ATTACHMENT 3 - PAST PERFORMANCE QUESTIONAIRE.docx

DOCX document 55 KB Posted

Attached to
VISN 7 CONSTRUCTION MATOC 36C24726R0026 - SOLICITATION
Solicitation number
36C24726R0026
Issued by

About this file

This is a Past Performance Questionnaire template used by the Department of Veterans Affairs, Veterans Health Administration, Network Contracting Office 7 (NCO 7) to evaluate contractor performance on past projects. The questionnaire is submitted by contractors as part of their proposal evaluation for the VISN 7 Construction Multiple Award Task Order Contract (MATOC), an Indefinite-Delivery, Indefinite-Quantity contract for construction services across eight VISN 7 major medical facilities.

The questionnaire requests references to complete a detailed assessment of contractor performance across 26 evaluation criteria using a six-point scale: Exceptional (E), Good (G), Satisfactory (S), Marginal (M), Unsatisfactory (U), and Neutral (N). Evaluation areas include contractor management capabilities, quality control procedures, schedule adherence, personnel management, safety compliance, and performance on specific work elements such as standing seam metal roof installation, brick veneer installation, HVAC equipment and ductwork installation, Direct Digital Controls installation, and Testing, Adjusting, and Balancing of HVAC systems. References must provide narrative explanations for any Marginal or Unsatisfactory ratings. Completed questionnaires must be submitted via email to elissa.goodman@va.gov and joyce.powers1@va.gov, with contact information provided for the Contract Specialist and Contracting Officer. Per FAR 15.201(d)(4), respondent names will remain confidential to the offeror, though responses may be released to the offeror.

View the file

Other files

File Type Posted
36C24726R0026 0013.pdf PDF
RFI LOG AMENDMENT 0013_ SEED 1 AND 2.pdf PDF
Seed 2_Project 557-20-101_27 10 00_Update Structured Cabling.pdf PDF
RFI LOG AMENDMENT 0012_ SEED 3.pdf PDF
RFI LOG AMENDMENT 0011_ SEED 2 REVISED.pdf PDF
36C24726R0026 0011.pdf PDF
RFI LOG AMENDMENT 0011_ SEED 2.pdf PDF
SEED 1_PROJECT 534-23-910 INFECTION CONTROL DETAILS.pdf PDF
SEED 1_PROJECT 534-23-910 INFECTION CONTROL RISK ASSESSMENT.pdf PDF
RFI LOG AMENDMENT 0009_SEED 1_ SEED 2_ MATOC RFP.pdf PDF
ATTACHMENT 18 - SEED 3 WAGE DETERMINATION TUSKEGEE AL20260078 5 18 2026.pdf PDF
36C24726R0026 0008.pdf PDF
ATTACHMENT 14 - SEED 2_WAGE DETERMINATION GA20260095 05 18 2026.pdf PDF
Seed 2_557-20-101 - Project Bldg 5 As-Builts.pdf PDF
36C24726R0026 0006.pdf PDF
RFI LOG AMENDMENT 0006_SEED 2-557-20-101.pdf PDF
Seed 2_557-20-101 -GEHC-SP_REVAPEX_6-120F.pdf PDF
Seed 2_557-20-101 - Persona RF PREMIUM Brochure Fuji.pdf PDF
Seed 2_557-20-101 -Cardiac_D-Spect Specs.pdf PDF
Seed 2_557.20-101 - REVIT and CAD Screenshot.docx DOCX document
Seed 2_557-20-101 - Monitors.jpg JPG image
Seed 2_557-20-101 - Zone Valve.jpg JPG image
Seed 2_557-20-101 -Zone Valve A133-5.jpg JPG image
Seed 2_557-20-101- CT_GE Revolution Apex spec sheet_brosh.pdf PDF
Seed 2_557-20-101 -Signa Voyager 1_5 MRI.pdf PDF
Seed 2_557-20-101 -GC85A Site planning - Samsung Healthcare.pdf PDF
Seed 2_557-20-101 -HME_DR_GC85A_Datasheet_v43_230316_FDA.pdf PDF
Seed 2_557-20-101 -gehealthcare-brochure_idxa_pdf.pdf PDF
Seed 2_557-20-101 Ultrasound_RS85PrestigeTechSpecv2051RS85145rev01.pdf PDF
078400-Rev 2.pdf PDF
36C24726R0026 0004.pdf PDF
RFI LOG AMENDMENT 0004_RFP.pdf PDF
RFI LOG AMENDMENT 0003.pdf PDF
534-23-910 VA Charleston Stairwells Restrooms and Doors - Revision 1- A101-A601.pdf PDF
534-23-910 VA Charleston Stairwells Restrooms and Doors - Revision 1-Demolition pages.pdf PDF
Seed 1 - 534-23-910 Site Visit Attendance Roster_4 21 26.pdf PDF
Seed 2 - 557-20-101 Site Visit Attendance Roster_4 22 26.pdf PDF
RFI LOG AMENDMENT 0002.pdf PDF
SEED 2 - SPECIFICATION COMBINED - FINAL BID DOCUMENTS.pdf PDF
36C24726R0026 0001.docx DOCX document
36C24726R0026 AMENDMENT 0001 RFI LOG.pdf PDF
ATTACHMENT 10 - SEED 1_ PROJECT 534-23-910_ FINAL CONSTRUCTION DOCUMENTS VOL II.pdf PDF
ATTACHMENT 13 - SEED 2_PROJECT 557-20-101 DRAWINGS.pdf PDF
ATTACHMENT 14 - SEED 2_WAGE DETERMINATION GA20260095 01 23 26.pdf PDF
ATTACHMENT 18 - SEED 3_ WAGE DETERMINATION AL20260098 01 02 26.pdf PDF
ATTACHMENT 6 - INVOICING.pdf PDF
ATTACHMENT 8 - SEED 1_PROJECT 534-23-910_SPECIFICATIONS.pdf PDF
ATTACHMENT 9 - SEED 1_PROJECT 534-23-910_ FINAL CONSTRUCTION DOCUMENTS VOL I.pdf PDF
ATTACHMENT 12 - SEED 2_PROJECT 557-20-101 SPECS FINAL.pdf PDF
ATTACHMENT 16 - SEED 3_PROJECT 619A4-25-102_100 FINAL DWGs.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 3

