Attachment 09 - VOL_3b-ARCH-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf

PDF 7 MB Posted

Attached to
Z2DA--689-22-700 EHRM IU West Haven VAMC This ONLY for the PCAC VISN 1 Construction MATOC Pool
Solicitation number
36C77626R0106
Issued by

About this file

These are 100% construction documents for the EHRM Infrastructure Upgrades project at the Department of Veterans Affairs (VA) facility located at 950 Campbell Avenue, West Haven, Connecticut 06516. Project Number 689-22-700 involves improving, reconfiguring, expanding, and renovating existing spaces across 27 applicable buildings to accommodate new telecommunication rooms, a data center, generator enclosure, and fuel yard. The design team includes SPEES DESIGN BUILD (Architectural, Structural, Mechanical, Fire Protection, Plumbing, and Electrical disciplines) located in Kent, Washington, and WSP USA, INC. (Civil discipline) located in Federal Way, Washington. The construction documents are dated April 20, 2026, at 100% completion phase.

The project encompasses multiple building types including healthcare facilities (Buildings 1, 2, 3, 5, 36) and administrative buildings (Buildings 2B, 4, 6, 11, 11A, 12, 12A, 14A, 15, 15A, 16, 16A, 21, 22, 24, 27-34, 35, 35A, 36A, and the new Buildings 41 for the data center and 42 for the generator enclosure and fuel yard). The documents include comprehensive architectural specifications covering door and louver schedules, room finish schedules, wall types, fire protection requirements, Infection Control Risk Assessment (ICRA) standards for construction zones with Class I through IV requirements, signage schedules with tactile and braille specifications, and construction details for doors, frames, walls, windows, roof penetrations, and shade structures. All work must comply with applicable codes including the 2018 International Building Code, NFPA standards, ADA accessibility requirements, VA directives, and federal contracting standards. The contractor is responsible for site verification, high-level workmanship, ICRA barrier installation and maintenance, coordination with existing building systems, material verification prior to purchase, and compliance with all specification requirements before work completion.

View the file

Other files

File Type Posted
Attachment 01 - 36C77626R0106 Tech Questions - dated 7-30-26.docx DOCX document
36C77626R0106 0004.docx DOCX document
Attachment 01d - Addendum R1-001EP400Ga_041EP101_041EP702-Door Schedule-EHRM-689-22-700.pdf PDF
Attachment 01c - Addendum R1-A-601-Door Schedule-EHRM-689-22-700.pdf PDF
Attachment 01a - Addendum R1-S-101_S-502-EHRM-689-22-700.pdf PDF
Attachment 01 - 36C77626R0106 Tech Questions - dated 7-31-26.docx DOCX document
Attachment 01b - Addendum R1-087100 Door Hardware Spec-EHRM-689-22-700.pdf PDF
Attachment 01e - Addendum R1-001TN400Ga_041TN101-Door Schedule-EHRM-689-22-700.pdf PDF
Attachment 01 - 36C77626R0106 Tech Questions - dated 7-30-26.docx DOCX document
36C77626R0106 0003.docx DOCX document
Attachment 01a - Addendum R1-A-601-Door Schedule-EHRM-689-22-700.pdf PDF
Attachment 02 - Revised 1442 - 36C77626R0106.docx DOCX document
Attachment 01c -Addendum R1-Structural Drawings-EHRM-689-22-700.pdf PDF
Attachment 01b - 08 71 00 - Door Hardware_Rev1.pdf PDF
36C77626R0106 0002.docx DOCX document
Attachment 01 - Sign-In Sheet - 689-22-700 - EHRM West Haven - 7-13-26.pdf PDF
36C77626R0106 0001.docx DOCX document
Attachment 08 - VOL_3a-ARCH-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 13 - VOL_5c-ELECTRICAL-VA CT West Haven EHRM IU-689-22-700.pdf PDF
Attachment 05c - Specifications_Div_26-28-West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 05a - Specifications_Div_00-13-West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 19 - APPNDX_D-Geotechnical_Report-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 05b - Specifications_Div_21-23-West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 17 - APPNDX_B-Drainage_Rprt-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 07 - VOL_2-STRUCT-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 06 - VOL_1-CIVIL-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 22 - 689-22-700 Risk Matrix 2026.pdf PDF
Attachment 21 - APPNDX_F-Topo Survey-VA CT West Haven EHRM IU-689-22-700.pdf PDF
Attachment 16 - APPNDX_A-Commissioning_Plan-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 18 - APPNDX_C-Environmental_Report-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 15 - VOL_6b-TELECOM-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 11 - VOL_5a-ELECTRICAL-VA CT West Haven EHRM IU-689-22-700.pdf PDF
Attachment 14 - VOL_6a-TELECOM-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 05d - Specifications_Div_31-33-West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 10 - VOL_4-MECH-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 20 - APPNDX_E-PSRDM_Conformance_Letter-VA_CT_West_Haven_EHRM_IU-689-22-700.pdf PDF
Attachment 12 - VOL_5b-ELECTRICAL-VA CT West Haven EHRM IU-689-22-700.pdf PDF
Attachment 02 - Site Visit - West Haven.docx DOCX document
Attachment 01 - Limitations on Subcontracting - EHRM West Haven.docx DOCX document
Attachment 03 - Wage Determination CT20260023 Rev 2 dated 5-18-26.pdf PDF
Attachment 04 - Project Information Sheet for Contractors.docx DOCX document
36C77626R0106.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516-2770

11A

12A

14A

15A

24 27

35A

36A

2B

DATA CENTER

GENERATOR

ENCLOSURE

FUEL YARD

BUILDINGS WITHIN THE SCOPE OF THIS PROJECT

16A

ARCHITECTURAL

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

PHONE: (206) 590-2118

DESIGN TEAM

STRUCTURAL

MECHANICAL

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

PHONE: (206) 590-2118

SIGNATURE LINE

COR

FIRE PROTECTION

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

PHONE: (206) 590-2118

CIVIL

WSP USA, INC.

33301 9TH AVENUE SOUTH

FEDERAL WAY, WA 98003-2600

PHONE: (206) 431-2300

PLUMBING

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

PHONE: (206) 590-2118

ELECTRICAL

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

PHONE: (206) 590-2118

WSP USA, INC.

33301 9TH AVENUE SOUTH

FEDERAL WAY, WA 98003-2600

PHONE: (206) 431-2300

PROJECT INFORMATION

STATE:

COUNTY:

JURISDICTION:

OWNER:

CODE ANALYSIS

PROJECT DESCRIPTION

THE PROPOSED DESIGN SHALL IMPROVE,

RECONFIGURE, EXPAND AND RENOVATE EXISTING

SPACES FOR NEW TELECOMMUNICATION ROOMS,

DATA CENTER, GENERATOR ENCLOSURE, AND

FUEL YARD.

APPLICABLE BUILDING

BUILDING 1, 2, 2B, 3, 4, 5, 6, 11, 11A, 12, 12A,

14A, 15, 15A, 16, 16A, 21, 22, 24, 27-34, 35, 35A, 36, 36A, 41 (DATA CENTER),

42 (GENERATOR ENCLOSURE, FUEL YARD)

ICRA CLASS REQUIREMENTS

REQUIREMENTS DEPENDENT ON

EACH INDIVIDUAL ROOM LOCATION.

