Attachment 18 - Drawing B06 20250627.pdf
PDF 47 MB Posted
- Solicitation number
- RFP-36C77626R0033
About this file
This is a comprehensive drawing set and general project notes document for Building 06 of the Electronic Health Records Modernization (EHRM) Infrastructure Upgrades project at VA Hudson Valley Healthcare System in Montrose, NY. The project involves complete recabling, telecommunications infrastructure upgrades, and associated mechanical, electrical, fire protection, and site work across multiple buildings on the VA campus, with Building 06 being fully sprinklered.
The scope of work includes installation of new Cat 6A telecommunications cabling and fiber optic cables to all locations, new telecommunications rooms (TR) with equipment racks, UPS systems, and patch panels; new electrical panels, transformers, and circuit breakers; new HVAC and dedicated cooling units; reconfiguration of existing fire suppression systems with new sprinkler heads and clean agent systems for the new Main Computer Room; new physical security access control (PACS) systems for TR doors; new IP-addressable CCTV cameras; and site infrastructure improvements including concrete walkways, planting beds, and fiber conduit. All work must comply with comprehensive third-party inspections paid by the General Contractor, with the VA performing no inspections. The project requires commissioning of all new and impacted existing systems per specifications 01 91 00 and related sections, with a 30-day load test on electrical panels serving new work. Construction must maintain fire safety, means of egress, infection control measures in occupied areas, and indoor air quality standards, including negative pressure in construction zones, dust control, and weekly occupant coordination meetings. The project is a competitive Small Business Set-Aside under Solicitation RFP-36C77626R0033, administered by the Department of Veterans Affairs Technology Acquisition Center Austin.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
VA HUDSON VALLEY HEALTHCARE SYSTEM (VAIHCS)
STAMP
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .M
EP
.G en er al .S he et s.
rv t
-0 6-
7:
:5
06G-000
COVER SHEET 620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
ISSUED FOR CONSTRUCTION
06/27/2025
620-22-700 - ELECTRONIC HEALTH RECORDS MODERNIZATION
(EHRM) INFRASTRUCTURE UPGRADES
PROJECT SCOPE OF WORK:
COMPREHENSIVE THIRD-PARTY INSPECTIONS, TESTING AND
WRITTEN REPORTS FOR ALL DIVISIONS (PAID BY THE GENERAL
CONTRACTOR).
CONTRACTOR SHALL EMPLOY THIRD-PARTY INSPECTION
CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY THIS
CONTRACT. THE VA HAS NO INSPECTION CAPABILITY. ANY
REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY
INSPECTOR QUALIFIED TO PERFORM THE WORK. CREDENTIALS
SHALL BE SUPPLIED TO THE VA/AE AS REQUIRED BY THIS
CONTRACT. ALL INSPECTIONS, TESTING, CERTIFICATIONS, AND
PERMITS ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR. THE
VA WILL NOT PAY FOR OR PERFORM ANY REQUIRED INSPECTIONS.
VA INSPECTIONS ARE FOR VA USE ONLY, WHEN PERFORMED, AND
DO NOT REDUCE THE INSPECTION BURDEN ON THE CONTRACTOR.
THIRD-PARTY INSPECTIONS:
a.
b.
c.
d.
e.
f.
g.
h.
i.
This project provides complete recabling within multiple buildings at the VA Hudson Valley Heath Care System.
Multiple buildings on campus including Buildings 1, 2, 3, 4, 5, 6, 7, 12, 13, 14, 15, 16, 17, 18, 19, 20, 26, 27, 28, 29, 31, 52, GS and also site infrastructure upgrades. See main project cover sheet for building priority.
This project shall include general construction, alterations, and necessary removal of existing structures and construction and certain other items. Contract documents, drawings, and specifications, indicate the scope of work. The purpose of this project is to address deficiencies and upgrade communications cabling and infrastructure. Scope includes newTelecommunications Rooms (TR) located within multiple buildings on campus and new, redundant site infrastructure. Project scope also includes a new Main Computer Room building with temporary and new fiber. This project provides the new construction, renovation and infrastructure required to provide new telecommunications infrastructure, include (but not limited to): new Fiber optic cable and new CAT 6a telecommunications cable to all locations, work area outlets (WAO), racks, UPS, power supplies and associated electrical distribution equipment, new HVAC, new CCTV, new fire protection and fire alarm, new advanced utility monitoring system and new PACS and doors for all buildings in this project.
Construction addresses deficiencies including new electrical service, new dedicated mechanical units, new UPS, new grounding and bonding conditions within each TR, new racks and cable management equipment within the TRs and new cable tray for each building as shown on the plans.
Provide new equipment rack(s) furnished with both horizontal and vertical cable managers, vertical bonding bars, UPS, patch panel and an optical fiber termination shelf. All telecommunications equipment and cabling shall be tested, approved, and accepted by the VA prior to connecting to active, ongoing operations. Any modifications required to existing systems (HVAC, smoke detectors, fire alarm, fire sprinklers, lights, other devices, etc..) are the responsibility of the Contractor. The VA will not assist with any modification.
Includes all labor, material, equipment, and supervision to perform the required electrical and telecommunications construction work on this project including materials and construction equipment to provide new telecommunications Cat 6A and Fiber cable throughout, new outlets, and new racks, patch panels, UPS, fiber panels and associated equipment for all buildings.
Provide new electrical panels, transformers, circuit breakers and distribution to serve the new spaces/equipment.
For communications functions, provide cable trays, equipment racks with vertical/horizontal wire management.
Replace all fiber optic lines serving the TRs. Provide network drops in each new TR. Provide a new digital, wall mounted CCTV (Closed Circuit Television) camera at each TR, camera shall comply with Campus standards (IP addressable network camera, POE+, PTZ, motion sensor, auto-tracking, dome with wall mount. Integrate camera into existing VMS. provide controllability through existing IT network).
Temporary fiber shall be provided between existing entrance room and newMain Computer Room and from the existing Data Center to the new MCR.
Provide Physical Security Access Control (PACS) for all the TR doors (including controllers and power supplies), coordinate with the door hardware specification for additional requirements.
The existing fire alarm system will be modified by relocating and/or adding compatible devices to the existing building fire alarm system for all TRs and providing a new fire alarm system for the new MCR building.
Contractor shall provide a 30-day load test on all existing source panels serving new work at each Building. This test is required by NEC 220.87 for In addition to replacing all of the communications cabling and additional 10% capacity shall be provided as shown on the drawings and specifications. verification that no loads have been added since the design level survey. Contractor shall provide load monitoring data to the COR/AE. New electrical panels and electrical service branch circuits are specified by the scope of work and shall be furnished by the contractor. Load monitoring shall also be performed on all panels upstream of the new branch circuit panels.
Work includes all labor, material, equipment, and supervision to perform the required Mechanical, Plumbing and Fire Protection construction work on this project including new dedicated cooling, condensate pumps and drains, and reconfiguring and certifying existing wet pipe fire protection system.
Contractor shall submit coordination drawings for approval showing all trades including: equipment locations, proposed routing, supports and penetrations prior to beginning any work. Also indicate new and existing systems and all provisions for coordinating existing utilities.
For fire suppression, contractor shall reconfigure and/or provide additional sprinkler heads to the existing building automatic sprinkler system as shown on the drawings. Provide new wet-pipe and clean agent fire suppression system for the new MCR.
Site work includes all labor, material, equipment and supervision to perform the required hardscape and landscape construction work on this project including materials and construction equipment to provide new concrete walkways, planting beds, artificial turf, fencing, trees and additional landscape materials to the new building and renovations detailed by the construction drawings and specifications. Protection for existing plantings, trees and hardscape to remain shall be installed, maintained and enforced by contractor.
New site fiber conduit shall be encased in concrete. Base bid shall include trenching, concrete ductbank and hand digging at existing utility crossings. Directional boring with annular concrete encasement requires Government approval.