PAST PERFORMANCE QUESTIONNAIRE

TRANSMITTAL LETTER SAMPLE

<Your Company Letterhead>

Date: To:

We have listed your firm as a reference for the work we have performed for you as listed below. Our firm has submitted a proposal under a project advertised by the Department of Veterans Affairs, Veterans Health Administration, Network Contracting Office 7 (NCO 7).

In accordance with Federal Acquisition Regulations (FAR), they will evaluate our firm's past performance, and your candid response to the attached questionnaire will assist the evaluation team in this process. We understand that you have a busy schedule and your participation in this evaluation is greatly appreciated. Please complete the enclosed questionnaire as thoroughly as possible.

Understand that while the responses to this questionnaire may be released to the offeror, FAR 15.201(d)(4) prohibits the release of the names of the persons providing the responses. Complete confidentiality will be maintained. Only one response from each office is required.

Please send your completed questionnaire to the following email address. Do not return them to our company.

elissa.goodman@va.gov & joyce.powers1@va.gov

If you have questions regarding the attached questionnaire, or require assistance, please contact Elissa Goodman, Contract Specialist at (352)213-6751, or Joyce Powers, Contracting Officer at (470)501-5673.

Thank you for your assistance.

Please be advised that email is the preferred method of receiving questions. The requested information will only be accepted via email.

<Signature and Title of Principal>

(WHEN FILLED IN) SOURCE SELECTION SENSITIVE IAW FAR 2.101 AND FAR

3.104 FOR OFFICIAL USE ONLY

A. GENERAL INFORMATION: (Contractor to be evaluated)

Contractor’s Name: Telephone Number: Address:

Point of Contact:

E-mail:

Project Title and Brief Description of Work:*
*
Contract Number Provided by Offeror:Dollar Amount:*
Contract Period or Dates of Performance Provided by Offeror:* Contractor performed as thePrime ContractorSub-ContractorKey Personnel

* Note: If offeror holds or has held other contracts with your agency/organization in the last 3 years, please complete separate evaluation forms for those contracts as well.

