This document is a set of infection control construction detail drawings for a Veterans Affairs medical facility renovation project located at 109 Bee Street, Charleston, SC 29401 (Project 534-23-910). The drawings establish comprehensive requirements for Infection Control Risk Assessment (ICRA) containment barriers that contractors must implement during construction activities in hospital areas.

The specifications mandate Class IV ICRA barriers with ante rooms, negative air pressure systems maintained at -0.01 inches of water or greater, and HEPA filtration for dust control. Key contractor requirements include: isolating existing HVAC systems, sealing all air vents near work areas, implementing designated entry/exit procedures with traffic control signage, placing and maintaining daily dust mats, performing HEPA vacuuming and wet mopping with disinfectant daily, obtaining an infection control permit before construction begins, providing personal protective equipment including N95 respirators and face shields, protecting above-ceiling areas within containment zones, sealing medical gas outlets to prevent contamination, and performing complete HEPA cleaning of all surfaces upon project completion before barrier removal. Barriers must include metal, wipeable doors with closers and VA-compatible locks; may utilize mobile containment units or plastic zippered doors for projects under 30 calendar days with minimal dust generation (subject to infection prevention approval); and cannot be constructed during business hours (8:00 AM–4:30 PM, Monday–Friday). The VA retains the right to modify ICRA barrier extents and areas at no additional cost to the government, and contractors must adhere to all current ICRA/ILSM documentation with failure to comply resulting in disciplinary action and mandatory training.

View the file

Other files

File Type Posted
36C24726R0026 0013.pdf PDF
RFI LOG AMENDMENT 0013_ SEED 1 AND 2.pdf PDF
Seed 2_Project 557-20-101_27 13 23_Comm Optical Fiber Backbone Cabling.pdf PDF
RFI LOG AMENDMENT 0012_ SEED 3.pdf PDF
Seed 2_Project 557-20-101_27 10 00_Update Structured Cabling.pdf PDF
RFI LOG AMENDMENT 0011_ SEED 2 REVISED.pdf PDF
36C24726R0026 0012.pdf PDF
RFI LOG AMENDMENT 0011_ SEED 2.pdf PDF
36C24726R0026 0011.pdf PDF
36C24726R0026 0010.pdf PDF
SEED 1_PROJECT 534-23-910 INFECTION CONTROL RISK ASSESSMENT.pdf PDF
36C24726R0026 0009.pdf PDF
RFI LOG AMENDMENT 0009_SEED 1_ SEED 2_ MATOC RFP.pdf PDF
ATTACHMENT 18 - SEED 3 WAGE DETERMINATION TUSKEGEE AL20260078 5 18 2026.pdf PDF
36C24726R0026 0008.pdf PDF
ATTACHMENT 14 - SEED 2_WAGE DETERMINATION GA20260095 05 18 2026.pdf PDF
RFI LOG AMENDMENT 0007_Seed 3 - 619A4-25-102.pdf PDF
36C24726R0026 0007.pdf PDF
Seed 3_ 619A4-25-102 - Correct Egress Door Deficiencies Final Drawings.pdf PDF
RFI LOG AMENDMENT 0006_SEED 2 - Revised.pdf PDF
ATTACHMENT 11 - SEED 1_WAGE DETERMINATION SC20260023 05 18 2026.pdf PDF
Seed 2_557-20-101 - Project Bldg 5 As-Builts.pdf PDF
Seed 2_557-20-101 - Photos_RFI 262 263.docx DOCX document
Seed 3_619A4-25-102 Wage Rates AL20260078 01 02 2026.pdf PDF
Seed 1_534-23-910 SOW Rev1 - Final.pdf PDF
Seed 2_557-20-101 -Typical - Symbia Intevo Bold.pdf PDF
Seed 2_557-20-101 - 2024-06-19_SD Rpt_ GC85A_Physicist Rp.pdf PDF
Seed 2_557-20-101 -HME_DR_GM85_Datasheet_v42_230209_FDA.pdf PDF
Seed 2_557-20-101 -GEHC-SP_SIGNA-VOYAGER_8-278F.pdf PDF
Seed 2_557-20-101 -5418654-1EN Rev 22.pdf PDF
Seed 2_557-20-101- CT_GE Revolution Apex spec sheet_brosh.pdf PDF
Seed 2_557-20-101 -HME_DR_GC85A_Datasheet_v43_230316_FDA.pdf PDF
RFI LOG AMENDMENT 0006_SEED 2-557-20-101.pdf PDF
36C24726R0026 0006.pdf PDF
Seed 2_557-20-101 -gehealthcare-brochure_idxa_pdf.pdf PDF
Seed 2_557-20-101 - Zone Valve.jpg JPG image
Seed 2_557-20-101 - Monitors.jpg JPG image
Seed 2_557-20-101 Ultrasound_RS85PrestigeTechSpecv2051RS85145rev01.pdf PDF
Seed 2_557-20-101 -GEHC-SP_REVAPEX_6-120F.pdf PDF
Seed 2_557-20-101 -Cardiac_D-Spect Specs.pdf PDF
Seed 2_557-20-101 -Zone Valve A133-5.jpg JPG image
Seed 2_557-20-101 - Persona RF PREMIUM Brochure Fuji.pdf PDF
Seed 2_557.20-101 - REVIT and CAD Screenshot.docx DOCX document
Seed 2_557-20-101 -GC85A Site planning - Samsung Healthcare.pdf PDF
Seed 2_557-20-101 -Signa Voyager 1_5 MRI.pdf PDF
Seed 2_557-20-101 - VA Radiology - CD100 Final Bid Documents - Combined Set - SIGNED.pdf PDF
Seed 2_557-20-101 -Probe Cabinet specs.pdf PDF
Seed 2_557-20-101 - Med Gas Master Alarm Panel.jpg JPG image
RFI LOG AMENDMENT 0006_MATOC RFP.pdf PDF
RFI LOG AMENDMENT 0005_Seed 1.pdf PDF
Show 40 more

