This is a structural foundation plan and concrete foundation details drawing for the EHRM Infrastructure Upgrades project at VA CT West Haven, located at 950 Campbell Avenue, West Haven, CT 06516. The drawings are prepared by WSP USA Inc. as the Architect/Engineer of Record, with SPEES Design Build as the design-build consultant, and were issued at the 100% Construction Documents phase on April 20, 2026.

The foundation plan (Sheet S-101) depicts a slab-on-grade system with 5-inch thick reinforced concrete slabs supported by 12-inch concrete masonry unit (CMU) walls and various footing configurations. Key structural elements include #4 rebar at 12 inches on-center with mid-depth spacing, concrete joints (CJ) at typical locations, and housekeeping pads sized per architectural and mechanical drawings. Foundation depths vary with top-of-footing (TOF) elevations ranging from -3'-0" to -3'-6" below finished grade. The concrete foundation details sheet (Sheet S-502) provides eight detailed sections at 3/4-inch scale showing typical CMU wall footings, wall footings adjacent to existing conditions, mechanical yard wall sections, and frost-protected slab configurations at entrances. All sections specify reinforcement patterns, drainage requirements, insulation specifications (R-10 rigid insulation for mechanical yard slabs), expansion joints, and connections to existing structural elements. The project is fully sprinklered and includes notes referencing additional design information in related sheets. An addendum pre-bid RFI 1 was issued on July 27, 2026.

View the file

Other files

File Type Posted
Attachment 01 - 36C77626R0106 Tech Questions - dated 7-30-26.docx DOCX document
36C77626R0106 0004.docx DOCX document
Attachment 01d - Addendum R1-001EP400Ga_041EP101_041EP702-Door Schedule-EHRM-689-22-700.pdf PDF
Attachment 01c - Addendum R1-A-601-Door Schedule-EHRM-689-22-700.pdf PDF
Attachment 01 - 36C77626R0106 Tech Questions - dated 7-31-26.docx DOCX document
Attachment 01b - Addendum R1-087100 Door Hardware Spec-EHRM-689-22-700.pdf PDF
Attachment 01e - Addendum R1-001TN400Ga_041TN101-Door Schedule-EHRM-689-22-700.pdf PDF
Attachment 01 - 36C77626R0106 Tech Questions - dated 7-30-26.docx DOCX document
36C77626R0106 0003.docx DOCX document
Attachment 01a - Addendum R1-A-601-Door Schedule-EHRM-689-22-700.pdf PDF
Attachment 02 - Revised 1442 - 36C77626R0106.docx DOCX document
Attachment 01c -Addendum R1-Structural Drawings-EHRM-689-22-700.pdf PDF
Attachment 01b - 08 71 00 - Door Hardware_Rev1.pdf PDF
36C77626R0106 0002.docx DOCX document
Attachment 01 - Sign-In Sheet - 689-22-700 - EHRM West Haven - 7-13-26.pdf PDF
36C77626R0106 0001.docx DOCX document
Attachment 08 - VOL_3a-ARCH-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 13 - VOL_5c-ELECTRICAL-VA CT West Haven EHRM IU-689-22-700.pdf PDF
Attachment 05c - Specifications_Div_26-28-West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 05a - Specifications_Div_00-13-West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 19 - APPNDX_D-Geotechnical_Report-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 05b - Specifications_Div_21-23-West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 17 - APPNDX_B-Drainage_Rprt-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 07 - VOL_2-STRUCT-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 06 - VOL_1-CIVIL-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 09 - VOL_3b-ARCH-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 22 - 689-22-700 Risk Matrix 2026.pdf PDF
Attachment 21 - APPNDX_F-Topo Survey-VA CT West Haven EHRM IU-689-22-700.pdf PDF
Attachment 16 - APPNDX_A-Commissioning_Plan-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 18 - APPNDX_C-Environmental_Report-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 15 - VOL_6b-TELECOM-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 11 - VOL_5a-ELECTRICAL-VA CT West Haven EHRM IU-689-22-700.pdf PDF
Attachment 14 - VOL_6a-TELECOM-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 05d - Specifications_Div_31-33-West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 10 - VOL_4-MECH-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 20 - APPNDX_E-PSRDM_Conformance_Letter-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 12 - VOL_5b-ELECTRICAL-VA CT West Haven EHRM IU-689-22-700.pdf PDF
Attachment 02 - Site Visit - West Haven.docx DOCX document
Attachment 01 - Limitations on Subcontracting - EHRM West Haven.docx DOCX document
Attachment 03 - Wage Determination CT20260023 Rev 2 dated 5-18-26.pdf PDF
Attachment 04 - Project Information Sheet for Contractors.docx DOCX document
36C77626R0106.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2