CONNECTICUT

NEW HAVEN

WEST HAVEN

DEPARTMENT OF VETERANS

AFFAIRS

BUILDING TYPES

BUILDING 01 - HEALTHCARE

BUILDING 02 - HEALTHCARE

BUILDING 2B - ADMIN

BUILDING 03 - HEALTHCARE

BUILDING 04 - ADMIN

BUILDING 05 - HEALTHCARE

BUILDING 06 - ADMIN

BUILDING 11 - ADMIN

BUILDING 11A - ADMIN

BUILDING 12 - ADMIN

BUILDING 12A - ADMIN

BUILDING 14A - ADMIN

BUILDING 15 - ADMIN

BUILDING 15A - ADMIN

BUILDING 16 - ADMIN

BUILDING 16A - ADMIN

BUILDING 21 - ADMIN

BUILDING 22 - ADMIN

BUILDING 24 - ADMIN

BUILDING 27-34 - ADMIN

BUILDING 35 - ADMIN

BUILDING 35A - ADMIN

BUILDING 36 - HEALTHCARE

BUILDING 36A - ADMIN

41 (DATA CENTER) - ADMIN

42 (GENERATOR ENCLOSURE) - ADMIN

1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &

SPECIFICATIONS.

2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.

BRING TO THE AWARENESS OF AND VERIFY WITH VA COR PRIOR TO PROCEEDING.

3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE

TO VISIT THE SITE.

4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT

IMMEDIATELY TO THE ATTENTION OF THE COR.

5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.

6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE

WALKTHROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.

7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE

WITH THE CONTRACT DOCUMENTS.

GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/ DISCIPLINE

321 4 5 6 7 8 9 10

DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

08/05/2026 7:15:41 am

Autodesk Docs://689-22-700 VA CT West Haven EHRM

IU/VAWH_GEN

SHEETS_SDB.rvt

G-001

COVER PAGE

JS/JRS JRS

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

1" = 30'-0"

LOCATION MAP

PROJECT

NORTH

PROJECT

NORTH

1" = 150'-0"

SITE PLAN

EHRM INFRASTRUCTURE UPGRADES

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516-2770

PROJECT #: 689-22-700

Revisions: Date:

jamesstoddard Text Box

VOLUME 3 - ARCHITECTURAL SHEETS

A.B.

ABA

ABV.

A.C.T.

A.C.M.

A.W.

ADA

ADJ.

A/E A.F.

A.F.F.

AGG.

ALT.

ALUM.

APPROX.

ARCH

ASPH.

A/V

BARR.

BATH

B.B.

BLDG.

BLK.

BLKG.

BLW.

BM.

B.M.T.U.

B.C.

B.O.

B.O.C.

B.O.S.

BRC

BRKT.

BRNG.

BTTM.

BTWN.

CAB.

C.F.C.I

CD

C.J.

CLG.

CLR.

CMU

C.O.

COL.

COMP.

CONC.

CONN.

CONST.

CONT.

CONTR.

COORD.

C.O.R.

CORR.

C.S.

C.T.

CTR.

C.F.V.I

AND

ANGLE

AT

CENTERLINE

DEGREES

NUMBER

ANCHOR BOLT

ARCHITECTURAL BARRIERS ACT

ABOVE

ACOUSTICAL CEILING TILE

ASBESTOS CONTAINING MATERIAL

ACOUSTICAL WALL

AMERICANS W/ DISABILITIES ACT

ADJACENT

ARCHITECT/ENGINEER

ACCESS FLOOR

ABOVE FINISH FLOOR

AGGREGATE

ALTERNATE

ALUMINUM

APPROXIMATELY

ARCHITECT OR ARCHITECTURAL

ASPHALT

AUDIO / VIDEO

BARRIER

BATHROOM

BACKER BOARD

BUILDING

BLOCK

BLOCKING

BELOW

BEAM

BONE MARROW TRANSPLANT UNIT

BOTTOM OF CONCRETE

BOTTOM OF

BOTTOM OF CURB

BOTTOM OF SLAB

BRACE, BRACING

BRACKET

BEARING

BOTTOM

BETWEEN

CABINET

CONTRACTOR FURN. CONTR. INST.

CONSTRUCTION OR CONTRACT DOCUMENTS

CONTROL JOINT

CEILING

CLEAR(ANCE)

CONCRETE MASONRY UNIT

CONTRACTING OFFICER

COLUMN

COMPOSITION

CONCRETE

CONNECTION

CONSTRUCTION

CONTINUOUS

CONTRACTOR

COORDINATE

CONTRACTING OFFICER REPRESENTATIVE

CORRIDOR

CONCRETE SEALER

CERAMIC TILE

CENTER

CONTRACTOR FURN. VA INSTALLED

HDR.

HDWE.

H.M.

HORIZ.

H.P.D.L.

HR

HGHT.

HVAC

ICRA

I.D.

I.L.S.M.

INCL.

INST.

INSUL.

INT.

JNT.

KV

LAM.

LAV.

L.C.M.

LT.

MAT.

MAX.

MDF

MECH

MEP

MFR.

MIN.

MISC.

MOD.

MTL.

N.

N/A

NEG

NO.

NOM

NTS

O.C.

OPNG

OPP

OPT.

OVHD.

PNT.

P.C.

PCRA

PL.

PLAM.

PLWD.

PNL.

PR.

PRFB.

PLSTC.

P.T.

PTN.(S)

PVMT.

QUAL.

QUANT.

HEADER

HARDWARE

HOLLOW METAL

HORIZONTAL

HIGH PRESSURE DECORATIVE LAM

HOUR

HEIGHT

HEATING, VENTILATION & AIR CONDITIONING

INFECTIOUS CONTROL RISK ASSESSMENT

INSIDE DIAMETER

INTERIM LIFE SAFETY MEASURES

INCLUDE OR INCLUDING

INSTALL

INSULATION

INTERIOR

JOINT

KILOVOLT

LAMINATE(D)

LAVATORY

LEAD CONTAINING MATERIAL(S)

LIGHT

MATERIAL OR MATERIALS

MAXIMUM

MEDIUM-DENSITY FIBREBOARD

MECHANIC(AL)

MECHANICAL, ELECTRICAL, PLUMBING

MANUFACTURE OR MANUFACTURER

MINIMUM

MISCELLANEOUS

MODIFIED

METAL

NORTH

NOT APPLICABLE

NEGATIVE

NUMBER

NOMINAL

NOT TO SCALE

ON CENTER(S)

OPENING

OPPOSITE

OPTION OR OPTIONAL

OVERHEAD

PAINT

PRECAST CONCRETE

PRE-CONSTRUCTION RISK ASSESSMENT

PLATE

PLASTIC LAMINATE

PLYWOOD

PANEL

PAIR

PREFABRICATE(D)

PLASTIC

PRESSURE TREATED

PARTITION(S)

PAVEMENT

QUALITY

QUANTITY

RAD.

R.C.P.

REF.

REINF.

REP.

REQ.D.

RESIL.

REV.

R.F.

RF.

RM.

RMV.

R.O.

S.

SCT.

SCHED.

SD

SECT.

S.F.

S.F.R.M.

SHG.

SHT.

SHTH.

SGN.

SIM.

SM.

S.O.W.

SPEC.

SQ.

ST.STL.

ST.

STNDG.

STL.

STOR.

STRUCT.

SUSP.

S.V.

SYS.

TEMP.

T&G

THK.

THRESH.

T.C.

T.O.C.

T.O.S.

T.P.H.

TRANS.

T.S.

TYP.

U.N.O.

VA

VAR.

V.B.

V.F.C.I.

VERT.

V.I.F.

V.F.V.I.

W.

W/

WD.

WIN.

WGHT.

W/O W.R.

