This is a set of electrical panel schedule drawings for the EHRM Infrastructure Upgrades project at West Haven VA Medical Center in Connecticut. The document contains 100% construction documents prepared by SPEES Design Build (23830 Pacific Highway S., Suite 300, Kent, WA 98032) and issued on April 20, 2026. The file covers electrical panel schedules for multiple buildings across the facility, including Buildings 011, 011A, 012, 012A, 014A, 015, 015A, 021, 022, 024, 027-034, 035, 035A, 036, 036A, and 041. The drawings use a standardized format distinguishing between existing panelboard ratings, circuits, and loads (shown in gray text) and revised circuits with provided equipment and additional loads (shown in black text). All digital power meters (DPM) and surge protective devices (SPD) are integral to the electrical distribution equipment unless otherwise noted.

The contractor is required to update all panel circuit directories to document any and all changes, with all revised directories to be typewritten. For revised panel schedules, contractors must reference associated equipment load schedules for overall panel load calculations. The revised panel schedules are provided specifically for added branch circuit sizing purposes. The document references a comprehensive drawing set listed in the construction documents, including electrical plans for each level of each building, one-line diagrams, enlarged electrical plans, electrical details, and telecommunications bonding riser diagrams. The project is identified as 689-22-700 and is part of the VA Construction MATOC Pool for VISN 1 under solicitation 36C77626R0106.

View the file

Other files

File Type Posted
Attachment 01 - 36C77626R0106 Tech Questions - dated 7-30-26.docx DOCX document
36C77626R0106 0004.docx DOCX document
Attachment 01d - Addendum R1-001EP400Ga_041EP101_041EP702-Door Schedule-EHRM-689-22-700.pdf PDF
Attachment 01c - Addendum R1-A-601-Door Schedule-EHRM-689-22-700.pdf PDF
Attachment 01a - Addendum R1-S-101_S-502-EHRM-689-22-700.pdf PDF
Attachment 01 - 36C77626R0106 Tech Questions - dated 7-31-26.docx DOCX document
Attachment 01b - Addendum R1-087100 Door Hardware Spec-EHRM-689-22-700.pdf PDF
Attachment 01e - Addendum R1-001TN400Ga_041TN101-Door Schedule-EHRM-689-22-700.pdf PDF
Attachment 01 - 36C77626R0106 Tech Questions - dated 7-30-26.docx DOCX document
36C77626R0106 0003.docx DOCX document
Attachment 01a - Addendum R1-A-601-Door Schedule-EHRM-689-22-700.pdf PDF
Attachment 02 - Revised 1442 - 36C77626R0106.docx DOCX document
Attachment 01c -Addendum R1-Structural Drawings-EHRM-689-22-700.pdf PDF
Attachment 01b - 08 71 00 - Door Hardware_Rev1.pdf PDF
36C77626R0106 0002.docx DOCX document
Attachment 01 - Sign-In Sheet - 689-22-700 - EHRM West Haven - 7-13-26.pdf PDF
36C77626R0106 0001.docx DOCX document
Attachment 08 - VOL_3a-ARCH-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 05c - Specifications_Div_26-28-West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 05a - Specifications_Div_00-13-West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 19 - APPNDX_D-Geotechnical_Report-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 05b - Specifications_Div_21-23-West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 17 - APPNDX_B-Drainage_Rprt-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 07 - VOL_2-STRUCT-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 06 - VOL_1-CIVIL-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 09 - VOL_3b-ARCH-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 22 - 689-22-700 Risk Matrix 2026.pdf PDF
Attachment 21 - APPNDX_F-Topo Survey-VA CT West Haven EHRM IU-689-22-700.pdf PDF
Attachment 16 - APPNDX_A-Commissioning_Plan-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 18 - APPNDX_C-Environmental_Report-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 15 - VOL_6b-TELECOM-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 11 - VOL_5a-ELECTRICAL-VA CT West Haven EHRM IU-689-22-700.pdf PDF
Attachment 14 - VOL_6a-TELECOM-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 05d - Specifications_Div_31-33-West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 10 - VOL_4-MECH-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 20 - APPNDX_E-PSRDM_Conformance_Letter-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 12 - VOL_5b-ELECTRICAL-VA CT West Haven EHRM IU-689-22-700.pdf PDF
Attachment 02 - Site Visit - West Haven.docx DOCX document
Attachment 01 - Limitations on Subcontracting - EHRM West Haven.docx DOCX document
Attachment 03 - Wage Determination CT20260023 Rev 2 dated 5-18-26.pdf PDF
Attachment 04 - Project Information Sheet for Contractors.docx DOCX document
36C77626R0106.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

0:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

011EP701

BLDG 011 - ELECTRICAL PANEL SCHEDULES

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

ADDITIONAL LOAD.

Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

0:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

011AEP701

BLDG 011A - ELECTRICAL PANEL SCHEDULES

011A

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

0:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

012EP701

BLDG 012 - ELECTRICAL PANEL SCHEDULES

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

0:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

012AEP701

BLDG 012A - ELECTRICAL PANEL SCHEDULES

012A

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

0:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

014AEP701

BLDG 014A - ELECTRICAL PANEL SCHEDULES

014A

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

0:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

015EP701

BLDG 015 - ELECTRICAL PANEL SCHEDULES

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

0:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

015AEP701

BLDG 015A - ELECTRICAL PANEL SCHEDULES

15A

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

0:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

021EP701

BLDG 021 - ELECTRICAL PANEL SCHEDULES

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

0:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

022EP701

BLDG 022 - ELECTRICAL PANEL SCHEDULES

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

0:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

024EP701

BLDG 024 - ELECTRICAL PANEL SCHEDULES

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

0:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

027-034EP701

BLDG 027-034 - ELECTRICAL PANEL

SCHEDULES

027-034

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

0:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

035EP701

BLDG 035 - ELECTRICAL PANEL SCHEDULES

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

1:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

035AEP701

BLDG 035A - ELECTRICAL PANEL SCHEDULES

035A

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

1:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

036EP701

BLDG 036 - ELECTRICAL PANEL SCHEDULES

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

1:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

036AEP701

BLDG 036A - ELECTRICAL PANEL SCHEDULES

036A

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

1:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

041EP701

BLDG 041 - ELECTRICAL PANEL SCHEDULES

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

1:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

041EP702

BLDG 041 - ELECTRICAL PANEL SCHEDULES

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

5/ 5/

:3

1:

A M

Au to de sk

D oc s:

//6

-2

2-

VA

C T

W es t H av en E

H R

M

IU

/V

AW

H _G

EN

ER

AL

SH

EE

TS

_E L_

SD

B.

rv t

041EP703

BLDG 041 - ELECTRICAL PANEL SCHEDULES

DCW/MMM RTS/JGD

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

GENERAL NOTES

1.

2.

3.

4.

CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

SCHEDULES WITH GRAY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

G-001 - COVER PAGE
EG001 - ABBREVIATIONS AND GENERAL NOTES
EG002 - ELECTRICAL LEGENDS
ES001 - BLDG 041 - ELECTRICAL SITE PLAN
001EP100SG - BLDG 001 - LEVEL 0SG - ELECTRICAL PLAN
001EP100G - BLDG 001 - LEVEL 0G - ELECTRICAL PLAN
001EP101 - BLDG 001 - LEVEL 01 - ELECTRICAL PLAN
001EP102 - BLDG 001 - LEVEL 02 - ELECTRICAL PLAN
001EP103 - BLDG 001 - LEVEL 03 - ELECTRICAL PLAN
001EP104 - BLDG 001 - LEVEL 04 - ELECTRICAL PLAN
001EP105 - BLDG 001 - LEVEL 05 - ELECTRICAL PLAN
001EP107 - BLDG 001 - LEVEL 07 - ELECTRICAL PLAN
001EP108 - BLDG 001 - LEVEL 08 - ELECTRICAL PLAN
001EP109 - BLDG 001 - LEVEL 09 - ELECTRICAL PLAN
002EP100G - BLDG 002 - LEVEL 0G - ELECTRICAL PLAN
002EP101 - BLDG 002 - LEVEL 01 - ELECTRICAL PLAN
002EP102 - BLDG 002 - LEVEL 02 - ELECTRICAL PLAN
002EP103 - BLDG 002 - LEVEL 03 - ELECTRICAL PLAN
002EP107 - BLDG 002 - LEVEL 07 - ELECTRICAL PLAN
003EP100 - BLDG 003 - LEVEL 00 - ELECTRICAL PLAN
003EP101 - BLDG 003 - LEVEL 01 - ELECTRICAL PLAN
003EP102 - BLDG 003 - LEVEL 02 - ELECTRICAL PLAN
004EP100 - BLDG 004 - LEVEL 00 - ELECTRICAL PLAN
004EP101 - BLDG 004 - LEVEL 01 - ELECTRICAL PLAN
005EP100 - BLDG 005 - LEVEL 00 - ELECTRICAL PLAN
005EP101 - BLDG 005 - LEVEL 01 - ELECTRICAL PLAN
006EP100 - BLDG 006 - LEVEL 00 - ELECTRICAL PLAN
011EP100 - BLDG 011 - LEVEL 00 - ELECTRICAL PLAN
011EP101 - BLDG 011 - LEVEL 01 - ELECTRICAL PLAN
012EP100 - BLDG 012 - LEVEL 00 - ELECTRICAL PLAN
012EP101 - BLDG 012 - LEVEL 01 - ELECTRICAL PLAN
012AEP101 - BLDG 012A - LEVEL 01 - ELECTRICAL PLAN
014AEP101 - BLDG 014A - LEVEL 01 - ELECTRICAL PLAN
015EP101 - BLDG 015 - LEVEL 01 - ELECTRICAL PLAN
015AEP101 - BLDG 015A - LEVEL 01 - ELECTRICAL PLAN
016EP100 - BLDG 016 - LEVEL 00 - ELECTRICAL PLAN
021EP101 - BLDG 021 - LEVEL 01 - ELECTRICAL PLAN
022EP101 - BLDG 022 - LEVEL 01 - ELECTRICAL PLAN
024EP100 - BLDG 024 - LEVEL 00 - ELECTRICAL PLAN
027-034EP101 - BLDG 027-034 - LEVEL 01 - ELECTRICAL PLAN
027-034EP102 - BLDG 027-034 - ROOF - ELECTRICAL PLAN
035EP100 - BLDG 035 - LEVEL 00 - ELECTRICAL PLAN
035EP102 - BLDG 035 - ROOF - ELECTRICAL PLAN
035AEP101 - BLDG 035A - LEVEL 01 - ELECTRICAL PLAN
035AEP103 - BLDG 035A - ROOF - ELECTRICAL PLAN
036EP100 - BLDG 036 - LEVEL 00 - ELECTRICAL PLAN
036EP102 - BLDG 036 - LEVEL 02 - ELECTRICAL PLAN
041ED101 - BLDG 41 AND 42 - DEMOLITION ELECTRICAL PLAN
041EL101 - BLDG 41 AND 42 - LIGHTING PLAN - LEVEL 01
041EP101 - BLDG 41 AND 42 - POWER PLAN - LEVEL 01
041EP102 - BLDG 41 AND 42 - RECEPTACLE PLAN - LEVEL 01
