Section 27100.0: Structured Cabling Specification

This is a technical specification section for telecommunications structured cabling systems installation within federal facilities. The specification details requirements for four primary cabling infrastructure components: Computer Room Backbone Structured Cabling, Computer Room Horizontal Structured Cabling, Facility Backbone Structured Cabling, and Facility Horizontal Structured Cabling.

Computer room backbone cabling must connect Main Distribution Areas (MDAs) to Horizontal Distribution Areas (HDAs) using pre-terminated cabling installed in overhead trays with diverse path routing, limited to 1 meter excess length per end. First-level backbone termination shall occupy top RU positions in network racks with mirrored A-side and B-side MDA and HDA configurations. In MDA racks, angled UTP patch panels (2x3) shall begin at RU45 with fiber optic distribution cabinets supporting backbone distribution; HDA racks require fiber optic distribution cabinets populated starting at RU45, with UTP patch panels below blanking panels. Computer room horizontal cabling connects Equipment Distributors (EDs) in server cabinets to HDAs using pre-terminated copper and fiber cabling in overhead systems. Installation requires fiber optic distribution cabinets in server cabinets starting at RU45 with UTP patch panels below, and 12- or 24-strand multimode fiber optic cables between server cabinet EDs and both HDAs.

Facility backbone cabling (inter- and intra-building) connects Entrance Rooms to MDAs and MDAs to Telecommunications Rooms (TRs) using redundant, diversely routed field-terminated paths. Between each Entrance Room and computer room, minimum 24 strands of multimode and 12 strands of single-mode fiber per path are required with appropriate splice cassettes (OM4 multimode, OS1 single-mode). Between MDAs and TRs, two diversely routed paths from A-side and B-side MDAs are mandated, with cable specifications varying by distance and building location: same-building paths under 400 meters require 24 multimode and 12 single-mode strands per path; different-building or longer paths require minimum 24 single-mode strands per path with OS2 splice cassettes. Facility horizontal cabling connects TRs to end-user Work Area Outlets requiring minimum 2 cables per outlet with UTP patch panels occupying top-third rack positions (RU31-45). All cabling and equipment must be labeled per VA Infrastructure Standards for Telecommunications Spaces, and 100% construction drawing sets must include cable media categories, equipment quantities, elevation drawings, full interconnection diagrams, and port/cable label matrices.