RADIUS

REFLECTED CEILING PLAN

REFERENCE

REINFORCE(D,ING)

REPRESENTATIVE

REQUIRED OR REQUIREMENT

RESILIENT

REVERSE

RADIO FREQUENCY

ROOF

ROOM

REMOVE

ROUGH OPENING

SOUTH

SECTION

SCHEDULE

SCHEMATIC DESIGN

SECTION

SQUARE FEET

SPRAY APPLIED FIRE-RESISTIVE MATERIAL

SHINGLES

SHEET

SHEATHING

SIGN

SIMILAR

SEAM

SCOPE OF WORK

SPECIFICATION

SQUARE

STAINLESS STEEL

STAIN

STANDING

STEEL

STORAGE

STRUCTURAL

SUSPENDED

SHEET VINYL

SYSTEM

TEMPORARY

TONGUE AND GROOVE

THICK(NESS)

THRESHOLD

TOP OF CONCRETE

TABLE OF CONTENTS

TOP OF SLAB

TOILET PAPER HOLDER

TRANSITION

TUBE STEEL

TYPICAL

UNLESS NOTED OTHERWISE

VETERANS AFFAIRS

VARIES OR VARIED

VAPOR BARRIER

VA FURNISHED & CONTRACTOR INSTALLED

VERTICAL

VERIFY IN FIELD

VA FURNISHED, VA INSTALLED

WEST

WITH

WOOD

WINDOW

WEIGHT

WITHOUT

WATER RESISTANT

DBL.

D.C.

D.D.

DEMO.

DEPT.

D.G.

DTL.

DIA.

DIM.

DN.

DR.

DTL.

DWG.

E.

EA.

E.J.

ELEC.

ELEV.

ELV.

ENG.

E.O.C.

E.O.P.

EPDM

EQ.

EQUIP.

E.S.

E.T.S.

EXIST.

EXP.

EXT.

F.A.

F.D.

F.E.C.

F.F.

F.F.B.

F.F.L.

FIN.

FLSH.

FLR.

FLRSNT.

FNDN.

F.O.C.

F.O.F.

F.O.S.

F.P.

F.R.

FRM.

FT.

FTG.

FUR.

FURN.

GA.

GALV.

G.E.

G.W.B.

G.C.

G.L.

G.L.B.

G.M.U.

GOVT.

GYP.

DOUBLE

DIRECT CURRENT

DESIGN DEVELOPMENT

DEMOLISH OR DEMOLISION

DEPARTMENT

DESIGN GUIDE

DETAIL

DIAMETER

DIMENSION

DOWN

DOOR

DETAIL

DRAWING(S)

EAST

EACH

EXPANSION JOINT

ELECTRIC OR ELCTRICAL

ELEVATION

ELEVATOR

ENGINEER OR ENGINEERING

EDGE OF CURB

EDGE OF PAVEMENT

ETHYLENE PROPYLENE DIENE TERPOLYMER

EQUAL

EQUIPMENT

EACH SIDE

EXPOSED TO STRUCTURE

EXISTING

EXPANSION

EXTERIOR

FIRE ALARM

FLOOR DRAIN

FIRE EXTINGUISHER OR W/ CABINET

FACTORY FINISH

FINISH FLOOR BREAK

FINISH FLOOR LINE

FINISH OR FINISHED

FLASH OR FLASHING

FLOOR OR FLOORING

FLUORESCENT

FOUNDATION

FACE OF CONCRETE

FACE OF FINISH

FACE OF STUDS

FIRE PROOF

FIRE RATED

FRAME

FOOT OR FEET

FOOTING

FURRING

FURNISHED

GAUGE

GALVANIZED

GENERAL ELECTRIC

GYPSUM WALL BOARD

GENERAL CONTRACTOR

GRID LINE

GLUE LAMINATED BEAM

GLASS MASONRY UNIT

GOVERNMENT

GYPSUM WALL BOARD

A-101 ELEVATION11

SHEET WHERE

SECTION IS TAKEN FROM

ELEVATION NUMBER

A101

A-101

A101

BUILDING SECTION FLAG

BUILDING ELEVATION

SHEET WHERE

SECTION IS TAKEN FROM

ELEVATION NUMBER

SHEET WHERE

SECTION IS TAKEN FROM

SECTION NUMBER

CALLOUT FLAG

DETAIL NUMBER

DETAIL AREA

SHEET ON WHICH

DETAIL APPEARS

A

TRUE

NORTH

PROJECT

NORTH

ROOM

150 SF

AFF

ACT 2' x 4'

9' - 0"

01a

F01

R01

101.1

W01

A5175

IN-03.01-01

GRID LINES

TRUE NORTH ARROW

PROJECT NORTH ARROW

ELEVATION MARKER

ROOM TAG (AREA OPTIONAL)

ROOM NUMBER

ROOM AREA

ROOM NAME

CEILING TAG

CEILING TYPE

CEILING HEIGHT

KEYNOTE

WALL TAG

FLOOR TAG

ROOF TAG

DOOR TAG

WINDOW TAG

EQUIPMENT TAG

SIGNAGE TAG

X X

FEC

XFEC

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

FIRE WALL (2 HOUR MIN.)

SMOKE PARTITION

SMOKE BARRIER

TO DEMOLISH

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

EXISTING WALL TO DEMOLISH

EXISTING WALL TO REMAIN

NEW WALL

FIRE EXTINGUISHER CABINET

EXISTING FIRE EXTINGUISHER CABINET

BATT INSULATION

RIGID INSULATION

GYPSUM BOARD, TYPE X

ACOUSTICAL CEILING TILE, 2' x 2'

CONCRETE

STEEL

PLYWOOD

EARTH

ACOUSTICAL CEILING TILE, 2' x 4'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/ DISCIPLINE

321 4 5 6 7 8 9 10

DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

08/05/2026 7:15:41 am

Autodesk Docs://689-22-700 VA CT West Haven EHRM

IU/VAWH_GEN

SHEETS_SDB.rvt

A-001

ARCHITECTURAL SYMBOLS & ABBREVIATIONS

JS/JRS JRS

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

SYMBOLS ABBREVIATIONSARCHITECTURAL SYMBOLS ARCHITECTURAL ABBREVIATIONS

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/ DISCIPLINE

321 4 5 6 7 8 9 10

DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

08/05/2026 7:15:42 am

Autodesk Docs://689-22-700 VA CT West Haven EHRM

IU/VAWH_GEN

SHEETS_SDB.rvt

A-002

APPLICABLE CODES/ STANDARDS,

ARCHITECTURAL GENERAL NOTES

JS/JRS JRS

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

ARCHITECTURAL GENERAL NOTES

1. ALL WORK DONE BY THE CONTRACTOR OR SUB-CONTRACTORS SHALL BE PERFORMED WITH A HIGH LEVEL OF

WORKMANSHIP.

2. MAINTAIN A SAFE, CLEAN CONSTRUCTION ZONE AT ALL TIMES.

3. DO NOT SCALE DRAWINGS.

4. DIMENSIONS ARE NOT ADJUSTABLE UNLESS NOTED WITH A +/- SYMBOL. ONLY NORMAL INDUSTRY STANDARD

TOLERANCES ARE ACCEPTABLE DEVIATIONS FROM DIMENSIONS INDICATED.

5. ALL DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN THE FULL SPACE INDICATED WITHOUT ENCROACHMENTS.

6. FURNISH ALL MATERIALS & PRODUCTS TO COMPLY WITH THE CONTRACT DOCUMENTS.

7. ALL VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH FLOOR ELEVATION, UON.

8. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE BLOCKING IN WALL BEHIND, THIS INCLUDES BACKING FOR WALL MOUNTED DOOR STOPS. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN WALLS PRIOR TO INSTALLING

DRYWALL.

9. IN TOILET ROOMS PROVIDE STAINLESS STEEL FILLER BEHIND ANY MIRRORS AND OTHER WALL MOUNTED

ACCESSORIES WHEN ITEM IS INSTALLED PARTIALLY OVER CERAMIC TILE.