041EP103 - BLDG 41 AND 42 - POWER PLAN - LEVEL 01 -MECHANICAL EQUIPMENT
041EP104 - BLDG 41 AND 42 - POWER PLAN - ROOF -MECHANICAL EQUIPMENT
041EB101 - BLDG 41 AND 42 - GROUNDING PLAN
041EB102 - BLDG 41 AND 42 - GROUNDING PLAN -LIGHTNING PROTECTION
041EF101 - BLDG 41 AND 42 - FIRE ALARM PLAN - LEVEL 01
041EP201 - BLDG 041 - EXTERIOR ELEVATION PLANS
041EP202 - BLDG 041 - EXTERIOR ELEVATION PLANS
042EP201 - BLDG 042 - EXTERIOR ELEVATION PLANS
042EP202 - BLDG 042 - EXTERIOR ELEVATION PLANS
001EP400SGa - BLDG 001 - LEVEL 0SG - ENLARGED ELECTRICAL PLANS
001EP400SGb - BLDG 001 - LEVEL 0SG - ENLARGED ELECTRICAL PLANS
001EP400SGc - BLDG 001 - LEVEL 0SG - ENLARGED ELECTRICAL PLANS
001EP400Ga - BLDG 001 - LEVEL 0G - ENLARGED ELECTRICAL PLANS
001EP400Gb - BLDG 001 - LEVEL 0G - ENLARGED ELECTRICAL PLANS
001EP400Gc - BLDG 001 - LEVEL 0G - ENLARGED ELECTRICAL PLANS
001EP400Gd - BLDG 001 - LEVEL 0G - ENLARGED ELECTRICAL PLAN
001EP400Ge - BLDG 001 - LEVEL 0G - ENLARGED ELECTRICAL PLAN
001EP401 - BLDG 001 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
001EP402 - BLDG 001 - LEVEL 02 - ENLARGED ELECTRICAL PLANS
001EP403 - BLDG 001 - LEVEL 03 - ENLARGED ELECTRICAL PLANS
001EP404 - BLDG 001 - LEVEL 04 - ENLARGED ELECTRICAL PLANS
001EP405 - BLDG 001 - LEVEL 05 - ENLARGED ELECTRICAL PLANS
001EP406 - BLDG 001 - LEVEL 06 - ENLARGED ELECTRICAL PLANS
001EP407 - BLDG 001 - LEVEL 07 - ENLARGED ELECTRICAL PLANS
001EP408 - BLDG 001 - LEVEL 08 - ENLARGED ELECTRICAL PLANS
001EP409 - BLDG 001 - LEVEL 09 - ENLARGED ELECTRICAL PLANS
002EP400Ga - BLDG 002 - LEVEL 0G - ENLARGED ELECTRICAL PLANS
002EP400Gb - BLDG 002 - LEVEL 00G - ENLARGED ELECTRICAL PLANS
002EP400Gc - RM G145, G145A & G145B - ELECTRICAL PLAN
002EP401a - BLDG 002 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
002EP401b - BLDG 002 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
002EP401c - BLDG 002 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
002EP402a - BLDG 002 - LEVEL 02 - ENLARGED ELECTRICAL PLANS
002EP402b - BLDG 002 - LEVEL 02 - ENLARGED ELECTRICAL PLANS
002EP403 - BLDG 002 - LEVEL 03 - ENLARGED ELECTRICAL PLANS
002EP404 - BLDG 002 - LEVEL 04 - ENLARGED ELECTRICAL PLANS
002EP405 - BLDG 002 - LEVEL 05 - ENLARGED ELECTRICAL PLANS
002EP406 - BLDG 002 - LEVEL 06 - ENLARGED ELECTRICAL PLANS
002EP407 - BLDG 002 - LEVEL 07 - ENLARGED ELECTRICAL PLANS
002EP408 - BLDG 002 - LEVEL 08 - ENLARGED ELECTRICAL PLANS
002EP409 - BLDG 002 - LEVEL 09 - ENLARGED ELECTRICAL PLAN
002BEP401 - BLDG 002B - LEVEL 01 - ENLARGED ELECTRICAL PLANS
003EP401 - BLDG 003 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