View the file

Other files

File Type Posted
36C24726R0026 0013.pdf PDF
RFI LOG AMENDMENT 0013_ SEED 1 AND 2.pdf PDF
RFI LOG AMENDMENT 0012_ SEED 3.pdf PDF
RFI LOG AMENDMENT 0011_ SEED 2 REVISED.pdf PDF
36C24726R0026 0011.pdf PDF
RFI LOG AMENDMENT 0011_ SEED 2.pdf PDF
SEED 1_PROJECT 534-23-910 INFECTION CONTROL DETAILS.pdf PDF
SEED 1_PROJECT 534-23-910 INFECTION CONTROL RISK ASSESSMENT.pdf PDF
RFI LOG AMENDMENT 0009_SEED 1_ SEED 2_ MATOC RFP.pdf PDF
ATTACHMENT 18 - SEED 3 WAGE DETERMINATION TUSKEGEE AL20260078 5 18 2026.pdf PDF
36C24726R0026 0008.pdf PDF
ATTACHMENT 14 - SEED 2_WAGE DETERMINATION GA20260095 05 18 2026.pdf PDF
Seed 2_557-20-101 - Project Bldg 5 As-Builts.pdf PDF
36C24726R0026 0006.pdf PDF
RFI LOG AMENDMENT 0006_SEED 2-557-20-101.pdf PDF
Seed 2_557-20-101 -GEHC-SP_REVAPEX_6-120F.pdf PDF
Seed 2_557-20-101 - Persona RF PREMIUM Brochure Fuji.pdf PDF
Seed 2_557-20-101 -Cardiac_D-Spect Specs.pdf PDF
Seed 2_557.20-101 - REVIT and CAD Screenshot.docx DOCX document
Seed 2_557-20-101 - Monitors.jpg JPG image
Seed 2_557-20-101 - Zone Valve.jpg JPG image
Seed 2_557-20-101 -Zone Valve A133-5.jpg JPG image
Seed 2_557-20-101- CT_GE Revolution Apex spec sheet_brosh.pdf PDF
Seed 2_557-20-101 -Signa Voyager 1_5 MRI.pdf PDF
Seed 2_557-20-101 -GC85A Site planning - Samsung Healthcare.pdf PDF
Seed 2_557-20-101 -HME_DR_GC85A_Datasheet_v43_230316_FDA.pdf PDF
Seed 2_557-20-101 -gehealthcare-brochure_idxa_pdf.pdf PDF
Seed 2_557-20-101 Ultrasound_RS85PrestigeTechSpecv2051RS85145rev01.pdf PDF
078400-Rev 2.pdf PDF
36C24726R0026 0004.pdf PDF
RFI LOG AMENDMENT 0004_RFP.pdf PDF
RFI LOG AMENDMENT 0003.pdf PDF
534-23-910 VA Charleston Stairwells Restrooms and Doors - Revision 1- A101-A601.pdf PDF
534-23-910 VA Charleston Stairwells Restrooms and Doors - Revision 1-Demolition pages.pdf PDF
Seed 1 - 534-23-910 Site Visit Attendance Roster_4 21 26.pdf PDF
Seed 2 - 557-20-101 Site Visit Attendance Roster_4 22 26.pdf PDF
RFI LOG AMENDMENT 0002.pdf PDF
SEED 2 - SPECIFICATION COMBINED - FINAL BID DOCUMENTS.pdf PDF
36C24726R0026 0001.docx DOCX document
36C24726R0026 AMENDMENT 0001 RFI LOG.pdf PDF
ATTACHMENT 10 - SEED 1_ PROJECT 534-23-910_ FINAL CONSTRUCTION DOCUMENTS VOL II.pdf PDF
ATTACHMENT 13 - SEED 2_PROJECT 557-20-101 DRAWINGS.pdf PDF
ATTACHMENT 14 - SEED 2_WAGE DETERMINATION GA20260095 01 23 26.pdf PDF
ATTACHMENT 18 - SEED 3_ WAGE DETERMINATION AL20260098 01 02 26.pdf PDF
ATTACHMENT 3 - PAST PERFORMANCE QUESTIONAIRE.docx DOCX document
ATTACHMENT 6 - INVOICING.pdf PDF
ATTACHMENT 8 - SEED 1_PROJECT 534-23-910_SPECIFICATIONS.pdf PDF
ATTACHMENT 9 - SEED 1_PROJECT 534-23-910_ FINAL CONSTRUCTION DOCUMENTS VOL I.pdf PDF
ATTACHMENT 12 - SEED 2_PROJECT 557-20-101 SPECS FINAL.pdf PDF
ATTACHMENT 16 - SEED 3_PROJECT 619A4-25-102_100 FINAL DWGs.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2 7 1 0 0 0 - 1

SECTI ON 2 7 1 0 0 0

STRUCTURED CABLI NG

PART 1 - GENERAL

1 C 1 DESCRI PTI OND

A) T hi s s e c t i o n s pe c i f i e s r e qui r e me nt s f o r t e l e c o mmuni c a t i o ns s t r uc t ur e d c a bl i ng s ys t e ms )

1 C 2 SUMMARY

S e c t i o n I nc l ude s M

A)

B )

C )

D )

C o mput e r Ro o m Ba c kbo ne S t r uc t ur e d C a bl i ng)

C o mput e r Ro o m Ho r i z o nt a l S t r uc t ur e d C a bl i ng)

Fa c i l i t y Ba c kbo ne S t r uc t ur e d C a bl i ng)

Fa c i l i t y Ho r i z o nt a l S t r uc t ur e d C a bl i ng)

1 C 3 REFERENCES

A) VA I nf r a s t r uc t ur e S t a nda r d f o r T e l e c o mmuni c a t i o ns S pa c e s )

1 C 4 RELATED WORKD

A) C a bl i ng l a be l i ng a nd i de nt i f i c a t i o n M S e c t i o n 2 7 0 5 5 3 , I DENT I FI C AT I ON

FOR C OMMUNI C AT I ONS S YS T EMS )

B ) C a bl e t e r mi na t i o n l o c a t i o ns a nd e qui pme nt M S e c t i o n 2 7 1 1 1 9 , C OMMUNI C AT I ONS T ERMI NAT I ON BLOC KS AND P AT C H P ANELS )