10. MOVE AND STORE ALL FURNITURE, FIXTURES, AND EQUIPMENT (FFE) AS NEEDED. FFE WILL BE COVERED WITH PLASTIC BEFORE BEING MOVED. FFE WILL BE MOVED BACK TO THE SAME LOCATION IT WAS ORIGINALLY LOCATED WHEN CONTRACTORS WORK IS COMPLETE. IF EQUIPMENT NEEDS TO BE MOVED OUTSIDE THE ROOM IT IS THE CONTRACTOR'S RESPONSIBILITY TO COVER ALL COSTS ASSOCIATED WITH MOVING, STORING, AND REINSTALLING FFE. MOVING, REMOVING ANY RETURN OF FURTNITURE WILL BE THE RESPONSIBILITY OF THE VA.

11. WHEN THE CONTRACTOR MOVES FFE, THE CONTRACTOR IS RESPONSIBLE FOR UNPLUGGING ALL EQUIPMENT FROM WALLS APPROPRIATELY. DURING REINSTALLATION OF FFE, IT IS THE CONTRACTOR'S RESPONSIBILITY TO RECONNECT

POWER PLUGS. THE VA WILL RECONNECT ALL DATA TO THE NEW CAT 6A DATA PORTS.

12. WHILE CONSTRUCTION WORK TAKES PLACE, TEMPORARY SPRINKLERS MUST PROVIDE FULL COVERAGE TO AREAS IMPACTED BY WORK, INCLUDING THE INSTALLATION OF TEMPORARY ICRA BARRIERS. PROPOSED SPRINKLER WORK MUST ALSO BE COORDINATED TO HAPPEN CONCURRENTLY WITH THE REMOVAL OF THE TR CEILING.

TEMPORARY ICRA BARRIERS ARE STILL REQUIRED PER NFPA 241. HOWEVER, THEY ARE NOT REQUIRED TO BE 1HR

RATED SINCE SPRINKLER COVERAGE IS MAINTAINED VIA TEMPORARY SPRINKLERS.

13. REINSTALL CEILING TILES AT THE END OF EVERY WORK SHIFT.

14. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRE STOPPING COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

15. ANY EXISTING FIRE EXTINGUISHER REPLACED AS PART OF THIS PROJECT WILL BE CLEAN AGENT TYPE EXTINGUISHERS

THAT MATCH OR EXCEED THE EXISTING EXTINGUISHER IN ABC RATING AND SIZE.

16. THE CONTRACTOR SHALL PROVIDE EVIDENCE THAT ALL PRODUCTS INSTALLS OR BROUGHT ONTO THE PREMISIS DO NOT CONTAIN ASBESTOS. AT THE TIME OF SUBMISSION THE CONTRACTOR SHALL PROVIDE A CERTIFIED LETTER FROM

THE PRODUCT MANUFACTURER THAT THE PRODUCTS DO NOT CONTAIN ASBESTOS.

17. CONTRACTOR SHALL PROVIDE PITTSBURG PAINT COLOR SELECTION PER VA SPECIFICATIONS. VENDOR SHALL SUBMIT

SUPPLY MIX FORMULAS.

18. PAINTS SELECTED FOR INTERIOR USE SHALL BE LOW ODOR.

19. EVALUATE EXISTING FLOOR HEIGHTS WHEN EXISTING INTERIOR WALLS ARE REMOVED. ADJACENT ROOMS MAY NOT BE AT THE SAME ELEVATION DUE TO VARIED EXISTING TOPPING SLAB ELEVATIONS. WHEN TOPPING SLAB ELEVATIONS ARE INCONSISTENT, CONTRACTOR TO PROVIDE NEW TOPPING SLAB, RAISING THE LOWER PORTIONS TO MATCH THE HEIGHT OF THE ROOM WITH THE TALLEST TOPPING SLAB. TOPPING SLAB WILL ALSO BE REQURIED IN PLACE OF THE EXISTING WALLS WHERE EXISTING WALLS ARE DEMO'D. ALL NEW / MODIFIED ROOMS WILL EACH BE AT A CONSISTENT

ELEVATION.

20. DURING CONSTRUCTION, ELEVATOR ACCESS WILL BE COORDINATED BETWEEN THE CONTRACTOR AND THE COR.

21. CONTRACTOR TO COORDINATE FINAL LOCATION OF DUMPSTER WITH COR PRIOR TO CONSTRUCTION.

22. CONTRACTOR TO COORDINATE PARKING AND EQUIPMENT STAGING WITH COR PRIOR TO CONSTRUCTION.

23. CONTRACTOR TO COORDINATE BUILDING ACCESS WITH CHIEF ENGINEER, LOCK SHOP, AND OIT.

• AS AN AGENCY OF THE FEDERAL GOVERNMENT, THE VA IS NOT SUBJECT TO LOCAL

IMPOSITIONS OF CODE ENFORCEMENT PROCEDURES ( DRAWING REVIEWS, BUILDING

PERMITS, INSPECTIONS, FEES, ETC). THE VA SHALL FUNCTION AS THE AUTHORITY HAVING

JURISTICTION (AHJ).

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD

APPLICATION GUIDE AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL).

• INTERNATIONAL BUILDING CODE (IBC) 2018.

• INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2018.

• NATIONAL FIRE PROTECTION AGENCY (NFPA) 101 LIFE SAFETY CODE. NFPA 101 TAKES

PRECEDENCE OVER IBC.

• NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900.

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8.

• NATIONAL ELECTRICAL CODE (NEC)

• INTERNATIONAL PLUMBING CODE (IPC).

• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL

ENGINEERS (ASME) A 17.1.

• ASME BOILER AND PRESSURE VESSEL CODE.

• ASME CODE FOR PRESSURE PIPING.

• ARCHITECTURAL BARRIER ACT ACCESSIBILITY STANDARDS (ABAAS), INCLUDING VA

SUPPLEMENT BARRIER FREE DESIGN GUIDE (PG-18-3).

• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE

INSTITUE AND COMMENTARY (ACI 318).

• MANUAL OF STEEL CONSTRUCTION , LOAD AND RESISTANCE FACTOR DESIGN

SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL

CONSTRUCTION (AISC).

• ENERGY POLICY ACT OF 2005 (EPACT).

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL,

COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE

RESIDENTIAL BUILDINGS, 10 CFR PARTS 433,434 AND 435.

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM

OF UNDERSTANDING (MOU).

• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY AND

TRANSPORTATON MANAGEMENT.

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL

REQUIREMENTS SECTION 01 01 0 OF THE VA MASTER CONSTRUCTION SPECIFICATION.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1 - 2004.

• SAFETY STANDARD FOR REFRIDERATION SYSTEMS - ASHRAE STANDARD 15 - 2007.

• VAMC APPROVED HARDWARE LOCKING STANDARDS.

• AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI).

• AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM).

• FEDERAL COMMUNICATIONS COMMISSION (FCC), ALL REGULATIONS, PROCEDURES AND

STANDARDS FOR TWO-WAY RADIO EQUIPMENT, SYSTEMS AND OPERATION.

• ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IESNA).

• INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE).

• INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO), STANDARDS FOR PROTOCOLS

AND INTERFACES THAT INCLUDE OPEN SYSTEM INTERCONNECTIONS (OSI).

• JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS (JACHO),

ENVIRONMENT OF CARE GUIDELINES AND STANDARDS.

• FACILITIES GUIDELINES INSTITUTE (FGI): 2010 , OR MOST CURRENT ISSUE, GUIDELINES FOR

THE DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES.

• THE AMERICAN INSTITUTE OF ARCHITECTS (AIA) AND NATIONAL SOCIETY OF PROFESSIONAL

ENGINEERS(NSPE) RECENT ADDITIONS TO THEIR PROFESSIONAL CODES OF ETHICS

ENCOURAGING “ENVIRONMENTALLY RESPONSIBLE DESIGN”.

