Attachment 13 - VOL_5c-ELECTRICAL-VA CT West Haven EHRM IU-689-22-700.pdf
PDF 42 MB Posted
- Attached to
- Z2DA--689-22-700 EHRM IU West Haven VAMC This ONLY for the PCAC VISN 1 Construction MATOC Pool
- Solicitation number
- 36C77626R0106
About this file
This is a set of electrical panel schedule drawings for the EHRM Infrastructure Upgrades project at West Haven VA Medical Center in Connecticut. The document contains 100% construction documents prepared by SPEES Design Build (23830 Pacific Highway S., Suite 300, Kent, WA 98032) and issued on April 20, 2026. The file covers electrical panel schedules for multiple buildings across the facility, including Buildings 011, 011A, 012, 012A, 014A, 015, 015A, 021, 022, 024, 027-034, 035, 035A, 036, 036A, and 041. The drawings use a standardized format distinguishing between existing panelboard ratings, circuits, and loads (shown in gray text) and revised circuits with provided equipment and additional loads (shown in black text). All digital power meters (DPM) and surge protective devices (SPD) are integral to the electrical distribution equipment unless otherwise noted.
The contractor is required to update all panel circuit directories to document any and all changes, with all revised directories to be typewritten. For revised panel schedules, contractors must reference associated equipment load schedules for overall panel load calculations. The revised panel schedules are provided specifically for added branch circuit sizing purposes. The document references a comprehensive drawing set listed in the construction documents, including electrical plans for each level of each building, one-line diagrams, enlarged electrical plans, electrical details, and telecommunications bonding riser diagrams. The project is identified as 689-22-700 and is part of the VA Construction MATOC Pool for VISN 1 under solicitation 36C77626R0106.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
0:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
011EP701
BLDG 011 - ELECTRICAL PANEL SCHEDULES
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
ADDITIONAL LOAD.
Revisions: Date:
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
0:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
011AEP701
BLDG 011A - ELECTRICAL PANEL SCHEDULES
011A
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
0:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
012EP701
BLDG 012 - ELECTRICAL PANEL SCHEDULES
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
0:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
012AEP701
BLDG 012A - ELECTRICAL PANEL SCHEDULES
012A
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
0:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
014AEP701
BLDG 014A - ELECTRICAL PANEL SCHEDULES
014A
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
0:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
015EP701
BLDG 015 - ELECTRICAL PANEL SCHEDULES
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
0:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
015AEP701
BLDG 015A - ELECTRICAL PANEL SCHEDULES
15A
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
0:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
021EP701
BLDG 021 - ELECTRICAL PANEL SCHEDULES
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
0:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
022EP701
BLDG 022 - ELECTRICAL PANEL SCHEDULES
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
0:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
024EP701
BLDG 024 - ELECTRICAL PANEL SCHEDULES
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
0:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
027-034EP701
BLDG 027-034 - ELECTRICAL PANEL
SCHEDULES
027-034
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
0:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
035EP701
BLDG 035 - ELECTRICAL PANEL SCHEDULES
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
1:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
035AEP701
BLDG 035A - ELECTRICAL PANEL SCHEDULES
035A
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
1:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
036EP701
BLDG 036 - ELECTRICAL PANEL SCHEDULES
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
1:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
036AEP701
BLDG 036A - ELECTRICAL PANEL SCHEDULES
036A
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
1:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
041EP701
BLDG 041 - ELECTRICAL PANEL SCHEDULES
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
1:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
041EP702
BLDG 041 - ELECTRICAL PANEL SCHEDULES
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
5/ 5/
:3
1:
A M
Au to de sk
D oc s:
//6
-2
2-
VA
C T
W es t H av en E
H R
M
IU
/V
AW
H _G
EN
ER
AL
SH
EE
TS
_E L_
SD
B.
rv t
041EP703
BLDG 041 - ELECTRICAL PANEL SCHEDULES
DCW/MMM RTS/JGD
100% CONSTRUCTION
DOCUMENTS
04/20/2026
689-22-700EHRM INFRASTRUCTURE
UPGRADES - WEST HAVEN
VA CT WEST HAVEN
950 CAMPBELL AVENUE, WEST HAVEN, CT 06516
GENERAL NOTES
1.
2.
3.
4.
CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
SCHEDULES WITH GRAY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
| G-001 - COVER PAGE |
| EG001 - ABBREVIATIONS AND GENERAL NOTES |
| EG002 - ELECTRICAL LEGENDS |
| ES001 - BLDG 041 - ELECTRICAL SITE PLAN |
| 001EP100SG - BLDG 001 - LEVEL 0SG - ELECTRICAL PLAN |
| 001EP100G - BLDG 001 - LEVEL 0G - ELECTRICAL PLAN |
| 001EP101 - BLDG 001 - LEVEL 01 - ELECTRICAL PLAN |
| 001EP102 - BLDG 001 - LEVEL 02 - ELECTRICAL PLAN |
| 001EP103 - BLDG 001 - LEVEL 03 - ELECTRICAL PLAN |
| 001EP104 - BLDG 001 - LEVEL 04 - ELECTRICAL PLAN |
| 001EP105 - BLDG 001 - LEVEL 05 - ELECTRICAL PLAN |
| 001EP107 - BLDG 001 - LEVEL 07 - ELECTRICAL PLAN |
| 001EP108 - BLDG 001 - LEVEL 08 - ELECTRICAL PLAN |
| 001EP109 - BLDG 001 - LEVEL 09 - ELECTRICAL PLAN |
| 002EP100G - BLDG 002 - LEVEL 0G - ELECTRICAL PLAN |
| 002EP101 - BLDG 002 - LEVEL 01 - ELECTRICAL PLAN |
| 002EP102 - BLDG 002 - LEVEL 02 - ELECTRICAL PLAN |
| 002EP103 - BLDG 002 - LEVEL 03 - ELECTRICAL PLAN |
| 002EP107 - BLDG 002 - LEVEL 07 - ELECTRICAL PLAN |
| 003EP100 - BLDG 003 - LEVEL 00 - ELECTRICAL PLAN |
| 003EP101 - BLDG 003 - LEVEL 01 - ELECTRICAL PLAN |
| 003EP102 - BLDG 003 - LEVEL 02 - ELECTRICAL PLAN |
| 004EP100 - BLDG 004 - LEVEL 00 - ELECTRICAL PLAN |
| 004EP101 - BLDG 004 - LEVEL 01 - ELECTRICAL PLAN |
| 005EP100 - BLDG 005 - LEVEL 00 - ELECTRICAL PLAN |
| 005EP101 - BLDG 005 - LEVEL 01 - ELECTRICAL PLAN |
| 006EP100 - BLDG 006 - LEVEL 00 - ELECTRICAL PLAN |
| 011EP100 - BLDG 011 - LEVEL 00 - ELECTRICAL PLAN |
| 011EP101 - BLDG 011 - LEVEL 01 - ELECTRICAL PLAN |
| 012EP100 - BLDG 012 - LEVEL 00 - ELECTRICAL PLAN |
| 012EP101 - BLDG 012 - LEVEL 01 - ELECTRICAL PLAN |
| 012AEP101 - BLDG 012A - LEVEL 01 - ELECTRICAL PLAN |
| 014AEP101 - BLDG 014A - LEVEL 01 - ELECTRICAL PLAN |
| 015EP101 - BLDG 015 - LEVEL 01 - ELECTRICAL PLAN |
| 015AEP101 - BLDG 015A - LEVEL 01 - ELECTRICAL PLAN |
| 016EP100 - BLDG 016 - LEVEL 00 - ELECTRICAL PLAN |
| 021EP101 - BLDG 021 - LEVEL 01 - ELECTRICAL PLAN |
| 022EP101 - BLDG 022 - LEVEL 01 - ELECTRICAL PLAN |
| 024EP100 - BLDG 024 - LEVEL 00 - ELECTRICAL PLAN |
| 027-034EP101 - BLDG 027-034 - LEVEL 01 - ELECTRICAL PLAN |
| 027-034EP102 - BLDG 027-034 - ROOF - ELECTRICAL PLAN |
| 035EP100 - BLDG 035 - LEVEL 00 - ELECTRICAL PLAN |
| 035EP102 - BLDG 035 - ROOF - ELECTRICAL PLAN |
| 035AEP101 - BLDG 035A - LEVEL 01 - ELECTRICAL PLAN |
| 035AEP103 - BLDG 035A - ROOF - ELECTRICAL PLAN |
| 036EP100 - BLDG 036 - LEVEL 00 - ELECTRICAL PLAN |
| 036EP102 - BLDG 036 - LEVEL 02 - ELECTRICAL PLAN |
| 041ED101 - BLDG 41 AND 42 - DEMOLITION ELECTRICAL PLAN |
| 041EL101 - BLDG 41 AND 42 - LIGHTING PLAN - LEVEL 01 |
| 041EP101 - BLDG 41 AND 42 - POWER PLAN - LEVEL 01 |
| 041EP102 - BLDG 41 AND 42 - RECEPTACLE PLAN - LEVEL 01 |