1 C 5 SUBMI TTALSD

A) S ubmi t i n a c c o r da nc e wi t h S e c t i o n 2 7 0 5 0 0 , C OMMON WORK RES ULT S FOR

C OMMUNI C AT I ONS S YS T EMS )

PART 2 - PRODUCTS

2 C 1 COMPUTER ROOM BACKBONE STRUCTURED CABLI NGC

A) Ba c kbo ne s t r uc t ur e d c a bl i ng i n t he c o mput e r r o o m e nvi r o nme nt ^ f i r s t l e ve l ba c kbo ne _ c o nne c t s t he Ma i n Di s t r i but i o n Ar e a s ^ MDAs _ t o t he

Ho r i z o nt a l Di s t r i but i o n Ar e a s ^ HDAs _ )

B) I ns t a l l f i r s t l e ve l ba c kbo ne s t r uc t ur e d c a bl i ng i n o ve r he a d t r a y o r j -ho o ks f o l l o wi ng di ve r s e pa t h r o ut i ng)

C) Al l c a bl i ng us e d s ha l l be pr e - t e r mi na t e d a nd pr o c ur e d t o t he s pe c i f i c l e ngt h r e qui r e d by t he de s i gn ^ ho r i z o nt a l a nd ve r t i c a l pa t hs _ wi t h no mo r e t ha n 1 me t e r o f e xc e s s l e ngt h o n e a c h e nd)

D) T e r mi na t e f i r s t l e ve l ba c kbo ne s t r uc t ur e d c a bl i ng i n t he t o p RU po s i t i o ns o f e a c h ne t wo r k r a c k , wo r ki ng do wnwa r d, wi t h pa t c h pa ne l e qui pme nt mo unt e d o n t he f r o nt r a i l s )

E) Mi r r o r di s t r i but i o n o n t he A- s i de a nd B- s i de MDA a nd HDA e l e me nt s )

1) I n MDA ne t wo r k r a c ks M

2 7 1 0 0 0 - 2

a) I ns ta l l a ngl e d UT P pa tc h pa ne l 2 s 3 f o r e a c h ba c kbo ne UT P pa tc h pa ne l i n the s a me - s i de HDA i n the c o mpute r ro o m be gi nni ng i n

RU4 5 )

b) I ns ta l l a n a ngl e d pa ne l c o ve r o n the l o we s t UT P pa tc h pa ne l )

c) I ns ta l l a bl a nki ng pa ne l i n the RU be l o w the UT P pa tc h pa ne l s )

d) I ns ta l l f i be r o pti c di s tri buti o n c a bi ne ts to s uppo rt the ba c kbo ne f i be r di s tri buti o n f ro m e a c h HDA)

e) I ns ta l l a bl a nki ng pa ne l i n the RU be l o w the f i be r o pti c di s tri buti o n c a bi ne t 2 s 3 )

2) I n HDA ne two rk c a bi ne ts 6

a) I ns ta l l f i be r o pti c di s tri buti o n c a bi ne t 2 s 3 a nd po pul a te wi th f i be r o pti c di s tri buti o n c a s s e tte s s ta rti ng i n RU4 5 )

b) I ns ta l l a bl a nki ng pa ne l i n the RU be l o w the l a s t f i be r c a bi ne t )

c) I ns ta l l UT P pa tc h pa ne l 2 s 3 be l o w the bl a nki ng pa ne l )

d) I ns ta l l a bl a nki ng pa ne l i n the RU be l o w the l a s t UT P pa tc h pa ne l )

e) I ns ta l l UT P c a bl e s be twe e n the s a me - s i de MDAs a nd HDAs )

f) I ns ta l l 1 2 - o r 2 4 - s tra nd mul ti mo de f i be r o pti c c a bl e s be twe e n e a c h f i be r c a s s e tte i n the HDA to e i the r the s a me - s i de MDA o r the o ppo s i te s i de MDA a s a ppro pri a te )

2 8 2 COMPUTER ROOM HORI Z ONTAL STRUCTURED CABLI NG8

A) Ho ri z o nta l s truc ture d c a bl i ng i n the c o mpute r ro o m e nvi ro nme nt c o nne c ts the Equi pme nt Di s tri buto rs 2 EDs 3 i n the s e rve r c a bi ne ts to e a c h s uppo rte d Ho ri z o nta l Di s tri buti o n Are a 2 HDA3 )