APPLICABLE CODES

APPLICABLE VA OR GOVT. PUBLICATIONS & STANDARDS

EXISTING SUSPENDED

CEILING TO REMAIN ON

CORRIDOR SIDE

EXISTING

WALLS TO

REMAIN

EXISTING

WALLS TO

REMAIN

EXISTING DOOR BEHIND

VISQUEEN BARRIER

NON-SKID PLATE JACK

SCREWED FROM END OF

POLE TO TOP OF CEILING,

TYPICAL

FIRE RESISTANT PLASTIC

DUST BARRIER

SURROUNDING DOOR,

TYPICAL

EXTENSION POLES, TYPICAL

NON-SKID PLATE JACK

SCREWED FROM END OF

POLE TO BOTTOM OF

FLOOR, TYPICAL

BOTTOM OF CEILING

ZIPPER OPENING, TYPICAL

STICKY TACKY MATT

INFRONT OF VISQUEEN

BARRIER

TAPE TOP OF

CONSTRUCTION BARRIER

TO BOTTOM OF CEILING

CONSTRUCTION BARRIER

SURROUNDING EXIST

DOOR, TYPICAL

TAPE BOTTOM OF

CONSTRUCTION BARRIER TO

FLOOR SURFACE, TYPICAL

TACKY MATT IN FRONT OF FIRE

RESISTANT PLASTIC BARRIER,

TYPICAL

NEGATIVE AIR MACHINE,

TYPICAL (INSTALL AT ICRA

BARRIER IF EXTERIOR

WINDOW IS NOTAVAILABLE).

TEMPORARY FIRE

RATED DOOR, TYPICAL

INSIDE OF

WORK AREA

OUTSIDE OF

WORK AREA

INSIDE OF

WORK AREA

OUTSIDE OF

WORK AREA

INSIDE OF

WORK AREA

OUTSIDE OF

WORK AREA

TYPE B

TYPE A

TYPE C

PATCH, REPAIR & PAINT WALLS & FLOORS TO

MATCH EXIST. FINISHES WHERE ICRA BARRIERS

ARE CONSTRUCTED & REMOVED.

PATCH & REPAIR CEILINGS TO MATCH EXIST.

FINISHES WHERE ICRA BARRIERS ARE

CONSTRUCTED & REMOVED.

INSIDE OF

WORK AREA

OUTSIDE OF

WORK AREA

TYPE B

PATCH, REPAIR & PAINT WALLS & FLOORS TO

MATCH EXIST. FINISHES WHERE ICRA BARRIERS

ARE CONSTRUCTED & REMOVED.

INSIDE OF

WORK AREA

OUTSIDE OF

WORK AREA

TYPE A

PATCH, REPAIR & PAINT WALLS & FLOORS TO

MATCH EXIST. FINISHES WHERE ICRA BARRIERS

ARE CONSTRUCTED & REMOVED.

PATCH & REPAIR CEILINGS TO MATCH EXIST.

FINISHES WHERE ICRA BARRIERS ARE

CONSTRUCTED & REMOVED.

ANTE

ROOM

INSIDE OF

WORK AREA

OUTSIDE OF

WORK AREA

TYPE B

TYPE A

INSIDE OF

WORK AREA

OUTSIDE OF

WORK AREA

ANTE

ROOM

PATCH, REPAIR & PAINT WALLS & FLOORS TO

MATCH EXIST. FINISHES WHERE ICRA BARRIERS

ARE CONSTRUCTED & REMOVED.

PATCH & REPAIR CEILINGS TO MATCH EXIST.

FINISHES WHERE ICRA BARRIERS ARE

CONSTRUCTED & REMOVED.

( + ) PRESSURE

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MATT

NEGATIVE AIR MACHINE

1. PROJECT SHALL CONFORM TO CLASS I, II, III & IV ICRA

LEVEL OF INFECTION CONTROL BY PRECAUTION PER

ICRA-(VHA 2-23-1.0- TABLE 4 LEVEL ICRA & CONTROL

PRECAUTIONS & TABLE 5 REQ. ICRA BY LEVEL OF

PRECAUTIONS), OR AS DIRECTED BY THE VA.

2. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH

ALL REQUIREMENTS LISTED IN THE INFECTION CONTROL

SECTION OF SPECIFICATION 01 35 26 - SAFETY

REQUIREMENTS.

3. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL

ICRA REQUIREMENTS. AT ANY TIME, THE VA's COR MAY

HALT WORK UNTIL ALL REQUIREMENTS ARE COMPLIANT.

4. CONTRACTOR IS TO REMOVE OR ISOLATE EXIST. HVAC

SYSTEMS WITHIN CONSTRUCTION AREA TO PREVENT

DUST CONTAMINATION.

5. CONTRACTOR IS TO CONTAIN ALL CONSTRUCTION WASTE

BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

WHEN POSSIBLE, REMOVE CONSTRUCTION DEBRIS WHEN

AREA IS IN ACTIVE ISOLATION. CONTRACTOR IS

RESPONSIBLE FOR THE REMEDIATION OF ANY

HAZARDOUS MATERIALS IN ACCORD WITH VA, LOCAL,

STATE OR FEDERAL TRANSPORT & DISPOSAL

REQUIREMENTS.

6. CONSTRUCTION ZONE ENTRANCES & EXITS SHALL BE

LOCKED AT ALL TIMES, UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED & MONITORED BY THE CONTRACTOR.

7. ADHESIVE WALK-OFF CONSTRUCTION MATS ARE TO BE

USED AT ALL CONSTRUCTION ZONES & ANTE ROOM

ENTRANCES & EXITS.

8. TEMPORARY BARRIERS & DOORS MAY ONLY BE

DEMOLISHED ONCE GIVEN FINAL APPROVAL BY THE VA's

COR.

9. SEAL OFF ANY EXIST., UNUSED DOORS WITH TAPE

DURING CONSTRUCTION, TYP.

10. DURING WORK IN AREAS DISTURBED BY CONSTRUCTION,

CLASS I, II, III, & IV ICRA BARRIERS ARE TO CONFORM TO

THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS &

THE ICRA-(VHA 2023-1.0- TABLE 5- REQUIRED INFECTION

PREVENTION & CONTROL MEASURES, BY LEVEL OF

PRECAUTIONS.)- SEE SHEET AS102.

11. PRIOR TO, & IN ORDER TO SATISFY COMPLETION OF

WORK, ANY SPACE DESIGNATED WITH A CLASS I, II, III, &

IV ICRA BARRIER, ON THESE DOCUMENTS OR AS

DIRECTED BY THE VA, IS TO CONFORM TO THE

REQUIREMENTS OF THE PROJECT SPECIFICATIONS & THE

ICRA-(VHA 2023-1.0- TABLE 6- MIN. INFECTION PREVENTION

& CONTROL MEASURES REQUIRED UPON COMPLETION) &

ICRA-(VHA 2023-1.0- INFECTION PREVENTION & CONTROL

CONSTRUCTION/ RENOVATION/ MAINTENANCE PERMIT-

SEE SHEET AS102.

INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER

TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED

SPACE.

INSTALL TEMPORARY POLY. FIRE RESISTANT, DUST

BARRIER. MAY ONLY BE DURING NON FUNCTIONAL

MEDICAL CENTER HOURS.

INSTALL FIRE RESISTANT TEMPORARY DOOR AT OPENING

& MATCH RATING OF ICRA BARRIER, TYP.

PLACE TACKY CONSTRUCTION WALK-OFF MATS AT

ENTRANCE & EXIT SIDE OF CONSTRUCTION ACTIVITY

AREAS, TYPICAL.

FOR CLASS III, NEGATIVE PRESSURE AIR MACHINE IS REQ.

