Seed 2_557-20-101 - Project Bldg 5 As-Builts.pdf

PDF 37 MB Posted

Attached to
VISN 7 CONSTRUCTION MATOC 36C24726R0026 - SOLICITATION
Solicitation number
36C24726R0026
Issued by

About this file

This file is an as-built drawing document for Project Building 5 under the VISN 7 Construction MATOC solicitation (36C24726R0026). The document serves as a reference artifact related to the broader Indefinite-Delivery, Indefinite-Quantity (IDIQ) construction contract vehicle established by the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 7 (VISN 7).

The as-built drawing provides visual and technical documentation of Building 5's completed construction or renovation work, which falls within the scope of services covered under the VISN 7 Construction MATOC. This MATOC is designed to support a broad range of construction, maintenance, alteration, and repair services affecting real property at eight major VISN 7 medical facilities and related off-site VA-owned medical facilities. The as-built documentation is critical for record-keeping, future maintenance planning, and compliance verification for construction projects executed under task orders awarded through this federal contract vehicle.

View the file

Other files

File Type Posted
36C24726R0026 0013.pdf PDF
RFI LOG AMENDMENT 0013_ SEED 1 AND 2.pdf PDF
Seed 2_Project 557-20-101_27 13 23_Comm Optical Fiber Backbone Cabling.pdf PDF
RFI LOG AMENDMENT 0012_ SEED 3.pdf PDF
Seed 2_Project 557-20-101_27 10 00_Update Structured Cabling.pdf PDF
RFI LOG AMENDMENT 0011_ SEED 2 REVISED.pdf PDF
36C24726R0026 0012.pdf PDF
RFI LOG AMENDMENT 0011_ SEED 2.pdf PDF
36C24726R0026 0011.pdf PDF
36C24726R0026 0010.pdf PDF
SEED 1_PROJECT 534-23-910 INFECTION CONTROL RISK ASSESSMENT.pdf PDF
36C24726R0026 0009.pdf PDF
RFI LOG AMENDMENT 0009_SEED 1_ SEED 2_ MATOC RFP.pdf PDF
SEED 1_PROJECT 534-23-910 INFECTION CONTROL DETAILS.pdf PDF
ATTACHMENT 18 - SEED 3 WAGE DETERMINATION TUSKEGEE AL20260078 5 18 2026.pdf PDF
36C24726R0026 0008.pdf PDF
ATTACHMENT 14 - SEED 2_WAGE DETERMINATION GA20260095 05 18 2026.pdf PDF
RFI LOG AMENDMENT 0007_Seed 3 - 619A4-25-102.pdf PDF
36C24726R0026 0007.pdf PDF
Seed 3_ 619A4-25-102 - Correct Egress Door Deficiencies Final Drawings.pdf PDF
RFI LOG AMENDMENT 0006_SEED 2 - Revised.pdf PDF
ATTACHMENT 11 - SEED 1_WAGE DETERMINATION SC20260023 05 18 2026.pdf PDF
Seed 2_557-20-101 - Photos_RFI 262 263.docx DOCX document
Seed 3_619A4-25-102 Wage Rates AL20260078 01 02 2026.pdf PDF
Seed 1_534-23-910 SOW Rev1 - Final.pdf PDF
Seed 2_557-20-101 -Typical - Symbia Intevo Bold.pdf PDF
Seed 2_557-20-101 - 2024-06-19_SD Rpt_ GC85A_Physicist Rp.pdf PDF
Seed 2_557-20-101 -HME_DR_GM85_Datasheet_v42_230209_FDA.pdf PDF
Seed 2_557-20-101 -GEHC-SP_SIGNA-VOYAGER_8-278F.pdf PDF
Seed 2_557-20-101 -5418654-1EN Rev 22.pdf PDF
Seed 2_557-20-101- CT_GE Revolution Apex spec sheet_brosh.pdf PDF
Seed 2_557-20-101 -HME_DR_GC85A_Datasheet_v43_230316_FDA.pdf PDF
RFI LOG AMENDMENT 0006_SEED 2-557-20-101.pdf PDF
36C24726R0026 0006.pdf PDF
Seed 2_557-20-101 -gehealthcare-brochure_idxa_pdf.pdf PDF
Seed 2_557-20-101 - Zone Valve.jpg JPG image
Seed 2_557-20-101 - Monitors.jpg JPG image
Seed 2_557-20-101 Ultrasound_RS85PrestigeTechSpecv2051RS85145rev01.pdf PDF
Seed 2_557-20-101 -GEHC-SP_REVAPEX_6-120F.pdf PDF
Seed 2_557-20-101 -Cardiac_D-Spect Specs.pdf PDF
Seed 2_557-20-101 -Zone Valve A133-5.jpg JPG image
Seed 2_557-20-101 - Persona RF PREMIUM Brochure Fuji.pdf PDF
Seed 2_557.20-101 - REVIT and CAD Screenshot.docx DOCX document
Seed 2_557-20-101 -GC85A Site planning - Samsung Healthcare.pdf PDF
Seed 2_557-20-101 -Signa Voyager 1_5 MRI.pdf PDF
Seed 2_557-20-101 - VA Radiology - CD100 Final Bid Documents - Combined Set - SIGNED.pdf PDF
Seed 2_557-20-101 -Probe Cabinet specs.pdf PDF
Seed 2_557-20-101 - Med Gas Master Alarm Panel.jpg JPG image
RFI LOG AMENDMENT 0006_MATOC RFP.pdf PDF
RFI LOG AMENDMENT 0005_Seed 1.pdf PDF
Show 40 more