For all telecommunications rooms (TR), the contractor is responsible for providing a new fire extinguisher cabinet with a Type 2A:10B:C clean agent fire extinguisher located no greater than 75 feet away from the new TR.
Contractor to coordinate the new location with the COR. Contractor shall bid a new FEC for each TR in the Scope of Work. See specification 10 44 13.
All new and existing systems within the Scope of Work shall be commissioned (or recommissioned) for each building per Specification 01 91 00.
No wireless access points shall be replaced and shall be protected-in-place, cabling, face plate and jack will be replaced. All cabling for wireless access points shall be labeled in accordance with the specifications.
This project will require working on multiple buildings simultaneously with multiple crews to achieve the overall construction period duration for the entire project. Based on the approved schedule by the VA COR (and based on approved Project Schedule and Phasing plan submittals), multiple buildings shall be renovated simultaneously to meet Construction Schedule requirements. However, any required shutdowns shall be limited to one at a time to minimize the impact on Facility Operations.
The expected construction period includes all pre-construction activity, construction, and post-construction testing, third-party inspections, Owner inspections, and commissioning. Contractor shall submit a comprehensive schedule of work in compliance with 01 32 16.15 PROJECT SCHEDULES (SMALL PROJECTS DESIGN/BID/BUILD).
Contractor shall submit and obtain approval for all project submittals including coordination drawings prior to beginning physical construction.
Contractor shall perform Commissioning per 01 91 00 of all new systems and existing systems impacted by the project according to requirements in sections:
01 91 00 – GENERAL COMMISSIONING REQUIREMENTS.
07 08 00 – FACILITY EXTERIOR CLOSURE COMMISSIONING.
21 08 00 – COMMISSIONING OF FIRE SUPPRESSION SYSTEMS.
22 08 00 – COMMISSIONING OF PLUMBING SYSTEMS.
23 08 00 – COMMISSIONING OF HVAC SYSTEMS.
26 08 00 – COMMISSIONING OF ELECTRICAL SYSTEMS.
27 08 00 – COMMISSIONING OF COMMUNICATIONS SYSTEMS.
28 08 00 – COMMISSIONING OF SECURITY SYSTEMS.
33 08 00 – COMMISSIONING OF SITE UTILITIES.
Inspections: Comprehensive Third-Party inspections, testing and written reports for all Divisions are required and paid by the General Contractor. Contractor shall employ third party inspection consultants to perform all inspections required by this contract.
Contractor shall appoint an individual, company, or firm to act as the Commissioning Manager. The Commissioning Manager is the designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process. A detailed commissioning plan is required to ensure that all systems are calibrated, programmed, and all graphic displays are accurate and approved by applicable VA staff.
THIS PROJECT MUST BE "STAND ALONE". THAT IS, THE PROJECT CANNOT DEPEND ON ANOTHER PROJECT
OR OTHER FUNDING SOURCE TO MAKE THE FINAL RESULT COMPLETE AND USABLE.
THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.
SIGNATURE DATE: 06/27/2025
AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C
TRIPLE C - THE A&E GROUP
CO:
Sean C. Kaminski
(216) 447-8300 x49714 sean.kaminski@va.gov Contracting Officer Department of Veterans Affairs
ACOR:
Kyle A.Morgan Planning & Design - Montrose Campus VA Hudson Valley Healthcare System 2094 Albany Post Rd.
Montrose, NY 10548 Phone: 845- 522-1338 Email : kyle.morgan@va.govUSER:
Edward Simpson
(914) 788-4822
(914) 224-2854 edward.simpson2@va.gov
COR:
Walter Hoffman Planning & Design - Montrose Campus VA Hudson Valley Healthcare System 2094 Albany Post Rd.
Montrose, NY 10548 Email : walter.hoffman@va.gov
BUILDING 06
CAMPUS MAP
GENERAL NOTES:
1.
2.
3.
4.
ALL EXISTING PORTS ARE BEING REPLACED ON THIS PROJECT. DEMO
SHEETS HAVE NOT BEEN PROVIDED UNLESS WALL REVISIONS ARE
REQUIRED. EXISTING WORK AREA OUTLETS WITH (3) OR (4) EXISTING
DATA PORTS SHALL BE REDUCED AND PROVIDED WITH (2) NEW
PORTS/(2) NEW CAT 6A CABLES. COORDINATED WITH OWNER PRIOR TO
REDUCTION AT EACH LOCATION.
WHILE ALL POSSIBLE DUE DILIGENCE WAS PERFORMED THE BIDDERS
ARE REQUIRED TO PROVIDE A 10% ALLOWANCE FOR NEW DATA PORTS.
ALL DEVIATIONS FROM THE DESIGN DOCUMENTS FOR LOCATIONS AND
QUANTITIES OF DATA PORTS ARE REQUIRED TO BE VERIFIED BY THE VA
COR AND A/E. AS AN EXAMPLE, IF 100 DATA DROPS WERE IDENTIFIED AND
DOCUMENTED IN A BUILDING, THE CONTRACTOR SHALL BID 110 DATA
DROPS AND CABLE, CONNECTION, TESTING, AND LABELING FOR THAT
BUILDING. DURING THE COURSE OF THE INSTALLATION THE
CONTRACTOR SHALL IDENTIFY ANY ADDITIONAL DATA PORTS AND ANY
DATA DROPS NOT FOUND TO ENSURE THE AGGREGATE SUM IS
CAPTURED IN THE RECORD DRAWINGS AND THE OWNER HAS AN
ACCURATE COUNT AT THE END OF THE PROJECT.
NO IN-WALL CONDUIT DEMOLITION SHALL OCCUR, ONLY OUTLETS AND
CABLE TO BE REPLACED. CONTRACTOR TO UTILIZE EXISTING CONDUIT IN
ALL LOCATIONS WHERE CABLES ARE BEING REPLACED. WHERE NO
EXISTING CONDUIT EXISTS, CONTRACTOR TO UTILIZE SURFACE
MOUNTED WIREWAY SIZED TO SUPPORT NEW CAT 6A AND NOT EXCEED
40% FILL.
THIS STATION ESTIMATES THAT 50% OF THE EXISTING IN-WALL CABLING
IS LOOSE AND NOT IN CONDUIT. TO MEET THE EHRM REQUIREMENT THAT
ALL NEW CABLE BE IN CONDUIT, CONTRACTOR SHALL INSTALL NEW
CAT6A CABLING TO EXISTING WAOs IN NEW SURFACE MOUNTED
RACEWAYS WHEN NO EXISTING CONDUIT IS LOCATED. CABLE, RACEWAY,
FIBER, AND CABLETRAY QUANTITIES HAVE BEEN IDENTIFIED ON THE
T-700 SERIES SCHEDULES.
LOCATION MAP
VICINITY MAP
N
S
W
E
POND
THREE 30,000 GAL.
FUEL OIL TANKS
1824 28
GB
G
FIRE ZO
N
E
FIRE ZO
N E
NO PARKING NO PARKINGNO
PARKING
NO
PARKING
N O
P A R K
IN
G
POND
G
PP
FUEL
TANK
CB
CB
CBCB
PROJECT LOCATION
CS:
Michael Rankins
(405) 326-3599 michael.rankins1@va.gov
IT AREA MANAGER:
Angel Pagan
(914) 788-4828
Revisions: Date:
06/27/2025
06/27/2025
Warren Bickerstaff
BICSI ID# 39965
Expires 12-31-2026
Warren Bickerstaff
BICSI ID# 39965
Expires 12-31-2026
Tajammul Text Box
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group
201 E. Jefferson Street, Suite 200
Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
A u to d e s k D o c s /6
-2 -7
M o n tr o s e V
A M
C E
H R
M I U
/6
-2
-7
.M o n tr o s e
.E H
R M
.M E
P .B
.r v t
-0
-2
:1
:2
06G-001
DRAWING INDEX 620-22-700
06/27/2025 M. PERKINS K.
