About this file

This is a comprehensive architectural and engineering drawing set for the Electronic Health Record Modernization (EHRM) Infrastructure Upgrades project at VA Hudson Valley Healthcare System (Montrose VAMC), located at 2094 Albany Post Road, Montrose, New York. The project involves complete recabling and infrastructure upgrades across multiple buildings (Buildings 1-31, 52, and GS) at the facility, with Drawing B29 specifically detailing work for Building 29. The project is issued for construction as of June 27, 2025, and is being managed by TRIPLE C - The A/E Group (Syracuse, NY), with the Contracting Officer being Sean C. Kaminski and the Contracting Officer's Representative being Walter Hoffman.

The scope of work encompasses comprehensive telecommunications infrastructure upgrades including new Cat 6A and fiber optic cabling, new Telecommunications Rooms (TRs) across multiple buildings, work area outlets, network racks, UPS systems, patch panels, and associated electrical distribution equipment. Additional work includes new mechanical systems (HVAC, condensate pumps), fire protection systems (wet-pipe sprinkler heads and clean agent suppression for the new Main Computer Room), CCTV installations, Physical Security Access Control (PACS) for TR doors, electrical panels and transformers, site infrastructure (concrete walkways, landscaping, fiber conduit), and full commissioning of all systems. The contractor is responsible for all third-party inspections, testing, certifications, and permits—the VA will not provide inspection capability. The project requires a 10% allowance for additional data ports beyond identified locations, coordination drawings prior to construction, and compliance with NEC 220.87 for 30-day load testing on source panels. Infection control and indoor air quality measures are mandated throughout construction, including negative air units, HEPA filtration, and temporary barriers in occupied areas. All work must be coordinated across multiple buildings simultaneously to meet the overall construction schedule while limiting facility shutdowns to one building at a time.

View the file

Other files

File Type Posted
Amend 5 - B03.2020330.pdf PDF
Amend 5 - B05.20260330.pdf PDF
Amend 5 - B06.20260330.pdf PDF
Amend 5 - B26.20260330.pdf PDF
Amend 5 - B27.20260330.pdf PDF
Original attachments 13-17 B01-B05.zip ZIP file
Original attachments 18-21 B06-B13.zip ZIP file
Original attachments 22-29 B14-B28.zip ZIP file
Amendment 5 - 36C77626R0033 0005.pdf PDF
5-4 - RFI TRACKING SHEET.pdf PDF
Amend 5 - B01.20260330.pdf PDF
ATTACHMENT 2 - 01 00 00.A - Appendix A - OIT-InfrastrucStdTelecomSpaces.pdf PDF
ATTACHMENT 7 - 01 00 00.F - Appendix F - VHA PCRA 2024 1.1 Final.Template Fillable.pdf PDF
Attachment 12 - Additional Security Badging Requirements rev 2.pdf PDF
ATTACHMENT 18 - Montrose.EHRM.Addendum.01.B06.20260330.pdf PDF
ATTACHMENT 23 - Montrose.EHRM.Addendum.01.B15.20260330.pdf PDF
ATTACHMENT 29 - Montrose.EHRM.Addendum.01.B28.20260330.pdf PDF
ATTACHMENT 33 - Montrose.EHRM.Addendum.01.Site.20260330.pdf PDF
ATTACHMENT 3 - 01 00 00.B - Appendix B - Submittal Log.pdf PDF
ATTACHMENT 8 - 01 00 00.G - Appendix G - GPRS Triple C Montrose Full Report.pdf PDF
ATTACHMENT 16 - Montrose.EHRM.Addendum.01.B04.20260330.pdf PDF
ATTACHMENT 21 - Montrose.EHRM.Addendum.01.B13.20260330.pdf PDF
ATTACHMENT 24 - Montrose.EHRM.Addendum.01.B16.20260330.pdf PDF
ATTACHMENT 27 - Montrose.EHRM.Addendum.01.B20.20260330.pdf PDF
ATTACHMENT 28 - Montrose.EHRM.Addendum.01.B26.20260330.pdf PDF
ATTACHMENT 28A - Montrose.EHRM.Addendum.01.B27.20260330.pdf PDF
ATTACHMENT 32 - Montrose.EHRM.Addendum.01.B52.20260330.pdf PDF
ATTACHMENT 33A - 00 41 13.10 - Construction Estimate Breakdown Template.xlsx XLSX spreadsheet
Amendment 2 - 36C77626R0033 0002.pdf PDF
Attachment 2 - 01 00 00.A - Appendix A - OIT-InfrastrucStdTelecomSpaces.pdf PDF
Attachment 11 - 01 00 00.I - Appendix I - K9245005 EHRM Montrose NY GeoReport 4.12.2024.pdf PDF
Attachment 14 - Drawing B02 20250627.pdf PDF
Attachment 15 - Drawing B03 20250627.pdf PDF
Attachment 19 - Drawing B07 20250627.pdf PDF
Attachment 21 - Drawing B13 20250627.pdf PDF
Attachment 23 - Drawing B15 20250627.pdf PDF
Attachment 26 - Drawing B18 20250627.pdf PDF
Attachment 28 - Drawing B26 20250627.pdf PDF
Attachment 34 - Wage rates Westchester Co NY 1-30-2026.pdf PDF
Attachment 37 - Site Visit Instructions.pdf PDF
Attachment 39 - Project Information Sheet for Contractors.docx DOCX document
Attachment 1 - SPECS - 620-22-700.Montrose.EHRM.Spec.IFC.20260205.pdf PDF
Attachment 6 - 01 00 00.E - Appendix E - VHA ICRA-1.3 - Dec 9 2024.pdf PDF
Attachment 7 - 01 00 00.F - Appendix F - VHA PCRA 2024 1.1 Final.Template Fillable.pdf PDF
Attachment 8 - 01 00 00.G - Appendix G - GPRS Triple C Montrose Full Report.pdf PDF
Attachment 9 - 01 00 00.H - Appendix H - J2237038 Montrose ACM Ld Pnt InspRpt Final 8-21-2023.pdf PDF
Attachment 12 - Additional Security Badging Requirements rev 2.pdf PDF
Attachment 13 - Drawing B01 20250627.pdf PDF
Attachment 31 - Drawing B31 20250627.pdf PDF
Attachment 33 - Drawing Site 20250627.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

VA HUDSON VALLEY HEALTHCARE SYSTEM (VAIHCS)

STAMP

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .M

EP

.G en er al .S he et s.

rv t

-0 6-

7:

:3

29G-000

COVER SHEET 620-22-700

06/27/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

ISSUED FOR CONSTRUCTION

06/27/2025

620-22-700 - ELECTRONIC HEALTH RECORDS MODERNIZATION

(EHRM) INFRASTRUCTURE UPGRADES

PROJECT SCOPE OF WORK:

COMPREHENSIVE THIRD-PARTY INSPECTIONS, TESTING AND

WRITTEN REPORTS FOR ALL DIVISIONS (PAID BY THE GENERAL

CONTRACTOR).

CONTRACTOR SHALL EMPLOY THIRD-PARTY INSPECTION

CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY THIS

CONTRACT. THE VA HAS NO INSPECTION CAPABILITY. ANY

REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY

INSPECTOR QUALIFIED TO PERFORM THE WORK. CREDENTIALS

SHALL BE SUPPLIED TO THE VA/AE AS REQUIRED BY THIS

CONTRACT. ALL INSPECTIONS, TESTING, CERTIFICATIONS, AND

PERMITS ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR. THE

VA WILL NOT PAY FOR OR PERFORM ANY REQUIRED INSPECTIONS.

VA INSPECTIONS ARE FOR VA USE ONLY, WHEN PERFORMED, AND

DO NOT REDUCE THE INSPECTION BURDEN ON THE CONTRACTOR.

THIRD-PARTY INSPECTIONS:

a.

b.

c.

d.

e.

f.

g.

h.

i.

This project provides complete recabling within multiple buildings at the VA Hudson Valley Heath Care System.

Multiple buildings on campus including Buildings 1, 2, 3, 4, 5, 6, 7, 12, 13, 14, 15, 16, 17, 18, 19, 20, 26, 27, 28, 29, 31, 52, GS and also site infrastructure upgrades. See main project cover sheet for building priority.

