This is a Door Schedule & Louver Schedule drawing (Sheet A-601) for the EHRM Infrastructure Upgrades project at the VA Connecticut West Haven facility located at 950 Campbell Avenue, West Haven, CT 06516. The document is a 100% Construction Documents package dated April 20, 2026, prepared by SPEES Design Build as the Architect/Engineer of Record.

The schedule specifies door and louver requirements across multiple buildings (Buildings 001-042) and levels, detailing door dimensions, materials, finishes, hardware specifications, and fire ratings. Door specifications include width, height, thickness, material types (primarily solid core [SH-3D] and hollow metal [HM]), and finishes (wood stain or paint). Fire ratings range from 45 minutes to 3 hours, with select doors (121a, 121b, 122, 114a, 114b) designated as blast-rated. The louver schedule specifies two louvers (L-01 and L-02) in Building 042, Level 01, each measuring 8 feet wide by 4 feet high. All exterior entry doors and frames are specified as a minimum 14-gauge hollow metal. A general note indicates that all fire-rated doors shall be finished to match existing facility standards and confirmed with the Contracting Officer Representative prior to installation.

View the file

Other files

File Type Posted
Attachment 01 - 36C77626R0106 Tech Questions - dated 7-30-26.docx DOCX document
36C77626R0106 0004.docx DOCX document
Attachment 01d - Addendum R1-001EP400Ga_041EP101_041EP702-Door Schedule-EHRM-689-22-700.pdf PDF
Attachment 01c - Addendum R1-A-601-Door Schedule-EHRM-689-22-700.pdf PDF
Attachment 01a - Addendum R1-S-101_S-502-EHRM-689-22-700.pdf PDF
Attachment 01 - 36C77626R0106 Tech Questions - dated 7-31-26.docx DOCX document
Attachment 01b - Addendum R1-087100 Door Hardware Spec-EHRM-689-22-700.pdf PDF
Attachment 01e - Addendum R1-001TN400Ga_041TN101-Door Schedule-EHRM-689-22-700.pdf PDF
Attachment 01 - 36C77626R0106 Tech Questions - dated 7-30-26.docx DOCX document
36C77626R0106 0003.docx DOCX document
Attachment 02 - Revised 1442 - 36C77626R0106.docx DOCX document
Attachment 01c -Addendum R1-Structural Drawings-EHRM-689-22-700.pdf PDF
Attachment 01b - 08 71 00 - Door Hardware_Rev1.pdf PDF
36C77626R0106 0002.docx DOCX document
Attachment 01 - Sign-In Sheet - 689-22-700 - EHRM West Haven - 7-13-26.pdf PDF
36C77626R0106 0001.docx DOCX document
Attachment 08 - VOL_3a-ARCH-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 13 - VOL_5c-ELECTRICAL-VA CT West Haven EHRM IU-689-22-700.pdf PDF
Attachment 05c - Specifications_Div_26-28-West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 05a - Specifications_Div_00-13-West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 19 - APPNDX_D-Geotechnical_Report-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 05b - Specifications_Div_21-23-West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 17 - APPNDX_B-Drainage_Rprt-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 07 - VOL_2-STRUCT-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 06 - VOL_1-CIVIL-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 09 - VOL_3b-ARCH-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 22 - 689-22-700 Risk Matrix 2026.pdf PDF
Attachment 21 - APPNDX_F-Topo Survey-VA CT West Haven EHRM IU-689-22-700.pdf PDF
Attachment 16 - APPNDX_A-Commissioning_Plan-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 18 - APPNDX_C-Environmental_Report-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 15 - VOL_6b-TELECOM-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 11 - VOL_5a-ELECTRICAL-VA CT West Haven EHRM IU-689-22-700.pdf PDF
Attachment 14 - VOL_6a-TELECOM-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 05d - Specifications_Div_31-33-West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 10 - VOL_4-MECH-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 20 - APPNDX_E-PSRDM_Conformance_Letter-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 12 - VOL_5b-ELECTRICAL-VA CT West Haven EHRM IU-689-22-700.pdf PDF
Attachment 02 - Site Visit - West Haven.docx DOCX document
Attachment 01 - Limitations on Subcontracting - EHRM West Haven.docx DOCX document
Attachment 03 - Wage Determination CT20260023 Rev 2 dated 5-18-26.pdf PDF
Attachment 04 - Project Information Sheet for Contractors.docx DOCX document
36C77626R0106.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/ DISCIPLINE