MCDERMOTT
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPDATE
2094 Albany Post Road, Montrose, NY 10548
- DRAWING INDEX -
SHEET
NUMBER SHEET NAME INCLUDED IN 35% SD INCLUDED IN 65% DD INCLUDED IN 95% CD ISSUED FOR CONSTRUCTION
GENERAL
06G-000 COVER SHEET Yes Yes Yes Yes
06G-001 DRAWING INDEX Yes Yes Yes Yes
06G-010 GENERAL PROJECT NOTES Yes Yes Yes Yes
06G-011 GENERAL INFECTION CONTROL NOTES AND SYMBOLS Yes Yes Yes Yes
06G-012 GENERAL INDOOR AIR QUALITY NOTES Yes Yes Yes Yes
HAZARDOUS
06H-100 HAZARDOUS MATERIAL ABATEMENT PLAN - GROUND LEVEL No Yes Yes Yes
ARCHITECTURAL
06A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES No Yes Yes Yes
06A-400 ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL No Yes Yes Yes
06A-501 ARCHITECTURAL ROOF PLAN & DETAILS No Yes Yes Yes
06A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS No Yes Yes Yes
06A-512 ARCHITECTURAL PARTITION HEAD DETAILS No Yes Yes Yes
06A-531 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes
INTERIORS
06IN101 INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES No Yes Yes Yes
FIRE PROTECTION
06FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND DETAILS No Yes Yes Yes
06FX101 FIRE PROTECTION PLAN - FIRST LEVEL Yes Yes Yes Yes
06FX102 FIRE PROTECTION PLAN - SECOND LEVEL Yes Yes Yes Yes
06FX401 FIRE PROTECTION ENLARGED PLANS Yes Yes Yes Yes
06FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes
MECHANICAL
06M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS No Yes Yes Yes
06M-100 MECHANICAL PLAN - GROUND LEVEL No Yes Yes Yes
06M-101 MECHANICAL PLAN - FIRST LEVEL No Yes Yes Yes
06M-102 MECHANICAL PLAN - SECOND LEVEL No Yes Yes Yes
06M-401 MECHANICAL ENLARGED PLANS No Yes Yes Yes
06M-501 MECHANICAL DETAILS No Yes Yes Yes
06M-701 MECHANICAL SCHEDULES No Yes Yes Yes
06M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS No Yes Yes Yes
06M-802 MECHANICAL CONTROL DIAGRAMS No Yes Yes Yes
06M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes
06M-902 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes
ELECTRICAL
06E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes
06E-101 ELECTRICAL PLAN -GROUND LEVEL No Yes Yes Yes
06E-102 ELECTRICAL PLAN - FIRST LEVEL No Yes Yes Yes
06E-103 ELECTRICAL PLAN - SECOND LEVEL No Yes Yes Yes
06E-401 ELECTRICAL ENLARGED PLANS No Yes Yes Yes
06E-501 ELECTRICAL DETAILS Yes Yes Yes Yes
06E-601 ELECTRICAL ONE-LINE DIAGRAMS No Yes Yes Yes
06E-701 ELECTRICAL SCHEDULES No Yes Yes Yes
06E-702 ELECTRICAL SCHEDULES Yes Yes Yes Yes
06E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
TELECOMMUNICATION
06T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes
06T-101 TELECOMMUNICATION PLAN - GROUND LEVEL Yes Yes Yes Yes
06T-102 TELECOMMUNICATION PLAN - FIRST LEVEL Yes Yes Yes Yes
06T-103 TELECOMMUNICATION PLAN - SECOND LEVEL Yes Yes Yes Yes
06T-401 TELECOMMUNICATION ENLARGED PLANS No Yes Yes Yes
06T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes
06T-502 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes
06T-503 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes
06T-504 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS No Yes Yes Yes
06T-601 TELECOMMUNICATION RISER DIAGRAMS Yes Yes Yes Yes
06T-603 TELECOMMUNICATION FIBER RISER DIAGRAM - NEW No Yes Yes Yes
06T-604 TELECOMMUNICATION RACK ELEVATIONS Yes Yes Yes Yes
06T-701 TELECOMMUNICATION SCHEDULES No Yes Yes Yes
06T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
06T-902 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes
06T-903 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes
REFERENCE
06R-900 PHOTO REFERENCES No Yes Yes Yes
06R-901 PHOTO REFERENCES No Yes Yes Yes
06R-902 PHOTO REFERENCES No Yes Yes Yes
Grand total: 58
Revisions: Date:
06/27/2025
GENERAL NOTES GENERAL FIRE AND LIFE SAFETY NOTES
GENERAL DIMENSIONING NOTES
GENERAL PAINTING NOTES
GENERAL SEALANT / CAULKING NOTES
GENERAL DEMOLITION AND PHASING NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
THESE GENERAL NOTES APPLY TO ALL DRAWINGS.
COMPLY WITH ALL APPLICABLE CODES, RULES, AND REGULATIONS. WHEN REQUIRED BY CODE,
ALL WORK MUST BE INSPECTED AND APPROVED BY LOCAL AUTHORITIES.
ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR(S) PRIOR
TO FABRICATION AND CONSTRUCTION. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS
AND THESE DRAWINGS, WHICH AFFECT THE SCOPE AND INTENT OF THE WORK DESCRIBED IN
CONSTRUCTION DOCUMENTS, SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND
COR IMMEDIATELY.
GENERAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL DUCT SIZES
AND LOCATIONS.
ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL
KNOWLEDGE.
WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE INSTALLED LEVEL WITH EACH OTHER
AND PLUMB.
THE WORK INDICATED IN THE NOTES DESCRIBES THE GENERAL SCOPE OF WORK ONLY AND IS
NOT INTENDED TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE FULL SCOPE OF
WORK.
DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE FIELD VERIFIED. ALL DISCREPANCIES
SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND COR.
FIELD VERIFICATION: BEFORE BIDDING AND DURING CONSTRUCTION, CONTRACTOR SHALL
VERIFY THAT ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE CONTRACT DOCUMENTS.
REPORT DISCREPANCIES TO ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING WORK
RELATED TO ANY DISCREPANCIES. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS AS "NIC" IS NOT IN THE CONTRACT.
HOWEVER, THE CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK INDICATED AS NIC.
SITE COORDINATION: COORDINATE ALL SITE OPERATIONS WITH OWNER, INCLUDING STAGING
AREAS, MATERIAL STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY OPERATIONS,
INTERRUPTION OF UTILITIES, ETC. SEE SPECIFICATIONS.
TRADE COORDINATION: CONTRACTOR SHALL COORDINATE THE PLACEMENT OF EACH TRADE'S
WORK SO THAT THERE ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR FUNCTION
IMPAIRED. IT IS ESPECIALLY IMPORTANT TO COORDINATE PENETRATIONS THROUGH
FOUNDATIONS, FLOORS, WALLS AND CEILING SPACES. SEE SPECIFICATIONS.
PROVIDE GALVANIC SEPARATION MATERIAL, ACCEPTABLE TO ARCHITECT AND COR, BETWEEN
DISSIMILAR METALS. SEE SPECIFICATIONS.
ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE FIRE TREATED. SEE
SPECIFICATIONS. ALL SURFACE ATTACHED METAL SHALL BE SEPARATED FROM CONCRETE OR
MASONRY BY NON-METALLIC MATERIAL SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER
MATERIAL AS APPROVED BY ARCHITECT AND COR.
EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL EQUIPMENT, FIXTURES, DEVICES,
MECHANICAL, PLUMBING OR ELECTRICAL ITEMS. SEE PLANS FOR ADDITIONAL ELEVATION
COORDINATION.