B. RESPONDENT INFORMATION:

Name of Respondent:Title:
Address:Telephone Number:

Email Address:

C. E-MAIL COMPLETED SURVEY FORM TO: elissa.goodman@va.gov & joyce.power1@va.gov .

D. PERFORMANCE INFORMATION: Choose the appropriate letter on the scale (E, G, S, M, U, and N) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF M or U.

E (1)
G (2)
S (3)
M (4)
U (5)
N (6)
Exceptional
Good
Satisfactory
Marginal
Unsatisfactory
Neutral
Performance meets/met contractual requirements with many exceeded to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were highly effective.
Performance meets/met contractual requirements with some exceeded to the Government’s benefit. The contractual performance of the element or sub- element being assessed was accomplished with no more than some minor problems for which corrective actions taken by the contractor were effective.
Performance meets/met contractual requirements. The contractual performance of the element or sub- element contains some minor problems for which corrective actions taken by the contractor were satisfactory.
Performance does not meet/did not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet Identified Corrective actions or the

contractor’s proposed actions appear only marginally effective or were not fully implemented.

Performance does not meet/did not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub- element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Performance was not observed or not applicable to the current effort being reported against.

CONTRACTOR’S NAME:

CONTRACT NUMBER:

E=1
G=2
S=3
M=4
U=5
N=6

Place an “X” in the appropriate column using the definitions matrix above. The contractor:

1.
Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.
1
2
3
4
5
6
NA
2.
Demonstrated ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.
1
2
3
4
5
6
NA
3.
Delegated authority to project managers and supervisors commensurate with contract requirements.
1
2
3
4
5
6
NA
4.
Home office participated in solving significant local problems.
1
2
3
4
5
6
NA
5.
Followed approved quality control plan.
1
2
3
4
5
6
NA
6.
Provided effective quality control and/or inspection procedures to meet contract requirements.
1
2
3
4
5
6
NA
7.
Corrected deficiencies in timely manner and pursuant to their quality control procedures.
1
2
3
4
5
6
NA
8.
Provided timely resolution of contract discrepancies.
1
2
3
4
5
6
NA
9.
Identified risks/problems as they occurred.
1
2
3
4
5
6
NA
10.
Suggested alternative approaches to problems.
1
2
3
4
5
6
NA
11.
Displayed initiative to solve problems.
1
2
3
4
5
6
NA
12.
Developed realistic progress schedules.
1
2
3
4
5
6
NA
13.
Met established project schedules.
1
2
3
4
5
6
NA
14.
Provided timely resolution of warranty defects.
1
2
3
4
5
6
NA
15.
Was responsive to contract changes.
1
2
3
4
5
6
NA
16.
Provided adequate project supervision.
1
2
3
4
5
6
NA
17.
Obtained consent of surety for increases in bonding as work-in- progress increased.
1
2
3
4
5
6
NA
18.
Paid subcontractors/suppliers in a timely manner.
1
2
3
4
5
6
NA
20.
With respect to the safety plan, the contractor
1
2
3
4
5
6
NA
a.
Followed the approved safety plan.
1
2
3
4
5
6
NA
b.
Had no significant safety problems at the job site.
1
2
3
4
5
6
NA
21.
The contractor met contractual requirements for the following work elements:
1
2
3
4
5
6
NA
a.
Installation of standing seam metal roof
1
2
3
4
5
6
NA
b.
Installation of brick veneer
1
2
3
4
5
6
NA
c.
Installation of HVAC equipment and ductwork
1
2
3
4
5
6
NA
d.
Installation of Direct Digital Controls
1
2
3
4
5
6
NA
e.
Testing, Adjusting, and Balancing of HVAC systems
1
2
3
4
5
6
NA
f.
Phased Construction
1
2
3
4
5
6
NA
22.
Cooperated with Government personnel after award.
YES
NO
23.
Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”
1
2
3
4
5
6
NA
24.
Would you award another contract to this contractor? If not, explain in “remarks.”
1
2
3
4
5
6
NA
25.
Has contractor demonstrated a history of environmental compliance? If not, explain in “remarks.”
YES
NO
26.
How would you rate the contractor's overall performance?
1
2
3
4
5
6
NA

Remarks: