Colmery-ONeil VA Medical Center - Asbestos and Lead Survey Report signed.pdf

PDF 20 MB Posted

Attached to
Y1DA--589A5-21-700 EHRM INFRASTRUCTURE UPGRADES (VA-24-00076324) Topeka, KS
Solicitation number
36C77624B0026_1
Issued by

About this file

This is an Asbestos and Lead Survey Report for the Colmery-O'Neil VA Medical Center, which appears to be related to the EHRM Infrastructure Upgrades project in Topeka, Kansas. Based on the file name and its connection to a solicitation for infrastructure upgrades, this document likely contains environmental testing results that bidders would need to consider when preparing proposals for work at the facility. Without access to the actual contents of the survey report, I cannot provide specific details about the asbestos and lead findings or recommendations contained within the document.

View the file

Other files

File Type Posted
36C77624B0026 0007.docx DOCX document
36C77624B0026 0006.docx DOCX document
Government Answers to Contractor questions.docx DOCX document
Add Spec Section 23 21 13 Attachment A.pdf PDF
Revised Vol3 Drawing_M503.pdf PDF
Revised Spec Section 23 21 13.pdf PDF
36C77624B0026 0005.docx DOCX document
Pages from Addendum1_Vol2_2of2__20241209.pdf PDF
Submittal 024 Pipe - Valve- Fittings 8-8-17.pdf PDF
589A5-21-700_TOPEKA_EHRM_SURVEY LOCATIONS-Markup.pdf PDF
Pages from Addendum1_Vol2_1of2__20241209.pdf PDF
EHRM Contractor Parking and Laydown.pdf PDF
Addendum1_Specifications_20241209.pdf PDF
Addendum1_Vol3_2of3_20241209.pdf PDF
230415-000 Topeka VA Geotech Final Report_S.pdf PDF
Addendum1_Vol3_1of3_20241209.pdf PDF
Addendum1_Vol3_3of3_20241209.pdf PDF
36C77624B0026 0004.docx DOCX document
589A5-21-700_Topeka KS_EHRM_Tech Q1_20241210.docx DOCX document
589A5-21-700_Topeka EHRM_IFB_BOD_Blast.pdf PDF
589A5-21-700_19550421_Steam Distro Plot Plan.pdf PDF
Submittal 023B Perma Pipe Fittings 8-21-17.pdf PDF
589A5-21-700_Topeka KS_EHRM_Tech Q2_20241210.docx DOCX document
Addendum1_Vol1_20241209.pdf PDF
36C77624B0026 0003.docx DOCX document
36C77624B0026 0002.docx DOCX document
S04_Site Visit Sign-in Sheet_Topeka KS.pdf PDF
S06- 36C77624B0026 0001.docx DOCX document
Attachment 1 - 589A5-21-700_Topeka EHRM__SOWV3.docx DOCX document
Attachment 16 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 3_1.pdf PDF
Attachment 15 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2-8.pdf PDF
Attachment 10 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 91-129.pdf PDF
Attachment 3 - DB Wage Determination Topeka-KS.pdf PDF
Attachment 8 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 3_1-90.pdf PDF
Attachment 4 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_118-180.pdf PDF
Attachment 11 -589A5-21-700_Topeka EHRM_IFBR2_Spec-VOL1_032224.pdf PDF
Attachment 5 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_181-240.pdf PDF
Attachment 14 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 1_134-204.pdf PDF
Attachment 13 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 1_1-18.pdf PDF
Attachment 9 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 3-2.pdf PDF
Attachment 12 -589A5-21-700_Topeka EHRM_IFBR2_Spec-VOL2_032224.pdf PDF
Attachment 20 -Site Visit Instructions.docx DOCX document
Attachment 19 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_111-117.pdf PDF
Attachment 6 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_241-281.pdf PDF
Attachment 18 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2_1-110.pdf PDF
36C77624B0026_1.docx DOCX document
Attachment 2- Limitations on Subcontracting - Construction.docx DOCX document
Attachment 7 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2-7.pdf PDF
Attachment 17 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 1_19-133.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Asbestos and Lead Paint Survey

Report

Colmery-O’Neil VA Medical Center

2200 SW Gage Boulevard

Topeka, Kansas 66622

EHRM Infrastructure Upgrades Design

VA Project 589A5-21-700

Bancroft AE Project 21-116

August 16, 2022

Terracon Project No. 02227177

Prepared for:

Bancroft Architects + Engineers Northbrook, Illinois

Prepared by:

Terracon Consultants, Inc.

Lenexa, Kansas

Terracon Consultants, Inc. 15620 W 113 th Street Lenexa, KS 66219

P 913-492-7777 F 913-492-7443 terracon.com

Bancroft Architects + Engineers

3300 Dundee Road

Northbrook, IL 60062

Attn: Vince Bertucci, RA

Project Manager – Registered Architect

O: 847-952-9362

D: 224-875-6872

C: 312-451-5103

E: vbertucci@bancroft-ae.com

RE: Hazardous Materials Consulting Serivices

EHRM Infrastructure Upgrades Design

Colmery-O’Neil VA Medical Center

2200 SW Gage Boulevard

Topeka, KS 66622

VA Project 589A5-21-700

Bancroft AE Project 21-116

Dear Mr. Bertucci:

Terracon Consultants, Inc. (Terracon) is pleased to submit the attached report for the above referenced site to Bancroft Architects + Engineers. The purpose of this report is to present the results of an asbestos and lead paint survey conducted on June 27 to July 14, 2022. This survey was conducted in general accordance with our Proposal No. P02227177, dated May 26, 2022.

Building 1

Asbestos was identified at a concentration of greater than one percent in samples collected from the following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

9” x 9” Various Color Floor Tile

C7B, C125, C212, A233A, B325A, A554, A601, A601B, A618A

Category I Nonfriable

1,200 square feet

12” x 12” Brown Floor Tile and Mastic

A234, beneath raised floor Category I Nonfriable

1,100 square feet

Yellow Sheet Vinyl Flooring

C302 RACM 16 square foot

Asbestos and Lead Paint Survey Report Colmery-O’Neil VA Medical Center ■ Topeka, Kansas August 16, 2022 ■ Terracon Project No. 02227177

Responsive ■ Resourceful ■ Reliable i

The following materials are assumed to be asbestos containing.

Material Description Material Location

NESHAP

Category

Estimated Quantity

Cement Board Radiator Cabinet Backing

A13, A127A, B119, C125, A232A, A233A, A234, A235, A328, B226A, B325A, C303, A432, B402, C402, A525, C503, A601, A601A, A604, A618

Category II Nonfriable

324 square feet

Building 2

Material Description Material Location

NESHAP

Category

Estimated Quantity

Cement Board Radiator Cabinet Backing

B110B, C148, C236 Category II

60 square feet

Asbestos was detected at less than 1% in samples collected from the following materials.