| 041EP103 - BLDG 41 AND 42 - POWER PLAN - LEVEL 01 -MECHANICAL EQUIPMENT |
| 041EP104 - BLDG 41 AND 42 - POWER PLAN - ROOF -MECHANICAL EQUIPMENT |
| 041EB101 - BLDG 41 AND 42 - GROUNDING PLAN |
| 041EB102 - BLDG 41 AND 42 - GROUNDING PLAN -LIGHTNING PROTECTION |
| 041EF101 - BLDG 41 AND 42 - FIRE ALARM PLAN - LEVEL 01 |
| 041EP201 - BLDG 041 - EXTERIOR ELEVATION PLANS |
| 041EP202 - BLDG 041 - EXTERIOR ELEVATION PLANS |
| 042EP201 - BLDG 042 - EXTERIOR ELEVATION PLANS |
| 042EP202 - BLDG 042 - EXTERIOR ELEVATION PLANS |
| 001EP400SGa - BLDG 001 - LEVEL 0SG - ENLARGED ELECTRICAL PLANS |
| 001EP400SGb - BLDG 001 - LEVEL 0SG - ENLARGED ELECTRICAL PLANS |
| 001EP400SGc - BLDG 001 - LEVEL 0SG - ENLARGED ELECTRICAL PLANS |
| 001EP400Ga - BLDG 001 - LEVEL 0G - ENLARGED ELECTRICAL PLANS |
| 001EP400Gb - BLDG 001 - LEVEL 0G - ENLARGED ELECTRICAL PLANS |
| 001EP400Gc - BLDG 001 - LEVEL 0G - ENLARGED ELECTRICAL PLANS |
| 001EP400Gd - BLDG 001 - LEVEL 0G - ENLARGED ELECTRICAL PLAN |
| 001EP400Ge - BLDG 001 - LEVEL 0G - ENLARGED ELECTRICAL PLAN |
| 001EP401 - BLDG 001 - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 001EP402 - BLDG 001 - LEVEL 02 - ENLARGED ELECTRICAL PLANS |
| 001EP403 - BLDG 001 - LEVEL 03 - ENLARGED ELECTRICAL PLANS |
| 001EP404 - BLDG 001 - LEVEL 04 - ENLARGED ELECTRICAL PLANS |
| 001EP405 - BLDG 001 - LEVEL 05 - ENLARGED ELECTRICAL PLANS |
| 001EP406 - BLDG 001 - LEVEL 06 - ENLARGED ELECTRICAL PLANS |
| 001EP407 - BLDG 001 - LEVEL 07 - ENLARGED ELECTRICAL PLANS |
| 001EP408 - BLDG 001 - LEVEL 08 - ENLARGED ELECTRICAL PLANS |
| 001EP409 - BLDG 001 - LEVEL 09 - ENLARGED ELECTRICAL PLANS |
| 002EP400Ga - BLDG 002 - LEVEL 0G - ENLARGED ELECTRICAL PLANS |
| 002EP400Gb - BLDG 002 - LEVEL 00G - ENLARGED ELECTRICAL PLANS |
| 002EP400Gc - RM G145, G145A & G145B - ELECTRICAL PLAN |
| 002EP401a - BLDG 002 - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 002EP401b - BLDG 002 - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 002EP401c - BLDG 002 - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 002EP402a - BLDG 002 - LEVEL 02 - ENLARGED ELECTRICAL PLANS |
| 002EP402b - BLDG 002 - LEVEL 02 - ENLARGED ELECTRICAL PLANS |
| 002EP403 - BLDG 002 - LEVEL 03 - ENLARGED ELECTRICAL PLANS |
| 002EP404 - BLDG 002 - LEVEL 04 - ENLARGED ELECTRICAL PLANS |
| 002EP405 - BLDG 002 - LEVEL 05 - ENLARGED ELECTRICAL PLANS |
| 002EP406 - BLDG 002 - LEVEL 06 - ENLARGED ELECTRICAL PLANS |
| 002EP407 - BLDG 002 - LEVEL 07 - ENLARGED ELECTRICAL PLANS |
| 002EP408 - BLDG 002 - LEVEL 08 - ENLARGED ELECTRICAL PLANS |
| 002EP409 - BLDG 002 - LEVEL 09 - ENLARGED ELECTRICAL PLAN |
| 002BEP401 - BLDG 002B - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 003EP401 - BLDG 003 - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 003EP402 - BLDG 003 - LEVEL 02 - ENLARGED ELECTRICAL PLANS |