This project shall include general construction, alterations, and necessary removal of existing structures and construction and certain other items. Contract documents, drawings, and specifications, indicate the scope of work. The purpose of this project is to address deficiencies and upgrade communications cabling and infrastructure. Scope includes newTelecommunications Rooms (TR) located within multiple buildings on campus and new, redundant site infrastructure. Project scope also includes a new Main Computer Room building with temporary and new fiber. This project provides the new construction, renovation and infrastructure required to provide new telecommunications infrastructure, include (but not limited to): new Fiber optic cable and new CAT 6a telecommunications cable to all locations, work area outlets (WAO), racks, UPS, power supplies and associated electrical distribution equipment, new HVAC, new CCTV, new fire protection and fire alarm, new advanced utility monitoring system and new PACS and doors for all buildings in this project.

Construction addresses deficiencies including new electrical service, new dedicated mechanical units, new UPS, new grounding and bonding conditions within each TR, new racks and cable management equipment within the TRs and new cable tray for each building as shown on the plans.

Provide new equipment rack(s) furnished with both horizontal and vertical cable managers, vertical bonding bars, UPS, patch panel and an optical fiber termination shelf. All telecommunications equipment and cabling shall be tested, approved, and accepted by the VA prior to connecting to active, ongoing operations. Any modifications required to existing systems (HVAC, smoke detectors, fire alarm, fire sprinklers, lights, other devices, etc..) are the responsibility of the Contractor. The VA will not assist with any modification.

Includes all labor, material, equipment, and supervision to perform the required electrical and telecommunications construction work on this project including materials and construction equipment to provide new telecommunications Cat 6A and Fiber cable throughout, new outlets, and new racks, patch panels, UPS, fiber panels and associated equipment for all buildings.

Provide new electrical panels, transformers, circuit breakers and distribution to serve the new spaces/equipment.

For communications functions, provide cable trays, equipment racks with vertical/horizontal wire management.

Replace all fiber optic lines serving the TRs. Provide network drops in each new TR. Provide a new digital, wall mounted CCTV (Closed Circuit Television) camera at each TR, camera shall comply with Campus standards (IP addressable network camera, POE+, PTZ, motion sensor, auto-tracking, dome with wall mount. Integrate camera into existing VMS. provide controllability through existing IT network).

Temporary fiber shall be provided between existing entrance room and newMain Computer Room and from the existing Data Center to the new MCR.

Provide Physical Security Access Control (PACS) for all the TR doors (including controllers and power supplies), coordinate with the door hardware specification for additional requirements.

The existing fire alarm system will be modified by relocating and/or adding compatible devices to the existing building fire alarm system for all TRs and providing a new fire alarm system for the new MCR building.

Contractor shall provide a 30-day load test on all existing source panels serving new work at each Building. This test is required by NEC 220.87 for In addition to replacing all of the communications cabling and additional 10% capacity shall be provided as shown on the drawings and specifications. verification that no loads have been added since the design level survey. Contractor shall provide load monitoring data to the COR/AE. New electrical panels and electrical service branch circuits are specified by the scope of work and shall be furnished by the contractor. Load monitoring shall also be performed on all panels upstream of the new branch circuit panels.

Work includes all labor, material, equipment, and supervision to perform the required Mechanical, Plumbing and Fire Protection construction work on this project including new dedicated cooling, condensate pumps and drains, and reconfiguring and certifying existing wet pipe fire protection system.

Contractor shall submit coordination drawings for approval showing all trades including: equipment locations, proposed routing, supports and penetrations prior to beginning any work. Also indicate new and existing systems and all provisions for coordinating existing utilities.

For fire suppression, contractor shall reconfigure and/or provide additional sprinkler heads to the existing building automatic sprinkler system as shown on the drawings. Provide new wet-pipe and clean agent fire suppression system for the new MCR.

Site work includes all labor, material, equipment and supervision to perform the required hardscape and landscape construction work on this project including materials and construction equipment to provide new concrete walkways, planting beds, artificial turf, fencing, trees and additional landscape materials to the new building and renovations detailed by the construction drawings and specifications. Protection for existing plantings, trees and hardscape to remain shall be installed, maintained and enforced by contractor.

New site fiber conduit shall be encased in concrete. Base bid shall include trenching, concrete ductbank and hand digging at existing utility crossings. Directional boring with annular concrete encasement requires Government approval.

For all telecommunications rooms (TR), the contractor is responsible for providing a new fire extinguisher cabinet with a Type 2A:10B:C clean agent fire extinguisher located no greater than 75 feet away from the new TR.

Contractor to coordinate the new location with the COR. Contractor shall bid a new FEC for each TR in the Scope of Work. See specification 10 44 13.

All new and existing systems within the Scope of Work shall be commissioned (or recommissioned) for each building per Specification 01 91 00.

No wireless access points shall be replaced and shall be protected-in-place, cabling, face plate and jack will be replaced. All cabling for wireless access points shall be labeled in accordance with the specifications.

This project will require working on multiple buildings simultaneously with multiple crews to achieve the overall construction period duration for the entire project. Based on the approved schedule by the VA COR (and based on approved Project Schedule and Phasing plan submittals), multiple buildings shall be renovated simultaneously to meet Construction Schedule requirements. However, any required shutdowns shall be limited to one at a time to minimize the impact on Facility Operations.

The expected construction period includes all pre-construction activity, construction, and post-construction testing, third-party inspections, Owner inspections, and commissioning. Contractor shall submit a comprehensive schedule of work in compliance with 01 32 16.15 PROJECT SCHEDULES (SMALL PROJECTS DESIGN/BID/BUILD).

Contractor shall submit and obtain approval for all project submittals including coordination drawings prior to beginning physical construction.

Contractor shall perform Commissioning per 01 91 00 of all new systems and existing systems impacted by the project according to requirements in sections:

01 91 00 – GENERAL COMMISSIONING REQUIREMENTS.

07 08 00 – FACILITY EXTERIOR CLOSURE COMMISSIONING.

21 08 00 – COMMISSIONING OF FIRE SUPPRESSION SYSTEMS.

22 08 00 – COMMISSIONING OF PLUMBING SYSTEMS.

23 08 00 – COMMISSIONING OF HVAC SYSTEMS.

26 08 00 – COMMISSIONING OF ELECTRICAL SYSTEMS.

27 08 00 – COMMISSIONING OF COMMUNICATIONS SYSTEMS.

28 08 00 – COMMISSIONING OF SECURITY SYSTEMS.

33 08 00 – COMMISSIONING OF SITE UTILITIES.

Inspections: Comprehensive Third-Party inspections, testing and written reports for all Divisions are required and paid by the General Contractor. Contractor shall employ third party inspection consultants to perform all inspections required by this contract.

Contractor shall appoint an individual, company, or firm to act as the Commissioning Manager. The Commissioning Manager is the designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process. A detailed commissioning plan is required to ensure that all systems are calibrated, programmed, and all graphic displays are accurate and approved by applicable VA staff.

THIS PROJECT MUST BE "STAND ALONE". THAT IS, THE PROJECT CANNOT DEPEND ON ANOTHER PROJECT

OR OTHER FUNDING SOURCE TO MAKE THE FINAL RESULT COMPLETE AND USABLE.

THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.

SIGNATURE DATE: 06/27/2025

AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C

TRIPLE C - THE A&E GROUP

CO:

Sean C. Kaminski

(216) 447-8300 x49714 sean.kaminski@va.gov Contracting Officer Department of Veterans Affairs

ACOR:

Kyle A.Morgan Planning & Design - Montrose Campus VA Hudson Valley Healthcare System 2094 Albany Post Rd.

Montrose, NY 10548 Phone: 845- 522-1338 Email : kyle.morgan@va.govUSER:

Edward Simpson

(914) 788-4822

(914) 224-2854 edward.simpson2@va.gov

COR:

Walter Hoffman Planning & Design - Montrose Campus VA Hudson Valley Healthcare System 2094 Albany Post Rd.

Montrose, NY 10548 Email : walter.hoffman@va.gov

BUILDING 29

CAMPUS MAP

GENERAL NOTES:

1.

2.

3.

4.

ALL EXISTING PORTS ARE BEING REPLACED ON THIS PROJECT. DEMO

SHEETS HAVE NOT BEEN PROVIDED UNLESS WALL REVISIONS ARE

REQUIRED. EXISTING WORK AREA OUTLETS WITH (3) OR (4) EXISTING

DATA PORTS SHALL BE REDUCED AND PROVIDED WITH (2) NEW

PORTS/(2) NEW CAT 6A CABLES. COORDINATED WITH OWNER PRIOR TO

REDUCTION AT EACH LOCATION.