NESHAP

Category

Estimated Quantity

Mastic Beneath 12” x 12” Off-white Mottle Floor Tile

C236 Category I

150 square feet

Building 3 following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

Black Mastic on Concrete Beneath Gray/White Sheet Vinyl Flooring

B126A Category I

288 square feet

NESHAP

Category

Estimated Quantity

Cement Board Radiator Cabinet Backing

B15A, C23A, B126A, C130B Category II

NESHAP

Category

Estimated Quantity

Tar Coating on Concrete Wall

C230A Category I

Building 4 following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

Mastic Beneath 12” x 12” Tan Floor Tile

C21 Category I

144 square feet

NESHAP

Category

Estimated Quantity

Cement Board Radiator Cabinet Backing

B130, B230A, C242A Category II

36 square feet

Building 5 following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

9” x 9” Brown/Orange Floor Tile

B206 Category I Nonfriable

6 square feet

Mastic Beneath 12” x 12” White Floor Tile

B206 Category I

255 square feet

NESHAP

Category

Estimated Quantity

Cement Board Radiator Cabinet Backing

B206 Category II

12 square feet

Building 6 following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

9” x 9” Brown/Tan Floor Tile

B110 Category I

117 square feet

NESHAP

Category

Estimated Quantity

Cement Board Radiator Cabinet Backing

B110 Category II

Building 20 following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

White Paper Tape on Fiberglass Duct

Insulation 104A, Above Ceiling on Ductwork RACM 180 square feet

12” X 12” Off- White/Brown Floor Tile, Mastic Non-Detect 104A

Category I

400 square feet

NESHAP

Category

Estimated Quantity

Cream Colored Plaster 104A Walls Category II

880 square feet

Building 23 following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

Mudded Joint Packing (MJP) on Fiberglass Pipe

Insulation 103, Above Closet RACM 5 MJPs

9” X 9” Tan Floor Tile 103, Beneath Carpet Category I

132 square feet

Building 24 following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

9” X 9” Tan Floor Tile, Mastic Non-Detect

A112H, A121 Category I Nonfriable

360 square feet

Mastic Beneath 12” x 12” Tan Mottle Floor Tile

A103, B106C Category I Nonfriable

135 square feet

Pegboard Cement Wall Panel

A112H, South and East Walls Category II

170 square feet

NESHAP

Category

Estimated Quantity

Cement Board Radiator Cabinet Backing

A103, A121 Category II

24 square feet

Building 25

Material Description Material Location

NESHAP

Category

Estimated Quantity

Mastic Beneath Carpet 105C Category I

Building 41 following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

Mudded Joint Packing (MJP) on Fiberglass Pipe

Insulation 109A RACM 8 MJPs

Building 42 following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

Mastic Beneath 12” x 12” Tan Floor Tile

105A Category I

10 square feet

Building 51 following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

Window Glazing 100 Category II

50 linear feet

Lead based paint (LBP) as defined by the United States Environmental Protection Agency

(USEPA), and the State of Kansas, was identified in samples collected from the following surfaces.

• Metal window frame in room A235 – tan paint

• Metal window sill in room A328 – brown paint

• Glazing on ceramic wall tile in rooms C208A, A601A, A604B and A618B – brown glazing

• Glazing on concrete wall blocks in room C303 – blue glazing

• Glazing on ceramic wall tile in rooms B15A and C23 – gray glazing

• Metal fire sprinkler pipe in room 114B – tan paint

• Metal window frame in room A105C – blue paint

• Metal door jamb in room A105C - blue paint

Building 40

• Wood door in room 201 – purple paint

• Structural steel beams in room 109A – tan paint

Building 45

• Structural steel ceiling bar joists in room 100 – red paint

Building 49

• Structural steel ceiling bar joists in room 001 – red/silver paint

Pipe Tunnels

• Structural steel pipe supports – gray paint

Please refer to attached report for detailed information.

Terracon appreciates the opportunity to provide this service to Bancroft Architects + Engineers. If you have any questions regarding this report please contact the undersigned at 913-492-7777.

Sincerely, Terracon Consultants, Inc.

Timothy Easley Mitch Reiber, PG, CIH Environmental Technician Principal

Mitch Reiber https://na3.documents.adobe.com/verifier?tx=CBJCHBCAABAAElZj3BphOfxx_526eH6c9EhJu1U8oSUE https://na3.documents.adobe.com/verifier?tx=CBJCHBCAABAAElZj3BphOfxx_526eH6c9EhJu1U8oSUE https://na3.documents.adobe.com/verifier?tx=CBJCHBCAABAAHFklkOQu4wGpsh8stYpe5cPZG7TjZEFJ

Responsive ■ Resourceful ■ Reliable ii

TABLE OF CONTENTS

1.0 INTRODUCTION

2.0 BUILDING DESCRIPTION

3.0 ASBESTOS-CONTAINING MATERIAL SURVEY

3.1 Visual Assessment

3.2 Physical Assessment

3.3 Sample Collection

3.4 Sample Analysis

3.5 Regulatory Overview

3.6 Findings

4.0 LEAD-BASED PAINT SURVEY ................................................................ .…….. 8

4.1 Visual Assessment and Sampling

4.2 Sample Analysis

4.3 Lead Paint Regulatory Overview

4.4 Findings

5.0 GENERAL COMMENTS

APPENDICES

APPENDIX A ASBESTOS CONTAINING MATERIALS BY HOMOGENEOUS AREA

APPENDIX B ASBESTOS SURVEY SAMPLE LOCATION SUMMARY

APPENDIX C ASBESTOS ANALYTICAL LABORATORY DATA

APPENDIX D XRF PAINT TEST RESULTS

APPENDIX E LEAD ANALYTICAL LABORATORY DATA

APPENDIX F CERTIFICATIONS/LICENSES

Responsive ■ Resourceful ■ Reliable 1

ASBESTOS AND LEAD PAINT SURVEY REPORT

Colmery-O’Neil VA Medical Center 2200 SW Gage Boulevard

Topeka, Kansas

1.0 INTRODUCTION

Terracon Consultants Inc. (Terracon) conducted an asbestos and lead paint survey of the

Colmery-O’Neil VA Medical Center in Topeka, Kansas. The survey was conducted by an AHERA accredited Asbestos Inspector and State of Kansas certified Lead Inspector in general accordance with our Proposal No. P02227177 dated May 26, 2022.

The project is part of the Electronic Health Records Modernization (EHRM) program being initiated by the VA to improve delivery of quality health care to Veterans. The project includes selected interior renovations within thirty-two (32) buildings for approximately ninety (90) new and/or renovated Telecommunication Room (TR) locations and the interior structural reconstruction of the

Main Computer Room (MCR).

Building areas were visually assessed for suspect asbestos-containing materials (ACM) and lead-based paint (LBP). Reasonable effort was made to survey accessible areas. Additional suspect materials could be present walls, in voids or in other concealed areas.

2.0 BUILDING DESCRIPTION

The Colmery-O’Neil VA Medical Center was constructed during the 1950’s. The buildings have concrete floors covered with floor tile or carpet in most areas. Interior walls are hard plaster or drywall in most areas. The buildings have concrete ceiling decks with drop ceiling tiles in most areas.

3.0 ASBESTOS-CONTAINING MATERIAL SURVEY

The survey was conducted by Timothy Easley, AmberLee O’Brien and Blake Harris, United States

Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) accredited asbestos inspectors. The asbestos inspectors’ certifications are attached in Appendix F.

The survey was conducted in general accordance with the sample collection protocols established in U.S. Environmental Protection Agency (EPA) 40 CFR Part 763 Subpart E 763.86, known as the

AHERA. A summary of survey activities is provided below.

