This is a Request for Information (RFI) Log for VISN 7 Construction MATOC (Multiple Award Task Order Contract) Amendment #0011, Seed 2, Project #557-20-101. The document contains six questions and government responses addressing clarifications needed for bid preparation.

The RFI addresses critical low-voltage infrastructure requirements for the Seed 2 project. Key clarifications include: (1) CAT6A cabling is required for all horizontal cabling throughout the project per revised Spec Section 27 10 00; (2) New diversely routed fiber backbone cabling is required from the existing IT closet (Room D127-5/D129-5) to Building 40 Main Server Room (approximately 800 feet), consisting of 24-strand OM-4 optical multi-mode fiber and 12 strands of OS-2 single-mode fiber per path; (3) Rack elevations and equipment layouts must be provided per Division 27 with specified clearances (3 feet from front, back, and one side of rack rows; 12 inches on the fourth side; 12 inches dedicated backboard space; and 30 inches wide by 36 inches front clearance around electrical panels); (4) Contractor must install approximately 40 wireless access point locations with CAT6A coiled ceiling drops, though VA OIT will provide the actual WAPs; (5) CCTV/surveillance camera cabling falls under Division 28 security contractor responsibility; and (6) All new access control and video surveillance systems must match and extend existing systems (Avigilon ACC 7 cameras and Software House Tyco C-Cure 9000 with HID Signo card readers), including all required software licenses, programming, testing, and integration. The document notes that the question submission deadline has passed and the government is no longer accepting questions.

View the file

Other files

File Type Posted
36C24726R0026 0013.pdf PDF
36C24726R0026 0012.pdf PDF
Seed 2_Project 557-20-101_27 10 00_Update Structured Cabling.pdf PDF
RFI LOG AMENDMENT 0012_ SEED 3.pdf PDF
SEED 1_PROJECT 534-23-910 INFECTION CONTROL DETAILS.pdf PDF
SEED 1_PROJECT 534-23-910 INFECTION CONTROL RISK ASSESSMENT.pdf PDF
ATTACHMENT 18 - SEED 3 WAGE DETERMINATION TUSKEGEE AL20260078 5 18 2026.pdf PDF
RFI LOG AMENDMENT 0006_SEED 2 - Revised.pdf PDF
ATTACHMENT 11 - SEED 1_WAGE DETERMINATION SC20260023 05 18 2026.pdf PDF
Seed 1_534-23-910 SOW Rev1 - Final.pdf PDF
Seed 3_619A4-25-102 Wage Rates AL20260078 01 02 2026.pdf PDF
Seed 2_557-20-101 - Photos_RFI 262 263.docx DOCX document
Seed 2_557-20-101 - Project Bldg 5 As-Builts.pdf PDF
RFI LOG AMENDMENT 0006_MATOC RFP.pdf PDF
Seed 2_557-20-101 - VA Radiology - CD100 Final Bid Documents - Combined Set - SIGNED.pdf PDF
Seed 2_557-20-101 - Med Gas Master Alarm Panel.jpg JPG image
Seed 2_557-20-101 -Probe Cabinet specs.pdf PDF
36C24726R0026 0006.pdf PDF
RFI LOG AMENDMENT 0006_SEED 2-557-20-101.pdf PDF
Seed 2_557-20-101 -GEHC-SP_REVAPEX_6-120F.pdf PDF
Seed 2_557-20-101 - Persona RF PREMIUM Brochure Fuji.pdf PDF
Seed 2_557-20-101 -Cardiac_D-Spect Specs.pdf PDF
Seed 2_557.20-101 - REVIT and CAD Screenshot.docx DOCX document
RFI LOG AMENDMENT 0005_Seed 1.pdf PDF
534-23-910 VA Charleston Stairwells Restrooms and Doors - Revision 2.pdf PDF
078400-Rev 2.pdf PDF
534-23-910 - Environmental Survey Report.pdf PDF
534-23-910 VA Charleston Stairwells Restrooms and Doors - Revision 1- A101-A601.pdf PDF
534-23-910 VA Charleston Stairwells Restrooms and Doors - Revision 1-Demolition pages.pdf PDF
36C24726R0026 0003.pdf PDF
36C24726R0026 0002.pdf PDF
Seed 1 - 534-23-910 Site Visit Attendance Roster_4 21 26.pdf PDF
Seed 2 - 557-20-101 Site Visit Attendance Roster_4 22 26.pdf PDF
NCS-VISN 7-MATOC-SEED 2-RFI 1 - 2 A600.pdf PDF
Seed 3 - 619A4-25-102 Site Visit Attendance Roster_4 23 26.pdf PDF
ATTACHMENT 8R - SEED 1_PROJECT 534-23-910_SPECIFICATIONS REV 4.pdf PDF
ATTACHMENT 1 - CONTRACTOR EXPERIENCE FORM.docx DOCX document
ATTACHMENT 2 - CONTRACTOR SURETY LIMITATION.docx DOCX document
ATTACHMENT 7 - ITEMIZED COST BREAKDOWN.xlsx XLSX spreadsheet
ATTACHMENT 19 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting Jan 2023 Deviation.pdf PDF
ATTACHMENT 10 - SEED 1_ PROJECT 534-23-910_ FINAL CONSTRUCTION DOCUMENTS VOL II.pdf PDF
ATTACHMENT 13 - SEED 2_PROJECT 557-20-101 DRAWINGS.pdf PDF
ATTACHMENT 14 - SEED 2_WAGE DETERMINATION GA20260095 01 23 26.pdf PDF
ATTACHMENT 18 - SEED 3_ WAGE DETERMINATION AL20260098 01 02 26.pdf PDF
36C24726R0026_VISN 7 CONSTRUCTION MATOC.pdf PDF
ATTACHMENT 4 - SUBCONTRACTOR CONSENT FOR PAST PERFORMANCE.docx DOCX document
ATTACHMENT 5 - EXPERIENCE MODIFICATION RATE FORM.docx DOCX document
ATTACHMENT 11 - SEED 1_WAGE DETERMINATION SC20260023 01 02 26.pdf PDF
ATTACHMENT 15 - SEED 3_PROJECT 619A4-25-102_SPECS 100 FINAL rev1.pdf PDF
ATTACHMENT 17 - SEED 3_PROJECT 619A4-25-102_PIC BOOK 100 FINAL.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24726R0026