B) I ns ta l l ho ri z o nta l s truc ture d c a bl i ng i n o ve rhe a d c a bl e tra y a nd f i be r ra c e wa y s ys te ms f o l l o wi ng di ve rs e pa th ro uti ng)

C) Al l c a bl i ng us e d s ha l l be pre - te rmi na te d a nd pro c ure d to the s pe c i f i c l e ngth re qui re d by the de s i gn 2 ho ri z o nta l a nd ve rti c a l pa ths 3 wi th no mo re tha n 1 me te r o f e xc e s s l e ngth o n e a c h e nd)

1) I n the s e rve r c a bi ne ts , te rmi na te ho ri z o nta l s truc ture d c a bl i ng i n

EDs l o c a te d i n the to p 5 U o f e a c h c a bi ne t , wi th pa tc h pa ne l e qui pme nt mo unte d o n the re a r ra i l s )

a) I ns ta l l f i be r o pti c di s tri buti o n c a bi ne t 2 s 3 s ta rti ng i n RU4 5 a nd po pul a te wi th f i be r o pti c di s tri buti o n c a s s e tte s to s uppo rt the re qui re me nt)

b) I ns ta l l a bl a nki ng pa ne l i n the RU be l o w the l a s t f i be r c a bi ne t )

c) I ns ta l l c o ppe r UT P pa tc h pa ne l 2 s 3 be l o w the bl a nki ng pa ne l )

2 7 1 0 0 0 - 3

2) I n t he HDAs , t e r mi na t e ho r i z o nt a l s t r uc t ur e d c a bl i ng i n t he RU po s i t i o ns i mme di a t e l y be l o w t he f i r s t l e ve l ba c kbo ne s t r uc t ur e d c a bl i ng e qui pme nt o f e a c h ne t wo r k c a bi ne t , wo r ki ng do wnwa r d, wi t h pa t c h pa ne l e qui pme nt mo unt e d o n t he f r o nt r a i l s )

a) I ns t a l l f i be r o pt i c di s t r i but i o n c a bi ne t 6 s ) a nd po pul a t e wi t h f i be r o pt i c di s t r i but i o n c a s s e t t e s t o s uppo r t e a c h s e r ve r c a bi ne t )

b) I ns t a l l a bl a nki ng pa ne l i n t he RU be l o w t he f i be r o pt i c di s t r i but i o n c a bi ne t 6 s ) )

D) I ns t a l l 1 2 - o r 2 4 - s t r a nd mul t i mo de f i be r o pt i c c a bl e s be t we e n t he s e r ve r c a bi ne t ED a nd bo t h HDAs )

E) I ns t a l l UT P c a bl e s be t we e n t he s e r ve r c a bi ne t ED a nd bo t h HDAs )

2 : 3 FACI LI TY BACKBONE STRUCTURED CABLI NG:

Ba c kbo ne s t r uc t ur e d c a bl i ng 6 i nt e r - bui l di ng a nd i nt r a - bui l di ng f i r s t l e ve l ba c kbo ne ) c o nne c t s t he Ent r a nc e Ro o ms t o t he Ma i n Di s t r i but i o n Ar e a s 6 MDAs ) i n t he c o mput e r r o o m, a nd c o nne c t s t he Ma i n Di s t r i but i o n Ar e a s t o e a c h

T e l e c o mmuni c a t i o ns Ro o m 6 T R) ) T hi s s pe c i f i c a t i o n de s c r i be s f a c i l i t y ba c kbo ne s t r uc t ur e d c a bl i ng whe n t he Ent r a nc e Ro o ms a nd c o mput e r r o o m a r e i n t he s a me bui l di ng, c o nne c t e d e nt i r e l y by e nvi r o nme nt a l l y c o ndi t i o ne d pa t hwa ys 6 no o ut s i de pl a nt pa t hwa ys a r e t r a ns i t e d) )

A) I nt e r i o r t o e a c h t e l e c o mmuni c a t i o ns s pa c e , i ns t a l l f a c i l i t y ba c kbo ne s t r uc t ur e d c a bl i ng i n o ve r he a d c a bl e t r a y a nd f i be r r a c e wa y s ys t e ms )