C

6'-9 1/4" 47'-9 1/2" 18'-10 13/16"

5" THICK SLAB-ON-GRADE

W/ #4 @ 12" OC,

EW @ MID DEPTH

CJ, TYP

A

C6

S-502

F1

S-502

C1

S-502

C1

S-502

S-201C7

S-202

C1

S-201 F1

2' -6

S-202

F1

S-201

S-201

F5

C1

S-202 F6

HOUSEKEEPING PAD

PER LOCATION & SIZE

PER ARCH/MECH DRAWINGS

'-3

/8

'-3

12" CMU WALL, TYP

12" CMU

WALL, TYP

S-202C6

EDGE OF FTG

BELOW, TYP

12" CMU

WALL, TYP

B

5" THICK SLAB-ON-GRADE

W/ #4 @ 12" OC,

EW @ MID DEPTH

EQ EQ EQ EQ EQ

E Q

E Q

E Q

CJ, TYP

E Q

E Q

E Q

E Q

EQ EQ

F1

S-502

C1

S-502

C1

S-502

F1

S-502

C1

S-502

1.1 2.1

A.1

B.1

25'-8 3/4"

'-4

/4

'-8

EXISTING BUILDING

2'-6" 2'-6"

2' -6

2' -6

8" CMU WALL

D6

S-531

2' -6

F3

S-502

C3

S-502

F3

S-502

C3

S-502

/B7 S-501

C.1

F6

S-502

C6

S-502

C6

S-502

CJ

'-1

COLD JOINT

HORIZ REINF DOES NOT

CROSS THE COLD JOINT

S-202

F4

C8

S-502

8" MIN THICK SLAB-ON-GRADE

W/ #4 @ 12" OC EW TOP

& #5 @ 12" OC EW BOT

TOC EL PER CIVIL

F8

S-502

2'-6"

2'-6"

TOF = -3' - 0"

TOF = -3' - 0"

TOF = -3' - 6"

TOF = -3' - 6"

4' -0

4'-0" 4'-0"

2' -6

TOF = -3' - 6"

TOF = -3' - 0"

PLAN NOTES:

1. FOR FOUNDATION DETAILS, SEE SHEETS S-501 & S-502.

2. FOR SLAB-ON-GRADE DESIGN SEE /B1 S-501

WSP USA Inc.

1201 Pacific Ave, Suite 550 Tacoma WA, 98402

TEL: (206) 431-2300

FAX: (206) 431-2250

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/2

/2

:0

:3

P

M

A u to d e s k D o c s /6

-2

-7

V

A C

T W e s t H a v e n E

H R

M

IU

/V A

W H

D

A T

A C

E N

T E

R -S

T R

.r v t

S-101

FOUNDATION PLAN

NRT JKM

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

3/16" = 1'-0" F1

FOUNDATION PLAN

PROJECT

NORTH

Revisions: Date:

ADDENDUM PRE-BID RFI 1 07-27-2026

TOC LEVEL 1

0' - 0"

TOF

-3' - 0"

DOWELS TO MATCH SIZE AND

SPACING OF CMU WALL VERTICAL

REINFORCEMENT, TYP

TYP WALL REINF PER ELEVTYP WALL REINF PER ELEV

1/2" JT W/FILLER AND SEALANT, TYP

EXTERIOR WALL FINISH

PER ARCH

#4 @ 12" OC

#5 CONT

DOWELS TO MATCH SIZE AND

SPACING OF CMU WALL VERTICAL

REINFORCEMENT, TYP.