VISN 7 CONSTRUCTION MATOC

REQUEST FOR INFORMATION (RFI) LOG

AMENDMENT #0011

SEED 2

QUESTION #

RELATED

SECTION

REQUESTED CLARIFICATION/INFORMATION GOVERNMENT RESPONSE

Seed 2, Project #557- 20-101 - CAT6 vs.

CAT6A

cabling

The Seed 2 bid drawings appear to call for CAT6 cabling. Please confirm that CAT6 is the intended horizontal cabling requirement for Seed 2 unless specifically noted otherwise. If CAT6A (typical VA standard) is required for any data, voice, security, imaging equipment, or other low-voltage drops, please identify the applicable locations and cable types.

Utilize CAT6A for all horizontal cabling requirements.See revised Spec Section 27 10 00.

Seed 2, Project #557- 20-101 - Fiber optic backbone / cross-connect scope

The specifications include fiber optic cross-connect/backbone requirements, but the drawings do not appear to include detailed fiber riser diagrams, cable elevations, fiber routing, strand counts by run, or diverse/redundant path requirements. Please confirm whether the contractor is required to replace, extend, or provide new fiber backbone/cross-connect cabling from the local TR to the CR/MDF as part of the base bid. If required, please provide routing, termination locations, fiber type, strand count, spare capacity, and any physically diverse/redundant path requirements.

New diversly routed A & B side fiber back to Building 40, Main Server Room (approximately 800 feet), is required from existing IT closet, which will be expanded as part of this construction project (Room D127-5/D129-5). Fiber type- OM-4, optical multi-mode, 24-strand and 12 strands of OS-2 single-mode fiber optic cabling per path. See revised Spec Section 27 10 00.

Seed 2, Project #557- 20-101 - Rack elevations and telecom room buildout

The drawings do not appear to include detailed rack elevations or equipment layout elevations for the telecom/security rack buildouts. Please confirm that rack layouts, patch panel arrangement, cable management, and equipment placement are to be provided in accordance with Division 27, the low-voltage drawings, and VA coordination after award. If specific VA rack elevations or equipment arrangements are required for bidding, please provide those details.

Rack elevations and equipment layouts to be provided in accordance with Division 27, low-voltage drawings, and VA coordination to ensure EHRM compliance. See detail 1/5- LV105. 3 ft distance clearance from the front, back, and one side of each rack row to TR walls. The fourth side must not abut a wall and needs to leave 12 in. clearance. • Provide an additional 12 in. dedicated space on backboards to accommodate service provider, security, video, etc. equipment mounted on them. • Provide an additional 30 in. wide by 36 in.

front clearance required around electrical panel boards.

36C24726R0026

VISN 7 CONSTRUCTION MATOC

REQUEST FOR INFORMATION (RFI) LOG

AMENDMENT #0011

SEED 2

QUESTION #

RELATED

SECTION

REQUESTED CLARIFICATION/INFORMATION GOVERNMENT RESPONSE

Seed 2, Project #557- 20-101 - Wireless access points

We do not see wireless access points identified on the Seed 2 drawings. Please confirm that new wireless access points are not required as part of the Seed 2 base bid unless specifically shown in the drawings. If WAPs are required, please provide locations, cable type, mounting requirements, and responsible trade

Wireless access points will be provided by VA OIT, however, contractor will be responsible for CAT6A coiled in ceiling in approximate locations. Contractor should plan for 40 WAPs throughout the space.

Seed 2, Project #557- 20-101 - Surveillance camera cabling responsibility

The bid documents appear to assign security system cabling to the security contractor rather than the structured cabling contractor. Please confirm whether CCTV/surveillance camera cabling is to be furnished, installed, terminated, tested, and certified by the security contractor as part of the security scope. If the VA intends for the telecom contractor to provide the surveillance CAT6 cabling, please clarify the division of responsibility between telecom and security contractors.

CCTV/Surveillance camera cabling contractor to be in according with Division 28 requirements.

Seed 2, Project #557- 20-101 - Access control and video surveillance system basis

Prior amended RFI responses identify the existing camera monitoring system as Avigilon ACC 7 and the access control system as Software House Tyco C-Cure 9000 with HID Signo card readers. Please confirm that all new Seed 2 access control and video surveillance additions are to match/extend these existing systems and include all required software licenses, programming, testing, and integration.

Yes, match/extend these existing services, include all licenses, programming, testing, and integration.

Please be advised that the due date for submitting questions has passed. The Government is not longer accepting questions. We appreciate your understanding and look forward to your proposal submission. DUE DATE FOR ELECTRONIC TECHNICAL AND PRICE PROPOSAL REMAINS UNCHANGED.

RFI LOG