representative (COR). No Security Accreditation Package is required. This project is part of Solicitation #36C77624B0026_1 issued by the Department of Veterans Affairs Technology Acquisition Center Austin.

View the file

Other files

File Type Posted
36C77624B0026 0007.docx DOCX document
36C77624B0026 0006.docx DOCX document
Government Answers to Contractor questions.docx DOCX document
Add Spec Section 23 21 13 Attachment A.pdf PDF
Revised Vol3 Drawing_M503.pdf PDF
Revised Spec Section 23 21 13.pdf PDF
36C77624B0026 0005.docx DOCX document
Pages from Addendum1_Vol2_2of2__20241209.pdf PDF
Colmery-ONeil VA Medical Center - Asbestos and Lead Survey Report signed.pdf PDF
Submittal 024 Pipe - Valve- Fittings 8-8-17.pdf PDF
589A5-21-700_TOPEKA_EHRM_SURVEY LOCATIONS-Markup.pdf PDF
Pages from Addendum1_Vol2_1of2__20241209.pdf PDF
EHRM Contractor Parking and Laydown.pdf PDF
Addendum1_Specifications_20241209.pdf PDF
Addendum1_Vol3_2of3_20241209.pdf PDF
230415-000 Topeka VA Geotech Final Report_S.pdf PDF
Addendum1_Vol3_1of3_20241209.pdf PDF
Addendum1_Vol3_3of3_20241209.pdf PDF
36C77624B0026 0004.docx DOCX document
589A5-21-700_Topeka KS_EHRM_Tech Q1_20241210.docx DOCX document
589A5-21-700_Topeka EHRM_IFB_BOD_Blast.pdf PDF
589A5-21-700_19550421_Steam Distro Plot Plan.pdf PDF
Submittal 023B Perma Pipe Fittings 8-21-17.pdf PDF
589A5-21-700_Topeka KS_EHRM_Tech Q2_20241210.docx DOCX document
Addendum1_Vol1_20241209.pdf PDF
36C77624B0026 0003.docx DOCX document
36C77624B0026 0002.docx DOCX document
S04_Site Visit Sign-in Sheet_Topeka KS.pdf PDF
S06- 36C77624B0026 0001.docx DOCX document
Attachment 16 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 3_1.pdf PDF
Attachment 15 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2-8.pdf PDF
Attachment 10 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 91-129.pdf PDF
Attachment 3 - DB Wage Determination Topeka-KS.pdf PDF
Attachment 8 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 3_1-90.pdf PDF
Attachment 4 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_118-180.pdf PDF
Attachment 11 -589A5-21-700_Topeka EHRM_IFBR2_Spec-VOL1_032224.pdf PDF
Attachment 5 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_181-240.pdf PDF
Attachment 14 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 1_134-204.pdf PDF
Attachment 13 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 1_1-18.pdf PDF
Attachment 9 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 3-2.pdf PDF
Attachment 12 -589A5-21-700_Topeka EHRM_IFBR2_Spec-VOL2_032224.pdf PDF
Attachment 20 -Site Visit Instructions.docx DOCX document
Attachment 19 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_111-117.pdf PDF
Attachment 6 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_241-281.pdf PDF
Attachment 18 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_1-110.pdf PDF
36C77624B0026_1.docx DOCX document
Attachment 2- Limitations on Subcontracting - Construction.docx DOCX document
Attachment 7 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2-7.pdf PDF
Attachment 17 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 1_19-133.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Project No. 589A5-21-700 EHRM Infrastructure Upgrades

STATEMENT OF WORK

COLMERY-O’NEIL VA MEDICAL CENTER, TOPEKA, KANSAS

Project 589A5-21-700, 23 April 2024

I. SCOPE:

This specification herein describes a construction project SOW. The contractor shall construct a new data center, renovate existing space in specified areas of buildings 40, 42, 43, 44, 45, 48, 49, 50, 51, 53, 54, 55, 56, 57, and 58 and replace all data cables across the hospital campus.

2. STATEMENT OF WORK:

As provided in the contract documents this project will engage a Contractor to furnish all labor, tools, material, equipment, and supervision to construct a new approximately 6,020 SF Data Center and renovate approximately 6,856 SF of existing building space across the campus. Work includes general construction, abatement, alterations, necessary removal of existing structures and construction, concrete (buildings only), steel, plumbing, HVAC, electrical, millwork, permanently mounted equipment, interior finishes, and certain other items.

All project work shall be installed in accordance with all applicable standards available at time of installation to include published commercial specifications as well as standards and preferences expressed in this document. All installation details shall be fully coordinated with VA CO and on-site Contracting Officer’s Representative (COR). Period of Performance for all work is 486 days.

The C&A requirements do not apply, and that a Security Accreditation Package is not required.

Exceptions:

Contractor shall be responsible for meeting all fire, safety and VA standards as specified in Statement of Work, Drawings, and Specifications. All testing shall be provided to COR in digital and paper copies. All products shall be submitted on to COR and examples displayed prior to installation. Materials shall be onsite prior to starting the portion of the work. All utility outages shall be coordinated well in advance with the COR before notification time begins. Utility outages shall be reflected on the contractor’s construction schedule.