ALL APPLICABLE PERMITS SHALL BE KEPT ON SITE AT ALL TIMES DURING PERMITTED WORK.
WORK SHALL BE COORDINATED WITH COR, SUBMIT CERTIFICATIONS AS REQUIRED BY THE
SPECIFICATIONS. REQUIRED PERMITS INCLUDE, BUT ARE NOT LIMITED TO; DAILY BURN PERMITS
FOR ANY CUTTING/WELDING, LOCK-OUT-TAG-OUT AND LIVE ELECTRICAL PERMITS FOR ANY
ELECTRICAL WORK, CONFINED SPACE ENTRY PERMITS FOR ACCESSING TUNNELS, PIPE
CHASES, ETC., AND DIG PERMITS FOR SITE WORK.
1.
2.
3.
FIRE LIFE SAFETY NOTES
FIRE RATED ASSEMBLIES, INCLUDING FIREPROOFING, DAMAGED DURING CONSTRUCTION
MUST BE RESTORED TO THEIR ORIGINAL CONDITION.
FIRE RESISTIVE ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION, AND THE MEANS OF EGRESS
MUST BE MAINTAINED AT ALL TIMES. WHEN IT IS NOT POSSIBLE TO MAINTAIN FIRE RESISTIVE
ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION AND/OR MEANS OF EGRESS, TEMPORARY
CONSTRUCTION BARRIERS AND/OR A FIRE WATCH MUST BE PROVIDED.
VHA DIRECTIVE 7715 SAFETY AND HEALTH DURING CONSTRUCTION DATED SEPTEMBER 5,
2023, REQUIRES VA MASTER SPECIFICATIONS, DIVISION 1 - GENERAL REQUIREMENTS,
SECTION 01 35 26 - SAFETY REQUIREMENTS MADE SPECIFIC FOR THE ASSOCIATED
CONSTRUCTION WORK.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
FIRE SAFETY DURING CONSTRUCTION, ALTERATIONS AND DEMOLITION
FIRE DEPARTMENT ACCESS ROADS SHALL BE ESTABLISHED AND MAINTAINED AT ALL TIMES
PER LOCAL FIRE DEPARTMENT.
FIRE DEPARTMENT WATER MAINS AND FIRE HYDRANTS SHALL BE OPERATIONAL AT ALL TIMES
AND SHALL BE IN ACCORDANCE WITH LOCAL FIRE DEPARTMENT.
FIRE EXTINGUISHERS SHALL BE PROVIDED FOR BUILDINGS UNDER CONSTRUCTION. THE
NUMBER AND TYPE OF EXTINGUISHERS SHALL BE AS REQUIRED BY THE STATE FIRE MARSHAL
OR LOCAL FIRE DEPARTMENT.
COMBUSTIBLE DEBRIS SHALL NOT ACCUMULATE WITHIN BUILDINGS.
CUTTING AND WELDING OPERATIONS SHALL BE IN ACCORDANCE WITH VA.
FIRE PROTECTION SYSTEMS SHALL BE MAINTAINED OPERATIONAL AT ALL TIMES PER LOCAL
FIRE CODES.
REQUIRED MEANS OF EGRESS COMPONENTS SHALL BE MAINTAINED AT ALL TIMES.
TEMPORARY EXITING SHALL BE APPROVED BY THE VA.
FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE MAINTAINED.
PLASTIC FILM (VISQUEEN) WHEN USED FOR DUST PROTECTION, SHALL BE FLAME RETARDANT.
SMOKE DETECTORS SHALL BE COVERED OR REMOVED DURING ALTERATIONS. WHEN
REQUIRED BY THE STATE FIRE MARSHAL OR LOCAL FIRE DEPARTMENT, HEAT DETECTORS MAY
BE SUBSTITUTED FOR SMOKE DETECTORS DURING ALTERATIONS.
ALL FIRE HYDRANTS, WATER SUPPLY TO FIRE HYDRANTS, AND FIRE DEPARTMENT VEHICLE
ACCESS ROADWAYS SHALL BE INSTALLED, TESTED AND PLACED IN SERVICE PRIOR TO AND
DURING THE TIME OF CONSTRUCTION. INSTALLATION MUST BE COORDINATED WITH LOCAL
FIRE DEPARTMENT IN THE FIELD.
CULTURAL RESOURCE PROPERTIES - CONSTRUCTION AND ALTERATION OPERATIONS WITHIN
CULTURAL RESOURCE PROPERTIES SHALL BE PERFORMED IN ACCORDANCE WITH NFPA 914.
1.
2.
3.
4.
5.
ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF THERE IS A DIMENSIONAL VARIANCE BETWEEN DISCIPLINES OR SIGNIFICANT OMISSION OR CONFLICT WITHIN A DISCIPLINE, CONTACT ARCHITECT AND COR PRIOR
TO BID. IF DISCREPANCIES ARE DISCOVERED AFTER THE BID, CONTRACTOR SHALL CONFIRM
DIMENSIONS WITH ARCHITECT AND COR PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.
ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL AND EQUIPMENT SIZES MAY NOT BE
THOSE ANTICIPATED BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND SHOP DRAWINGS
CONTRACTOR SHALL VERIFY DIMENSIONS AND RECOMMEND DIMENSIONAL MODIFICATIONS AS
REQUIRED.
ARCHITECTURAL DIMENSIONS MAY BE FOUND THROUGHOUT THE DRAWINGS - COORDINATE ALL
DISCIPLINES.
ADDITIONAL DIMENSIONS MAY BE SHOWN ON ENGINEERING DRAWINGS. MECHANICAL AND
ELECTRICAL EQUIPMENT SCHEDULES MAY ALSO CONTAIN DIMENSIONAL INFORMATION RELATED
TO EQUIPMENT SIZES AND CLEARANCES.
DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X 4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE. (FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE SHOWN IN THE 16THS OF AN INCH, BUT STANDARD
MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").
1.
2.
3.
4.
5.
6.
7.
8.
FLOOR PLAN DIMENSIONS
THE LOWEST FLOOR OVERALL BUILDING DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE
FOUNDATION WALL TO THE OPPOSITE OUTSIDE FACE OF THE FOUNDATION WALL (OR, FROM
OUTSIDE GRIDLINE TO OUTSIDE GRIDLINE) AS SHOWN.
DIMENSIONS FOR NON-LOAD BEARING WALLS ARE TO ONE FACE OF THE STUDS, BOTH FACES OF
MASONRY WALLS, OR BOTH FACES OF CONCRETE WALLS, ETC, UNLESS NOTED OTHERWISE.
WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL (UNLESS NOTED AS "NOM").
DOOR OPENING DIMENSIONS IN FRAME CONSTRUCTION (WOOD OR STEEL STUDS) ARE TYPICALLY
SHOWN AT THEIR CENTERLINES. HOWEVER, WHEN THE EDGE OF THE DOOR IS IMPORTANT, OR
MAKES THE PLACEMENT CLEARER, THE DIMENSION MAY BE TO THE ACTUAL FRAME EDGE.
DOOR DIMENSIONS IN LOAD-BEARING MASONRY AND CONCRETE WALLS ARE TO "ROUGH"
OPENINGS (FACES OF MASONRY OR CONCRETE). TYPICAL DOOR ROUGH OPENING DIMENSIONS
ARE THE FRAME WIDTH PLUS 1/2" (1/4" CLEARANCE EACH SIDE) AND PLUS 1/2" TOTAL FOR THE
HEAD/SILL DIMENSIONS.
"TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS TO ADJACENT WALLS: BETWEEN FRAME FACES
AND FACES OF STUDS, OR FACES OF MASONRY OR CONCRETE, AT NEARBY PERPENDICULAR
WALLS ARE TYPICALLY 4", DEPENDING ON HARDWARE CLEARANCES AND FRAME REQUIREMENTS
(2.5"-DOOR HANDLE PLUS 1" -WALL STOP PLUS 1/2" GB=4.0")
SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH AS AT REQUIRED EXIT WAYS, APPLIANCE
COVES OR PREFABRICATED STAIR ENCLOSURES, ARE NOTED "CLR" OR "CLEAR" AND ARE SHOWN
TO THE FACES OF FINISHES.