Responsive ■ Resourceful ■ Reliable 2

3.1 Visual Assessment

Survey activities were initiated with visual observation of the buildings to identify homogeneous areas of suspect ACM. A homogeneous area (HA) consists of building materials that appear similar throughout in terms of color and texture with consideration given to the date of application. The interior assessment was conducted in visually accessible areas of the buildings.

3.2 Physical Assessment

A physical assessment of each homogeneous area (HA) of suspect ACM was conducted to assess the friability and condition of the materials. A friable material is defined by the EPA as a material that can be crumbled, pulverized or reduced to powder by hand pressure when dry. Friability was assessed by physically touching suspect materials.

3.3 Sample Collection

Based on results of the visual observation, bulk samples of suspect ACM were collected in general accordance with EPA AHERA sampling protocols. Samples of suspect materials were collected from randomly selected locations in each homogeneous area. Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker. The selection of sample locations and frequency of sampling were based on Terracon’s observations and the assumption that like materials in the same area are homogeneous in content.

3.4 Sample Analysis

Bulk samples were submitted under chain of custody to International Asbestos Testing Laboratories of Mount Laurel, New Jersey for analysis by Polarized Light Microscopy (PLM) with dispersion staining techniques per USEPA Method 600/R-93/116. The asbestos content, where applicable, was determined by microscopic visual estimation. International Asbestos Testing Laboratories is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP) Accreditation

No. 101165-0.

3.5 Regulatory Overview

The Kansas Department of Health and Environment’s, (KDHE) Asbestos Control Section within the

Bureau of Air and Radiation, enforces the Asbestos NESAHP as adopted by reference at Kansas

Administrative Regulations (K.A.R.) 28-19-735. The owner or operator must provide KDHE with written notification at least 10 working days prior to the commencement of asbestos abatement activities that will disturb RACM in amounts greater than or equal to 10 square feet or 25 linear feet.

The asbestos NESHAP (40 CFR Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices. The asbestos NESHAP regulation also requires the identification and classification of existing ACM according to friability prior to demolition or

Responsive ■ Resourceful ■ Reliable 3 renovation activity. Friable ACM is a material containing more than 1% asbestos that, when dry, can be crumbled, pulverized or reduced to powder by hand pressure. All friable ACM is considered regulated asbestos containing material (RACM).

The asbestos NESHAP regulation classifies ACM as either RACM, Category I non-friable ACM or

Category II non-friable ACM. RACM includes all friable ACM, along with Category I and Category II non-friable ACM that has become friable, will be or has been subjected to sanding, grinding, cutting or abrading, or ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder during renovation or demolition activity. Category I non-friable ACM are exclusively asbestos-containing packings, gaskets, resilient floor coverings, resilient floor covering mastics and asphalt roofing products that contain more than 1% asbestos. Category II non-friable

ACM are all other non-friable materials other than Category I non-friable ACM that contain more than 1% asbestos. Category II non-friable ACM generally includes but is not limited to cementitious material such as: cement pipes, cement siding, cement panels, glazing, mortar and grouts.

The United States Occupational Safety and Health Administration (USOSHA) asbestos standard for construction (29 CFR 1926.1101) regulates workplace exposure to asbestos. The USOSHA standard requires that employee exposure to airborne asbestos must not exceed 0.1 fibers per cubic centimeter of air (0.1 f/cc) as an eight-hour time weighted average (TWA) and not exceed 1.0 fibers per cubic centimeter of air (1.0 f/cc) over a 30-minute period known as an excursion limit (EL).

The TWA and EL are known as USOSHA’s asbestos permissible exposure limits (PELs). The

USOSHA standard classifies construction and maintenance activities which could disturb ACM and specifies work practices and precautions which employers must follow when engaging in each class of regulated work. The standard also establishes requirements for handling materials containing asbestos in concentrations less than or equal to one percent.

3.6 Findings

following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

9” x 9” Various Color Floor Tile

C7B, C125, C212, A233A, B325A, A554, A601, A601B, A618A

Category I Nonfriable

1,200 square feet

12” x 12” Brown Floor Tile and Mastic

A234, beneath raised floor Category I Nonfriable

1,100 square feet

Yellow Sheet Vinyl Flooring

C302 RACM 16 square foot

Responsive ■ Resourceful ■ Reliable 4

NESHAP

Category

Estimated Quantity

Cement Board Radiator Cabinet Backing

A13, A127A, B119, C125, A232A, A233A, A234, A235, A328, B226A, B325A, C303, A432, B402, C402, A525, C503, A601, A601A, A604, A618

Category II

324 square feet

Material Description Material Location

NESHAP

Category

Estimated Quantity

Cement Board Radiator Cabinet Backing

B110B, C148, C236 Category II

NESHAP

Category

Estimated Quantity

Mastic Beneath 12” x 12” Off-white Mottle Floor Tile

C236 Category I

150 square feet following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

Black Mastic on Concrete Beneath Gray/White Sheet Vinyl Flooring

B126A Category I

288 square feet

NESHAP

Category

Estimated Quantity

Cement Board Radiator Cabinet Backing

B15A, C23A, B126A, C130B Category II

NESHAP

Category

Estimated Quantity

Tar Coating on Concrete Wall

C230A Category I

Responsive ■ Resourceful ■ Reliable 5 following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

Mastic Beneath 12” x 12” Tan Floor Tile

C21 Category I

144 square feet

NESHAP

Category

Estimated Quantity

Cement Board Radiator Cabinet Backing

B130, B230A, C242A Category II

36 square feet following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

9” x 9” Brown/Orange Floor Tile

B206 Category I Nonfriable

6 square feet

Mastic Beneath 12” x 12” White Floor Tile

B206 Category I

255 square feet

NESHAP

Category

Estimated Quantity

Cement Board Radiator Cabinet Backing

B206 Category II following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

9” x 9” Brown/Tan Floor Tile

B110 Category I

117 square feet

NESHAP

Category

Estimated Quantity

Cement Board Radiator Cabinet Backing

B110 Category II

Responsive ■ Resourceful ■ Reliable 6 following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

White Paper Tape on Fiberglass Duct

Insulation 104A, Above Ceiling on Ductwork RACM 180 square feet

12” X 12” Off- White/Brown Floor Tile, Mastic Non-Detect 104A

Category I

400 square feet

NESHAP

Category

Estimated Quantity

Cream Colored Plaster 104A Walls Category II

880 square feet following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

Mudded Joint Packing (MJP) on Fiberglass Pipe

Insulation 103, Above Closet RACM 5 MJPs

9” X 9” Tan Floor Tile 103, Beneath Carpet Category I

132 square feet following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

9” X 9” Tan Floor Tile, Mastic Non-Detect

A112H, A121 Category I Nonfriable

360 square feet

Mastic Beneath 12” x 12” Tan Mottle Floor Tile

A103, B106C Category I Nonfriable

135 square feet

Pegboard Cement Wall Panel

A112H, South and East Walls Category II

NESHAP

Category

Estimated Quantity

Cement Board Radiator Cabinet Backing

A103, A121 Category II

24 square feet

Responsive ■ Resourceful ■ Reliable 7

Material Description Material Location

NESHAP

Category

Estimated Quantity

Mastic Beneath Carpet 105C Category I following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

Mudded Joint Packing (MJP) on Fiberglass Pipe

Insulation 109A RACM 8 MJPs following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

Mastic Beneath 12” x 12” Tan Floor Tile

105A Category I

10 square feet following materials.