WHILE ALL POSSIBLE DUE DILIGENCE WAS PERFORMED THE BIDDERS

ARE REQUIRED TO PROVIDE A 10% ALLOWANCE FOR NEW DATA PORTS.

ALL DEVIATIONS FROM THE DESIGN DOCUMENTS FOR LOCATIONS AND

QUANTITIES OF DATA PORTS ARE REQUIRED TO BE VERIFIED BY THE VA

COR AND A/E. AS AN EXAMPLE, IF 100 DATA DROPS WERE IDENTIFIED AND

DOCUMENTED IN A BUILDING, THE CONTRACTOR SHALL BID 110 DATA

DROPS AND CABLE, CONNECTION, TESTING, AND LABELING FOR THAT

BUILDING. DURING THE COURSE OF THE INSTALLATION THE

CONTRACTOR SHALL IDENTIFY ANY ADDITIONAL DATA PORTS AND ANY

DATA DROPS NOT FOUND TO ENSURE THE AGGREGATE SUM IS

CAPTURED IN THE RECORD DRAWINGS AND THE OWNER HAS AN

ACCURATE COUNT AT THE END OF THE PROJECT.

NO IN-WALL CONDUIT DEMOLITION SHALL OCCUR, ONLY OUTLETS AND

CABLE TO BE REPLACED. CONTRACTOR TO UTILIZE EXISTING CONDUIT IN

ALL LOCATIONS WHERE CABLES ARE BEING REPLACED. WHERE NO

EXISTING CONDUIT EXISTS, CONTRACTOR TO UTILIZE SURFACE

MOUNTED WIREWAY SIZED TO SUPPORT NEW CAT 6A AND NOT EXCEED

40% FILL.

THIS STATION ESTIMATES THAT 50% OF THE EXISTING IN-WALL CABLING

IS LOOSE AND NOT IN CONDUIT. TO MEET THE EHRM REQUIREMENT THAT

ALL NEW CABLE BE IN CONDUIT, CONTRACTOR SHALL INSTALL NEW

CAT6A CABLING TO EXISTING WAOs IN NEW SURFACE MOUNTED

RACEWAYS WHEN NO EXISTING CONDUIT IS LOCATED. CABLE, RACEWAY,

FIBER, AND CABLETRAY QUANTITIES HAVE BEEN IDENTIFIED ON THE

T-700 SERIES SCHEDULES.

LOCATION MAP

VICINITY MAP

N

S

W

E

POND

THREE 30,000 GAL.

FUEL OIL TANKS

1824 28

GB

G

FIRE ZO

N E

FIRE ZO

N E

NO PARKING NO PARKINGNO

PARKING

NO

PARKING

N O

P A R K

IN

G

POND

G

PP

FUEL

TANK

CB

CB

CBCB

PROJECT LOCATION

CS:

Michael Rankins

(405) 326-3599 michael.rankins1@va.gov

IT AREA MANAGER:

Angel Pagan

(914) 788-4828

Revisions: Date:

06/27/2025

06/27/2025

Warren Bickerstaff

BICSI ID# 39965

Expires 12-31-2026

Tajammul Text Box

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .M

EP

.B

.rv t

-0 6-

6:

:4

29G-001

DRAWING INDEX 620-22-700

06/27/2025 M. PERKINS K.

MCDERMOTT

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

- DRAWING INDEX -

SHEET

NUMBER SHEET NAME INCLUDED IN 35% SD INCLUDED IN 65% DD INCLUDED IN 95% CD ISSUED FOR CONSTRUCTION

GENERAL

29G-000 COVER SHEET Yes Yes Yes Yes 29G-001 DRAWING INDEX Yes Yes Yes Yes 29G-010 GENERAL PROJECT NOTES Yes Yes Yes Yes 29G-011 GENERAL INFECTION CONTROL NOTES AND SYMBOLS Yes Yes Yes Yes 29G-012 GENERAL INDOOR AIR QUALITY NOTES Yes Yes Yes Yes

ARCHITECTURAL

29A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES No Yes Yes Yes 29A-400 ARCHITECTURAL ENLARGED VIEWS - FIRST & SECOND LEVELS No Yes Yes Yes 29A-501 ARCHITECTURAL ROOF PLAN & DETAILS No Yes Yes Yes 29A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS No Yes Yes Yes 29A-512 ARCHITECTURAL PARTITION HEAD DETAILS No Yes Yes Yes 29A-531 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes

INTERIORS

29IN101 INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES No Yes Yes Yes

FIRE PROTECTION

29FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND DETAILS No Yes Yes Yes 29FX101 FIRE PROTECTION PLAN - FIRST LEVEL No Yes Yes Yes 29FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes

MECHANICAL

29M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS No Yes Yes Yes 29M-101 MECHANICAL PLAN - FIRST LEVEL No Yes Yes Yes 29M-501 MECHANICAL DETAILS No Yes Yes Yes 29M-701 MECHANICAL SCHEDULES No Yes Yes Yes 29M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS No Yes Yes Yes 29M-802 MECHANICAL CONTROL DIAGRAMS No Yes Yes Yes 29M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes 29M-902 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes

ELECTRICAL

29E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 29E-101 ELECTRICAL PLAN - FIRST LEVEL No Yes Yes Yes 29E-400 ELECTRICAL ENLARGED PLANS No Yes Yes Yes 29E-501 ELECTRICAL DETAILS Yes Yes Yes Yes 29E-601 ELECTRICAL ONE-LINE DIAGRAMS No Yes Yes Yes 29E-701 ELECTRICAL SCHEDULES No Yes Yes Yes 29E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes

TELECOMMUNICATION

29T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 29T-100 TELECOMMUNICATION PLAN - BASEMENT LEVEL Yes Yes Yes Yes 29T-101 TELECOMMUNICATION PLAN - FIRST LEVEL Yes Yes Yes Yes 29T-102 TELECOMMUNICATION PLAN - SECOND LEVEL Yes Yes Yes Yes 29T-103 TELECOMMUNICATION PLAN - THIRD LEVEL Yes Yes Yes Yes 29T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes 29T-502 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 29T-503 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 29T-504 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS No Yes Yes Yes 29T-601 TELECOMMUNICATION RISER DIAGRAMS Yes Yes Yes Yes 29T-603 TELECOMMUNICATION FIBER RISER DIAGRAM - NEW No Yes Yes Yes 29T-604 TELECOMMUNICATION RACK ELEVATIONS Yes Yes Yes Yes 29T-701 TELECOMMUNICATION SCHEDULES Yes Yes Yes Yes 29T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 29T-902 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes 29T-903 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes

REFERENCE

29R-900 PHOTO REFERENCES No Yes Yes Yes Grand total: 47

Revisions: Date:

06/27/2025

GENERAL NOTES GENERAL FIRE AND LIFE SAFETY NOTES

GENERAL DIMENSIONING NOTES

GENERAL PAINTING NOTES

GENERAL SEALANT / CAULKING NOTES

GENERAL DEMOLITION AND PHASING NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

THESE GENERAL NOTES APPLY TO ALL DRAWINGS.

COMPLY WITH ALL APPLICABLE CODES, RULES, AND REGULATIONS. WHEN REQUIRED BY CODE,

ALL WORK MUST BE INSPECTED AND APPROVED BY LOCAL AUTHORITIES.

ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR(S) PRIOR

TO FABRICATION AND CONSTRUCTION. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS

AND THESE DRAWINGS, WHICH AFFECT THE SCOPE AND INTENT OF THE WORK DESCRIBED IN

CONSTRUCTION DOCUMENTS, SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND

COR IMMEDIATELY.

GENERAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL DUCT SIZES

AND LOCATIONS.

ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL

KNOWLEDGE.

WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE INSTALLED LEVEL WITH EACH OTHER

AND PLUMB.

THE WORK INDICATED IN THE NOTES DESCRIBES THE GENERAL SCOPE OF WORK ONLY AND IS

NOT INTENDED TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE FULL SCOPE OF

WORK.

DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE FIELD VERIFIED. ALL DISCREPANCIES

SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND COR.

FIELD VERIFICATION: BEFORE BIDDING AND DURING CONSTRUCTION, CONTRACTOR SHALL

VERIFY THAT ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE CONTRACT DOCUMENTS.