& SHALL BE LOCATED EITHER AT THE ICRA BARRIER OR

AT AN EXTERIOR WINDOW. COORDINATE WITH VA

INFECTIOUS PREVENTION TEAM & THE VA's COR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/ DISCIPLINE

321 4 5 6 7 8 9 10

DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

08/05/2026 7:15:43 am

Autodesk Docs://689-22-700 VA CT West Haven EHRM

IU/VAWH_GEN

SHEETS_SDB.rvt

AS101

ICRA DETAILS

JS/JRS ME

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

1/2" = 1'-0"

ICRA CLASS I DETAIL

1/2" = 1'-0"

ICRA CLASS II DETAIL

1/2" = 1'-0"

ICRA CLASS III DETAIL

1/2" = 1'-0"

TYPICAL ICRA CLASS II BARRIER - PLAN VIEW

1/2" = 1'-0"

TYPICAL ICRA CLASS III BARRIER - PLAN VIEW

1/2" = 1'-0"

TYPICAL ICRA CLASS IV BARRIER - PLAN VIEW

ICRA DETAILS KEY

ICRA GENERAL NOTES

ICRA DETAIL KEY NOTES

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/ DISCIPLINE

321 4 5 6 7 8 9 10

DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

08/05/2026 7:15:52 am

Autodesk Docs://689-22-700 VA CT West Haven EHRM

IU/VAWH_GEN

SHEETS_SDB.rvt

AS102

ICRA STANDARDS

JS/JRS ME

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/ DISCIPLINE

321 4 5 6 7 8 9 10

DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

08/05/2026 7:14:44 am

Autodesk Docs://689-22-700 VA CT West Haven EHRM

IU/VAWH_GEN

SHEETS_SDB.rvt

A-601

DOOR SCHEDULE & LOUVER SCHEDULE

JS/JRS JRS/RB

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

DOOR SCHEDULE - DATA CENTER

BLDG # LEVEL DOOR NUMBER

DOOR SIZE

Door Type HW

DOOR DOOR FRAME

FIRE RATING COMMENTSWIDTH HT. THK MAT FIN MAT FIN

041 LEVEL 01 104a 6' - 0" 8' - 0" 0' - 1 3/4" 5A 3E HM PAINT HM* PAINT - -

041 LEVEL 01 104b 6' - 0" 8' - 0" 0' - 1 3/4" 4A 3E HM PAINT HM* PAINT 45 MIN -

041 LEVEL 01 105 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

041 LEVEL 01 106 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT 45 MIN -

041 LEVEL 01 107 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

041 LEVEL 01 108 6' - 0" 8' - 0" 0' - 1 3/4" 4A 3E WOOD STAIN HM PAINT - -

041 LEVEL 01 109 2' - 10" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT 45 MIN -

041 LEVEL 01 110 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT 45 MIN -

041 LEVEL 01 111 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

041 LEVEL 01 113 3' - 8" 7' - 0" 0' - 1 3/4" 2A SH-3D HM PAINT HM* PAINT 45 MIN -

041 LEVEL 01 114a 6' - 0" 8' - 0" 0' - 1 3/4" 4A 3E HM PAINT HM* PAINT 45 MIN BLAST RATED

041 LEVEL 01 114b 6' - 0" 8' - 0" 0' - 1 3/4" 4A 3E HM PAINT HM* PAINT 45 MIN BLAST RATED

042 LEVEL 01 121a 8' - 0" 8' - 0" 0' - 1 3/4" 5A 3E HM PAINT HM* PAINT 3 HR BLAST RATED

042 LEVEL 01 121b 6' - 0" 8' - 0" 0' - 1 3/4" 5A 3E HM PAINT HM* PAINT 3 HR BLAST RATED

042 LEVEL 01 122 8' - 0" 8' - 0" 0' - 1 3/4" 5A 3E HM PAINT HM* PAINT 3 HR BLAST RATED

LOUVER SCHEDULE

BLDG # LEVEL

LOUVER

NUMBER WIDTH HEIGHT

SILL

HEIGHT QUANTITY

042 LEVEL 01 L-01 8' - 0" 4' - 0" 1

042 LEVEL 01 L-02 8' - 0" 4' - 0" 1

DOOR SCHEDULE

BLDG # LEVEL DOOR NUMBER

DOOR SIZE DOOR

TYPE HW

DOOR DOOR FRAME

FIRE RATING CommentsWIDTH HT. THK MAT FIN MAT FIN

001 LEVEL 0SG SG171 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 0SG SG105B 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 0SG SG170A 3' - 0" 7' - 0" 0' - 1 3/4" 1A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 0G G277 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 0G G192A 3' - 0" 7' - 0" 0' - 1 3/4" 1A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 0G G192C 3' - 0" 7' - 0" 0' - 1 3/4" 1A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 0G G192 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 0G G108 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 0G G192B 3' - 0" 7' - 0" 0' - 1 3/4" 3A 3A WOOD STAIN HM PAINT - -

001 LEVEL 01 1190 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT -

001 LEVEL 02 2151 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 03 3154 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 04 4259A 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 05 5195 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 06 6204 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 07 7204 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 08 8139 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 09 9122A 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

001 LEVEL 09 9122B 2' - 6" 7' - 0" 0' - 1 3/4" 1A SH-3D WOOD STAIN HM PAINT -

002 LEVEL 0G G132 6' - 0" 7' - 0" 0' - 1 3/4" 4A 3E WOOD STAIN HM PAINT - -

002 LEVEL 0G G132A 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 0G G143C 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 01 1303B 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 01 1279A 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 01 1238 3' - 0" 7' - 0" 0' - 1 3/4" 1A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 01 1239 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 02 2107D 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 02 2107E 3' - 0" 7' - 0" 0' - 1 3/4" 1A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 02 2228 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 03 3222 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 04 4222 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 05 5222 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 06 6209 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 07 7205 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

002 LEVEL 08 8141 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

003 LEVEL 01 105A 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

003 LEVEL 02 206 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

004 LEVEL 01 110 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

004 LEVEL 02 210A 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

005 LEVEL 01 C-103 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

005 LEVEL 02 C-244 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

005 LEVEL 03 C-314 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

006 LEVEL 01 128 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

006 LEVEL 02 222 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

006 LEVEL 02 223 3' - 0" 7' - 0" 0' - 1 3/4" 1A SH-3D WOOD STAIN HM PAINT - -

011A LEVEL 01 113 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

014A LEVEL 01 102 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

015 LEVEL 01 128 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

015A LEVEL 01 112 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

024 LEVEL 01 A-1A 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

027-034 LEVEL 01 159 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

035 LEVEL 00 B18 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

035 LEVEL 01 115 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

035A LEVEL 01 124A 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

035A LEVEL 02 225A 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

036 LEVEL 01 105 3' - 0" 8' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT - -

036A LEVEL 01 114 3' - 0" 7' - 0" 0' - 1 3/4" 2A SH-3D WOOD STAIN HM PAINT -

* ALL EXTERIOR ENTRY DOORS AND FRAMES SHALL BE A MINIMUM OF 14GA HOLLOW METAL.

GENERAL NOTES:

- ALL FIRE RATED DOORS SHALL BE FINISHED TO MATCH EXISTING FACILITY STANDARDS AND CONFIRMED WITH COR PRIOR TO INSTALLATION.