FIN GRADE PER CIVIL

#4 @ 8" OC MAX EW

EA FACE OF WALL

#5 @ 12" OC LAP W/

SLAB REINF SOG W/ REINF

PER PLAN

SUBGRADE PER

GEOTECH REPORT

EXTEND CONCRETE TO

ALLOW FULL BEARING OF

VENEER WALL, TYP

1'-0" Ld

DOUBLE TAPE OR SLEEVE

SLOPE FOR DRAINAGE 2% MIN

AIR BARRIER PER ARCH

1' -0

#4 @ 8" OC MAX EW

EA FACE OF WALL

PER PLAN

TOC LEVEL 1

0' - 0"

TOF

-3' - 0"

D O

O R

O P

N G

P E

R A

R C

H

NOTE:

FOR INFORMATION NOT

SHOWN REFER TO /C1 S-502

FIN GRADE PER CIVIL SOG W/ REINF

PER PLAN

#7 @ 8" OC MIN

DOUBLE TAPE OR SLEEVE

PER PLAN

#4 @ 8" OC MAX EW

EA FACE OF WALL

#4 @ 8" OC MAX EW

EA FACE OF WALL

1' -0

#4 @ 12" OC

#5 CONT

DOWELS TO MATCH SIZE AND

SPACING OF CMU WALL VERTICAL

REINFORCEMENT, TYP.

#4 @ 8" OC MAX EA

FACE OF WALL

#5 @ 12" OC LAP W/ SLAB REINF

SOG W/ REINF

PER PLAN, TYP

TYP WALL REINF PER ELEVTYP WALL REINF PER ELEV

SUBGRADE PER

GEOTECH REPORT

1'-0" Ld

DOUBLE TAPE OR SLEEVE

1/2" JT W/FILLER AND SEALANT, TYP

EXIST SLAB & FND

TO REMAIN

EXIST WALL TO REMAIN

CONC STEM WALL

A 4

FTG EDGE BEYOND

TOC LEVEL 1

0'-0"

T/FTG

-3'-0"

#5 @ 12" OC x12" LONG. EMBED TO

EXITING FOOTING 5" MIN WITH EPOXY

2" EXPANSION JOINT

1' -0

PER PLAN

FURRING PER ARCH

DO NOT EXCAVATE BELOW EXISTING

FOOTING WITHOUT SHORING BUILDING

#4 @ 12" OC

#5 CONT

DOWELS TO MATCH SIZE AND

SPACING OF CMU WALL VERTICAL

REINFORCEMENT, TYP.

#4 @ 8" OC MAX EA

FACE OF WALL

#5 @ 12" OC LAP W/ SLAB REINF

SOG W/ REINF

PER PLAN, TYP

TYP WALL REINF PER ELEVTYP WALL REINF PER ELEV

SUBGRADE PER

GEOTECH REPORT

1'-0" Ld

DOUBLE TAPE OR SLEEVE

1/2" JT W/FILLER AND SEALANT, TYP

EXIST SLAB & COLUMN

FTG TO REMAIN

EXIST COLUMN TO REMAIN

DO NOT OVER DIG.

WHERE IN CONFLICT WITH

EXISTING FOOTING

MAINTAIN 1" OF

COMPRESSIBLE MATERIAL

BETWEEN CONC STEM WALL

AND EXISTING WALL

FOOTINGS

CONC STEM WALL

A

FTG EDGE BEYOND

TOC LEVEL 1

0'-0"

T/FTG

-3'-0"

PER PLAN

#5 @ 12" OC x12" LONG. EMBED TO

EXITING FOOTING 5" MIN WITH EPOXY

FURRING PER ARCH

1' -0

TOC LEVEL 1

0' - 0"

#4 @ 8" OC EW, T&B

WALL FINISH PER ARCH

SEE PLAN FOR SOG REINF

DOWELS TO MATCH SIZE

AND SPACING OF CMU

WALL VERTICAL

REINFORCEMENT, TYP

TYP WALL REINF PER ELEV

FIN GRADE

PER CIVIL

#4 @ 8" OC EW, T&B

TYP WALL REINF PER ELEV

NOTE:

TOP OF WALL CONDITION

DIFFERS @ SIM.

