RFI LOG AMENDMENT 0013_ SEED 1 AND 2.pdf
PDF 153 KB Posted
- Solicitation number
- 36C24726R0026
About this file
This is a Request for Information (RFI) Log for the VISN 7 Construction MATOC (Multiple Award Task Order Contract) solicitation 36C24726R0026, Amendment #0013, covering Seed 1 and Seed 2 projects.
The log documents four clarification questions and government responses regarding two construction projects. For Seed 1, Project #534-23-910, three questions addressed Specification Section 28 31 00 regarding a five-year inspection, testing, maintenance, and repair service requirement for the fire alarm system. The Government clarified that the five-year service requirement applies only to fire alarm system components touched in the project scope (4th Floor Nursing Station, restrooms, and stairwells), not the entire building fire alarm system. The service will be administered through the General Contractor rather than a direct contractual relationship with the Government. For Seed 2, Project #557-20-101, one question addressed fiber optic backbone and cross-connect scope requirements. The Government response specified that the exact fiber routing path will be determined in coordination with the Contracting Officer Representative (COR) and OIT representative, with the contractor planning for an 800-foot distance between the telecommunications room (D127/D129-5) and Building 40 Server Room, with requirements complying with revised Section 27 10 00 and attached Section 27 13 23. The document notes that the question submission deadline has closed and the Government is no longer accepting questions, with the electronic technical and price proposal due date remaining unchanged.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24726R0026
VISN 7 CONSTRUCTION MATOC
REQUEST FOR INFORMATION (RFI) LOG
AMENDMENT #0013
SEED 1 AND 2
QUESTION #
RELATED
SECTION
REQUESTED CLARIFICATION/INFORMATION GOVERNMENT RESPONSE
Seed 1, Project #534-23-910, Section 28 31 00
Specification Section 28 31 00, Paragraph 1.6.A requires five years of inspection, testing, maintenance, and repair service for the fire alarm system.field and must be provided for all offerors to bid the work fairly. Given the limited fire alarm scope associated with this project, which appears to consist primarily of modifications within select restrooms and the 4th Floor Nurse Station, this requirement appears disproportionate to the scope of work and will increase project cost $3-5 million, reduce competition, and result in unnecessary contingency pricing. a. Five-year service agreements are typically associated with campus-wide fire alarm replacements or major system upgrades. Is the five-year service requirement included in this project, yes or no?
Only Fire Alarms System Components touched in the project scope which aligned to 4th Floor Nursing Station, Restrooms listed in Scope, and Stairwells listed in Scope.
This is not intended to perform five year years of inspection, testing, maintenance, and repair of the entire building fire alarm system.
Seed 1, Project #534-23-910, Section 28 31 00
Specification Section 28 31 00, Paragraph 1.6.A requires five years of inspection, testing, maintenance, and repair service for the fire alarm system. a. The entire Ralph H. Johnson VAMC fire alarm system; or b.Only the fire alarm devices and system modifications installed under this contract.
Only Fire Alarms System Components touched in the project scope which aligned to 4th Floor Nursing Station, Restrooms listed in Scope, and Stairwells listed in Scope.
This is not intended to perform five year years of inspection, testing, maintenance, and repair of the entire building fire alarm system.
Seed 1, Project #534-23-910, Section 28 31 00
Specification Section 28 31 00, Paragraph 1.6.A requires five years of inspection, testing, maintenance, and repair service for the fire alarm system. a. If the requirement remains, please clarify whether the five-year service agreement is intended to be administered through the General Contractor or through a direct contractual relationship between the Government and the fire alarm service provider following project acceptance.
Only Fire Alarms System Components touched in the project scope which aligned to 4th Floor Nursing Station, Restrooms listed in Scope, and Stairwells listed in Scope.
This is not intended to perform five year years of inspection, testing, maintenance, and repair of the entire building fire alarm system. This will be administered through the General Contractor.
36C24726R0026
VISN 7 CONSTRUCTION MATOC
REQUEST FOR INFORMATION (RFI) LOG
AMENDMENT #0013
SEED 1 AND 2
QUESTION #
RELATED
SECTION
REQUESTED CLARIFICATION/INFORMATION GOVERNMENT RESPONSE
Seed 2, Project #557-20-101 - Fiber optic backbone / cross-connect scope
The below question and response issued in the attached amendment [Reference #2 on "RFI Log_Seed 2 Revised" issued with Amendment #0012] needs additional details and the routing of the new fiber should be shown on an overall site plan with route identified through existing site and should include conduit and raceway details as needed. Please advise.
Exact path to be determined in coordination with COR and OIT representative. Contractor should plan for 800 ft distance between telecommunications room (D127/D129-
5) and Building 40 Server Room. Requirements shall comply with revised 27 10 00 and attached 27 13 23.
Please be advised that the due date for submitting questions has passed. The Government is not longer accepting questions. We appreciate your understanding and look forward to your proposal submission. DUE DATE FOR ELECTRONIC TECHNICAL AND PRICE PROPOSAL REMAINS
UNCHANGED.