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/ DISCIPLINE

321 4 5 6 7 8 9 10

DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

08/05/2026 7:14:47 am

Autodesk Docs://689-22-700 VA CT West Haven EHRM

IU/VAWH_GEN

SHEETS_SDB.rvt

A-601a

ROOM FINISH SCHEDULES

JS/JRS JRS/RB

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

ROOM FINISH SCHEDULE ABBREVIATIONS

AST

EXP

GWB

RB-01

TME

EXT

PAINT CODES

ANTI-STATIC COATING

EXPOSED

GYPSUM WALL BOARD

RUBBER BASE

TO MATCH EXISTING

EXTERIOR

ROOM FINISH SCHEDULE

BLDG # LEVEL ROOM NO. ROOM NAME

FLOOR BASE WALLS

CLG COMMENTSMAT FIN MAT HT

NORTH EAST SOUTH WEST

MAT FIN MAT FIN MAT FIN MAT FIN

001 LEVEL 0SG SG105 ADP - - TME TME - - - - GWB P-01 - - -

001 LEVEL 0SG SG105A VESTIBULE - - TME TME - - GWB P-01 - - - - -

001 LEVEL 0SG SG171 TR EXP AST RB-01 4" - P-00 - P-02 GWB P-00 - P-02 - P-00 - P-02 GWB P-00 - P-02 EXP

001 LEVEL 0SG SG172 OFFICE - - TME TME - - - - - - GWB P-01 -

001 LEVEL 0SG SGC1-01 CORRIDOR - - EXST EXST - P-01 - - - - - - -

001 LEVEL 0SG SGC4-01 CORRIDOR - - EXST EXST - P-01 - - - - - - -

001 LEVEL 0SG SG105B TR EXP AST RB-01 4" GWB P-02 - P-00 - P-02 - P-00 - P-02 GWB P-00 - P-02 EXP

001 LEVEL 0SG SG170 OFFICE - - TME TME - - GWB P-01 - - GWB P-01 -

001 LEVEL 0SG SG170A OFFICE - - TME TME - - GWB P-01 - P-01 - - -

001 LEVEL 0G G108 TR EXP AST RB-01 6" - P-00 - P-02 - P-00 - P-02 - P-00 - P-02 - P-00 - P-02 EXP

001 LEVEL 0G G191 OFFICE - - TME TME - - - - - - GWB P-01 -

001 LEVEL 0G G192 TR EXP AST RB-01 4" - P-02 GWB P-00 - P-02 GWB P-00 - P-02 - P-00 - P-02 EXP

001 LEVEL 0G G192A OFFICE - - TME TME - P-01 GWB P-01 GWB P-01 GWB P-01 TME

001 LEVEL 0G G192B OFFICE - - TME TME GWB P-01 - - - - GWB P-01 TME

001 LEVEL 0G G192C LOCKER - - TME TME GWB P-01 GWB P-01 - - - - -

001 LEVEL 0G G275 MAIN KITCHEN - - TME TME - - - - - - GWB P-01 -

001 LEVEL 0G G277 TR EXP AST RB-01 6" - P-00 - P-02 GWB P-00 - P-02 GWB P-02 - P-00 - P-02 EXP

001 LEVEL 0G GC1-01 CORRIDOR - - EXST EXST - - - - - P-01 - - -

001 LEVEL 0G GC3-01 CORRIDOR - - EXST EXST - P-01 - - - - - - -

001 LEVEL 01 1C1-01 CORRIDOR - - EXST EXST - P-01 - - - - - - -

001 LEVEL 01 1190 TR EXP AST RB-01 4" - P-00 - P-02 - P-00 - P-02 - P-02 - P-00 - P-02 EXP

001 LEVEL 02 2C1-01 CORRIDOR - - TME TME - - - - GWB P-01 - - -

001 LEVEL 02 2150 ANEST ON-CALL - - TME TME - - - - - - GWB P-01 -

001 LEVEL 02 2151 TR EXP AST RB-01 4" GWB P-00 - P-02 GWB P-00 - P-02 - P-02 - P-00 - P-02 EXP

001 LEVEL 03 3C1-01 CORRIDOR - - EXST EXST - - - - - P-01 - - -

001 LEVEL 03 3153 HEAD NURSE - - TME TME - - - - - - GWB P-01 -

001 LEVEL 03 3154 TR EXP AST RB-01 4" - P-00 - P-02 GWB P-00 - P-02 - P-02 - P-00 - P-02 EXP

001 LEVEL 04 4C6-01 CORRIDOR - - EXST EXST - P-01 - - - - - - -

001 LEVEL 04 4259 NURSE LOUNGE - - TME TME - - GWB P-01 GWB P-01 - - -

001 LEVEL 04 4259A TR EXP AST RB-01 4" GWB P-00 - P-02 - P-00 - P-02 - P-02 GWB P-00 - P-02 EXP

001 LEVEL 05 5C6-01 CORRIDOR - - TME TME GWB P-01 - - - - - P-01 -

001 LEVEL 05 5193 CYLINDER STORAGE - - TME TME GWB P-01 GWB P-01 GWB P-01 - - -

001 LEVEL 05 5195 TR EXP AST RB-01 4" - P-00 - P-02 - P-02 GWB P-00 - P-02 GWB P-00 - P-02 EXP

001 LEVEL 05 5196 OFFICE - - TME TME - - GWB P-01 GWB P-01 - - -

001 LEVEL 06 - CORRIDOR - - TME TME GWB P-01 - - - - - - -

001 LEVEL 06 6203 NURSES OFFICE - - TME TME - - GWB P-01 - - - - -

001 LEVEL 06 6204 TR EXP AST RB-01 4" - P-00 - P-02 GWB P-00 - P-02 GWB P-02 GWB P-00 - P-02 EXP

001 LEVEL 06 6205 NEUROLOGY-EEG - - TME TME - - - - - - GWB P-01 -

001 LEVEL 07 7C5-01 CORRIDOR - - TME TME GWB P-01 - - - - - - -

001 LEVEL 07 7204 TR EXP AST RB-01 6" - P-00 - P-02 GWB P-00 - P-02 GWB P-00 - P-02 - P-00 - P-02 EXP

001 LEVEL 07 7205 PSYCHIATRIST INTERN - - EXST EXST - - - - - - GWB P-01 -

001 LEVEL 08 8C5-01 CORRIDOR - - TME TME - - - - GWB P-01 - - -

001 LEVEL 08 8139 TR EXP AST RB-01 4" GWB P-00 - P-02 - P-00 - P-02 - P-00 - P-02 - P-00 - P-02 EXP

001 LEVEL 09 9C1-01 CORRIDOR - - EXST EXST - - - - - P-01 - - -

001 LEVEL 09 9C2-01 CORRIDOR - - EXST EXST - - - - - P-01 - - -

001 LEVEL 09 9122 DIRECTOR PSTD PGM - - TME TME - - GWB P-01 - - - - -

001 LEVEL 09 9122A TR EXP AST RB-01 4" - P-02 GWB P-00 - P-02 - P-00 - P-02 GWB P-00 - P-02 EXP

001 LEVEL 09 9122B CLOSET - - TME TME - P-01 - - - - GWB P-01 -

002 LEVEL 0G G132 STORAGE - - TME TME GWB P-01 GWB P-01 - - - - -

002 LEVEL 0G G132A TR EXP AST RB-01 6" - P-02 - P-00 - P-02 - P-00 - P-02 GWB P-00 - P-02 EXP

002 LEVEL 0G G143 STORAGE (SHARED WITH DIALYSIS) - - TME TME GWB P-01 GWB P-01 - - - - -

002 LEVEL 0G G143C TR EXP AST RB-01 4" - P-00 - P-02 - P-00 - P-02 GWB P-00 - P-02 GWB P-00 - P-02 EXP

002 LEVEL 0G GC1-02 CORRIDOR - - TME TME - - - - GWB P-01 - - -