| 004EP400 - BLDG 004 - LEVEL 00 - ENLARGED ELECTRICAL PLANS |
| 004EP401 - BLDG 004 - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 004EP402 - BLDG 004 - LEVEL 02 - ENLARGED ELECTRICAL PLANS |
| 005EP401 - BLDG 005 - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 005EP402 - BLDG 005 - LEVEL 02 - ENLARGED ELECTRICAL PLANS |
| 005EP403 - BLDG 005 - LEVEL 03 - ENLARGED ELECTRICAL PLANS |
| 006EP401 - BLDG 006 - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 006EP402 - BLDG 006 - LEVEL 02 - ENLARGED ELECTRICAL PLANS |
| 011EP402 - BLDG 011 - LEVEL 02 - ENLARGED ELECTRICAL PLANS |
| 011AEP401 - BLDG 011A - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 012EP402 - BLDG 012 - LEVEL 02 - ENLARGED ELECTRICAL PLANS |
| 012AEP401 - BLDG 012A - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 014AEP401 - BLDG 014A - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 015EP401 - BLDG 015 - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 015AEP401 - BLDG 015A - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 021EP401 - BLDG 021 - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 022EP401 - BLDG 022 - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 024EP401 - BLDG 024 - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 027-034EP401 - BLDG 027-034 - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 035EP400 - BLDG 035 - LEVEL 00 - ENLARGED ELECTRICAL PLANS |
| 035EP401 - BLDG 035 - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 035AEP401 - BLDG 035A - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 035AEP402 - BLDG 035A - LEVEL 02 - ENLARGED ELECTRICAL PLANS |
| 036EP401 - BLDG 036 - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| 036AEP401 - BLDG 036A - LEVEL 01 - ENLARGED ELECTRICAL PLANS |
| EP501 - ELECTRICAL DETAILS |
| EP502 - ELECTRICAL DETAILS |
| EP503 - ELECTRICAL DETAILS |
| EP504 - ELECTRICAL DETAILS |
| EP505 - ELECTRICAL DETAILS |
| EP506 - ELECTRICAL DETAILS |
| EP507 - ELECTRICAL DETAILS |
| EP508 - ELECTRICAL DETAILS |
| EP509 - ELECTRICAL DETAILS |
| EP510 - ELECTRICAL DETAILS |
| EP511 - ELECTRICAL DETAILS |
| EP512 - ELECTRICAL DETAILS |
| EF601 - DATA CENTER FIRE ALARM RISER DIAGRAM AND I/O MATRIX |
| EG601 - TELECOMMUNICATIONS BONDING RISER DIAGRAMS |
| EG602 - TELECOMMUNICATIONS BONDING RISER DIAGRAMS |
| EG603 - TELECOMMUNICATIONS BONDING RISER DIAGRAMS |
| EP601 - MV DISTRIBUTION SYSTEM - ONE-LINE DIAGRAM |
| 001EP601 - BLDG 001 - PARTIAL ONE-LINE DIAGRAM -PART 1 OF 3 |
| 001EP602 - BLDG 001 - PARTIAL ONE-LINE DIAGRAM -PART 2 OF 3 |
| 001EP603 - BLDG 001 - PARTIAL ONE-LINE DIAGRAM -PART 3 OF 3 |
| 002EP601 - BLDG 002 & 002B - PARTIAL ONE-LINE DIAGRAM - PART 1 OF 2 |