003EP402 - BLDG 003 - LEVEL 02 - ENLARGED ELECTRICAL PLANS
004EP400 - BLDG 004 - LEVEL 00 - ENLARGED ELECTRICAL PLANS
004EP401 - BLDG 004 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
004EP402 - BLDG 004 - LEVEL 02 - ENLARGED ELECTRICAL PLANS
005EP401 - BLDG 005 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
005EP402 - BLDG 005 - LEVEL 02 - ENLARGED ELECTRICAL PLANS
005EP403 - BLDG 005 - LEVEL 03 - ENLARGED ELECTRICAL PLANS
006EP401 - BLDG 006 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
006EP402 - BLDG 006 - LEVEL 02 - ENLARGED ELECTRICAL PLANS
011EP402 - BLDG 011 - LEVEL 02 - ENLARGED ELECTRICAL PLANS
011AEP401 - BLDG 011A - LEVEL 01 - ENLARGED ELECTRICAL PLANS
012EP402 - BLDG 012 - LEVEL 02 - ENLARGED ELECTRICAL PLANS
012AEP401 - BLDG 012A - LEVEL 01 - ENLARGED ELECTRICAL PLANS
014AEP401 - BLDG 014A - LEVEL 01 - ENLARGED ELECTRICAL PLANS
015EP401 - BLDG 015 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
015AEP401 - BLDG 015A - LEVEL 01 - ENLARGED ELECTRICAL PLANS
021EP401 - BLDG 021 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
022EP401 - BLDG 022 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
024EP401 - BLDG 024 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
027-034EP401 - BLDG 027-034 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
035EP400 - BLDG 035 - LEVEL 00 - ENLARGED ELECTRICAL PLANS
035EP401 - BLDG 035 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
035AEP401 - BLDG 035A - LEVEL 01 - ENLARGED ELECTRICAL PLANS
035AEP402 - BLDG 035A - LEVEL 02 - ENLARGED ELECTRICAL PLANS
036EP401 - BLDG 036 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
036AEP401 - BLDG 036A - LEVEL 01 - ENLARGED ELECTRICAL PLANS
EP501 - ELECTRICAL DETAILS
EP502 - ELECTRICAL DETAILS
EP503 - ELECTRICAL DETAILS
EP504 - ELECTRICAL DETAILS
EP505 - ELECTRICAL DETAILS
EP506 - ELECTRICAL DETAILS
EP507 - ELECTRICAL DETAILS
EP508 - ELECTRICAL DETAILS
EP509 - ELECTRICAL DETAILS
EP510 - ELECTRICAL DETAILS
EP511 - ELECTRICAL DETAILS
EP512 - ELECTRICAL DETAILS
EF601 - DATA CENTER FIRE ALARM RISER DIAGRAM AND I/O MATRIX
EG601 - TELECOMMUNICATIONS BONDING RISER DIAGRAMS
EG602 - TELECOMMUNICATIONS BONDING RISER DIAGRAMS
EG603 - TELECOMMUNICATIONS BONDING RISER DIAGRAMS
EP601 - MV DISTRIBUTION SYSTEM - ONE-LINE DIAGRAM
001EP601 - BLDG 001 - PARTIAL ONE-LINE DIAGRAM -PART 1 OF 3
001EP602 - BLDG 001 - PARTIAL ONE-LINE DIAGRAM -PART 2 OF 3
001EP603 - BLDG 001 - PARTIAL ONE-LINE DIAGRAM -PART 3 OF 3
002EP601 - BLDG 002 & 002B - PARTIAL ONE-LINE DIAGRAM - PART 1 OF 2