DIMENSIONS DESIGNATED WITH "MIN" INDICATE THE MINIMUM CLEARANCE OR SEPARATION
REQUIRED.
1.
ROOF PLAN DIMENSIONS
UN-DIMENSIONED LOCATIONS OF ROOFTOP EQUIPMENT AND CONSTRUCTION OFTEN MAY BE
DETERMINED BY THE FLOOR PLAN BELOW, SUCH AS ROOF HATCH DETERMINED BY REFERENCE
TO A FIXED WALL AND LADDER, OR MECHANICAL EQUIPMENT DETERMINED BY DUCT
PENETRATIONS BETWEEN JOISTS.
1.
2.
3.
4.
5.
VERTICAL DIMENSIONS
UNLESS OTHERWISE NOTED, THE FIRST FLOOR REFERENCE ELEVATION IS 100'-0". THIS IS
REFERENCED TO A GROUND ELEVATION ABOVE MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR STRUCTURAL DRAWINGS. ELEVATIONS BELOW 0'-0" ARE "-" (PREFIXED WITH A MINUS SIGN).
BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON ARCHITECTURAL DRAWINGS ARE TO TOP OF
DECKING OR SHEATHING, BUT DO NOT INCLUDE FINISHES OR ROOFING MATERIAL.
WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE TO FINISH HEIGHTS (UNLESS THEY ARE IN
LOAD-BEARING MASONRY OR CONCRETE WALLS, WHERE THEY ARE TO ROUGH OPENINGS).
HEIGHT REFERENCES SHOULD BE TO THE NEXT LOWER FINISH FLOOR ELEVATION.
LIGHTING HEIGHTS ON WALLS ARE TO CENTERLINES OF THE ELECTRICAL BOXES, UON.
EQUIPMENT, VENT, PLUMBING AND FIXTURE ELEVATIONS ARE TO CENTERLINES OF THE WALL
PENETRATIONS, UON.
SOME VERTICAL DIMENSIONS ARE SHOWN ON PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND
ELEVATION CHANGES. A PLAN ELEVATION CHANGE SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND INDICATES THE + OR - ELEVATION CHANGE IN INCHES FROM THE FINISHED FLOOR ELEVATION
(FFE) NEXT TO IT.
1.
2.
3.
4.
5.
6.
7.
HALF-TONED OR LIGHT LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION.
TEMPORARY BRACING OR SHORING MAY BE NECESSARY, AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES TO MEET APPROVAL OF CODE AGENCIES. COORDINATE DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE OWNER RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING THE PRE-CONSTRUCTION WALK THROUGH.
CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS OR PENETRATIONS LEFT BY THE INSTALLATION OR CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO MAINTAIN THE INTEGRITY OF THE WALL AND/OR ROOF.
THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-WAY OF THE PROJECT SITE WILL BE IMPACTED BY CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE WITH THE LATEST OSHA REQUIREMENTS. COORDINATE CONTRACTOR STAGING AREA WITH TEMPORARY ACCESSIBLE PARKING AND PUBLIC ACCESS WITH OWNER PRIOR TO CONSTRUCTION. PROTECT PARKING SIGNAGE WITHIN PROJECT AREA.
SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND DEMOLITION FOR RELATED DEMOLITION WORK.
CONTRACTOR TO PROVIDE INFECTION CONTROL PLAN AS REQUIRED BY VHA DIRECTIVE 7715 SAFETY AND HEALTH DURING CONSTRUCTION DATED SEPTEMBER 5, 2023. SUBMIT TO COR PRIOR TO START OF WORK.
1.
2.
3.
4.
5.
1.
2.
1.
2.
3.
1.
2.
1.
2.
3.
1.
1.
2.
1.
2.
3.
4.
A.
B.
C.
5.
6.
FIRE ALARM
DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN MANUAL, 2023
AND NFPA 72, 2025.
SUBMIT FOUR SETS OF PLANS TO VA (AHJ) FOR APPROVAL PRIOR TO THE INSTALLATION.
A RISER DIAGRAM, AS WELL AS A SYSTEM RESPONSE MATRIX, FOR THE NEW CLEAN AGENT SYSTEM IS TO BE PROVIDED AS PART OF THE DESIGN. THE CLEAN AGENT SYSTEM WILL BE MONITORED BY THE EXISTING BUILDING FIRE ALARM SYSTEM SO
THERE IS NO NEW OFFSITE MONITORING REQUIRED.
THE FIRE ALARM SYSTEM SHALL CONFORM TO APPLICABLE NFPA STANDARDS. FIRE ALARM SHOP DRAWINGS SHALL BE SUBMITTED TO VA FOR APPROVAL PRIOR TO INSTALLATION. UPON COMPLETION OF THE INSTALLATION OF THE FIRE ALARM SYSTEM, A SATISFACTORY TEST OF THE ENTIRE SYSTEM WILL BE PERFORMED IN THE PRESENCE OF THE ENFORCING AGENCY.
THE ADDITION OF NEW DEVICES TO THE EXISTING BUILDING FIRE ALARM SYSTEM SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS. DEVICE LOCATION AND WIRING RUNS SHOWN ON THE DRAWINGS ARE FOR REFERENCE ONLY. ACTUAL LOCATIONS SHALL BE IN ACCORDANCE WITH NFPA 72 AND PROJECT SPECIFICATIONS. THE FIRE ALARM SYSTEM IN THE MAIN COMPUTER ROOM SHALL INTERFACE WITH THE NEW CLEAN AGENT FIRE SUPPRESSION SYSTEM. THE EXISTING FIRE ALARM SYSTEMS IN ALL OTHER BUILDINGS SHALL INTERFACE WITH THE NEW DEVICES SHOWN ON
THE DRAWINGS.
FIRE EXTINGUISHERS
TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE WITH TEMPORARY PORTABLE FIRE EXTINGUISHERS AND SHALL MAINTAIN THEM DURING THE COURSE OF CONSTRUCTION. EACH EXTINGUISHER SHALL BE 10 lb. CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C FIRES. ALL EXTINGUISHERS SHALL BE U.L. LABELED AND SHALL BE DRY CHEMICAL TYPE.
FOR TELECOMMUNICATION ROOMS (TR), THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A:10B:C FIRE EXTINGUISHER LOCATED NO GREATER THAN 75 FEET AWAY FROM THE NEW TR AND THEY MUST BE CLEAN AGENT OR CARBON DIOXIDE TYPE. CONTRACTOR TO COORDINATE THE NEW LOCATION WITH THE COR.
FIRE SPRINKLER SYSTEM
EXISTING FIRE SPRINKLER MAIN PIPES AND BRANCH LINES TO BE RETAINED AND REUSED. NEW SPRINKLERS WILL BE PROVIDED AT EACH TR AND MCR LOCATION. CONTRACTOR TO VERIFY THE EXACT SIZE AND LOCATION IN FIELD.
THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH 2025 NFPA 13.
ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD PIPED, NO FLEXIBLE CONNECTIONS ARE PERMISSIBLE.
FIRE & SMOKE DAMPERS
EXISTING FIRE & SMOKE DAMPERS ARE TO BE RETAINED AND REUSED.
THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM AND FIRE SPRINKLER SYSTEM.
EXIT AND EMERGENCY LIGHTING
WHERE APPLICABLE, EXISTING AND/OR NEW EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING TO EXTERIOR WITH MINIMUM 6" HIGH LETTERS AT REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY; CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE WHEN NORMAL POWER IS INTERRUPTED. EMERGENCY LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE POWER AT FLOOR LEVEL. EXIT DOOR SHALL SWING IN THE DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2" BELOW
THE THRESHOLD.