REPORT DISCREPANCIES TO ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING WORK

RELATED TO ANY DISCREPANCIES. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS AS "NIC" IS NOT IN THE CONTRACT.

HOWEVER, THE CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK INDICATED AS NIC.

SITE COORDINATION: COORDINATE ALL SITE OPERATIONS WITH OWNER, INCLUDING STAGING

AREAS, MATERIAL STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY OPERATIONS,

INTERRUPTION OF UTILITIES, ETC. SEE SPECIFICATIONS.

TRADE COORDINATION: CONTRACTOR SHALL COORDINATE THE PLACEMENT OF EACH TRADE'S

WORK SO THAT THERE ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR FUNCTION

IMPAIRED. IT IS ESPECIALLY IMPORTANT TO COORDINATE PENETRATIONS THROUGH

FOUNDATIONS, FLOORS, WALLS AND CEILING SPACES. SEE SPECIFICATIONS.

PROVIDE GALVANIC SEPARATION MATERIAL, ACCEPTABLE TO ARCHITECT AND COR, BETWEEN

DISSIMILAR METALS. SEE SPECIFICATIONS.

ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE FIRE TREATED. SEE

SPECIFICATIONS. ALL SURFACE ATTACHED METAL SHALL BE SEPARATED FROM CONCRETE OR

MASONRY BY NON-METALLIC MATERIAL SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER

MATERIAL AS APPROVED BY ARCHITECT AND COR.

EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL EQUIPMENT, FIXTURES, DEVICES,

MECHANICAL, PLUMBING OR ELECTRICAL ITEMS. SEE PLANS FOR ADDITIONAL ELEVATION

COORDINATION.

ALL APPLICABLE PERMITS SHALL BE KEPT ON SITE AT ALL TIMES DURING PERMITTED WORK.

WORK SHALL BE COORDINATED WITH COR, SUBMIT CERTIFICATIONS AS REQUIRED BY THE

SPECIFICATIONS. REQUIRED PERMITS INCLUDE, BUT ARE NOT LIMITED TO; DAILY BURN PERMITS

FOR ANY CUTTING/WELDING, LOCK-OUT-TAG-OUT AND LIVE ELECTRICAL PERMITS FOR ANY

ELECTRICAL WORK, CONFINED SPACE ENTRY PERMITS FOR ACCESSING TUNNELS, PIPE

CHASES, ETC., AND DIG PERMITS FOR SITE WORK.

1.

2.

3.

FIRE LIFE SAFETY NOTES

FIRE RATED ASSEMBLIES, INCLUDING FIREPROOFING, DAMAGED DURING CONSTRUCTION

MUST BE RESTORED TO THEIR ORIGINAL CONDITION.

FIRE RESISTIVE ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION, AND THE MEANS OF EGRESS

MUST BE MAINTAINED AT ALL TIMES. WHEN IT IS NOT POSSIBLE TO MAINTAIN FIRE RESISTIVE

ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION AND/OR MEANS OF EGRESS, TEMPORARY

CONSTRUCTION BARRIERS AND/OR A FIRE WATCH MUST BE PROVIDED.

VHA DIRECTIVE 7715 SAFETY AND HEALTH DURING CONSTRUCTION DATED SEPTEMBER 5,

2023, REQUIRES VA MASTER SPECIFICATIONS, DIVISION 1 - GENERAL REQUIREMENTS,

SECTION 01 35 26 - SAFETY REQUIREMENTS MADE SPECIFIC FOR THE ASSOCIATED

CONSTRUCTION WORK.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

FIRE SAFETY DURING CONSTRUCTION, ALTERATIONS AND DEMOLITION

FIRE DEPARTMENT ACCESS ROADS SHALL BE ESTABLISHED AND MAINTAINED AT ALL TIMES

PER LOCAL FIRE DEPARTMENT.

FIRE DEPARTMENT WATER MAINS AND FIRE HYDRANTS SHALL BE OPERATIONAL AT ALL TIMES

AND SHALL BE IN ACCORDANCE WITH LOCAL FIRE DEPARTMENT.

FIRE EXTINGUISHERS SHALL BE PROVIDED FOR BUILDINGS UNDER CONSTRUCTION. THE

NUMBER AND TYPE OF EXTINGUISHERS SHALL BE AS REQUIRED BY THE STATE FIRE MARSHAL

OR LOCAL FIRE DEPARTMENT.

COMBUSTIBLE DEBRIS SHALL NOT ACCUMULATE WITHIN BUILDINGS.

CUTTING AND WELDING OPERATIONS SHALL BE IN ACCORDANCE WITH VA.

FIRE PROTECTION SYSTEMS SHALL BE MAINTAINED OPERATIONAL AT ALL TIMES PER LOCAL

FIRE CODES.

REQUIRED MEANS OF EGRESS COMPONENTS SHALL BE MAINTAINED AT ALL TIMES.

TEMPORARY EXITING SHALL BE APPROVED BY THE VA.

FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE MAINTAINED.

PLASTIC FILM (VISQUEEN) WHEN USED FOR DUST PROTECTION, SHALL BE FLAME RETARDANT.

SMOKE DETECTORS SHALL BE COVERED OR REMOVED DURING ALTERATIONS. WHEN

REQUIRED BY THE STATE FIRE MARSHAL OR LOCAL FIRE DEPARTMENT, HEAT DETECTORS MAY

BE SUBSTITUTED FOR SMOKE DETECTORS DURING ALTERATIONS.

ALL FIRE HYDRANTS, WATER SUPPLY TO FIRE HYDRANTS, AND FIRE DEPARTMENT VEHICLE

ACCESS ROADWAYS SHALL BE INSTALLED, TESTED AND PLACED IN SERVICE PRIOR TO AND

DURING THE TIME OF CONSTRUCTION. INSTALLATION MUST BE COORDINATED WITH LOCAL

FIRE DEPARTMENT IN THE FIELD.

CULTURAL RESOURCE PROPERTIES - CONSTRUCTION AND ALTERATION OPERATIONS WITHIN

CULTURAL RESOURCE PROPERTIES SHALL BE PERFORMED IN ACCORDANCE WITH NFPA 914.

1.

2.

3.

4.

5.

ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF THERE IS A DIMENSIONAL VARIANCE BETWEEN DISCIPLINES OR SIGNIFICANT OMISSION OR CONFLICT WITHIN A DISCIPLINE, CONTACT ARCHITECT AND COR PRIOR

TO BID. IF DISCREPANCIES ARE DISCOVERED AFTER THE BID, CONTRACTOR SHALL CONFIRM

DIMENSIONS WITH ARCHITECT AND COR PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.

ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL AND EQUIPMENT SIZES MAY NOT BE

THOSE ANTICIPATED BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND SHOP DRAWINGS

CONTRACTOR SHALL VERIFY DIMENSIONS AND RECOMMEND DIMENSIONAL MODIFICATIONS AS

REQUIRED.

ARCHITECTURAL DIMENSIONS MAY BE FOUND THROUGHOUT THE DRAWINGS - COORDINATE ALL

DISCIPLINES.

ADDITIONAL DIMENSIONS MAY BE SHOWN ON ENGINEERING DRAWINGS. MECHANICAL AND

ELECTRICAL EQUIPMENT SCHEDULES MAY ALSO CONTAIN DIMENSIONAL INFORMATION RELATED

TO EQUIPMENT SIZES AND CLEARANCES.

DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X 4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE. (FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE SHOWN IN THE 16THS OF AN INCH, BUT STANDARD

MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").

1.

2.

3.

4.

5.

6.

7.

8.

FLOOR PLAN DIMENSIONS

THE LOWEST FLOOR OVERALL BUILDING DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE

FOUNDATION WALL TO THE OPPOSITE OUTSIDE FACE OF THE FOUNDATION WALL (OR, FROM

OUTSIDE GRIDLINE TO OUTSIDE GRIDLINE) AS SHOWN.

DIMENSIONS FOR NON-LOAD BEARING WALLS ARE TO ONE FACE OF THE STUDS, BOTH FACES OF

MASONRY WALLS, OR BOTH FACES OF CONCRETE WALLS, ETC, UNLESS NOTED OTHERWISE.

WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL (UNLESS NOTED AS "NOM").

DOOR OPENING DIMENSIONS IN FRAME CONSTRUCTION (WOOD OR STEEL STUDS) ARE TYPICALLY

SHOWN AT THEIR CENTERLINES. HOWEVER, WHEN THE EDGE OF THE DOOR IS IMPORTANT, OR

MAKES THE PLACEMENT CLEARER, THE DIMENSION MAY BE TO THE ACTUAL FRAME EDGE.