Material Description Material Location

NESHAP

Category

Estimated Quantity

Window Glazing 100 Category II

50 linear feet

The above listed RACM must be removed by a state of Kansas licensed abatement contractor prior to any activities (renovation and/or demolition) that may disturb this material in accordance with applicable federal, state and local regulations.

The above listed Category I non-friable ACM that is damaged or could be damaged to the extent that it could be crumbled, pulverized or reduced to powder when dry, making it friable, must be removed prior to any activities (renovation and/or demolition) that may disturb this material in accordance with applicable federal, state and local regulations.

The above listed Category II non-friable ACM that has a high probability of becoming crumbled, pulverized, or reduced to powder when dry, making it friable, must be properly removed prior to any activities (renovation and/or demolition) that may disturb this material in accordance with applicable federal, state and local regulations. USEPA believes that most demolition activities will subject Category II non-friable ACM to the asbestos NESHAP regulation.

Responsive ■ Resourceful ■ Reliable 8

Materials containing 1% or less asbestos are not regulated by NESHAP or AHERA; however, OSHA has requirements for protection of employees when materials containing any concentration of asbestos are disturbed. The renovation/demolition contractor must make appropriate decisions concerning compliance issues with applicable OSHA regulations.

Materials containing asbestos by homogenous material are presented in Appendix A. The summary of sample locations is presented in Appendix B. Laboratory analytical reports are included in

Appendix C.

4.0 LEAD-BASED PAINT SURVEY

Mr. Timothy Easley, a State of Kansas licensed Lead Inspector, conducted lead-based paint (LBP) testing using an Innov-X systems, Alpha series model LBP – 4000, serial No. 11926, X-Ray

Fluorescence (XRF) instrument to determine if surface coatings contain lead.

A copy of the inspector’s certificate is included in Appendix F.

4.1 Visual Assessment and Sampling

The lead-based paint inspection began by visually surveying accessible building components such as walls, ceilings, floors, doors, and windows. Various paint colors were found on building surfaces.

These components will be disturbed during demolition activities.

A total of 753 XRF measurements were taken from testing combinations associated with the various components listed above. Lead concentrations using an XRF are measured in milligrams per square centimeter (mg/cm2) of surface area.

Paint chip samples were collected from representative accessible surfaces to verify XRF testing results.

4.2 Sample Analysis

An Innov-X System Alpha Series X-Ray Fluorescence Spectrometer analyzed the surface coating for lead content. The instrument was used in accordance with guidelines detailed in the manufacturer’s Standard Operating Procedures. Calibration checks were performed prior to and after sampling, using protocols provided by the instrument manufacturer.

Paint chip samples collected were sent with chain of custody to QuanTEM Labs in Oklahoma

City, Oklahoma for analysis by Flame Atomic Absorption Method SW 846-7000B.

Responsive ■ Resourceful ■ Reliable 9

4.3 Lead Paint Regulatory Overview

The USEPA and the KDHE currently regulate Lead Based Paint, paint containing a lead content of 1.0 mg/cm2 or 0.5% or greater of lead by weight, in “child occupied” and “targeted housing”.

There are currently no USEPA or KDHE regulations regarding commercial/industrial facilities.

The USEPA and KDHE do regulate the disposal of lead containing materials, but only if the lead paint has been abated and is specifically disposed of as lead paint. General renovation debris and demolition debris can currently be disposed of as Construction and Demolition (C&D) debris in the State of Kansas as long as the landfill accepts these materials.

The USOSHA 29 CFR 1926.62 has established permissible limits for airborne lead concentrations in the workplace. Owners or employers conducting renovation or demolition activities which may disturb building materials containing lead (in any concentration) are required to protect their employees from airborne lead exposures exceeding the USOSHA permissible exposure limit

(PEL).

USOSHA has established an “Action Level” for lead concentrations “in air” of 30 micrograms per cubic meter of air (µg/m3) and a “Permissible Exposure Limit” for lead concentrations “in air” of

50 µg/m3. Currently USOSHA has no established limits for lead content in bulk paint (non-airborne).

Their interpretation on this issue is that any amount of lead may cause airborne concentrations above the established limits.

4.4 Findings

Lead based paint (LBP) is defined by the USEPA and the State of Kansas as any paint or surface coating that contains 1.0 mg/cm2 or greater of lead by XRF testing or 0.5% or greater of lead by weight by laboratory analysis of paint chip samples, in “child occupied” and “targeted housing” and the USOSHA has indicated that owners or employers conducting renovation or demolition activities which may disturb building materials containing lead (in any concentration) are required to protect their employees from airborne lead exposures exceeding the USOSHA PEL.

Lead based paint (LBP) as defined by the United States Environmental Protection Agency

(USEPA), and the State of Kansas, was identified in samples collected from the following surfaces.

• Metal window frame in room A235 – tan paint

• Metal window sill in room A328 – brown paint

• Glazing on ceramic wall tile in rooms C208A, A601A, A604B and A618B – brown glazing, green glazing

• Glazing on concrete wall blocks in room C303 – blue glazing

Responsive ■ Resourceful ■ Reliable 10

• Glazing on ceramic wall tile in rooms B15A and C23 – gray glazing

• Metal fire sprinkler pipe in room 114B – tan paint

• Metal window frame in room A105C – blue paint

• Metal door jamb in room A105C - blue paint

• Wood door in room 201 – purple paint

• Structural steel beams in room 109A – tan paint

Building 45

• Structural steel ceiling bar joists in room 100 – red paint

Building 49

• Structural steel ceiling bar joists in room 001 – red/silver paint

Pipe Tunnels

• Structural steel pipe supports – gray paint

The following surfaces tested were found to be at 1.0 mg/cm2 lead as measured by an XRF instrument. Follow up paint chip testing and analysis of the below listed components found that the below listed paints do not contain lead at or above 0.5% lead by weight by laboratory analysis.

• Hard plaster wall paint in room C503 – tan paint

• Hard plaster wall paint in room A130C – white paint

Building 9

• Hard plaster wall paint in room A119 – white paint

Anomalies, though rare, can occur with X-Ray Fluorescence Spectrometer paint testing, potentially giving false positive or negative results due to substrate interferences. Paint chip sampling with laboratory analysis by Flame Atomic Absorption Method SW 846-7000B is

Responsive ■ Resourceful ■ Reliable 11 considered more definitive.

While the painted surfaces containing lead in concentrations less than 1.0 mg/cm2 by XRF testing or less than 0.5% by weight for paint chip sampling, do not meet the definition of lead-based paint under Housing and Urban Development (HUD), USEPA or the State of Kansas, the paint is considered Lead containing paint as defined by the United States Occupational Safety and

Health Administration (USOSHA), and is subject to exposure limits under USOSHA. Therefore, it is the contractor`s responsibility to make appropriate decisions concerning compliance with applicable USOSHA regulations.

The USOSHA hazard communication requirement states that when hazardous materials (lead, asbestos, etc.) are present, employers who have employees that may disturb the hazardous materials, employers must inform their employees of the presence of such materials.

Appendix D includes XRF Paint Test Results. Appendix E includes Lead Paint Laboratory Analytical

Data.