SLOPE FOR

DRAINAGE 2% MIN

#4 @ 12" OC

EXTEND CONCRETE TO

ALLOW FULL BEARING

OF VENEER WALL, TYP

P E

R A

R C

H

CONT #4 @ 8" OC MAX

EA FACE OF WALL

#4 @ 12" OC

ELEV & SLOPE PER CIVIL

ADD 2" MAX ADDITIONAL

CONC COVER TO

CREATE SLOPE

(2) #4 TOP AT THE CURB

1'-0 1/2"

6" MIN THICK GRAVEL

NOT SUSCEPTIBLE TO

FROST HEAVE BELOW

MECHANICAL YARD SLAB

(LESS THAN 6% BY MASS

PASSING #200 SIEVE)

R-10 RIGID INSULATION

UNDER MECH YARD SLAB.

18 PSI MIN COMPRESSION

STRENGTH

PER PLAN

1' -0

TOF

-3' - 0"

1.1

NOTES:

1. FOR INFORMATION NOT SHOWN REFER TO

2. INCREASE IN FOOTING THICKNESS TO ALLOW HOOK

DEVELOPMENT LENGTH OF JAMB REINFORCEMENT

/C6 S-502

#4 @ 8" OC MIN

FROST PROTECTED

SLAB PER

R-10 RIGID INSULATION UNDER MECH YARD

SLAP. 18 PSI MIN COMPRESSION STRENGTH

/E6 S-502

D O

O R

O P

N G

P E

R A

R C

H

1' -0

TOC LEVEL 1

0' - 0"

B.1

DOWELS TO MATCH SIZE AND

SPACING OF CMU WALL VERTICAL

REINFORCEMENT, TYP

TYP WALL REINF PER ELEVTYP WALL REINF PER ELEV

1/2" JT W/FILLER AND SEALANT, TYP

EXTERIOR WALL FINISH PER ARCH

#4 @ 12" OC

#5 CONT

#4 @ 8" OC MAX EW

EA FACE OF WALL

#5 @ 12" OC LAP W/ SLAB REINF SOG W/ REINF

PER PLAN, TYP

SUBGRADE PER

GEOTECH REPORT

EXTEND CONCRETE TO ALLOW FULL

BEARING OF VENEER WALL, TYP

Ld

DOUBLE TAPE OR SLEEVE

SLOPE FOR DRAINAGE 2% MIN

AIR BARRIER PER ARCH

#4 @ 8" OC MAX EW

EA FACE OF WALL

ELEV & SLOPE PER CIVIL

ADD 2" MAX ADDITIONAL CONC

COVER TO CREATE SLOPE

R-10 RIGID INSULATION

UNDER MECH YARD SLAP.

18 PSI MIN COMPRESSION

STRENGTH

(LESS THAN 6% BY MASS

PASSING #200 SIEVE)

PER PLAN

1' -0

TOC LEVEL 1

0' - 0"

TOF

-3' - 0"