DOOR DIMENSIONS IN LOAD-BEARING MASONRY AND CONCRETE WALLS ARE TO "ROUGH"

OPENINGS (FACES OF MASONRY OR CONCRETE). TYPICAL DOOR ROUGH OPENING DIMENSIONS

ARE THE FRAME WIDTH PLUS 1/2" (1/4" CLEARANCE EACH SIDE) AND PLUS 1/2" TOTAL FOR THE

HEAD/SILL DIMENSIONS.

"TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS TO ADJACENT WALLS: BETWEEN FRAME FACES

AND FACES OF STUDS, OR FACES OF MASONRY OR CONCRETE, AT NEARBY PERPENDICULAR

WALLS ARE TYPICALLY 4", DEPENDING ON HARDWARE CLEARANCES AND FRAME REQUIREMENTS

(2.5"-DOOR HANDLE PLUS 1" -WALL STOP PLUS 1/2" GB=4.0")

SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH AS AT REQUIRED EXIT WAYS, APPLIANCE

COVES OR PREFABRICATED STAIR ENCLOSURES, ARE NOTED "CLR" OR "CLEAR" AND ARE SHOWN

TO THE FACES OF FINISHES.

DIMENSIONS DESIGNATED WITH "MIN" INDICATE THE MINIMUM CLEARANCE OR SEPARATION

REQUIRED.

1.

ROOF PLAN DIMENSIONS

UN-DIMENSIONED LOCATIONS OF ROOFTOP EQUIPMENT AND CONSTRUCTION OFTEN MAY BE

DETERMINED BY THE FLOOR PLAN BELOW, SUCH AS ROOF HATCH DETERMINED BY REFERENCE

TO A FIXED WALL AND LADDER, OR MECHANICAL EQUIPMENT DETERMINED BY DUCT

PENETRATIONS BETWEEN JOISTS.

1.

2.

3.

4.

5.

VERTICAL DIMENSIONS

UNLESS OTHERWISE NOTED, THE FIRST FLOOR REFERENCE ELEVATION IS 100'-0". THIS IS

REFERENCED TO A GROUND ELEVATION ABOVE MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR STRUCTURAL DRAWINGS. ELEVATIONS BELOW 0'-0" ARE "-" (PREFIXED WITH A MINUS SIGN).

BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON ARCHITECTURAL DRAWINGS ARE TO TOP OF

DECKING OR SHEATHING, BUT DO NOT INCLUDE FINISHES OR ROOFING MATERIAL.

WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE TO FINISH HEIGHTS (UNLESS THEY ARE IN

LOAD-BEARING MASONRY OR CONCRETE WALLS, WHERE THEY ARE TO ROUGH OPENINGS).

HEIGHT REFERENCES SHOULD BE TO THE NEXT LOWER FINISH FLOOR ELEVATION.

LIGHTING HEIGHTS ON WALLS ARE TO CENTERLINES OF THE ELECTRICAL BOXES, UON.

EQUIPMENT, VENT, PLUMBING AND FIXTURE ELEVATIONS ARE TO CENTERLINES OF THE WALL

PENETRATIONS, UON.

SOME VERTICAL DIMENSIONS ARE SHOWN ON PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND

ELEVATION CHANGES. A PLAN ELEVATION CHANGE SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND INDICATES THE + OR - ELEVATION CHANGE IN INCHES FROM THE FINISHED FLOOR ELEVATION

(FFE) NEXT TO IT.

1.

2.

3.

4.

5.

6.

7.

HALF-TONED OR LIGHT LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION.

TEMPORARY BRACING OR SHORING MAY BE NECESSARY, AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES TO MEET APPROVAL OF CODE AGENCIES. COORDINATE DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE OWNER RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING THE PRE-CONSTRUCTION WALK THROUGH.

CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS OR PENETRATIONS LEFT BY THE INSTALLATION OR CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO MAINTAIN THE INTEGRITY OF THE WALL AND/OR ROOF.

THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-WAY OF THE PROJECT SITE WILL BE IMPACTED BY CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE WITH THE LATEST OSHA REQUIREMENTS. COORDINATE CONTRACTOR STAGING AREA WITH TEMPORARY ACCESSIBLE PARKING AND PUBLIC ACCESS WITH OWNER PRIOR TO CONSTRUCTION. PROTECT PARKING SIGNAGE WITHIN PROJECT AREA.

SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND DEMOLITION FOR RELATED DEMOLITION WORK.

CONTRACTOR TO PROVIDE INFECTION CONTROL PLAN AS REQUIRED BY VHA DIRECTIVE 7715 SAFETY AND HEALTH DURING CONSTRUCTION DATED SEPTEMBER 5, 2023. SUBMIT TO COR PRIOR TO START OF WORK.

1.

2.

3.

4.

5.

1.

2.

1.

2.

3.

1.

2.

1.

2.

3.

1.

1.

2.

1.

2.

3.

4.

A.

B.

C.

5.

6.

FIRE ALARM

DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN MANUAL, 2023

AND NFPA 72, 2025.

SUBMIT FOUR SETS OF PLANS TO VA (AHJ) FOR APPROVAL PRIOR TO THE INSTALLATION.

A RISER DIAGRAM, AS WELL AS A SYSTEM RESPONSE MATRIX, FOR THE NEW CLEAN AGENT SYSTEM IS TO BE PROVIDED AS PART OF THE DESIGN. THE CLEAN AGENT SYSTEM WILL BE MONITORED BY THE EXISTING BUILDING FIRE ALARM SYSTEM SO

THERE IS NO NEW OFFSITE MONITORING REQUIRED.

THE FIRE ALARM SYSTEM SHALL CONFORM TO APPLICABLE NFPA STANDARDS. FIRE ALARM SHOP DRAWINGS SHALL BE SUBMITTED TO VA FOR APPROVAL PRIOR TO INSTALLATION. UPON COMPLETION OF THE INSTALLATION OF THE FIRE ALARM SYSTEM, A SATISFACTORY TEST OF THE ENTIRE SYSTEM WILL BE PERFORMED IN THE PRESENCE OF THE ENFORCING AGENCY.

THE ADDITION OF NEW DEVICES TO THE EXISTING BUILDING FIRE ALARM SYSTEM SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS. DEVICE LOCATION AND WIRING RUNS SHOWN ON THE DRAWINGS ARE FOR REFERENCE ONLY. ACTUAL LOCATIONS SHALL BE IN ACCORDANCE WITH NFPA 72 AND PROJECT SPECIFICATIONS. THE FIRE ALARM SYSTEM IN THE MAIN COMPUTER ROOM SHALL INTERFACE WITH THE NEW CLEAN AGENT FIRE SUPPRESSION SYSTEM. THE EXISTING FIRE ALARM SYSTEMS IN ALL OTHER BUILDINGS SHALL INTERFACE WITH THE NEW DEVICES SHOWN ON

THE DRAWINGS.

FIRE EXTINGUISHERS

TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE WITH TEMPORARY PORTABLE FIRE EXTINGUISHERS AND SHALL MAINTAIN THEM DURING THE COURSE OF CONSTRUCTION. EACH EXTINGUISHER SHALL BE 10 lb. CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C FIRES. ALL EXTINGUISHERS SHALL BE U.L. LABELED AND SHALL BE DRY CHEMICAL TYPE.

FOR TELECOMMUNICATION ROOMS (TR), THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A:10B:C FIRE EXTINGUISHER LOCATED NO GREATER THAN 75 FEET AWAY FROM THE NEW TR AND THEY MUST BE CLEAN AGENT OR CARBON DIOXIDE TYPE. CONTRACTOR TO COORDINATE THE NEW LOCATION WITH THE COR.

FIRE SPRINKLER SYSTEM

EXISTING FIRE SPRINKLER MAIN PIPES AND BRANCH LINES TO BE RETAINED AND REUSED. NEW SPRINKLERS WILL BE PROVIDED AT EACH TR AND MCR LOCATION. CONTRACTOR TO VERIFY THE EXACT SIZE AND LOCATION IN FIELD.

THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH 2025 NFPA 13.

ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD PIPED, NO FLEXIBLE CONNECTIONS ARE PERMISSIBLE.