5.0 GENERAL COMMENTS

Terracon did not perform sampling that required demolition or destructive activities such as knocking holes in walls, dismantling of equipment or removal of protective coverings. Reasonable efforts to access suspect materials within known areas of restricted access (e.g., crawl spaces) were made; however, confined spaces or areas which may pose a health or safety risk to Terracon personnel were not sampled. Sampling did not include suspect materials that could not be safely reached with available ladders/man-lifts.

This survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions and recommendations expressed in this report are based on conditions observed during Terracon’s survey of the building. The information contained in this report is relevant to the date on which this survey was performed and should not be relied upon to represent conditions at a later date. This report has been prepared on behalf of and exclusively for use by Bancroft Architects + Engineers and is not a bidding document. Contractors or consultants reviewing this report must draw their own conclusions regarding further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories or other third parties supplying information that may have been used in the preparation of this report.

No warranty, express or implied is made.

APPENDIX A

2200 SW Gage Boulevard Topeka, Kansas

IDENTIFIED ASBESTOS CONTAINING MATERIALS BY HOMOGENEOUS AREA (HA)

HA No. Material Description Material Location % and Type

Asbestos*

NESHAP

Classification Condition

Estimated

Quantity**

9” x 9” Various Color Floor

Tile and Mastic C7B, C125, C212, A233A, B325A, A554, A601, A601B, A618A

Floor Tile – PC

6.7% Chrysotile

Category I

Nonfriable Good

1,200 square feet

12” x 12” Off-white

(brown) Floor Tile and Mastic

A234, beneath raised floor

Floor Tile – PC

1.2% Chrysotile

Black Mastic – PC

1.2% Chrysotile

Category I

Nonfriable Good

1,100 square feet

Yellow Sheet Vinyl

Flooring C302 20% Chrysotile RACM Good

16 square feet

Cement Board Radiator

Cabinet Backing

A13, A127A, B119, C125, A232A, A233A, A234, A235, A328, B226A, B325A, C303, A432, B402, C402, A525, C503, A601, A601A, A604, A618

Assumed ACM Category II

Nonfriable Good

324 square feet

% and Type

Asbestos*

NESHAP

Classification Condition

Estimated

Quantity**

Cement Board Radiator

Cabinet Backing B110B, C148, C236 Assumed ACM

Category II

Nonfriable Good

60 square

% and Type

Asbestos*

NESHAP

Classification Condition

Estimated

Quantity**

Black Mastic on Concrete

Beneath Gray/White Sheet Vinyl Flooring

B126A

Black Mastic –

PC 2.2%

Chrysotile

Category I

Nonfriable

Good 288 square

% and Type

Asbestos*

NESHAP

Classification Condition

Estimated

Quantity**

Cement Board Radiator

Cabinet Backing B15A, C23A, B126A, C130B Assumed ACM

Category II

Nonfriable Good

60 square

% and Type

Asbestos*

NESHAP

Classification Condition

Estimated

Quantity**

Mastic Beneath 12” x 12”

Tan Floor Tile C21

Black Mastic –

PC 1.3%

Chrysotile

Category I

Nonfriable

Good 144 square feet

Cement Board Radiator

Cabinet Backing B130, B230A, C242A Assumed ACM

Category II

Nonfriable Good

36 square

% and Type

Asbestos*

NESHAP

Classification Condition

Estimated

Quantity**

9” x 9” Brown/Orange

Floor Tile B206

Floor Tile – PC

1.8% Chrysotile

Category I

Nonfriable

Good 6 square feet

Mastic Beneath 12” x 12”

White Floor Tile B206

Black Mastic –

PC 3.9%

Chrysotile

Category I

Nonfriable

Good 255 square feet

Cement Board Radiator

Cabinet Backing B206 Assumed ACM

Category II

Nonfriable Good

12 square

% and Type

Asbestos*

NESHAP

Classification Condition

Estimated

Quantity**

9” x 9” Brown/Tan Floor

Tile B110

Floor Tile – PC

7.4% Chrysotile

Category I

Nonfriable

Good 117 square feet

Cement Board Radiator

Cabinet Backing B110 Assumed ACM

Category II

Nonfriable Good

12 square

% and Type

Asbestos*

NESHAP

Classification Condition

Estimated

Quantity**

White Paper Tape on

Fiberglass Duct Insulation 104A, Above Ceiling on Ductwork 25% Chrysotile RACM Good

180 square feet

12” x 12” Tan w/ Brown Floor Tile and Mastic

104A Floor Tile – PC

1.8% Chrysotile

Category I

Nonfriable

Good 400 square

% and Type

Asbestos*

NESHAP

Classification Condition

Estimated

Quantity**

Mudded Joint Packing

(MJP) on Fiberglass Pipe Insulation

103, Above Closet

PC 1.8%

Chrysotile

RACM

Good 5 MJPs

05 9” X 9” Tan Floor Tile 103, Beneath Carpet

Floor Tile – PC

6.8% Chrysotile

Black Mastic –

PC 0.25%

Chrysotile

Category I

Nonfriable

Good

132 square

% and Type

Asbestos*

NESHAP

Classification Condition

Estimated

Quantity**

9” X 9” Tan Floor Tile, Mastic Non-Detect A112H, A121

Floor Tile – PC

5.5% Chrysotile

Category I

Nonfriable

Good 360 square feet

Mastic Beneath 12” x 12”

Tan Mottle Floor Tile A103, B106C

Black/Tan

Mastic – PC

1.3% Chrysotile

Category I

Nonfriable

Good 135 square feet

Pegboard Cement Wall

Panel A112H, South and East Walls 25% Chrysotile

Category II

Nonfriable

Good 170 square feet

Cement Board Radiator

Cabinet Backing A103, A121 Assumed ACM

Category II

Nonfriable Good

24 square

% and Type

Asbestos*

NESHAP

Classification Condition

Estimated

Quantity**

Mudded Joint Packing

(MJP) on Fiberglass Pipe Insulation

109A

PC 1.3%

Chrysotile RACM Good 8 MJPs

% and Type

Asbestos*

NESHAP

Classification Condition

Estimated

Quantity**

Mastic Beneath 12” x

12” Tan Floor Tile 105A

Black Mastic –

PC 1.0%

Chrysotile

Category I

Nonfriable

Good 10 square

% and Type

Asbestos*

NESHAP

Classification Condition

Estimated

Quantity**

01 Window Glazing 100

PC 2.0%

Chrysotile

Category II

Nonfriable

Good 50 linear feet

*% & Type Asbestos = this column contains both the analytical result of the sample with the highest concentration of asbestos detected in the samples that make up the HA and the types of asbestos identified.

**Estimated quantities are based on a cursory field evaluation, and actual quantities may vary significantly, especially if asbestos containing materials are present in hidden and/or inaccessible areas not evaluated as part of this survey.

PC-indicates that stratified point count method of analysis was performed.

MATERIALS CONTAINING 1% OR LESS ASBESTOS BY HA

HA No. Material Description Material Location % and Type Asbestos* Condition Estimated Quantity

Mastic Beneath 12” x 12” Off-White Mottle Floor Tile

C236 Black/Tan Mastic – PC

0.5% Chrysotile Good 150 square feet

Estimated Quantity

Tar Coating on Concrete

Wall C230A PC Trace Chrysotile Good 60 square feet

Estimated Quantity

02 Cream Colored Plaster 104A Walls PC 0.25% Chrysotile Good 880 square feet

Estimated Quantity

Black Mastic Beneath

Carpet 105C PC 0.5% Chrysotile Good 170 square feet

*% & Type Asbestos = this column contains both the analytical result of the sample with the highest concentration of asbestos detected in the samples that make up the HA and the types of asbestos identified.