1/2" JT W/FILLER AND SEALANT, TYP

#4 @ 12" OC

#5 CONT

DOWELS TO MATCH SIZE AND

SPACING OF CMU WALL VERTICAL

REINFORCEMENT, TYP

#4 @ 8" OC MAX EW EA FACE OF WALL

#5 @ 12" OC LAP W/ SLAB REINF

SOG W/ REINF

PER PLAN, TYP

SUBGRADE PER

GEOTECH REPORT

Ld

DOUBLE TAPE OR SLEEVE

SLOPE FOR DRAINAGE 2% MIN

#4 @ 8" OC MAX EW EA FACE OF WALL

#4 @ 8" OC MAX EA

FACE OF WALL

#5 @ 12" OC LAP W/ SLAB REINF

EXIST SLAB & FND TO REMAIN

FTG EDGE BEYOND

#5 @ 12" OC x12" LONG. EMBED TO

EXITING FOOTING 5" MIN WITH EPOXY

PER PLAN

DO NOT EXCAVATE BELOW EXISTING

FOOTING WITHOUT SHORING BUILDING

1' -0

D O

O R

O P

N G

P E

R A

R C

H

FND WALL

#5 @ 12" OC EW

SS DOWEL #6x1'-4" LONG @ 12" OC

DRILL & EPOXY 8" INTO FND WALL

SLAB PER PLAN

SLOPE

1/4" TO 12"

8" 1'-6"

1' -0

1'

-0

SLOPE

1/4" TO 12"

8 "

1' -0

6"

3 " C

LR

#5 @ 12" OC EW

2" RIGID INSUL

#2 CRUSHED STONE.

WRAP IN FILTER FABRIC

1/2"x1" JOINT W/ BACKER ROD & SEALANT

CLR

2"

ALL SIDES

4'-0" MATCH WIDTH OF SIDEWALK PER CIVIL

8"

NOTE:

LENGTH OF SLAB SHALL EXTEND

MINIMUM 6" BEYOND SWING OF DOORS.

WSP USA Inc.

1201 Pacific Ave, Suite 550 Tacoma WA, 98402

TEL: (206) 431-2300

FAX: (206) 431-2250

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/2

/2

:0

:3

P

M

A u to d e s k D o c s /6

-2

-7

V

A C

T W e s t H a v e n E

H R

M

IU

/V A

W H

D

A T

A C

E N

T E

R -S

T R

.r v t

S-502

CONCRETE FOUNDATION DETAILS

NRT JKM

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

3/4" = 1'-0" C1

TYP CMU WALL FOOTING

3/4" = 1'-0" F1

TYP CMU WALL FOOTING AT DOOR

3/4" = 1'-0" C3

WALL FOOTING AGAINST EXIST WALL FOOTING

3/4" = 1'-0" F3

WALL FOOTING AGAINST EXIST COLUMN FOOTING

3/4" = 1'-0" C6

MECHANICAL YARD WALL SECTION

3/4" = 1'-0" F6

MECH YARD WALL SECTION AT DOOR

3/4" = 1'-0" C8

WALL FOOTING AT MECH YARD

3/4" = 1'-0" F8

WALL FOOTING AGAINST EXIST WALL FOOTING AT DOOR

Revisions: Date:

ADDENDUM PRE-BID RFI 1 07-27-2026

3/4" = 1'-0" E6

TYP FROST PROTECTED SLAB AT ENTRANCE

Sheets
S-001 - STRUCTURAL GENERAL NOTES
S-002 - STRUCTURAL GENERAL NOTES
S-003 - ABRREVIATIONS AND SYMBOLS
SD101 - DEMOLITION PLAN
S-101 - FOUNDATION PLAN
S-111 - ROOF PLAN
S-201 - STRUCTURAL WALL ELEVATIONS
S-202 - STRUCTURAL WALL ELEVATIONS
S-501 - TYPICAL CONCRETE DETAILS
S-502 - CONCRETE FOUNDATION DETAILS
S-511 - TYPICAL STRUCTURAL STEEL DETAILS
S-512 - TYPICAL STRUCTURAL STEEL DETAILS
S-531 - TYPICAL CMU WALL DETAILS
S-532 - TYPICAL CMU WALL DETAILS
S-541 - MECHANICAL ANCHORAGE DETAILS
S-542 - TYPICAL DETAILS-CABINET TO CFS FRAMED WALL
S-543 - TYPICAL DETAILS-CABINET TO WOOD FRAMED WALL
S-544 - TYPICAL DETAILS-CABINET TO CONCRETE AND CMU WALL