| 002EP602 - BLDG 002 & 002B - PARTIAL ONE-LINE DIAGRAM - PART 2 OF 2 |
| 003EP601 - BLDG 003 - ONE-LINE DIAGRAMS |
| 004EP601 - BLDG 004 - ONE-LINE DIAGRAMS |
| 005EP601 - BLDG 005 - ONE-LINE DIAGRAMS |
| 006EP601 - BLDG 006 - ONE-LINE DIAGRAMS |
| 011ED601 - BLDG 011, 011A, 012, 012A AND 014A -ONE-LINE DIAGRAM - EXISTING |
| 011EP601 - BLDG 011, 011A, 012, 012A AND 014A -ONE-LINE DIAGRAM - REVISED |
| 015ED601 - BLDG 015, 015A, & 016 - ONE-LINE DIAGRAMS -EXISTING |
| 015EP601 - BLDG 015, 015A, & 016 - ONE-LINE DIAGRAMS -REVISED |
| 021EP601 - BLDG 021 - ONE-LINE DIAGRAM |
| 022&024EP601 - BLDG 022 & 024 - ONE-LINE DIAGRAM |
| 027-034EP601 - BLDG 027-034 - ONE-LINE DIAGRAM |
| 035EP601 - BLDG 035, 035A, 036, & 036A - ONE-LINE DIAGRAM |
| 041EP601 - DATA CENTER - ONE-LINE DIAGRAM - PART 1 OF 2 |
| 041EP602 - DATA CENTER - ONE-LINE DIAGRAM - PART - 2 OF 2 |
| EP701 - ELECTRICAL SCHEDULES |
| 001EP701 - BLDG 001 - ELECTRICAL PANEL SCHEDULES |
| 001EP702 - BLDG 001 - ELECTRICAL PANEL SCHEDULES |
| 001EP703 - BLDG 001 - ELECTRICAL PANEL SCHEDULES |
| 001EP704 - BLDG 001 - ELECTRICAL PANEL SCHEDULES |
| 001EP705 - BLDG 001 - ELECTRICAL PANEL SCHEDULES |
| 002EP701 - BLDG 002 - ELECTRICAL PANEL SCHEDULES |
| 002EP702 - BLDG 002 - ELECTRICAL PANEL SCHEDULES |
| 002EP703 - BLDG 002 - ELECTRICAL PANEL SCHEDULES |
| 002EP704 - BLDG 002 - ELECTRICAL PANEL SCHEDULES |
| 002EP705 - BLDG 002 - ELECTRICAL PANEL SCHEDULES |
| 002BEP701 - BLDG 002B - ELECTRICAL PANEL SCHEDULES |
| 003EP701 - BLDG 003 - ELECTRICAL PANEL SCHEDULES |
| 004EP701 - BLDG 004 - ELECTRICAL PANEL SCHEDULES |
| 005EP701 - BLDG 005 - ELECTRICAL PANEL SCHEDULES |
| 005EP702 - BLDG 005 - ELECTRICAL PANEL SCHEDULES |
| 006EP701 - BLDG 006 - ELECTRICAL PANEL SCHEDULES |
| 011EP701 - BLDG 011 - ELECTRICAL PANEL SCHEDULES |
| 011AEP701 - BLDG 011A - ELECTRICAL PANEL SCHEDULES |
| 012EP701 - BLDG 012 - ELECTRICAL PANEL SCHEDULES |
| 012AEP701 - BLDG 012A - ELECTRICAL PANEL SCHEDULES |
| 014AEP701 - BLDG 014A - ELECTRICAL PANEL SCHEDULES |
| 015EP701 - BLDG 015 - ELECTRICAL PANEL SCHEDULES |
| 015AEP701 - BLDG 015A - ELECTRICAL PANEL SCHEDULES |
| 021EP701 - BLDG 021 - ELECTRICAL PANEL SCHEDULES |
| 022EP701 - BLDG 022 - ELECTRICAL PANEL SCHEDULES |
| 024EP701 - BLDG 024 - ELECTRICAL PANEL SCHEDULES |
| 027-034EP701 - BLDG 027-034 - ELECTRICAL PANEL SCHEDULES |
| 035EP701 - BLDG 035 - ELECTRICAL PANEL SCHEDULES |
| 035AEP701 - BLDG 035A - ELECTRICAL PANEL SCHEDULES |
| 036EP701 - BLDG 036 - ELECTRICAL PANEL SCHEDULES |
| 036AEP701 - BLDG 036A - ELECTRICAL PANEL SCHEDULES |
| 041EP701 - BLDG 041 - ELECTRICAL PANEL SCHEDULES |
| 041EP702 - BLDG 041 - ELECTRICAL PANEL SCHEDULES |
| 041EP703 - BLDG 041 - ELECTRICAL PANEL SCHEDULES |
File details come from the government source that posted it. Updated .