321 4 5 6 7 8 9 10

DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

08/05/2026 7:14:44 am

Autodesk Docs://689-22-700 VA CT West Haven EHRM

IU/VAWH_GEN

SHEETS_SDB.rvt

A-601

DOOR SCHEDULE & LOUVER SCHEDULE

JS/JRS JRS/RB

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

DOOR SCHEDULE - DATA CENTER

BLDG # LEVEL DOOR NUMBER

DOOR SIZE

Door Type HW

DOOR DOOR FRAME

FIRE RATING COMMENTSWIDTH HT. THK MAT FIN MAT FIN

041 LEVEL 01 104a 6' - 0" 8' - 0" 0' - 1 3/4" 5A 3E HM PAINT HM* PAINT - -

041 LEVEL 01 104b 6' - 0" 8' - 0" 0' - 1 3/4" 4A 3E HM PAINT HM* PAINT 45 MIN -

041 LEVEL 01 105 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

041 LEVEL 01 106 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT 45 MIN -

041 LEVEL 01 107 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

041 LEVEL 01 108 6' - 0" 8' - 0" 0' - 1 3/4" 4A 3E WOOD STAIN HM PAINT - -

041 LEVEL 01 109 2' - 10" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT 45 MIN -

041 LEVEL 01 110 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT 45 MIN -

041 LEVEL 01 111 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

041 LEVEL 01 113 3' - 8" 7' - 0" 0' - 1 3/4" 2A SH-3D HM PAINT HM* PAINT 45 MIN -

041 LEVEL 01 114a 6' - 0" 8' - 0" 0' - 1 3/4" 4A 3E HM PAINT HM* PAINT 45 MIN BLAST RATED

041 LEVEL 01 114b 6' - 0" 8' - 0" 0' - 1 3/4" 4A 3E HM PAINT HM* PAINT 45 MIN BLAST RATED

042 LEVEL 01 121a 8' - 0" 8' - 0" 0' - 1 3/4" 5A 3E HM PAINT HM* PAINT 3 HR BLAST RATED

042 LEVEL 01 121b 6' - 0" 8' - 0" 0' - 1 3/4" 5A 3E HM PAINT HM* PAINT 3 HR BLAST RATED

042 LEVEL 01 122 8' - 0" 8' - 0" 0' - 1 3/4" 5A 3E HM PAINT HM* PAINT 3 HR BLAST RATED

LOUVER SCHEDULE

BLDG # LEVEL

LOUVER

NUMBER WIDTH HEIGHT

SILL

HEIGHT QUANTITY

042 LEVEL 01 L-01 8' - 0" 4' - 0" 1

042 LEVEL 01 L-02 8' - 0" 4' - 0" 1

DOOR SCHEDULE

BLDG # LEVEL DOOR NUMBER

DOOR SIZE DOOR

TYPE HW

DOOR DOOR FRAME

FIRE RATING CommentsWIDTH HT. THK MAT FIN MAT FIN

001 LEVEL 0SG SG171 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 0SG SG105B 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 0SG SG170A 3' - 0" 7' - 0" 0' - 1 3/4" 1A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 0G G277 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 0G G192A 3' - 0" 7' - 0" 0' - 1 3/4" 1A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 0G G192C 3' - 0" 7' - 0" 0' - 1 3/4" 1A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 0G G192 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 0G G108 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 0G G192B 3' - 0" 7' - 0" 0' - 1 3/4" 3A 3A WOOD STAIN HM PAINT - -

001 LEVEL 01 1190 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT -

001 LEVEL 02 2151 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 03 3154 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 04 4259A 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 05 5195 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 06 6204 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 07 7204 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 08 8139 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 09 9122A 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 09 9122B 2' - 6" 7' - 0" 0' - 1 3/4" 1A SH-3D WOOD STAIN HM PAINT -

002 LEVEL 0G G132 6' - 0" 7' - 0" 0' - 1 3/4" 4A 3E WOOD STAIN HM PAINT - -

002 LEVEL 0G G132A 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 0G G143C 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 01 1303B 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 01 1279A 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 01 1238 3' - 0" 7' - 0" 0' - 1 3/4" 1A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 01 1239 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 02 2107D 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 02 2107E 3' - 0" 7' - 0" 0' - 1 3/4" 1A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 02 2228 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 03 3222 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 04 4222 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 05 5222 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 06 6209 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 07 7205 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 08 8141 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

003 LEVEL 01 105A 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

003 LEVEL 02 206 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

004 LEVEL 01 110 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

004 LEVEL 02 210A 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

005 LEVEL 01 C-103 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

005 LEVEL 02 C-244 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

005 LEVEL 03 C-314 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

006 LEVEL 01 128 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

006 LEVEL 02 222 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

006 LEVEL 02 223 3' - 0" 7' - 0" 0' - 1 3/4" 1A SH-3D WOOD STAIN HM PAINT - -

011A LEVEL 01 113 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

014A LEVEL 01 102 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

015 LEVEL 01 128 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

015A LEVEL 01 112 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

024 LEVEL 01 A-1A 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

027-034 LEVEL 01 159 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

035 LEVEL 00 B18 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

035 LEVEL 01 115 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

035A LEVEL 01 124A 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

035A LEVEL 02 225A 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

036 LEVEL 01 105 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

036A LEVEL 01 114 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT -

* ALL EXTERIOR ENTRY DOORS AND FRAMES SHALL BE A MINIMUM OF 14GA HOLLOW METAL.

GENERAL NOTES:

- ALL FIRE RATED DOORS SHALL BE FINISHED TO MATCH EXISTING FACILITY STANDARDS AND CONFIRMED WITH COR PRIOR TO INSTALLATION.

Revisions: Date:

SH-13

ADDENDUM PRE-BID RFI 1 07-28-2026

SH-13

SH-13

SH-9

SH-9

SH-12

SH-3

5G 5D

SH-3

SH-3

SH-3

SH-13

SH-9

3E

3E

SH-4

5D 10C

3E

4F

4F

2A

2A 2A

2A

2A

2A

2A

45 MIN

45 MIN

45 MIN

45 MIN

45 MIN

45 MIN

45 MIN

Nic Estona Architect

Nic Estona Polygon

Nic Estona Cloud

Nic Estona Cloud

Nic Estona Cloud

Nic Estona Cloud

Nic Estona Cloud

Nic Estona Cloud

Nic Estona Cloud

Nic Estona Cloud

Nic Estona Cloud

Nic Estona Architect

Nic Estona Polygon

Nic Estona Architect

Nic Estona Polygon

Nic Estona Architect

Nic Estona Polygon

Nic Estona Architect

Nic Estona Polygon

Nic Estona Architect

Nic Estona Polygon

Nic Estona Architect

Nic Estona Polygon

Nic Estona Architect

Nic Estona Polygon

Nic Estona Architect

Nic Estona Polygon

Nic Estona Architect

Nic Estona Polygon

File details come from the government source that posted it. Updated .