WHERE APPLICABLE, EXISTING AND/OR NEW EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH THE NFPA 101 AND THE VA
FIRE PROTECTION DESIGN MANUAL.
EMERGENCY LIGHTING SHALL BE PROVIDED FOR THE MAIN COMPUTER ROOM.
RATED DOOR AND WINDOW ASSEMBLIES
THE BUILDING IS EQUIPPED WITH RATED DOOR ASSEMBLIES. EXISTING RATINGS ARE TO BE MAINTAINED. NEW RATED DOORS
SHALL CLEARLY LABEL DOOR AND FRAME RATING, DO NOT PAINT.
FIRE STOPPING
FIRE STOPPING IS REQUIRED IN ALL FLOOR PENETRATIONS AND IN ALL PENETRATIONS OF RATED WALLS.ALL FIRE STOPPING
SHALL BE LISTED IN ACCORDANCE WITH NFPA REQUIREMENTS.
TEMPORARY FIRESTOPPING: IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED
PENETRATION.
GENERAL
INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE INSTALLATION, INCLUDING
INSULATION, FACING MATERIALS, TAPES AND ADHESIVES NORMALLY APPLIED.
ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25 AND A SMOKE DENSITY NOT TO EXCEED 50 WHEN TESTED IN ACCORDANCE WITH
ASTM E 84.
HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE CENTERED BETWEEN 30" AND 44" ABOVE THE FLOOR. LATCHING AND LOCKING DOORS THAT ARE HAND-ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE HARDWARE, PANIC BARS, PUSH-PULL PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS ABOVE IN EGRESS DIRECTION. DOOR CLOSERS (EXCEPT FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM AN OPEN POSITION OF 70 DEGREES, THE DOOR WILL TAKE AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE LATCH, MEASURED FROM THE LEADING EDGE OF THE DOOR.
COMPLY WITH NFPA REQUIREMENT FOR NEW AND EXISTING DOORS. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT
EXCEED:
INTERIOR DOORS - 5 lbs.
EXTERIOR DOORS - 8.5 lbs.
FIRE DOORS - 15 lbs.
ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED WITH A UL APPROVED
METHOD AND MATERIAL APPROVED PER BUILDING.
IF MULTIPLE CEILING TILES MUST BE REMOVED IN THE CORRIDOR SYSTEM AND CANNOT BE REPLACED AT THE END OF THE WORK SHIFT, A 1-HOUR FIRE BARRIER SHALL NEED TO BE CONSTRUCTED; THE ALTERNATIVE IS TO INSTALL TEMPORARY
UPRIGHT SPRINKLER.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR THIS PROJECT ARE DEFINED BY THE
SPECIFICATIONS AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING SPECIFICATION
MANUAL FOR NEW WORK AND THE MPI MAINTENANCE REPAINTING MANUAL FOR RENOVATION
OR REPAINTING WORK.
PAINTING WORK: INCLUDES TAPING, SURFACE PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD PAINTING AND FINISHING AS REQUIRED BY STANDARD PRACTICE, MANUFACTURER OR
SPECIFICATION. REQUIRED COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP PRIMING,
SURFACE TREATMENT AND FINISHING. THE WORK ALSO INCLUDES PAINTING CLEANUP AND
REMOVAL OF OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS MAY REQUIRE OTHER
TYPES OF PAINTING, INCLUDING, BUT NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND
FACTORY PRIMING.
PROJECT PAINTING SCOPE: EXCEPT AS NOTED OTHERWISE, CONTRACTOR IS TO FIELD PAINT
INTERIOR AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES, WHETHER OR NOT
PREVIOUSLY PAINTED, AND ALL NEW ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT
LIMITED TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL AND EXPOSED PIPING AND
FITTINGS (INCLUDING IRON AND PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE SHALL BE
SEALED, UNLESS NOTED OTHERWISE OR NOT RECOMMENDED BY MANUFACTURER. PAINTING
SCOPE ITEMS MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS, SPECIFICATIONS AND
PAINTING GENERAL NOTES. THESE SOURCES ARE COMPLEMENTARY, NOT MUTUALLY
EXCLUSIVE.
MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD PAINTING OF INTERIOR AND
EXTERIOR EXPOSED PIPES, DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND PRIMED
METAL SURFACES OF EQUIPMENT IN EXPOSED AREAS INSTALLED UNDER MECHANICAL AND
ELECTRICAL WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF ELECTRICAL AND
MECHANICAL WORK IN ELECTRICAL AND MECHANICAL ROOMS IS NOT REQUIRED UNLESS
NOTED OTHERWISE IN THE PROJECT SPECIFICATIONS. COLOR-CODING OF PIPING FOR
MECHANICAL AND PLUMBING WORK IS COVERED IN THE MECHANICAL OR PLUMBING
SPECIFICATIONS.
APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT AN EDGE, CORNER, CHANGE OF
MATERIALS OR CHANGE OF PAINT COLOR. COMPLETED PAINTING SHALL NOT IMPEDE THE
INTENDED OPERATION OF ANY ITEM, SUCH AS WINDOWS, DRAWERS, HINGES, DOORS, ETC.
TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE REPAIRED AS REQUIRED. PAINT
TEXTURE, GLOSS AND COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA ON ONE
SURFACE IS LARGER THAN 1 SQUARE FOOT, OF IF TEXTURE, GLOSS AND COLOR CANNOT BE
MATCHED, THE ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING EDGES OR CORNERS.
DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT PAINT ITEMS THAT ARE SPECIFIED
FACTORY-FINISHED OR INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE INDICATED, DO NOT
PAINT SUCH ITEMS AS ACOUSTIC MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND
EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL EQUIPMENT, SWITCH AND OUTLET
PLATES, THERMOSTATS, LIGHTING FIXTURES, SWITCHGEAR, MOTORS, DISTRIBUTION PANELS
AND INTERIOR AND EXTERIOR SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO PAINT
AN ITEM OR SURFACE, CONTACT THE ARCHITECT FOR INSTRUCTIONS PRIOR TO PAINTING.
EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT METAL
SURFACES OF ANODIZED ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE, COPPER,
BRASS, BRONZE AND SIMILAR FINISHED MATERIALS.
CONCEALED SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT SURFACES SUCH AS
WALLS AND CEILINGS IN CONCEALED AND GENERALLY INACCESSIBLE AREAS, INCLUDING
FURRED AREAS, UTILITY TUNNELS, PIPE SPACES, CHASES AND DUCT SHAFTS. WATERPROOF
SEAL CONCRETE IN PIPE SPACE.
OPERATING PARTS AND SENSING DEVICES: UNLESS OTHERWISE INDICATED, DO NOT PAINT
MOVING PARTS OF OPERATING UNITS SUCH AS VALVES, DAMPER OPERATORS, LINKAGES,
MOTOR AND FAN SHAFTS, LIGHT SENSING OR EMITTING DEVICES THAT MIGHT NOT FUNCTION
PROPERLY IF PAINTED.
CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-REQUIRED LABELS.
ALL FLOORS ARE TO BE CLEANED AND SEALED AT COMPLETION OF WORK. NO EPOXY PAINT.
ALL NEWLY EXPOSED SPRINKLER PIPING TO BE PAINTED.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
THE PRIMARY OBJECTIVE OF APPLYING SEALANT IS TO FACILITATE WEATHER TIGHTNESS AT
THE EXTERIOR BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR WET\DAMP
LOCATIONS. PROPER PRIMING MUST BE USED WITH SEALANTS.