B) Al l f a c i l i t y ba c kbo ne s t r uc t ur e d c a bl i ng s ha l l be r e dunda nt a nd f o l l o w di ve r s e pa t h r o ut i ng)

C) Fa c i l i t y ba c kbo ne c a bl i ng s ha l l be f i e l d- t e r mi na t e d 6 f us i o n s pl i c e d) )

D) Be t we e n e a c h Ent r a nc e Ro o m a nd t he c o mput e r r o o mN

1) P r o vi de 2 di ve r s e l y r o ut e d pa t hs o f ba c kbo ne c a bl i ng f r o m e a c h

Ent r a nc e Ro o m) One pa t h wi l l t e r mi na t e o n t he A- s i de MDA a nd o ne pa t h wi l l t e r mi na t e o n t he B- s i de MDA)

2) I ns t a l l a mi ni mum o f 2 4 s t r a nds o f mul t i mo de f i be r o pt i c c a bl i ng a nd

1 2 s t r a nds o f s i ngl e - mo de f i be r o pt i c c a bl i ng pe r pa t h)

3) P o pul a t e t he f i be r o pt i c di s t r i but i o n c a bi ne t s o n e a c h e nd wi t h a s uf f i c i e nt qua nt i t y o f mul t i mo de OM4 a nd s i ngl e - mo de OS 1 f i be r o pt i c s pl i c e c a s s e t t e s pe r pa t h)

2 7 1 0 0 0 - 4

E) Be t we e n e a c h MDA a nd e a c h T R3

1) No z o ne / i nt e r me di a t e di s t r i but i o n a r e a s 6 Z DAs / I DAs 8 i nt e r me di a t e c r o s s - c o nne c t s 6 I C C s 8 s ha l l be us e d) Al l f a c i l i t y ba c kbo ne c a bl i ng be t we e n t he MDAs a nd T Rs s ha l l be r un di r e c t l y a nd c o nt i nuo us l y)

2) P r o vi de 2 di ve r s e l y r o ut e d pa t hs o f ba c kbo ne c a bl i ng, o ne f r o m t he

A- s i de MDA a nd o ne f r o m t he B- s i de MDA)

3) Whe r e t he T R i s l o c a t e d i n t he s a me bui l di ng a s t he c o mput e r r o o m

MDAs 6 do e s no t t r a ns i t o ut s i de pl a nt pa t hwa ys 8 a nd t he pa t h di s t a nc e i s l e s s t ha n 4 0 0 me t e r s , i ns t a l l a mi ni mum o f 2 4 s t r a nds o f mul t i mo de f i be r o pt i c c a bl i ng a nd 1 2 s t r a nds o f s i ngl e - mo de f i be r o pt i c c a bl i ng pe r pa t h)

a) P o pul a t e t he f i be r o pt i c di s t r i but i o n c a bi ne t s o n e a c h e nd wi t h a s uf f i c i e nt qua nt i t y o f mul t i mo de OM4 a nd s i ngl e - mo de OS 1 f i be r o pt i c s pl i c e c a s s e t t e s pe r pa t h)

4) Whe r e t he T R i s l o c a t e d i n a di f f e r e nt bui l di ng a s t he c o mput e r r o o m

6 t r a ns i t s o ut s i de pl a nt pa t hwa ys 8 o r t he pa t h di s t a nc e i s gr e a t e r t ha n 4 0 0 m, i ns t a l l a mi ni mum o f 2 4 s t r a nds o f s i ngl e - mo de f i be r o pt i c c a bl i ng pe r pa t h)

a) P o pul a t e t he f i be r o pt i c di s t r i but i o n c a bi ne t s o n e a c h e nd wi t h a s uf f i c i e nt qua nt i t y o f s i ngl e - mo de OS 2 f i be r o pt i c s pl i c e c a s s e t t e s pe r pa t h)

2 @ 4 FACI LI TY HORI Z ONTAL STRUCTURED CABLI NG@

Fa c i l i t y ho r i z o nt a l s t r uc t ur e d c a bl i ng 6 ho r i z o nt a l di s t r i but i o n 8 c o nne c t s t he T e l e c o mmuni c a t i o ns Ro o m 6 T R8 t o e a c h e nd- us e r Wo r k Ar e a Out l e t 6 WAO 8 )