FIRE & SMOKE DAMPERS

EXISTING FIRE & SMOKE DAMPERS ARE TO BE RETAINED AND REUSED.

THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM AND FIRE SPRINKLER SYSTEM.

EXIT AND EMERGENCY LIGHTING

WHERE APPLICABLE, EXISTING AND/OR NEW EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING TO EXTERIOR WITH MINIMUM 6" HIGH LETTERS AT REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY; CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE WHEN NORMAL POWER IS INTERRUPTED. EMERGENCY LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE POWER AT FLOOR LEVEL. EXIT DOOR SHALL SWING IN THE DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2" BELOW

THE THRESHOLD.

WHERE APPLICABLE, EXISTING AND/OR NEW EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH THE NFPA 101 AND THE VA

FIRE PROTECTION DESIGN MANUAL.

EMERGENCY LIGHTING SHALL BE PROVIDED FOR THE MAIN COMPUTER ROOM.

RATED DOOR AND WINDOW ASSEMBLIES

THE BUILDING IS EQUIPPED WITH RATED DOOR ASSEMBLIES. EXISTING RATINGS ARE TO BE MAINTAINED. NEW RATED DOORS

SHALL CLEARLY LABEL DOOR AND FRAME RATING, DO NOT PAINT.

FIRE STOPPING

FIRE STOPPING IS REQUIRED IN ALL FLOOR PENETRATIONS AND IN ALL PENETRATIONS OF RATED WALLS.ALL FIRE STOPPING

SHALL BE LISTED IN ACCORDANCE WITH NFPA REQUIREMENTS.

TEMPORARY FIRESTOPPING: IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED

PENETRATION.

GENERAL

INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE INSTALLATION, INCLUDING

INSULATION, FACING MATERIALS, TAPES AND ADHESIVES NORMALLY APPLIED.

ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25 AND A SMOKE DENSITY NOT TO EXCEED 50 WHEN TESTED IN ACCORDANCE WITH

ASTM E 84.

HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE CENTERED BETWEEN 30" AND 44" ABOVE THE FLOOR. LATCHING AND LOCKING DOORS THAT ARE HAND-ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE HARDWARE, PANIC BARS, PUSH-PULL PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS ABOVE IN EGRESS DIRECTION. DOOR CLOSERS (EXCEPT FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM AN OPEN POSITION OF 70 DEGREES, THE DOOR WILL TAKE AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE LATCH, MEASURED FROM THE LEADING EDGE OF THE DOOR.

COMPLY WITH NFPA REQUIREMENT FOR NEW AND EXISTING DOORS. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT

EXCEED:

INTERIOR DOORS - 5 lbs.

EXTERIOR DOORS - 8.5 lbs.

FIRE DOORS - 15 lbs.

ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED WITH A UL APPROVED

METHOD AND MATERIAL APPROVED PER BUILDING.

IF MULTIPLE CEILING TILES MUST BE REMOVED IN THE CORRIDOR SYSTEM AND CANNOT BE REPLACED AT THE END OF THE WORK SHIFT, A 1-HOUR FIRE BARRIER SHALL NEED TO BE CONSTRUCTED; THE ALTERNATIVE IS TO INSTALL TEMPORARY

UPRIGHT SPRINKLER.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR THIS PROJECT ARE DEFINED BY THE

SPECIFICATIONS AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING SPECIFICATION

MANUAL FOR NEW WORK AND THE MPI MAINTENANCE REPAINTING MANUAL FOR RENOVATION

OR REPAINTING WORK.

PAINTING WORK: INCLUDES TAPING, SURFACE PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD PAINTING AND FINISHING AS REQUIRED BY STANDARD PRACTICE, MANUFACTURER OR

SPECIFICATION. REQUIRED COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP PRIMING,

SURFACE TREATMENT AND FINISHING. THE WORK ALSO INCLUDES PAINTING CLEANUP AND

REMOVAL OF OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS MAY REQUIRE OTHER

TYPES OF PAINTING, INCLUDING, BUT NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND

FACTORY PRIMING.

PROJECT PAINTING SCOPE: EXCEPT AS NOTED OTHERWISE, CONTRACTOR IS TO FIELD PAINT

INTERIOR AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES, WHETHER OR NOT

PREVIOUSLY PAINTED, AND ALL NEW ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT

LIMITED TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL AND EXPOSED PIPING AND

FITTINGS (INCLUDING IRON AND PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE SHALL BE

SEALED, UNLESS NOTED OTHERWISE OR NOT RECOMMENDED BY MANUFACTURER. PAINTING

SCOPE ITEMS MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS, SPECIFICATIONS AND

PAINTING GENERAL NOTES. THESE SOURCES ARE COMPLEMENTARY, NOT MUTUALLY

EXCLUSIVE.

MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD PAINTING OF INTERIOR AND

EXTERIOR EXPOSED PIPES, DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND PRIMED

METAL SURFACES OF EQUIPMENT IN EXPOSED AREAS INSTALLED UNDER MECHANICAL AND

ELECTRICAL WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF ELECTRICAL AND

MECHANICAL WORK IN ELECTRICAL AND MECHANICAL ROOMS IS NOT REQUIRED UNLESS

NOTED OTHERWISE IN THE PROJECT SPECIFICATIONS. COLOR-CODING OF PIPING FOR

MECHANICAL AND PLUMBING WORK IS COVERED IN THE MECHANICAL OR PLUMBING

SPECIFICATIONS.

APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT AN EDGE, CORNER, CHANGE OF

MATERIALS OR CHANGE OF PAINT COLOR. COMPLETED PAINTING SHALL NOT IMPEDE THE

INTENDED OPERATION OF ANY ITEM, SUCH AS WINDOWS, DRAWERS, HINGES, DOORS, ETC.

TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE REPAIRED AS REQUIRED. PAINT

TEXTURE, GLOSS AND COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA ON ONE

SURFACE IS LARGER THAN 1 SQUARE FOOT, OF IF TEXTURE, GLOSS AND COLOR CANNOT BE

MATCHED, THE ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING EDGES OR CORNERS.

DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT PAINT ITEMS THAT ARE SPECIFIED

FACTORY-FINISHED OR INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE INDICATED, DO NOT

PAINT SUCH ITEMS AS ACOUSTIC MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND

EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL EQUIPMENT, SWITCH AND OUTLET

PLATES, THERMOSTATS, LIGHTING FIXTURES, SWITCHGEAR, MOTORS, DISTRIBUTION PANELS

AND INTERIOR AND EXTERIOR SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO PAINT

AN ITEM OR SURFACE, CONTACT THE ARCHITECT FOR INSTRUCTIONS PRIOR TO PAINTING.

EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT METAL

SURFACES OF ANODIZED ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE, COPPER,

BRASS, BRONZE AND SIMILAR FINISHED MATERIALS.

CONCEALED SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT SURFACES SUCH AS

WALLS AND CEILINGS IN CONCEALED AND GENERALLY INACCESSIBLE AREAS, INCLUDING

FURRED AREAS, UTILITY TUNNELS, PIPE SPACES, CHASES AND DUCT SHAFTS. WATERPROOF

SEAL CONCRETE IN PIPE SPACE.

OPERATING PARTS AND SENSING DEVICES: UNLESS OTHERWISE INDICATED, DO NOT PAINT

MOVING PARTS OF OPERATING UNITS SUCH AS VALVES, DAMPER OPERATORS, LINKAGES,

MOTOR AND FAN SHAFTS, LIGHT SENSING OR EMITTING DEVICES THAT MIGHT NOT FUNCTION

PROPERLY IF PAINTED.

CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-REQUIRED LABELS.

ALL FLOORS ARE TO BE CLEANED AND SEALED AT COMPLETION OF WORK. NO EPOXY PAINT.

ALL NEWLY EXPOSED SPRINKLER PIPING TO BE PAINTED.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

THE PRIMARY OBJECTIVE OF APPLYING SEALANT IS TO FACILITATE WEATHER TIGHTNESS AT

THE EXTERIOR BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR WET\DAMP

LOCATIONS. PROPER PRIMING MUST BE USED WITH SEALANTS.