THE PRIMARY OBJECTIVE OF APPLYING CAULKING IS TO ENHANCE APPEARANCE AND FINISH
AT INTERIOR APPLICATIONS AND IN SOME SITUATIONS TO REDUCE AIRFLOW, SUCH AS AT
DUCTS, INTERIOR SIDES OF THE EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER
PENETRATIONS (FIRE CAULKING) AND TO DECREASE SOUND TRANSMISSION THROUGH WALLS
AND CEILINGS. OTHER USES MAY BE NOTED IN THE SPECIFICATIONS AND/OR ON THE
DRAWINGS. IF THERE ARE QUESTIONS ABOUT WHERE OR WHAT TYPE OF SEALANT OR
CAULKING SHOULD BE USED, CONTACT THE ARCHITECT.
SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED) SHALL BE USED AT HORIZONTAL AND
VERTICAL CONCRETE JOINTS AND AS NOTED.
SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION JOINT MATERIAL, AS REQUIRED,
SHALL BE USED AT MASONRY AND CONCRETE CONTROL JOINTS.
APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF SEALANT BETWEEN PERIMETER SOLE
PLATES AND FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR THRESHOLDS IN
SEALANT UNLESS NOTED OTHERWISE.
SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND BOTH SIDES OF DOOR FRAMES.
SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND INTERIOR WALL MOUNTED
EQUIPMENT FRAMES AND EXPOSED SUPPORTS.
SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS BETWEEN DIFFERENT WALL
MATERIALS (TILE TO BRICK, CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL TO P-
LAM, ETC).
USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL GAPS OF 1/16TH INCH OR MORE.
SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS THROUGH, FLOORS AND WALLS.
USE SPECIFIED SEALANT AROUND WALL, FLOOR AND CEILING PIPE PENETRATIONS. WHERE
ESCUTCHEONS ARE SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A BED OF SEALANT.
USE SPECIFIED CAULK OR SEALANT AROUND PENETRATIONS IN EXTERIOR WALLS AND
SOFFITS, SUCH AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE ENTRIES, GAS PIPE
ENTRIES, ELECTRIC OUTLETS, LIGHTING, VENTS, ETC.
13.
14.
15.
HISTORIC STRUCTURES - CONSTRUCTION AND ALTERATION OPERATIONS WITHIN HISTORIC
STRUCTURES SHALL BE PERFORMED IN ACCORDANCE WITH NFPA 914.
IMPAIRMENTS - IMPAIRMENTS SHALL BE IN ACCORDANCE WITH NFPA 241.
GENERAL NFPA 241 SHALL BE FOLLOWED, AS APPLICABLE, FOR ALL DEMOLITION OPERATIONS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .M
EP
.G en er al .S he et s.
rv t
-0 6-
8:
:0
06G-010
GENERAL PROJECT NOTES 620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
Revisions: Date:
INFECTION CONTROL / DUST
CONTROL PARTITION /
BARRIER
INFECTION CONTROL/DUST
CONTROL EGRESS DOOR NON-
TRANSFERRING MULTI-
SHEETED ADHESIVE FLOOR
PADS
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
STICKY
MAT
7'
/1 6"
FI
N
IS
H
ED
F
LO
O
R T
O U
N D
ER
SI
D E
O F
ST
R
U C
TU
R
E
VE
R
IF
Y
FL
O O
R T
O F
LO
O
R H
EI
G
H T
TEMPORARY WALL, STARC
SYSTEMS OR EQUAL
FLOOR LINE
CEILING SYSTEM AS SCHEDULED, IF MULTIPLE
CEILING TILES MUST BE REMOVED IN THE
CORRIDOR SYSTEM AND CANNOT BE REPLACED AT
THE END OF THE WORK SHIFT, A 1-HOUR FIRE
BARRIER MIGHT NEED TO BE CONSTRUCTED.
EXISTING STRUCTURE
FIRE RATED PLASTIC TO PREVENT DUST
INSTALL PRIOR TO CONSTRUCTION
SPRINKLER SYSTEM TO
REMAIN
PROVIDE 1-HOUR RATED TEMPORARY
BARRIER OR TEMPORARY UPRIGHT
SPRINKLER HEADS, AS REQUIRED.
COORDINATE WITH OWNER FOR EACH
LOCATION
PROVIDE 1-HOUR RATED TEMPORARY
BARRIER/ TEMPORARY UPRIGHT SPRINKLER
HEADS, AS REQUIRED. COORDINATE WITH
OWNER FOR EACH LOCATION
WEEKLY
CHANGED
OR MORE AS
NEEDED
PRE-FILTER
FLEX
DUCT
MONTHLY
CHANGED
HEPA FILTER
HEPA NEGATIVE
AIR UNIT
PROVIDE STICKY MATS (CHANGED
END OF EVERY SHIFT OR MORE IF
NECESSARY TO MAINTAIN
CLEANLINESS).
INDICATOR SHALL BE AT -0.03 W.G. OR GREATER (VERIFY
DAILY). IF NOT VERIFY ALL OPENING SUCH AS DOOR ARE
CLOSED AND/OR CHANGE OUR NEGATIVE AIR PRE-FILTER.
IN CLASS 3 OR 4 AREAS NEGATIVE PRESSURE MUST BE
CONTINUOUSLY MONITORED AND ALARMED. PLEASE
COORDINATE WITH THE IC TEAM.
SUPPLY DUCTS
EITHER KEEP
RUNNING OR COVER
WHEN RUNNING TO
KEEP DUST OUT.
A
V
O
TAPE ALL SERVICES TO
PROTECT AGAINST
CONTAMINATION
E
FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET
(SHALL REQUIRE MORE THAN
ONE.)
PROVIDE TEMPORARY
ENCLOSURE AT AREAS
TO REMAIN
OPERATIONAL, SEE
DETAIL (STARC SYSTEMS
OR EQUAL)
F6
03G-011
Sim
EXISTING RACK TO
BE REPLACED
PROVIDE NEW
HEPA FILTER AT
THE BEGINNING OF
CONSTRUCTION
NEW RACK IN TEMPORARY
LOCATION LOCATED
ADJACENT TO EXISTING RACK
OR IN ADJACENT CORRIDOR.
IF CORRIDOR IS USED,
PROVIDE INFECTION
CONTROLS FOR THAT AREA.
PROVIDE 1-HOUR RATED
TEMPORARY BARRIER/ TEMPORARY
UPRIGHT SPRINKLER HEADS, AS
REQUIRED. COORDINATE WITH
OWNER FOR EACH LOCATION
PB IC
FLOOR
DOOR
CL
12"
48"
AFF
80"
MIN
FIRE ALARM NOTIFIER
(STROBE/HORN/SPEAKER)
NOTES:
1. HEIGHTS SHOWN ARE TYPICAL TO CENTER OF BACKBOX / DEVICE UNLESS NOTED OTHERWISE.
2. DEVICES ABOVE DOORS SHALL BE CENTERED BETWEEN TOP OF DOOR TRIM AND CEILING LINE.
3. MOUNTING HEIGHTS SHOWN ON ARCHITECTURAL ELEVATIONS SHALL GOVERN OVER THOSE SHOWN ABOVE.
4. ALL ELEVATIONS ARE TO CENTER LINE OF DEVICE, UNLESS OTHERWISE NOTED.
5. REFER TO EQUIPMENT ELEVATION DRAWINGS FOR COORDINATION WITH CASEWORK.
6. MOUNT MANUAL MOTOR STARTER ADJACENT TO OR ON UNIT.
96"
MAX
6" MIN
LIGHT SWITCH (OR OCCUPANCY SENSOR/SWITCH)
PUSHBUTTON (DOOR ACTUATOR)
WALL PHONE JACK
INTERCOM
18"
AFF
VOICE/DATA OUTLET
POWER OUTLET
J
AUDIO-VISUAL INPUT JACK
J
AUDIO-VISUAL
CONTROL KEYPAD
CR
SECURITY CARD READER
4"
MAX
4"
MAX
UNDERSIDE OF
STRUCTURE
FIRE PROTECTION ZONE, BENEATH DECK
LIGHTING ZONE OR CEILING (9'-0")
CABLING ZONE TRAYS 6" ABOVE
DOOR
CABLE TRAY HVAC ZONE, LOCATION ON PLAN
T
THERMOSTAT
6" MIN
DISCONNECT
SWITCHES
M
MOTOR STARTER
PANELBOARDS &
CABINETS
INDIVIDUAL CIRCUIT BREAKERS
CK
CLOCK OUTLETS
NC
NURSE CALL
STATION
NURSE CALL DOME LIGHTS
DM
DIMMERS
FIRE ALARM - PULL STATIONS
FX
F
FIREMAN WALL PHONE JACK 90"
AFF
96"
AFF
66"
AFF
72"
AFF TO TOP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .M
EP
.G en er al .S he et s.