Latest 50 of 92 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OUTSIDE OF BUILDING

COVER ALL RETURNS AT THE

GRATE/DIFFUSERS WITH FIRE

RATED PLASTIC SHEETING AND

SECURE WITH DUCT TAPE.

FIRE RATED PLYWOOD

(REFER TO ELEVATION)

F L

E X

D U

C T

SUPPLY DUCTS TO BE COVERED

WITH FIRE RATED PLASTIC

SHEETING AND SECURE WITH

DUCT TAPE TO KEEP DUST OUT.

HEPA NEGATIVE AIR UNIT

E

EXHAUST DUCTS (COVER THE

GRATES AND THE DIFFUSERS)

TAPE ALL SERVICES TO

PROTECT AGAINST

CONTAMINATION

A

O

V

MONTHLY CHANGED

HEPA FILTER

WEEKLY CHANGED

(OR MORE AS NEEDED)

PRE-FILTER

ABC TYPE FIRE EXTINGUISHER ON

PORTABLE FLOOR BRACKET (ILSM

MAY REQUIRE MORE THAN ONE

OR WALL MOUNTED). NEED

INSPECTION TAG AND MONTHLY

INSPECION). (INITIALS/DATED).

HARD BARRIER

TEMP. ANTE ROOM

BLUE CORE LOCKSET

(LOCKED AT ALL TIMES)

STICKY MATS PROVIDED (CHANGED END OF SHIFT OR

MORE IF NECESSARY TO MAINTAIN CLEANLINESS).

POST ICRA, PCRA, ILSM, FIRE INSPECTION

SHEETS VISIBLE TO PUBLIC

(SEE ANTE ROOM ELEVATION DETAIL)

INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE

(VERIFY DAILY), IF NOT VERIFY ALL OPENING SUCH AS

DOORS ARE CLOSED AND/OR CHANGE OUT NEGATIVE

AIR PRE-FILTER. (TYPICAL REGULATOR INSTALLATION).

C L

E A

R

M

IN

I N

A L

L C

O R

R

ID

O R

S

M U

S T

M A

IN

T

A

IN

G003 A

G003 A

G003 A

A. ISOLATE EXISTING HVAC SYSTEM IN AREAS WHERE WORK IS TO BE PERFORMED.

ALL AIR VENTS MUST BE SEALED OFF NEAR THE CONSTRUCTION AREA AS

REQUIRED AFTER COORDINATION WITH COR TO ENSURE NON-INTERFERENCE

WITH HVAC AND NEGATIVE PRESSURE SYSTEMS. DUST TO BE CONTROLLED

WITHIN THE WORK SITE FROM FLOOR TO DECK. ISOLATED HVAC SYSTEMS SHALL

BE RETURNED IN PROPER WORKING ORDER AT THE COMPLETION OF PROJECT

WITH COR APPROVAL.

B. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES WILL BE DEFINED

AND CLEARLY ARTICULATED WITH CONSTRUCTION SIGNAGE TO BE PROVIDED BY

THE CONTRACTOR. ALL EGRESS WAYS MUST BE MAINTAINED FREE OF DEBRIS AT

ALL TIMES. THEY MUST BE UTILIZED AT SCHEDULED TIMES ONLY AS COORDINATED

WITH COR. DUST MATS MUST BE PLACED AT ENTRANCES/EXITS OF WORK AREA

AND REPLACED DAILY OR MORE FREQUENTLY IF NECESSARY. DEBRIS WHEN

TRANSPORTED THROUGH HOSPITAL AREAS MUST BE COMPLETELY TIGHTLY

COVERED TO CONTAIN DUST DURING TRANSPORT. DEBRIS SHALL BE REMOVED IN

EVENINGS OR NON-DUTY TIMES. ALL CART WHEELS MUST BE CLEANED BEFORE

LEAVING THE CONSTRUCTION AREA.

C. CLEANING: THE CONSTRUCTION ZONE AND ADJACENT ENTRY AREA SHALL BE

MAINTAINED IN A CLEAN AND SANITARY MANNER BY THE CONTRACTOR AND WILL

BE HIGH EFFICIENCY PARTICULATE AIR (HEPA) VACUUMED AND WET MOPPED WITH

DISINFECTANT DAILY OR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST

GENERATION. CLOTHING SHALL BE FREE OF LOOSE SOIL AND DEBRIS UPON

EXITING THE CONSTRUCTION ZONE. PROVIDE PERSONAL PROTECTIVE

EQUIPMENT, INCLUDING FACE SHIELDS, GLOVES, AND N95 RESPIRATORS

REQUIRED BY THE SAFETY SPECIFICATION.

D. INFECTION CONTROL CONSTRUCTION PERMIT: CONTRACTOR TO OBTAIN

INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.

E. STAGING AREAS WILL BE DESIGNATED BY THE COR. CONTRACTOR TO

COORDINATE WITH THE COR PRIOR TO CONSTRUCTION.

F. THE CONTRACTOR SHALL COORDINATE WITH RISK ASSESSMENT DOCUMENTATION

AND THE COR PRIOR TO IMPLEMENTATION.

G. CONTRACTOR TO PROVIDE PROTECTION ABOVE CEILING WITHIN THE

CONTAINMENT AREA, IF EXISTING WALLS AND/OR PARTITIONS DO NOT EXTEND TO

THE STRUCTURE ABOVE.

H. COORDINATE WITH MEP/FP. ALL MEDICAL GAS OUTLETS WITHIN THE ICRA

BARRIER SHALL BE SEALED IN A MANNOR TO PREVENT CONTAMINATION OF THE

GAS OUTLET. FAILURE TO PREVENT CONTAMINATION WILL RESULT IN THE

CONTRACTOR RE-CERTIFYING THE MEDICAL GAS AT NO COST TO THE

GOVERNMENT.

I. ICRA PLANS DENOTE TOTAL DEFINED AREAS OF WORK ON ALL AFFECTED LEVELS.

THE VA MAY, BASED ON DYNAMIC UNFORESEEN VARIABLES (PATIENT CENSUS,

OTHER PROJECTS, ETC.), REQUIRE THE GENERAL CONTRACTOR TO MODIFY

EXTENTS AND AREA SIZES OF ICRA BARRIERS AT NO COST TO THE GOVERNMENT.

ANY SUCH MODIFICATION WILL REQUIRE THE SAME REQUISITE PROVISIONS

REQUIRING CONTAINMENT (ANTE ROOM, WALK-OFF MATS, ETC.) AIR-

PRESSURIZATION CRITERIA, AND IDENTIFICATION AS NOTED ON THESE

DOCUMENTS.

