This is a Questions and Answers document for an EHRM Infrastructure Upgrades project at the VA facility in Topeka, KS. The document addresses four key technical clarifications: 1) Requirements for temporary LC to LC multi-mode armored fiber installation between the current and new MCR, with routing distance approximately 480 feet plus elevation changes, 2) Confirmation that cable trays can be filled to the EHRM standard of 40%, 3) Clarification that the 5-year warranty period for fire alarm testing and maintenance applies only to Building 19, and 4) Specifications regarding CAT5e cabling requirements, confirming that OIT guidelines require CAT5e and variances will not be approved, with high pair counts to be achieved through multiple 25-pair cables rather than single large pair count cables.

View the file

Other files

File Type Posted
36C77624B0026 0007.docx DOCX document
36C77624B0026 0006.docx DOCX document
Add Spec Section 23 21 13 Attachment A.pdf PDF
Revised Vol3 Drawing_M503.pdf PDF
Revised Spec Section 23 21 13.pdf PDF
36C77624B0026 0005.docx DOCX document
Pages from Addendum1_Vol2_2of2__20241209.pdf PDF
Colmery-ONeil VA Medical Center - Asbestos and Lead Survey Report signed.pdf PDF
Submittal 024 Pipe - Valve- Fittings 8-8-17.pdf PDF
589A5-21-700_TOPEKA_EHRM_SURVEY LOCATIONS-Markup.pdf PDF
Pages from Addendum1_Vol2_1of2__20241209.pdf PDF
EHRM Contractor Parking and Laydown.pdf PDF
Addendum1_Specifications_20241209.pdf PDF
Addendum1_Vol3_2of3_20241209.pdf PDF
230415-000 Topeka VA Geotech Final Report_S.pdf PDF
Addendum1_Vol3_1of3_20241209.pdf PDF
Addendum1_Vol3_3of3_20241209.pdf PDF
36C77624B0026 0004.docx DOCX document
589A5-21-700_Topeka KS_EHRM_Tech Q1_20241210.docx DOCX document
589A5-21-700_Topeka EHRM_IFB_BOD_Blast.pdf PDF
589A5-21-700_19550421_Steam Distro Plot Plan.pdf PDF
Submittal 023B Perma Pipe Fittings 8-21-17.pdf PDF
589A5-21-700_Topeka KS_EHRM_Tech Q2_20241210.docx DOCX document
Addendum1_Vol1_20241209.pdf PDF
36C77624B0026 0003.docx DOCX document
36C77624B0026 0002.docx DOCX document
S04_Site Visit Sign-in Sheet_Topeka KS.pdf PDF
S06- 36C77624B0026 0001.docx DOCX document
Attachment 1 - 589A5-21-700_Topeka EHRM__SOWV3.docx DOCX document
Attachment 16 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 3_1.pdf PDF
Attachment 15 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2-8.pdf PDF
Attachment 10 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 91-129.pdf PDF
Attachment 3 - DB Wage Determination Topeka-KS.pdf PDF
Attachment 8 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 3_1-90.pdf PDF
Attachment 4 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_118-180.pdf PDF
Attachment 11 -589A5-21-700_Topeka EHRM_IFBR2_Spec-VOL1_032224.pdf PDF
Attachment 5 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_181-240.pdf PDF
Attachment 14 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 1_134-204.pdf PDF
Attachment 13 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 1_1-18.pdf PDF
Attachment 9 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 3-2.pdf PDF
Attachment 12 -589A5-21-700_Topeka EHRM_IFBR2_Spec-VOL2_032224.pdf PDF
Attachment 20 -Site Visit Instructions.docx DOCX document
Attachment 19 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_111-117.pdf PDF
Attachment 6 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_241-281.pdf PDF
Attachment 18 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_1-110.pdf PDF
36C77624B0026_1.docx DOCX document
Attachment 2- Limitations on Subcontracting - Construction.docx DOCX document
Attachment 7 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2-7.pdf PDF
Attachment 17 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 1_19-133.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Government Answers to Contractor questions

1. Q&A Q2 173 states that the contractor is to provide temporary LC to LC multi-mode Fiber from the current MCR to new MCR to relocate the Existing Switches to building 19. Provide the quantity and type of fiber is needed and confirm that supporting this temporary fiber is means and methods.

Response: Armored LC to LC multi-mode Fiber. Length will depend upon final routing. Current serve is on the second floor of main hospital (Building 1). Potential routing down to pipe basement and then through the steam tunnels or above ceiling in the corridor to the new Building 19. Contractor to determine routing of the temporary line. Straight line distance is roughly 480 and then you must add for elevation changes and possible jogs in the line. Contractor to estimate quantity based on project drawings.

2. Q&A Q1 47 - Cable Tray Infill – Confirm the cable trays can be filled to the EHRM standard of 40%. If only 20% is allowed this will require multiple cable trays in the Steam / Tunnel and many of the corridors.

Response: Confirmed

3. Division 28 – Fire Detection & Alarm 283100:

In specifications 28 31 00 -6 it calls for a 5-year guaranty period services that includes annual testing and maintenance. We typically see this on a fire alarm replacement project not an EHRM project. Is the intent to provide testing and maintenance on the new devices in building 19 for 5 years or the entire hospital? If we are going to provide testing and maintenance on the entire hospital, we would need a matrix or test report showing the number of devices that need to be tested.

Response: The 5-year guaranty period only applies to building 19.

4. Division 27 – Telecom:

• Copper riser diagrams TT-600-001 thru 003. These drawing specify using CAT5E ARMM cables in various different pair counts. Industry does not make an ARMM cable that is CAT5e in high pair counts. Does the VA prefer to use ARMM CAT 3 cables which are available in pair counts larger than 25 pair? Or utilize multiple indoor/outdoor rated 25 pair CAT5e cables?

• Copper riser diagrams TT-600-001 thru 003. These drawing specify using CAT5E OSP/PE89 cables in various different pair counts. Industry does not make a OSP/PE89 cable that is CAT5e in high pair counts. Does the VA prefer to use OSP/PE89 CAT 3 cables which are available in pair counts larger than 25 pair? Or utilize multiple indoor/outdoor rated 25 pair CAT5e cables?

“What is listed on the copper one-lines is a total pair count not an actual cable size. These could have been listed differently, for example, 375-pr Cat 5e as (15) 25-pr Cat 5e. Same pair counts, listed different ways. OIT guidelines call for Cat 5e and variances will not be approved.”

File details come from the government source that posted it. Updated .