002EP602 - BLDG 002 & 002B - PARTIAL ONE-LINE DIAGRAM - PART 2 OF 2
003EP601 - BLDG 003 - ONE-LINE DIAGRAMS
004EP601 - BLDG 004 - ONE-LINE DIAGRAMS
005EP601 - BLDG 005 - ONE-LINE DIAGRAMS
006EP601 - BLDG 006 - ONE-LINE DIAGRAMS
011ED601 - BLDG 011, 011A, 012, 012A AND 014A -ONE-LINE DIAGRAM - EXISTING
011EP601 - BLDG 011, 011A, 012, 012A AND 014A -ONE-LINE DIAGRAM - REVISED
015ED601 - BLDG 015, 015A, & 016 - ONE-LINE DIAGRAMS -EXISTING
015EP601 - BLDG 015, 015A, & 016 - ONE-LINE DIAGRAMS -REVISED
021EP601 - BLDG 021 - ONE-LINE DIAGRAM
022&024EP601 - BLDG 022 & 024 - ONE-LINE DIAGRAM
027-034EP601 - BLDG 027-034 - ONE-LINE DIAGRAM
035EP601 - BLDG 035, 035A, 036, & 036A - ONE-LINE DIAGRAM
041EP601 - DATA CENTER - ONE-LINE DIAGRAM - PART 1 OF 2
041EP602 - DATA CENTER - ONE-LINE DIAGRAM - PART - 2 OF 2
EP701 - ELECTRICAL SCHEDULES
001EP701 - BLDG 001 - ELECTRICAL PANEL SCHEDULES
001EP702 - BLDG 001 - ELECTRICAL PANEL SCHEDULES
001EP703 - BLDG 001 - ELECTRICAL PANEL SCHEDULES
001EP704 - BLDG 001 - ELECTRICAL PANEL SCHEDULES
001EP705 - BLDG 001 - ELECTRICAL PANEL SCHEDULES
002EP701 - BLDG 002 - ELECTRICAL PANEL SCHEDULES
002EP702 - BLDG 002 - ELECTRICAL PANEL SCHEDULES
002EP703 - BLDG 002 - ELECTRICAL PANEL SCHEDULES
002EP704 - BLDG 002 - ELECTRICAL PANEL SCHEDULES
002EP705 - BLDG 002 - ELECTRICAL PANEL SCHEDULES
002BEP701 - BLDG 002B - ELECTRICAL PANEL SCHEDULES
003EP701 - BLDG 003 - ELECTRICAL PANEL SCHEDULES
004EP701 - BLDG 004 - ELECTRICAL PANEL SCHEDULES
005EP701 - BLDG 005 - ELECTRICAL PANEL SCHEDULES
005EP702 - BLDG 005 - ELECTRICAL PANEL SCHEDULES
006EP701 - BLDG 006 - ELECTRICAL PANEL SCHEDULES
011EP701 - BLDG 011 - ELECTRICAL PANEL SCHEDULES
011AEP701 - BLDG 011A - ELECTRICAL PANEL SCHEDULES
012EP701 - BLDG 012 - ELECTRICAL PANEL SCHEDULES
012AEP701 - BLDG 012A - ELECTRICAL PANEL SCHEDULES
014AEP701 - BLDG 014A - ELECTRICAL PANEL SCHEDULES
015EP701 - BLDG 015 - ELECTRICAL PANEL SCHEDULES
015AEP701 - BLDG 015A - ELECTRICAL PANEL SCHEDULES
021EP701 - BLDG 021 - ELECTRICAL PANEL SCHEDULES
022EP701 - BLDG 022 - ELECTRICAL PANEL SCHEDULES
024EP701 - BLDG 024 - ELECTRICAL PANEL SCHEDULES
027-034EP701 - BLDG 027-034 - ELECTRICAL PANEL SCHEDULES
035EP701 - BLDG 035 - ELECTRICAL PANEL SCHEDULES
035AEP701 - BLDG 035A - ELECTRICAL PANEL SCHEDULES
036EP701 - BLDG 036 - ELECTRICAL PANEL SCHEDULES
036AEP701 - BLDG 036A - ELECTRICAL PANEL SCHEDULES
041EP701 - BLDG 041 - ELECTRICAL PANEL SCHEDULES
041EP702 - BLDG 041 - ELECTRICAL PANEL SCHEDULES
041EP703 - BLDG 041 - ELECTRICAL PANEL SCHEDULES

File details come from the government source that posted it. Updated .