J. UPON COMPLETION OF CONSTRUCTION BUT BEFORE THE ICRA CONTAINMENT

BARRIER MAY BE REMOVED, THE CONTRACTOR SHALL CLEAN THE ENTIRE

CONSTRUCTION AREA OF ALL DEBRIS AND DUST. ALL SURFACES SHALL BE HEPA

FILTER VACUUMED AND WIPED CLEAN WITH DISINFECTANT OF ALL DUST

INCLUDING, BUT NOT LIMITED TO, FLOORS, WALLS, WINDOW SILLS, WINDOW

BLINDS, FURNITURE, EQUIPMENT, ARTWORK, MEDICAL GAS OUTLETS, ELECTRICAL

OUTLETS, HVAC VENTS, THERMOSTATS, MIRRORS, SINKS, AND WALL MOUNTED

ANCILLARY COMPONENTS.

K. ICRA BARRIERS SHALL NOT BE BUILT DURING MEDICAL CENTER BUSINESS HOURS

8:00AM-4:30PM M-F. SOME AREAS MAY HAVE ADDITIONAL TIME RESTRICTIONS.

L. ICRA BARRIERS AT MOST ROOMS SHALL BE CLASS IV. THERE MUST BE AN ANTE

ROOM.

M. THE BID DOCUMENTS HAVE EXAMPLES OF ICRA/ILSM FORMS THAT WILL BE

GENERATED AND POSTED FOR EVERY CONSTRUCTION CONTAINMENT BARRIER

THAT THE CONTRACTOR WILL BE REQUIRED TO ADHERE TO FOR INFECTION

PREVENTION WITHIN THE MEDICAL CENTER. DETAILS OF THE ICRA/ILSM

DOCUMENTS MAY CHANGE AT ANY TIME PER INFECTION PREVENTION OR VA

GUIDELINES ISSUED AT THAT TIME. THE CONTRACTOR IS REQUIRED TO ADHERE

TO THESE CURRENT STANDARD ICRA/ILSM DOCUMENTS DURING THE DURATION

OF THE CONTRACT AT NO COST TO THE GOVERNMENT. FAILURE TO COMPLY WITH

THE POSTED ICRA/ILSM WILL RESULT IN DISCIPLINARY ACTION AND THE

CONTRACTOR AND ITS EMPLOYEES REQUIRED TO ATTEND AN ON-STATION VA

PROVIDED TRAINING SESSION AT NO COST TO THE GOVERNMENT.

N. ICRA BARRIERS AT LOCATIONS THAT WILL BE ACTIVE FOR LESS THAN 30

CALENDAR DAYS AND HAVE MINIMAL DUST GENERATING ACTIVITY MAY BE

ALLOWED TO HAVE A PLASTIC ZIPPERED DOOR SEPARATING THE ANTE ROOM AND

CONSTRUCTION ZONE. THE CONTRACTOR SHALL PROVIDE A WRITTEN PROPOSAL

FOR VA INFECTION PREVENTION PERSONNEL TO REVIEW BUT MUST BE PREPARED

TO PROVIDE A MORE RESTRICTIVE BARRIER PER ICRA REQUIREMENTS AT NO

COST TO THE GOVERNMENT.

O. ICRA BARRIERS AT SOME LOCATIONS MAY BE ALLOWED TO BE A MOBILE

CONTAINMENT UNIT OR OTHER SIMILAR MOBILE OR MODULAR CONTAINMENT

SYSTEM. THE CONTRACTOR SHALL PROVIDE A WRITTEN PROPOSAL FOR VA

INFECTION PREVENTION PERSONNEL TO REVIEW BUT MUST BE PREPARED TO

PROVIDE A MORE RESTRICTIVE BARRIER PER ICRA REQUIREMENTS AT NO COST

TO THE GOVERNMENT.

P. ALL GAPS IN THE CONTAINMENT BARRIER MUST BE TAPED AND SEALED. TAPING IS

TO BE DONE IN A MANNER AS TO NOT BE DESTRUCTIVE TO EXISTING

INFRASTRUCTURE OR THE CONTRACTOR IS RESPONSIBLE FOR REPAIR. TAPING IS

TO BE INSPECTED DAILY AND ANY GAPS RESEALED OR RETAPED TO MAINTAIN THE

REQUIRED NEGATIVE AIR PRESSURE. NEGATIVE AIR OUTLET SHALL USE A PIECE

OF HARD FLAT MATERIAL IN THE WINDOW WITH A HOLE IN IT FOR THE TUBING AND

USE A ROUND FLANGE AND ATTACH THE TUBING WITH A BAND CLAMP OR SIMILAR

VA APPROVED METHOD.