PC-indicates that stratified point count method of analysis was performed.

<1% - Materials containing 1% or less asbestos are not regulated by NESHAP or AHERA. The renovation/demolition contractor must make appropriate decisions concerning compliance issues with applicable OSHA regulations

APPENDIX B

2200 SW Gage Boulevard Topeka, Kansas

ASBESTOS SURVEY SAMPLE LOCATION SUMMARY

HA

No.

Material Description Sample Number

Sample Location Sample Layer Lab Results

Gypsum Wallboard with Joint Compound and Tape

01-WB1-01 Room AC160 SE Corner Light Tan Drywall None Detected

01-WB1-01 Room AC160 SE Corner White Joint Compound None Detected

01-WB1-01 Room AC160 SE Corner Composite None Detected

01-WB1-02 Room C402 Above Door Light Tan Drywall None Detected

01-WB1-02 Room C402 Above Door White Joint Compound None Detected

01-WB1-02 Room C402 Above Door Composite None Detected

01-WB1-03 Room A601B East Side Light Tan Drywall None Detected

01-WB1-03 Room A601B East Side Off-White Joint Compound None Detected

01-WB1-03 Room A601B East Side Composite None Detected

02 Hard Plaster

02-HP1-04 Room B325A Above Drop Ceiling Tan Plaster None Detected

02-HP1-04 Room B325A Above Drop Ceiling White Plaster None Detected

02-HP1-05 Room A328 North Center Tan Plaster None Detected

02-HP1-05 Room A328 North Center White Plaster None Detected

02-HP1-06 Room A604A Above Drop Ceiling Tan Plaster None Detected

02-HP1-06 Room A604A Above Drop Ceiling White Plaster None Detected

Spray-Applied Fire

Proofing

03-FP1-07 Room AC160 NE Corner Tan Insulation None Detected

03-FP1-08 Room AC160 East Center Tan Insulation None Detected

03-FP1-09 Room AC160 SE Corner Tan Insulation None Detected

2’ x 2’ Pinhole Pattern

Ceiling Tile

04-CT3-10 Room B226A SE Corner Tan Ceiling Tile None Detected

04-CT3-11 Room B325A By Door Tan Ceiling Tile None Detected

04-CT3-12 Room A604A By Door Tan Ceiling Tile None Detected

No.

