Seed 2_557-20-101 - Project Bldg 5 As-Builts.pdf
PDF 37 MB Posted
- Solicitation number
- 36C24726R0026
About this file
This file is an as-built drawing document for Project Building 5 under the VISN 7 Construction MATOC solicitation (36C24726R0026). The document serves as a reference artifact related to the broader Indefinite-Delivery, Indefinite-Quantity (IDIQ) construction contract vehicle established by the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 7 (VISN 7).
The as-built drawing provides visual and technical documentation of Building 5's completed construction or renovation work, which falls within the scope of services covered under the VISN 7 Construction MATOC. This MATOC is designed to support a broad range of construction, maintenance, alteration, and repair services affecting real property at eight major VISN 7 medical facilities and related off-site VA-owned medical facilities. The as-built documentation is critical for record-keeping, future maintenance planning, and compliance verification for construction projects executed under task orders awarded through this federal contract vehicle.
View the file
Other files
Show 40 more
Latest 50 of 92 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5-7,Dimensions and Notes, Second Floor Plan AB
| 5-8,Dimensions and Notes, Second Floor Plan CD |
| 5-21, Elevations 1-12 |
| 5-22, Elevations 13-18 |
| 5-23, First Floor Plan A_B Reflected Ceiling |
| 5-24, First Floor Plan C_D Reflected Ceiling |
| 5-25, Second Floor Plan A_B Reflected Ceiling |
| 5-26, Second Floor Plan C_D Reflected Ceiling |
| 5-H1_Blue Team Expansion,HVAC |
| 5H-2, HVAC Schedules |
| 5-H2_Blue Team Expansion_HVAC |
| 5H-3, HVAC Schedules and Details |
| 5-H3_Blue Team Expansion_HVAC |
| 5H-4, HVAC Details |
| 5H-5, HVAC Details |
| 5H-6, HVAC Details |
| 5H-7, HVAC Details |
| 5H-8, HVAC Details |
| 5H-9, HVAC Airflow Diagram |
| 5H-10, HVAC Airflow Diagram |
| 5H-11, Misc HVAC Controls and Details |
| 5H-12, AC System Controls |
| 5H-13, HVAC Plant Controls and Instrumentation |
| 5H-14, DDC Point Schedule |
| 5H-15, Bldg 7 Basement Plan-HVAC Piping-Demo |
| 5H-16, Pipe Basement 1st&2nd Floor -Demolition |
| 5H-17, First & Second Floor Demo |
| 5H-18, First Floor Plan- Areas 1A&1B- HVAC |
| 5H-19, First Floor Plan- Areas 1C&1D- HVAC |
| 5H-20, Second Floor Plan- Areas 2A&2B- HVAC |
| 5H-21, Second Floor Plan- Areas 2C&2D- HVAC |
| 5H-22, Bldg 5 Attic Floor Plan, North-New Work-HVAC |
| 5H-23, Bldg 5 & 7 Basement Plan-HVAC Piping |
| 5H-24, First Floor Plan-1A&1B HVAC Piping |
| 5H-25, First Floor Plan-1C&1D HVAC Piping |
| 5H-26, Second Floor Plan-2A&2B HVAC Piping |
| 5H-27, Second Floor Plan-2C&2D HVAC Piping |
| 5H-28, Large Scale Mechanical Room 2A-232 & 2B-201 |
| 5H-29, Large Scale Mechanical Room 2C-201 & 2D-201 |
| 5H-30, Mechanical Room 1C-131 |
| 5H-31, Building Sections HVAC |
| 5P-6, First Floor Plan - Areas 1A and 1B- Plumbing |
| 5P-7, First Floor Plan - Areas 1C and 1D- Plumbing |
File details come from the government source that posted it. Updated .