Q. DOORS INTO ICRA BARRIERS SHALL BE:

a. •METAL AND WIPEABLE TO MAINTAIN A DUST FREE CLEAN SURFACE. NO

WOOD ALLOWED.

b. •PRE-MANUFACTURED TEMPORARY WALL SYSTEMS ARE ALLOWED PER VA

APPROVAL.

c. •ADA COMPLIANT THRESHOLD, OR NO THRESHOLD.

d. •HAVE A DOOR CLOSER.

e. •DOOR MUST CLOSE AND LATCH ON ITS OWN POWER WHILE THE NEGATIVE

AIR IS OPERATIONAL.

f. •A DOOR LATCH AND LOCK COMPATIBLE WITH THE VA KEY CORE.

INFECTION CONTROL NOTES:

FLEX DUCT

A D

JU

S

T A

B

LE

H

E

IG

H T

MOBILE CONTAINMENT

CART WITH CANVAS/

1-1/4" SQUARE STEEL

TUBULAR FRAME

A D

JU

S

T A

B

LE

H

E

IG

H T

ZIPPER SIDE ENTRY

PLASTIC WINDOW

(ON ALL SIDES)

HEPA NEGATIVE

AIR UNIT

SWIVEL CASTERS

FIRE/ UL RATED PLASTIC

TO PREVENT DUST

INFILTRATION (INSTALL PRIOR

TO CONSTRUCTION)

EXISTING DECK-V.I.F.

EXISTING AIR PLENUM

EXISTING FIRE SPRINKLER SYSTEM

NEW PARTITION.

REFER TO INFECTION

CONTROL PLAN FOR

PARTITION TYPE.

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING

REPLACED TO BE PROTECTED

OR COVERED WITH ROSEN

PAPER/FIRE RATED PLYWOOD.

HEATED DETECTOR CUT-OFF

HEPA NEGATIVE AIR UNIT

FUSIBLE 1-HR FIRE DAMPER

EXISTING PARTITION

NEW WALL OVER EXISTING WALL.

VIF EXISTING WALL. REFER TO

INFECTION CONTROL PLAN FOR

WALL PARTITION TYPE.

THIS IS A RESTRICTED AREA

AREA UNDER CONSTRUCTION

-D

ESCRIPTIO

N O F N

EWLY PROPOSED O

CCUPANCY-THIS

POST ICRA, PCRA,

ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE

(VERIFY DAILY), IF NOT VERIFY ALL OPENING

SUCH AS DOORS ARE CLOSED AND/OR CHANGE

OUT NEGATIVE AIR PRE-FILTER.

A P

P R

O X

. 4 8"

A .F

.F

ICRA, PCRA, ILSM

FIRE WATCH

MISC. FORMS

SNAP

FRAME

SNAP

FRAME

SDS, DAVIS

BACON WAGE

POSTER

FRAMED PICTURE

OF C.O.R. WITH

CONTACT

INFORMATION

CONST. SUPERVISOR

NAME AND CELL

PHONE

CHILLER PLANT AFTER HOURS

CALL (VA PROVIDED #)

IN-HOUSE PHONE (VA #) FIRE

EMERGENCY DIAL 911

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 a r c h i t e c t s

PS JC

THINKFORM DESIGN ARCHITECTS LLC

207 EAST BAY STREET, SUITE 302

CHARLESTON, SC 29401

T:609.644.3120 F:609.644.4397 Russell DiNardo, AIA SC 101675

A u to d e s k D o c s

/2

V

A C h a rl e s to n S ta ir w e lls

R e s tr o o m s a n d

D o o rs

/2

V A

C h a rl e s to n S ta ir w e lls

R e s tr o o m s a n d D o o rs .r v t

/2

/2

:0

:5

A

M

G003 A

INFECTION CONTROL DETAILS 24014 VA Charleston Restrooms, Stairwells, and Doors

109 Bee Street Charleston, SC 29401

534-23-910

08 DEC 2025

FINAL CONSTRUCTION

DOCUMENTS

Revision Number

Revisions: Date:

3 AMMENDMENT REV 5/28/2026

1/2" = 1'-0"

TYPICAL IDEAL CONSTRUCTION

LAYOUT CLASS IV

1/2" = 1'-0"

MOBILE CONTAINMENT CART

(CONST. BARRIER TYPES)

1/2" = 1'-0"

CROSS SECTION 'A-A'

1/2" = 1'-0"

ANTE ROOM ELEVATION

Sheets
G003 A - INFECTION CONTROL DETAILS