Material Description Sample Number

Sample Location Sample Layer Lab Results

2’ x 2’ Fissure Pattern

Ceiling Tile

05-CT3-13 Room C125 West Side Tan Ceiling Tile None Detected

05-CT3-14 Room B402 Center Tan Ceiling Tile None Detected

05-CT3-15 Room A604 By Door Tan Ceiling Tile None Detected

2’ x 2’ Dot Pattern

Ceiling Tile

06-CT3-16 Room C212 By Door Tan Ceiling Tile None Detected

06-CT3-17 Room C402 By Door Tan Ceiling Tile None Detected

06-CT3-18 Room A525 By Door Tan Ceiling Tile None Detected

2’ x 2’ Gouge Pattern

Ceiling Tile

07-CT3-19 Room B119 SW Corner Tan Ceiling Tile None Detected

07-CT3-20 Room A234 Near Center Tan Ceiling Tile None Detected

07-CT3-21 Room A328 Near Center Tan Ceiling Tile None Detected

2’ x 2’ Dot and Dash Pattern Ceiling Tile

08-CT3-22 Room B14A SE Corner Grey Insulation None Detected

08-CT3-23 Room A601A Restroom at Door Grey Insulation None Detected

08-CT3-24 Room A604B Restroom at Door Grey Insulation None Detected

2’ x 2’ Lunar Pattern

Ceiling Tile

09-CT3-25 Room C302 Ice Machine Room Tan/Silver Ceiling Tile None Detected

09-CT3-26 Room C302 Ice Machine Room Tan/Silver Ceiling Tile None Detected

09-CT3-27 Room C302 Ice Machine Room Tan/Silver Ceiling Tile None Detected

Fiberglass Pipe

Insulation W/ Tar Paper Wrap

10-PI4-28 Room A223A Above Ceiling Tan/Black/Silver Tar Paper None Detected

10-PI4-28 Room A223A Above Ceiling Beige Insulation None Detected

10-PI4-29 Room A328 Above Ceiling Black/Silver Tar Paper None Detected

10-PI4-29 Room A328 Above Ceiling Beige Insulation None Detected

10-PI4-30 Room A328 Above Ceiling Black/Silver Tar Paper None Detected

10-PI4-30 Room A328 Above Ceiling Beige Insulation None Detected

9” x 9” Various

Colors Floor Tile and Mastic

11-FT1-31 Room A118A At Entry Beige Floor Tile PC 6.7% Chrysotile

11-FT1-31 Room A118A At Entry Black Mastic None Detected

11-FT1-32 Room B325A At Entry Tan Floor Tile PC 5.8% Chrysotile

11-FT1-32 Room B325A At Entry Black Mastic None Detected

11-FT1-33 Room A601 SW Corner Blue Floor Tile PC 5.7% Chrysotile

11-FT1-33 Room A601 SW Corner Black Mastic None Detected

Material Description Sample Number

Sample Location Sample Layer Lab Results

12” x 12” Off-White (Brown) Floor Tile and Mastic

12-FT2-34 Room A234 Below Raised Floor Off-White Floor Tile PC 1.2% Chrysotile

12-FT2-34 Room A234 Below Raised Floor Black Mastic PC 0.5% Chrysotile

12-FT2-35 Room A234 Below Raised Floor Off-White Floor Tile PC 1.2% Chrysotile

12-FT2-35 Room A234 Below Raised Floor Black Mastic PC 0.5% Chrysotile

12-FT2-36 Room A234 Below Raised Floor Off-White Floor Tile PC 1.2% Chrysotile

12-FT2-36 Room A234 Below Raised Floor Black Mastic PC 1.2% Chrysotile

12” x 12” White w/

Green Floor Tile and Mastic

13-FT2-37 Room C116B West Center Off-White Floor Tile None Detected

13-FT2-37 Room C116B West Center Brown Mastic None Detected

13-FT2-38 Room B119 East Side Off-White Floor Tile None Detected

13-FT2-38 Room B119 East Side Black/Tan Mastic/Leveling

Compound None Detected

13-FT2-39 Room B226A SE Corner Off-White Floor Tile None Detected

13-FT2-39 Room B226A SE Corner Brown Mastic None Detected

12” x 12” Off-White

Mottle Floor Tile and Mastic

14-FT2-40 Room A223A East Side Off-White Floor Tile None Detected

14-FT2-40 Room A223A East Side Black/Tan Mastic/Leveling

Compound None Detected

14-FT2-41 Room C402 Near Radiator Off-White Floor Tile None Detected

14-FT2-41 Room C402 Near Radiator Tan Mastic None Detected

14-FT2-42 Room C402 Near Radiator Off-White Floor Tile None Detected

14-FT2-42 Room C402 Near Radiator Tan Mastic None Detected

12” x 12” Beige w/ Blue and Red Floor

Tile and Mastic

15-FT2-43 Room A127A SE Corner Off-White Floor Tile None Detected

15-FT2-43 Room A127A SE Corner Tan/Grey Mastic/Leveling

Compound None Detected

15-FT2-44 Room A127A SE Corner Off-White Floor Tile None Detected

15-FT2-44 Room A127A SE Corner Tan Mastic None Detected

15-FT2-45 Room A127A SE Corner Off-White Floor Tile None Detected

15-FT2-45 Room A127A SE Corner Tan/Black/Grey Mastic /

Leveling Compound / Mastic None Detected

Material Description Sample Number

Sample Location Sample Layer Lab Results

12” x 12” Gray Mottle Floor Tile and Mastic

16-FT2-46 Room AC160 SE Corner Grey Floor Tile None Detected

16-FT2-46 Room AC160 SE Corner Yellow Mastic None Detected

16-FT2-47 Room AC160 SE Corner Grey Floor Tile None Detected

16-FT2-47 Room AC160 SE Corner Yellow Mastic None Detected

16-FT2-48 Room AC160 SE Corner Grey Floor Tile None Detected

16-FT2-48 Room AC160 SE Corner Yellow Mastic None Detected

Black Mastic Under

Carpet

17-MG5-49 Room A118 Black Mastic None Detected

17-MG5-50 Room A118 Black Mastic None Detected

17-MG5-51 Room A604 Black Mastic None Detected

Yellow Stone Pattern Vinyl Sheet Flooring

18-FC1-52 Room C302 Yellow/Off-White Vinyl Sheet

Flooring 15% Chrysotile

18-FC1-53 Room C302 Yellow/Off-White Vinyl Sheet

Flooring 20% Chrysotile

18-FC1-54 Room C302 Yellow/Off-White Vinyl Sheet

Flooring 20% Chrysotile

19 Cove Base and Mastic

19-FC3-55 Room A104 By Door Tan Cove Base None Detected

19-FC3-55 Room A104 By Door Off-White Mastic None Detected

19-FC3-56 Room A223A SE Corner Tan Cove Base None Detected

19-FC3-56 Room A223A SE Corner Off-White Mastic None Detected

19-FC3-57 Room B325A By Door Brown Cove Base None Detected

19-FC3-57 Room B325A By Door Lt Tan/Black Mastic None Detected

1” Brown Ceramic

Flooring w/ Grout and Mortar

20-MA5-58 Room A601A Restroom by Door Tan Ceramic None Detected

20-MA5-58 Room A601A Restroom by Door Grey Grout None Detected

20-MA5-58 Room A601A Restroom by Door Tan Mortar None Detected

20-MA5-59 Room A601A Restroom by Door Tan Ceramic None Detected

20-MA5-59 Room A601A Restroom by Door Grey Grout None Detected

20-MA5-59 Room A601A Restroom by Door Tan Mortar None Detected

20-MA5-60 Room A604B Restroom by Door Tan Ceramic None Detected

20-MA5-60 Room A604B Restroom by Door Grey Grout None Detected

20-MA5-60 Room A604B Restroom by Door Tan Mortar None Detected

Material Description Sample Number

Sample Location Sample Layer Lab Results

2" Grey Ceramic

Flooring w/ Grout and Mortar

21-MA5-61 Room C303 Near Door Grey Ceramic None Detected

21-MA5-61 Room C303 Near Door Grey Grout None Detected

21-MA5-61 Room C303 Near Door White Mortar None Detected

21-MA5-62 Room A328 At Door Lt Green Ceramic None Detected

21-MA5-62 Room A328 At Door Grey Grout None Detected

21-MA5-62 Room A328 At Door White Mortar None Detected

21-MA5-63 Room A328 At Door Lt Green Ceramic None Detected

21-MA5-63 Room A328 At Door Grey Grout None Detected

21-MA5-63 Room A328 At Door Grey Mortar None Detected

4"x6" Ceramic Wall Tile w/ Grout and

Mortar

22-MA5-64 Room C208A SE Corner Grey Ceramic None Detected

22-MA5-64 Room C208A SE Corner White Grout None Detected

22-MA5-65 Room C208A SE Corner Grey Ceramic None Detected

22-MA5-65 Room C208A SE Corner Grey Grout None Detected

22-MA5-65 Room C208A SE Corner Off-White Mortar None Detected

22-MA5-66 Room A618B Below Sink Grey Ceramic None Detected

22-MA5-66 Room A618B Below Sink Off-White Grout None Detected

22-MA5-66 Room A618B Below Sink White Mortar None Detected

23 Terrazzo

23-FC5-67 Room B119 East Side Grey Terrazzo None Detected

23-FC5-68 Room C208A West Side Grey/White Terrazzo None Detected

23-FC5-69 Room A604 West Side Grey/White Terrazzo None Detected

Tar Coating on Concrete Wall

24-SC2-70 Room A328 Above Window Black Coating None Detected

24-SC2-71 Room A525 Above Window Black Coating None Detected

24-SC2-72 Room A601 Above Drop Ceiling Black Coating None Detected

25 Red Firestop Caulk

25-CA7-73 Room C212 Above Drop Ceiling Red Firestop None Detected

25-CA7-74 Room A554 Above Drop Ceiling Red Firestop None Detected