Latest 50 of 92 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5-7,Dimensions and Notes, Second Floor Plan AB

5-8,Dimensions and Notes, Second Floor Plan CD
5-21, Elevations 1-12
5-22, Elevations 13-18
5-23, First Floor Plan A_B Reflected Ceiling
5-24, First Floor Plan C_D Reflected Ceiling
5-25, Second Floor Plan A_B Reflected Ceiling
5-26, Second Floor Plan C_D Reflected Ceiling
5-H1_Blue Team Expansion,HVAC
5H-2, HVAC Schedules
5-H2_Blue Team Expansion_HVAC
5H-3, HVAC Schedules and Details
5-H3_Blue Team Expansion_HVAC
5H-4, HVAC Details
5H-5, HVAC Details
5H-6, HVAC Details
5H-7, HVAC Details
5H-8, HVAC Details
5H-9, HVAC Airflow Diagram
5H-10, HVAC Airflow Diagram
5H-11, Misc HVAC Controls and Details
5H-12, AC System Controls
5H-13, HVAC Plant Controls and Instrumentation
5H-14, DDC Point Schedule
5H-15, Bldg 7 Basement Plan-HVAC Piping-Demo
5H-16, Pipe Basement 1st&2nd Floor -Demolition
5H-17, First & Second Floor Demo
5H-18, First Floor Plan- Areas 1A&1B- HVAC
5H-19, First Floor Plan- Areas 1C&1D- HVAC
5H-20, Second Floor Plan- Areas 2A&2B- HVAC
5H-21, Second Floor Plan- Areas 2C&2D- HVAC
5H-22, Bldg 5 Attic Floor Plan, North-New Work-HVAC
5H-23, Bldg 5 & 7 Basement Plan-HVAC Piping
5H-24, First Floor Plan-1A&1B HVAC Piping
5H-25, First Floor Plan-1C&1D HVAC Piping
5H-26, Second Floor Plan-2A&2B HVAC Piping
5H-27, Second Floor Plan-2C&2D HVAC Piping
5H-28, Large Scale Mechanical Room 2A-232 & 2B-201
5H-29, Large Scale Mechanical Room 2C-201 & 2D-201
5H-30, Mechanical Room 1C-131
5H-31, Building Sections HVAC
5P-6, First Floor Plan - Areas 1A and 1B- Plumbing
5P-7, First Floor Plan - Areas 1C and 1D- Plumbing

File details come from the government source that posted it. Updated .