THE PRIMARY OBJECTIVE OF APPLYING CAULKING IS TO ENHANCE APPEARANCE AND FINISH

AT INTERIOR APPLICATIONS AND IN SOME SITUATIONS TO REDUCE AIRFLOW, SUCH AS AT

DUCTS, INTERIOR SIDES OF THE EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER

PENETRATIONS (FIRE CAULKING) AND TO DECREASE SOUND TRANSMISSION THROUGH WALLS

AND CEILINGS. OTHER USES MAY BE NOTED IN THE SPECIFICATIONS AND/OR ON THE

DRAWINGS. IF THERE ARE QUESTIONS ABOUT WHERE OR WHAT TYPE OF SEALANT OR

CAULKING SHOULD BE USED, CONTACT THE ARCHITECT.

SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED) SHALL BE USED AT HORIZONTAL AND

VERTICAL CONCRETE JOINTS AND AS NOTED.

SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION JOINT MATERIAL, AS REQUIRED,

SHALL BE USED AT MASONRY AND CONCRETE CONTROL JOINTS.

APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF SEALANT BETWEEN PERIMETER SOLE

PLATES AND FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR THRESHOLDS IN

SEALANT UNLESS NOTED OTHERWISE.

SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND BOTH SIDES OF DOOR FRAMES.

SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND INTERIOR WALL MOUNTED

EQUIPMENT FRAMES AND EXPOSED SUPPORTS.

SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS BETWEEN DIFFERENT WALL

MATERIALS (TILE TO BRICK, CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL TO P-

LAM, ETC).

USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL GAPS OF 1/16TH INCH OR MORE.

SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS THROUGH, FLOORS AND WALLS.

USE SPECIFIED SEALANT AROUND WALL, FLOOR AND CEILING PIPE PENETRATIONS. WHERE

ESCUTCHEONS ARE SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A BED OF SEALANT.

USE SPECIFIED CAULK OR SEALANT AROUND PENETRATIONS IN EXTERIOR WALLS AND

SOFFITS, SUCH AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE ENTRIES, GAS PIPE

ENTRIES, ELECTRIC OUTLETS, LIGHTING, VENTS, ETC.

13.

14.

15.

HISTORIC STRUCTURES - CONSTRUCTION AND ALTERATION OPERATIONS WITHIN HISTORIC

STRUCTURES SHALL BE PERFORMED IN ACCORDANCE WITH NFPA 914.

IMPAIRMENTS - IMPAIRMENTS SHALL BE IN ACCORDANCE WITH NFPA 241.

GENERAL NFPA 241 SHALL BE FOLLOWED, AS APPLICABLE, FOR ALL DEMOLITION OPERATIONS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .M

EP

.G en er al .S he et s.

rv t

-0 6-

7:

:3

29G-010

GENERAL PROJECT NOTES 620-22-700

06/27/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

Revisions: Date:

7'

/1 6"

FI

N

IS

H

ED

F

LO

O

R T

O U

N D

ER

SI

D E

O F

ST

R

U C

TU

R

E

VE

R

IF

Y

FL

O O

R T

O F

LO

O

R H

EI

G

H T

TEMPORARY WALL, STARC

SYSTEMS OR EQUAL

FLOOR LINE

CEILING SYSTEM AS SCHEDULED, IF MULTIPLE

CEILING TILES MUST BE REMOVED IN THE

CORRIDOR SYSTEM AND CANNOT BE REPLACED AT

THE END OF THE WORK SHIFT, A 1-HOUR FIRE

BARRIER MIGHT NEED TO BE CONSTRUCTED.

EXISTING STRUCTURE

FIRE RATED PLASTIC TO PREVENT DUST

INSTALL PRIOR TO CONSTRUCTION

SPRINKLER SYSTEM TO

REMAIN

PROVIDE 1-HOUR RATED TEMPORARY

BARRIER OR TEMPORARY UPRIGHT

SPRINKLER HEADS, AS REQUIRED.

COORDINATE WITH OWNER FOR EACH

LOCATION

PROVIDE 1-HOUR RATED TEMPORARY

BARRIER/ TEMPORARY UPRIGHT SPRINKLER

HEADS, AS REQUIRED. COORDINATE WITH

OWNER FOR EACH LOCATION

WEEKLY

CHANGED

OR MORE AS

NEEDED

PRE-FILTER

FLEX

DUCT

MONTHLY

CHANGED

HEPA FILTER

HEPA NEGATIVE

AIR UNIT

PROVIDE STICKY MATS (CHANGED

END OF EVERY SHIFT OR MORE IF

NECESSARY TO MAINTAIN

CLEANLINESS).

INDICATOR SHALL BE AT -0.03 W.G. OR GREATER (VERIFY

DAILY). IF NOT VERIFY ALL OPENING SUCH AS DOOR ARE

CLOSED AND/OR CHANGE OUR NEGATIVE AIR PRE-FILTER.

IN CLASS 3 OR 4 AREAS NEGATIVE PRESSURE MUST BE

CONTINUOUSLY MONITORED AND ALARMED. PLEASE

COORDINATE WITH THE IC TEAM.

SUPPLY DUCTS

EITHER KEEP

RUNNING OR COVER

WHEN RUNNING TO

KEEP DUST OUT.

A

V

O

TAPE ALL SERVICES TO

PROTECT AGAINST

CONTAMINATION

E

FIRE EXTINGUISHER ON

PORTABLE FLOOR BRACKET

(SHALL REQUIRE MORE THAN

ONE.)

PROVIDE TEMPORARY

ENCLOSURE AT AREAS

TO REMAIN

OPERATIONAL, SEE

DETAIL (STARC SYSTEMS

OR EQUAL)

EXISTING RACK TO

BE REPLACED

PROVIDE NEW

HEPA FILTER AT

THE BEGINNING OF

CONSTRUCTION

NEW RACK IN TEMPORARY

LOCATION LOCATED

ADJACENT TO EXISTING RACK

OR IN ADJACENT CORRIDOR.

IF CORRIDOR IS USED,

PROVIDE INFECTION

CONTROLS FOR THAT AREA.

PROVIDE 1-HOUR RATED

TEMPORARY BARRIER/ TEMPORARY

UPRIGHT SPRINKLER HEADS, AS

REQUIRED. COORDINATE WITH

OWNER FOR EACH LOCATIONINFECTION CONTROL / DUST

CONTROL PARTITION /

BARRIER

INFECTION CONTROL/DUST

CONTROL EGRESS DOOR NON-

TRANSFERRING MULTI-

SHEETED ADHESIVE FLOOR

PADS

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

STICKY

MAT

PB IC

FLOOR

DOOR

CL

12"

48"

AFF

80"

MIN

FIRE ALARM NOTIFIER

(STROBE/HORN/SPEAKER)

NOTES:

1. HEIGHTS SHOWN ARE TYPICAL TO CENTER OF BACKBOX / DEVICE UNLESS NOTED OTHERWISE.

2. DEVICES ABOVE DOORS SHALL BE CENTERED BETWEEN TOP OF DOOR TRIM AND CEILING LINE.

3. MOUNTING HEIGHTS SHOWN ON ARCHITECTURAL ELEVATIONS SHALL GOVERN OVER THOSE SHOWN ABOVE.

4. ALL ELEVATIONS ARE TO CENTER LINE OF DEVICE, UNLESS OTHERWISE NOTED.

5. REFER TO EQUIPMENT ELEVATION DRAWINGS FOR COORDINATION WITH CASEWORK.

6. MOUNT MANUAL MOTOR STARTER ADJACENT TO OR ON UNIT.

96"

MAX

6" MIN

LIGHT SWITCH (OR OCCUPANCY SENSOR/SWITCH)

PUSHBUTTON (DOOR ACTUATOR)

WALL PHONE JACK

INTERCOM

18"

AFF

VOICE/DATA OUTLET

POWER OUTLET

J

AUDIO-VISUAL INPUT JACK

J

AUDIO-VISUAL

CONTROL KEYPAD

CR

SECURITY CARD READER

4"

MAX

4"

MAX

UNDERSIDE OF

STRUCTURE

FIRE PROTECTION ZONE, BENEATH DECK

LIGHTING ZONE OR CEILING (9'-0")

CABLING ZONE TRAYS 6" ABOVE

DOOR

CABLE TRAY HVAC ZONE, LOCATION ON PLAN

T

THERMOSTAT

6" MIN

DISCONNECT

SWITCHES

M

MOTOR STARTER

PANELBOARDS &

CABINETS

INDIVIDUAL CIRCUIT BREAKERS

CK

CLOCK OUTLETS

NC

NURSE CALL

STATION

NURSE CALL DOME LIGHTS

DM

DIMMERS

FIRE ALARM - PULL STATIONS

FX

F

FIREMAN WALL PHONE JACK 90"

AFF

96"

AFF

66"

AFF

72"

AFF TO TOP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .M

EP

.G en er al .S he et s.

rv t

-0 6-

7:

:4

29G-011

GENERAL INFECTION CONTROL NOTES AND

SYMBOLS

620-22-700

06/27/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

NTSF6 INFECTION CONTROL MEASURES, TEMPORARY WALL SECTION

NTSF8 INFECTION CONTROL MEASURES, TYPICAL CONSTRUCTION LAYOUT

NTSF5 ICRA LEGEND

NOT TO SCALE

F1 ELECTRICAL COMPONENT MOUNTING HEIGHTS

Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .M

EP

.G en er al .S he et s.

rv t

-0 6-

7:

:5

29G-012

GENERAL INDOOR AIR QUALITY NOTES 620-22-700

06/27/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

KEEP DUCTS AND HVAC EQUIPMENT CLEAN, DRY, AND FREE OF DUST AND DEBRIS DURING CONSTRUCTION. CLEAN DUCTS

BEFORE OCCUPANCY.