rv t
-0 6-
8:
:2
06G-011
GENERAL INFECTION CONTROL NOTES AND
SYMBOLS
620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
NTSF5 ICRA LEGEND
NTSF6 INFECTION CONTROL MEASURES, TEMPORARY WALL SECTION
NTSF8 INFECTION CONTROL MEASURES, TYPICAL CONSTRUCTION LAYOUT
NOT TO SCALE
F1 ELECTRICAL COMPONENT MOUNTING HEIGHTS
Revisions: Date:
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .M
EP
.G en er al .S he et s.
rv t
-0 6-
8:
:3
06G-012
GENERAL INDOOR AIR QUALITY NOTES 620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
KEEP DUCTS AND HVAC EQUIPMENT CLEAN, DRY, AND FREE OF DUST AND DEBRIS DURING CONSTRUCTION. CLEAN DUCTS
BEFORE OCCUPANCY.
ASK THE HVAC CONTRACTOR TO CREATE A PLAN LISTING HOW THEY WILL PROTECT THE DUCTS AND EQUIPMENT DURING
INSTALLATION.
INSPECT DUCTS PRIOR TO INSTALLATION TO ENSURE THEY DON’T CONTAIN OIL OR DEBRIS.
PRIOR TO INSTALLATION STORE DUCTS AND MECHANICAL EQUIPMENT IN A CLEAN, DRY ENVIRONMENT. WRAP THE
EQUIPMENT WITH PLASTIC IF NECESSARY TO KEEP OUT DUST.
AVOID OPERATING THE HVAC SYSTEM DURING CONSTRUCTION TO PREVENT DUST FROM BEING PULLED INTO THE
SYSTEM. DO NOT RUN HVAC EQUIPMENT WHILE DRY-WALLING, SANDING, OR SAWING.
MAINTAIN A CLEAN WORK AREA BY SWEEPING AND VACUUMING THROUGHOUT CONSTRUCTION.
AFTER INSTALLATION AND BEFORE OPERATION, COVER HVAC AIR HANDLERS AND DUCT REGISTERS OR DUCT OPENINGS WITH PLASTIC UNTIL CONSTRUCTION (INCLUDING INSTALLATION OF FLOORING, CARPETS, CABINETRY, AND FINISH CARPENTRY) IS COMPLETED. IF REGISTERS HAVE NOT BEEN INSTALLED YET, COVER THE DUCT OPENINGS WITH
PLYWOOD FOR SAFETY.
AFTER CONSTRUCTION IS COMPLETE AND BEFORE OPERATING HVAC, CLEAN THE DUCTS USING A VACUUM AND PNEUMATIC BRUSHING SYSTEM MADE FOR DUCT CLEANING. DO NOT USE WET SOLUTIONS OR ULTRAVIOLET LIGHT
SYSTEMS.
AFTER CLEANING DUCTS, RUN THE CENTRAL FURNACE OR AIR HANDLER WITH A FILTER INSTALLED. REPLACE THE FILTER
BEFORE OCCUPANCY.
GENERAL INDOOR AIR QUALITY NOTES
SCOPE
1. GENERAL REQUIREMENTS FOR CONTRACTORS ON ALL CONSTRUCTION PROJECTS (SEE 01 57 19 TEMPORARY ENVIRONMENTAL
CONTROLS FOR ADDITIONAL REQUIREMENTS)
A.
B.
C.
D.
E.
F.
G.
H.
CONTRACTOR SHALL ESTABLISH A LIST OF BUILDING REPRESENTATIVE CONTACTS FOR BUILDINGS THAT WILL BE IMPACTED BY
THE CONSTRUCTION PROJECT.
CONTRACTOR SHALL KEEP THE FIRE LANES, HYDRANTS AND FIRE DEPARTMENT CONNECTIONS CLEAR AT ALL TIMES.
CONTRACTOR SHALL PROVIDE AND MAINTAIN DIRECTIONAL SIGNS AROUND CONSTRUCTION FENCES, BARRICADES AND AT
BLOCKED EXITS.
CONTRACTOR SHALL MAINTAIN PEDESTRIAN WALKWAY PROTECTION NEAR THE PROJECT FROM OVERHEAD FALLING OBJECTS, PROJECTILES AND CONSTRUCTION MATERIAL WHICH MAY PROTRUDE THROUGH THE FENCE.
MAINTAIN EROSION CONTROL DEVICES. DUST, MUD AND SILT SHALL NOT ESCAPE FROM THE SITE DURING A RAINSTORM. THE CONTRACTOR MUST INSPECT THE RUN-OFF AT THE BEGINNING AND DURING A STORM EVENT TO ENSURE COMPLIANCE.
CORRECTIVE ACTION MUST BE PUT IN PLACE IMMEDIATELY WHEN A DEFICIENCY IS DISCOVERED.
CONTRACTOR SHALL PROVIDE COVERED CHEMICAL SECONDARY CONTAINMENT AND SPILL RESPONSE EQUIPMENT.
PROTECT STREAMS, STORM DRAINS, SANITARY SEWER-NO CHEMICALS, DIRT OR CONSTRUCTION CHEMICALS OR DEBRIS.
CONTRACTOR SHALL MITIGATE EXPOSURE TO THE FOLLOWING:
NOISE: MAINTAIN CONSTRUCTION NOISE WITHIN ACCEPTABLE LEVELS (SEE SECTION 3 BELOW, AND SEE 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS FOR ADDITIONAL REQUIREMENTS). NOISE CONTROL TECHNIQUES INCLUDE PROPER EQUIPMENT PLACEMENT, MUFFLERS, AND/OR CONSTRUCTING NOISE DAMPENING ENCLOSURES.
DUST: ENSURE DUST CONTROL TECHNIQUES ARE USED ROUTINELY INCLUDING WET CLEANING METHODS SUCH AS WET
DRILLING/CUTTING OF MASONRY MATERIALS.
FUMES: LOCATE WELDING/CUTTING, HEATED TAR POTS ETC. AWAY FROM BUILDING AIR INTAKES.
ENGINE EXHAUSTS: TURN OFF VEHICLES, OR EQUIPMENT WHEN NOT IN USE. IDLING CREATES A GREAT DEAL OF
POLLUTION. KEEP IC ENGINES AWAY FROM AIR INTAKES.
LAY DOWN AREAS MUST OCCUR IN DESIGNATED AREAS ONLY TO PREVENT PEDESTRIAN SLIPS, TRIPS AND FALLS AND
TO KEEP FIRE LANES OPEN.
MAINTAIN MSD SHEETS ON SITE FOR RAPID ACCESS IN THE EVEN OF AN EMERGENCY.
REPAIR VEHICLE AND EQUIPMENT LEAKS IMMEDIATELY TO PREVENT FUEL, COOLANTS, AND OILS (HYDRAULICS AND
GEAR BOX) SPILLS.
MAINTAIN ACCESS AND CLEARANCE FOR SERVICE VEHICLES, INCLUDING TRASH AND RECYCLING COLLECTION
VEHICLES.
2. PROTECTING…