25-CA7-75 Room A601B Above Drop Ceiling Red Firestop None Detected

26 Duct Sealant

26-SC7-76 Room B14A Center Grey Sealant None Detected

26-SC7-77 Room C20A South Center Grey Sealant None Detected

26-SC7-78 Room C303 Center Grey Sealant None Detected

Material Description Sample Number

Sample Location Sample Layer Lab Results

Gypsum Wallboard with Joint Compound and Tape

01-WB1-01 Room C148 SW Corner White/Brown Drywall None Detected

01-WB1-01 Room C148 SW Corner White Joint Compound None Detected

01-WB1-01 Room C148 SW Corner Composite None Detected

01-WB1-02 Room C236 South Center White/Brown Drywall None Detected

01-WB1-02 Room C236 South Center White Joint Compound None Detected

01-WB1-02 Room C236 South Center Off-White Tape None Detected

01-WB1-02 Room C236 South Center Composite None Detected

01-WB1-03 Room C346 NW Corner White/Brown Drywall None Detected

01-WB1-03 Room C346 NW Corner White Joint Compound None Detected

01-WB1-03 Room C346 NW Corner Composite None Detected

02 Hard Plaster

02-HP1-04 Room C148 East Center White Plaster None Detected

02-HP1-04 Room C148 East Center Grey Plaster None Detected

02-HP1-05 Room C236 East Side White Plaster None Detected

02-HP1-05 Room C236 East Side Brown Plaster None Detected

02-HP1-06 Room B306A West Side White Plaster None Detected

02-HP1-06 Room B306A West Side Brown Plaster None Detected

2’ x 4’ Pinhole Pattern

Ceiling Tile

03-CT3-07 Room B306A West White/Tan Ceiling Tile None Detected

03-CT3-08 Room B306A East White/Tan Ceiling Tile None Detected

03-CT3-09 Room B306A North Center White/Tan Ceiling Tile None Detected

2’ x 2’ Dot Pattern

Ceiling Tile

04-CT3-10 Room B110B NE Corner White/Tan Ceiling Tile None Detected

04-CT3-11 Room C236 East Center White/Tan Ceiling Tile None Detected

04-CT3-12 Room C236 West Center White/Tan Ceiling Tile None Detected

2’ x 2’ Fissure Pattern

Ceiling Tile

05-CT3-13 Room C148 NW Corner White/Tan Ceiling Tile None Detected

05-CT3-14 Room C148 West Side White/Tan Ceiling Tile None Detected

05-CT3-15 Room C148 East Side White/Tan Ceiling Tile None Detected

2’ x 2’ Scratch Pattern

Ceiling Tile

06-CT3-16 Room A18 South Side White/Tan Ceiling Tile None Detected

06-CT3-17 Room A18 East Side White/Tan Ceiling Tile None Detected

06-CT3-18 Room A18 North Side White/Tan Ceiling Tile None Detected

Material Description Sample Number

Sample Location Sample Layer Lab Results

12” x 12” Off-White

Mottle Floor Tile and Mastic

07-FT2-19 Room C236 SW Corner Off-White Floor Tile None Detected

07-FT2-19 Room C236 SW Corner Clear Mastic None Detected

07-FT2-19 Room C236 SW Corner Grey Leveling Compound None Detected

07-FT2-20 Room C236 SW Corner Off-White Floor Tile None Detected

07-FT2-20 Room C236 SW Corner Clear Mastic None Detected

07-FT2-20 Room C236 SW Corner Grey Leveling Compound None Detected

07-FT2-20 Room C236 SW Corner Black/Tan Mastic PC 0.5% Chrysotile

07-FT2-21 Room C236 SW Corner Off-White Floor Tile None Detected

07-FT2-21 Room C236 SW Corner Clear Mastic None Detected

07-FT2-21 Room C236 SW Corner Grey Leveling Compound None Detected

07-FT2-21 Room C236 SW Corner Black/Tan Mastic PC Trace Chrysotile

Black Mastic Under

Carpet

08-MG5-22 Room C148 South Center Black Mastic None Detected

08-MG5-23 Room C148 North Center Black Mastic None Detected

08-MG5-24 Room C148 West Center Black Mastic None Detected

Yellow and Black

Carpet Glue

09-MG7-25 Room B110B West Side Yellow/Black Mastic None Detected

09-MG7-26 Room B110B Center Yellow/Black Mastic None Detected

09-MG7-27 Room B110B East Side Yellow/Black Mastic None Detected

10 Yellow Carpet Glue

10-MG7-28 Room A18 East Side Tan/Yellow Mastic None Detected

10-MG7-29 Room A18 NE Corner Tan/Yellow Mastic None Detected

10-MG7-30 Room A18 North Side Tan/Yellow Mastic None Detected

Gray Vinyl Sheet Flooring Beneath

Carpet

11-FC1-31 Room B212 SW Corner Beige/Grey Vinyl Sheet

Flooring None Detected

11-FC1-31 Room B212 SW Corner Yellow Mastic None Detected

11-FC1-32 Room B212 SE Corner Beige/Grey Vinyl Sheet

Flooring None Detected

11-FC1-32 Room B212 SE Corner Yellow Mastic None Detected

11-FC1-33 Room B212 At Door Beige/Grey Vinyl Sheet

Flooring None Detected

11-FC1-33 Room B212 At Door Yellow Mastic None Detected

Material Description Sample Number

Sample Location Sample Layer Lab Results

12 Cove Base and Mastic

12-FC3-34 Room C148 SE Corner Tan Cove Base None Detected

12-FC3-34 Room C148 SE Corner Pale Yellow Mastic None Detected

12-FC3-35 Room C148 SW Corner Tan Cove Base None Detected

12-FC3-35 Room C148 SW Corner Pale Yellow Mastic None Detected

12-FC3-36 Room C236 NW Corner Tan Cove Base None Detected

12-FC3-36 Room C236 NW Corner Pale Yellow Mastic None Detected

13 Terrazzo

13-FC5-37 Room C148 East Side Grey Terrazzo None Detected

13-FC5-38 Room C148 East Side Grey Terrazzo None Detected

13-FC5-39 Room C148 East Side Grey Terrazzo None Detected

Tar Coating on Concrete Wall

14-SC2-40 Room C148 East Side Black Coating None Detected

14-SC2-41 Room C236 East Side Black Coating None Detected

14-SC2-42 Room B306A West Side Black Coating None Detected

15 Red Firestop Caulk

15-CA7-43 Room C148 West Side Red Firestop None Detected

15-CA7-44 Room C148 West Side Red Firestop None Detected

15-CA7-45 Room C236 West Side Red Firestop None Detected

HA

No.

Material Description Sample Number

Sample Location Sample Layer Lab Results

Gypsum Wallboard with Joint Compound and Tape

01-WB1-01 Room C148 By Window White Drywall None Detected

01-WB1-01 Room C148 By Window White Joint Compound None Detected

01-WB1-01 Room C148 By Window Composite None Detected

01-WB1-02 Room A203A By Window White Drywall None Detected

01-WB1-02 Room A203A By Window White Joint Compound None Detected

01-WB1-02 Room A203A By Window Composite None Detected

01-WB1-03 Room C230A By Window White Drywall None Detected

01-WB1-03 Room C230A By Window White Joint Compound None Detected

01-WB1-03 Room C230A By Window Composite None Detected

Material Description Sample Number

Sample Location Sample Layer Lab Results

02 Hard Plaster

02-HP1-04 Room C23 North Wall Off-White Plaster None Detected

02-HP1-04 Room C23 North Wall White Plaster None Detected

02-HP1-05 Room B126A Above Entry Off-White Plaster None Detected

02-HP1-05 Room B126A Above Entry White Plaster None Detected

02-HP1-06 Room C130B South Center Off-White Plaster None Detected

02-HP1-06 Room C130B South Center White Plaster None Detected

2’ x 2’ Dot Pattern

Ceiling Tile

03-CT3-07 Room A203A White Ceiling Tile None Detected

03-CT3-08 Room C230A White Ceiling Tile None Detected

03-CT3-09 Room C230A White Ceiling Tile None Detected

2’ x 2’ Pinhole Pattern

Ceiling Tile

04-CT3-10 Room B126A Center White Ceiling Tile None Detected

04-CT3-11 Room B126A At Entry White Ceiling Tile None Detected

04-CT3-12 Room C148 Center White Ceiling Tile None Detected

12” x 12” Tan w/ Gray Floor Tile and Mastic

05-FT2-13 Room C31 SE Corner White Floor Tile None Detected

05-FT2-13 Room C31 SE Corner Clear/Yellow Mastic None Detected

05-FT2-14 Room C130B By Radiator White Floor Tile None Detected

05-FT2-14 Room C130B By Radiator Black Mastic None Detected

05-FT2-15 Room C148 Beneath Counter White Floor Tile None Detected

05-FT2-15 Room C148 Beneath Counter Black Mastic None Detected

Gray Pebble Vinyl

Sheet Flooring

06-FC1-16 Room B126A North Center Grey/White Flooring None Detected

06-FC1-16 Room B126A North Center Black/Yellow Mastic PC 2.2% Chrysotile

06-FC1-17 Room B126A At Entry Grey/White Flooring None Detected

06-FC1-18 Room B126A East Side Grey/White Flooring None Detected

06-FC1-18 Room B126A East Side Black Mastic PC 2.0% Chrysotile

06-FC1-18 Room B126A East Side Yellow…