ASK THE HVAC CONTRACTOR TO CREATE A PLAN LISTING HOW THEY WILL PROTECT THE DUCTS AND EQUIPMENT DURING

INSTALLATION.

INSPECT DUCTS PRIOR TO INSTALLATION TO ENSURE THEY DON’T CONTAIN OIL OR DEBRIS.

PRIOR TO INSTALLATION STORE DUCTS AND MECHANICAL EQUIPMENT IN A CLEAN, DRY ENVIRONMENT. WRAP THE

EQUIPMENT WITH PLASTIC IF NECESSARY TO KEEP OUT DUST.

AVOID OPERATING THE HVAC SYSTEM DURING CONSTRUCTION TO PREVENT DUST FROM BEING PULLED INTO THE

SYSTEM. DO NOT RUN HVAC EQUIPMENT WHILE DRY-WALLING, SANDING, OR SAWING.

MAINTAIN A CLEAN WORK AREA BY SWEEPING AND VACUUMING THROUGHOUT CONSTRUCTION.

AFTER INSTALLATION AND BEFORE OPERATION, COVER HVAC AIR HANDLERS AND DUCT REGISTERS OR DUCT OPENINGS WITH PLASTIC UNTIL CONSTRUCTION (INCLUDING INSTALLATION OF FLOORING, CARPETS, CABINETRY, AND FINISH CARPENTRY) IS COMPLETED. IF REGISTERS HAVE NOT BEEN INSTALLED YET, COVER THE DUCT OPENINGS WITH

PLYWOOD FOR SAFETY.

AFTER CONSTRUCTION IS COMPLETE AND BEFORE OPERATING HVAC, CLEAN THE DUCTS USING A VACUUM AND PNEUMATIC BRUSHING SYSTEM MADE FOR DUCT CLEANING. DO NOT USE WET SOLUTIONS OR ULTRAVIOLET LIGHT

SYSTEMS.

AFTER CLEANING DUCTS, RUN THE CENTRAL FURNACE OR AIR HANDLER WITH A FILTER INSTALLED. REPLACE THE FILTER

BEFORE OCCUPANCY.

GENERAL INDOOR AIR QUALITY NOTES

SCOPE

1. GENERAL REQUIREMENTS FOR CONTRACTORS ON ALL CONSTRUCTION PROJECTS (SEE 01 57 19 TEMPORARY ENVIRONMENTAL

CONTROLS FOR ADDITIONAL REQUIREMENTS)

A.

B.

C.

D.

E.

F.

G.

H.

CONTRACTOR SHALL ESTABLISH A LIST OF BUILDING REPRESENTATIVE CONTACTS FOR BUILDINGS THAT WILL BE IMPACTED BY

THE CONSTRUCTION PROJECT.

CONTRACTOR SHALL KEEP THE FIRE LANES, HYDRANTS AND FIRE DEPARTMENT CONNECTIONS CLEAR AT ALL TIMES.

CONTRACTOR SHALL PROVIDE AND MAINTAIN DIRECTIONAL SIGNS AROUND CONSTRUCTION FENCES, BARRICADES AND AT

BLOCKED EXITS.

CONTRACTOR SHALL MAINTAIN PEDESTRIAN WALKWAY PROTECTION NEAR THE PROJECT FROM OVERHEAD FALLING OBJECTS, PROJECTILES AND CONSTRUCTION MATERIAL WHICH MAY PROTRUDE THROUGH THE FENCE.

MAINTAIN EROSION CONTROL DEVICES. DUST, MUD AND SILT SHALL NOT ESCAPE FROM THE SITE DURING A RAINSTORM. THE CONTRACTOR MUST INSPECT THE RUN-OFF AT THE BEGINNING AND DURING A STORM EVENT TO ENSURE COMPLIANCE.

CORRECTIVE ACTION MUST BE PUT IN PLACE IMMEDIATELY WHEN A DEFICIENCY IS DISCOVERED.

CONTRACTOR SHALL PROVIDE COVERED CHEMICAL SECONDARY CONTAINMENT AND SPILL RESPONSE EQUIPMENT.

PROTECT STREAMS, STORM DRAINS, SANITARY SEWER-NO CHEMICALS, DIRT OR CONSTRUCTION CHEMICALS OR DEBRIS.

CONTRACTOR SHALL MITIGATE EXPOSURE TO THE FOLLOWING:

NOISE: MAINTAIN CONSTRUCTION NOISE WITHIN ACCEPTABLE LEVELS (SEE SECTION 3 BELOW, AND SEE 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS FOR ADDITIONAL REQUIREMENTS). NOISE CONTROL TECHNIQUES INCLUDE PROPER EQUIPMENT PLACEMENT, MUFFLERS, AND/OR CONSTRUCTING NOISE DAMPENING ENCLOSURES.

DUST: ENSURE DUST CONTROL TECHNIQUES ARE USED ROUTINELY INCLUDING WET CLEANING METHODS SUCH AS WET

DRILLING/CUTTING OF MASONRY MATERIALS.

FUMES: LOCATE WELDING/CUTTING, HEATED TAR POTS ETC. AWAY FROM BUILDING AIR INTAKES.

ENGINE EXHAUSTS: TURN OFF VEHICLES, OR EQUIPMENT WHEN NOT IN USE. IDLING CREATES A GREAT DEAL OF

POLLUTION. KEEP IC ENGINES AWAY FROM AIR INTAKES.

LAY DOWN AREAS MUST OCCUR IN DESIGNATED AREAS ONLY TO PREVENT PEDESTRIAN SLIPS, TRIPS AND FALLS AND

TO KEEP FIRE LANES OPEN.

MAINTAIN MSD SHEETS ON SITE FOR RAPID ACCESS IN THE EVEN OF AN EMERGENCY.

REPAIR VEHICLE AND EQUIPMENT LEAKS IMMEDIATELY TO PREVENT FUEL, COOLANTS, AND OILS (HYDRAULICS AND

GEAR BOX) SPILLS.

MAINTAIN ACCESS AND CLEARANCE FOR SERVICE VEHICLES, INCLUDING TRASH AND RECYCLING COLLECTION

VEHICLES.

2. PROTECTING ADJACENT BUILDING

A.

B.

C.

D.

E.

F.

G.

H.

PROTECT BUILDING AIR INTAKES FROM VEHICLE AND CONSTRUCTION EQUIPMENT EXHAUST.

CONTRACTOR SHALL:

BLOCK POTENTIALLY CONTAMINATED AIR INTAKES AND PROVIDE BUILDING MAKEUP AIR FROM CLEAN AIR INTAKES. PROVIDE

TEMPORARY MAKEUP/EXHAUST AIR PLAN TO AE AND VA COR FOR REVIEW AND APPROVAL.

PROVIDE FILTERS FOR INTAKE AIR FOR DUST AND EXHAUST.

PROVIDE PHYSICAL BARRIERS TO RESTRICT TRAFFIC AND DEFLECT EXHAUST.

USE LOW EMISSION EQUIPMENT-ELECTRICALLY POWERED, WHEN POSSIBLE.

POSITION PORTABLE IC GENERATORS/COMPRESSORS AWAY FROM BUILDING INTAKES.

LOCATE HOT TAR UNITS AWAY FROM…

This is the start of the file's text. The full file is on GovTribe.