A) I nt e r i o r t o e a c h T R, i ns t a l l ho r i z o nt a l di s t r i but i o n s t r uc t ur e d c a bl i ng i n o ve r he a d c a bl e t r a y s ys t e ms )

B) Al l ho r i z o nt a l di s t r i but i o n s t r uc t ur e d c a bl i ng s ha l l ha ve a mi ni mum o f

2 c a bl e s pe r WAO)

C) Ho r i z o nt a l di s t r i but i o n s t r uc t ur e d c a bl i ng ma y be f i e l d- t e r mi na t e d)

D) I n e a c h T R i ns t a l l s uf f i c i e nt UT P pa t c h pa ne l s t o s uppo r t t he qua nt i t y o f WAOs i n t he T R' s s e r vi ng z o ne g

1) P l a n ne t wo r k r a c ks s uc h t ha t pa t c h pa ne l s a nd ho r i z o nt a l c a bl e ma na ge r s a r e l o c a t e d i n t he t o p 1 / 3 6 RU3 1 - 4 5 8 , s wi t c hi ng e qui pme nt i n t he mi ddl e 1 / 3 6 RU1 6 - 3 0 8 , a nd po we r di s t r i but i o n a nd o t he r s e r vi c e s i n t he bo t t o m 1 / 3 6 RU1 - 1 5 8 )

E) I ns t a l l a mi ni mum o f 2 UT P c a bl e s be t we e n t he T R UT P pa t c h pa ne l s a nd e a c h wo r k a r e a f a c e pl a t e )

2 7 1 0 0 0 - 5

F 0 Ea c h t ypi c a l e nd- us e r r e c e pt a c l e s ha l l be c o ns t r uc t e d o f a s i ngl e - ga ng wo r kbo x wi t h o ne c o nne c t o r c ha s s i s , a mi ni mum o f t wo no n- pr o pr i e t a r y

C a t e go r y 6 A 8 P 8 C me di a i nt e r f a c e c o nne c t o r s 7 RJ- 4 5 9 , a nd a f o ur -po s i t i o n ke ys t o ne f a c e pl a t e 0

1 0 Mo dul a r pl ug t e r mi na t e d l i nks 7 MP T L 9 a r e pe r mi t t e d t o s e r vi c e wi r e l e s s a c c e s s po i nt s 7 WAP s 9 , c a me r a s , a nd o t he r P o we r o ve r

Et he r ne t 7 P o E 9 de vi c e s whe r e ma t i ng wi l l be ve r y i nf r e que nt 0

PART 3 - EXECUTI ON

3 K 1 I MPLEMENTI ONO

A0 1 0 0 % c o ns t r uc t i o n dr a wi ng s e t s s ha l l i nc l ude dr a wi ngs de t a i l i ng t he c o mput e r r o o m a nd f a c i l i t y/ c a mpus s t r uc t ur e d c a bl i ng s ys t e ms , i nc l udi ng Q

1 0 C a bl e me di a pe r f o r ma nc e c a t e go r i e s f o r e a c h t ype o f r un 0

2 0 C a bl i ng a nd e qui pme nt qua nt i t i e s 0

3 0 El e va t i o n dr a wi ngs s ho wi ng e qui pme nt pl a c e me nt i n i ndi vi dua l e nc l o s ur e s 0

4 0 Ful l i nt e r c o nne c t i o n di a gr a m f o r a l l s t r uc t ur e d c a bl i ng 0

5 0 P o r t ma p a nd c a bl e l a be l ma t r i c e s 0

B 0 Al l c a bl i ng a nd e qui pme nt s ha l l be l a be l e d pe r t he r e qui r e me nt s o f t he

VA I nf r a s t r uc t ur e S t a nda r d f o r T e l e c o mmuni c a t i o ns S pa c e s 0

- - - E N D - - -

SECTI ON 2 7 1 0 0 0 STRUCTURED CABLI NG
1 C 2 SUMMARY
PART 2 - PRODUCTS
2 8 2 COMPUTER ROOM HORI Z ONTAL STRUCTURED CABLI NG8
2 @ 4 FACI LI TY HORI Z ONTAL STRUCTURED CABLI NG@
PART 3 - EXECUTI ON 3 K 1 I MPLEMENTI ONO

File details come from the government source that posted it. Updated .