002 LEVEL 0G GC4B-02 CORRIDOR - - EXST EXST - - - - - P-01 - - -

002 LEVEL 01 1C12A-02 CORRIDOR - - EXST EXST - - - P-01 - - - - -

002 LEVEL 01 1238 PRIVATE OFFICE - - TME TME GWB P-01 GWB P-01 - - - - -

002 LEVEL 01 1239 TR EXP AST RB-01 4" GWB P-00 - P-02 - P-00 - P-02 - P-00 - P-02 GWB P-00 - P-02 EXP

002 LEVEL 01 1279 DINING RM - - TME TME - - - - - - GWB P-01 -

002 LEVEL 01 1279A TR EXP AST RB-01 6" - P-00 - P-02 GWB P-00 - P-02 - P-00 - P-02 - P-00 - P-02 EXP

002 LEVEL 01 1303A OFFICE - - TME TME GWB P-01 - - - - - - -

002 LEVEL 01 1303B TR EXP AST RB-01 4" - P-00 - P-02 - P-02 GWB P-00 - P-02 - P-00 - P-02 EXP

002 LEVEL 01 C130 STAFF CORRIDOR - - TME TME - - - - GWB P-01 - - -

002 LEVEL 02 2C2A-02 CORRIDOR - - TME TME - - - - - - GWB P-01 -

002 LEVEL 02 2C7-02 CORRIDOR - - EXST EXST - P-01 - - - - - - -

002 LEVEL 02 2C9-02 CORRIDOR - - TME TME - - - - - - GWB P-01 -

002 LEVEL 02 2107D TR EXP AST RB-01 4" - P-00 - P-02 GWB P-00 - P-02 GWB P-00 - P-02 - P-00 - P-02 EXP

002 LEVEL 02 2107E STORAGE - - TME TME GWB P-01 GWB P-01 - - - - -

002 LEVEL 02 2228 TR EXP AST RB-01 4" - P-00 - P-02 GWB P-00 - P-02 - P-00 - P-02 - P-00 - P-02 EXP

002 LEVEL 03 3HA1-02 CORRIDOR - - TME TME GWB P-01 - - - - - - -

002 LEVEL 03 3HA5-02 CORRIDOR - - TME TME GWB P-01 - - - - - - -

002 LEVEL 03 3222 TR EXP AST RB-01 4" - P-02 - P-00 - P-02 GWB P-00 - P-02 - P-00 - P-02 EXP

002 LEVEL 04 4C1-02 CORRIDOR - - TME TME GWB P-01 - - - - - - -

002 LEVEL 04 4222 TR EXP AST RB-01 4" - P-00 - P-02 - P-00 - P-02 GWB P-00 - P-02 - P-00 - P-02 EXP

002 LEVEL 04 GC5-02 CORRIDOR - - TME TME GWB P-01 - - - - - - -

002 LEVEL 05 5C5-02 CORRIDOR - - TME TME GWB P-01 - - - - - - -

002 LEVEL 05 5222 TR EXP AST RB-01 4" - P-02 - P-00 - P-02 GWB P-00 - P-02 - P-00 - P-02 EXP

002 LEVEL 06 6C5-02 CORRIDOR - - TME TME GWB P-01 - - - - - - -

002 LEVEL 06 6208 TREAT AND EXAM - - TME TME - - GWB P-01 - - - - -

002 LEVEL 06 6209 TR EXP AST RB-01 4" - P-00 - P-02 - P-00 - P-02 GWB P-00 - P-02 GWB P-00 - P-02 EXP

002 LEVEL 07 7C1-02 CORRIDOR - - TME TME GWB P-01 - - - - - - -

002 LEVEL 07 7C5-02 CORRIDOR - - TME TME GWB P-01 - - - - - - -

002 LEVEL 07 7205 TR EXP AST RB-01 4" - P-00 - P-02 - P-00 - P-02 GWB P-00 - P-02 - P-00 - P-02 EXP

002 LEVEL 08 8C4-02 CORRIDOR - - TME TME GWB P-01 - - - - - - -

002 LEVEL 08 8141 TR EXP AST RB-01 4" - P-02 GWB P-00 - P-02 GWB P-00 - P-02 - P-00 - P-02 EXP

002 LEVEL 08 8145 LAB - - TME TME - - - - - - GWB P-01 -

002B LEVEL 01 2B-107 IT/ELECTRICAL CLOSET (TE) - - - - - P-00 - P-02 - - - - - - -

003 LEVEL 01 105A TR EXP AST RB-01 4" - P-00 - P-02 - P-00 - P-02 GWB P-02 - P-00 - P-02 EXP

003 LEVEL 01 105B STORAGE - - TME TME GWB P-01 - P-01 - - - - -

003 LEVEL 02 200 LAB - - TME TME GWB P-01 - - - - - - -

003 LEVEL 02 206 TR EXP AST RB-01 4" - P-00 - P-02 - P-00 - P-02 GWB P-00 - P-02 - P-00 - P-02 EXP

004 LEVEL 00 19 SIGNAGE (TE) - - - - GWB P-01 - - - P-00 - P-02 - - -

004 LEVEL 00 19A STORAGE - - TME TME - - - - GWB P-01 - - -

004 LEVEL 01 110 TR EXP AST RB-01 4" - P-02 - P-00 - P-02 - P-02 - P-00 - P-02 EXP

004 LEVEL 01 115 CORRIDOR - - EXST EXST - P-01 - - - - - - -

004 LEVEL 02 210 - - - TME TME - - GWB P-01 - - - - -

004 LEVEL 02 210A TR EXP AST RB-01 4" - P-00 - P-02 - P-00 - P-02 - P-00 - P-02 GWB P-00 - P-02 EXP

005 LEVEL 01 1C3-05 CORRIDOR - - EXST EXST - P-01 - - - - - - -

005 LEVEL 01 C-103 TR EXP AST RB-01 6" - P-00 - P-02 - P-00 - P-02 - P-02 - P-00 - P-02 EXP

P-01

P-02

MATCH EXISTING

SW7005 PURE WHITE

P-00 FIRE RATED PLYWOOD

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/ DISCIPLINE

321 4 5 6 7 8 9 10

DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

08/05/2026 7:14:51 am

Autodesk Docs://689-22-700 VA CT West Haven EHRM

IU/VAWH_GEN

SHEETS_SDB.rvt

A-601b

ROOM FINISH SCHEDULES

JS/JRS JRS/RB

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

ROOM FINISH SCHEDULE

BLDG # LEVEL ROOM NO. ROOM NAME

FLOOR BASE WALLS

CLG COMMENTSMAT FIN MAT HT

NORTH EAST SOUTH WEST

MAT FIN MAT FIN MAT FIN MAT FIN

005 LEVEL 02 2C2A-05 CORRIDOR - - TME TME GWB P-01 - - - - - - -

005 LEVEL 02 246 VIROLOGY STAFF LOUNGE - - TME TME - - - - - - GWB P-01 -

005 LEVEL 02 C-244 TR EXP AST RB-01 6" - P-02 GWB P-00 - P-02 GWB P-02 - P-00 - P-02 EXP

005 LEVEL 03 3C1A-05 CORRIDOR - - TME TME GWB P-01 - - - - - - -

005 LEVEL 03 315 RESEARCH PSYCHOLOGIST OF

COMPREHENSIVE PAIN MGMT

- - TME TME - - - - - - GWB P-01 -

005 LEVEL 03 C-314 TR EXP AST RB-01 4" - P-02 GWB P-00 - P-02 GWB P-00 - P-02 - P-00 - P-02 EXP

006 LEVEL 01 - CORRIDOR - - TME TME GWB P-01 - - - - - - -

006 LEVEL 01 128 TR EXP AST RB-01 4" GWB P-00 - P-02 - P-00 - P-02 GWB P-00 - P-02 - P-00 - P-02 EXP

006 LEVEL 01 129 OFFICE - - TME TME - - - - GWB P-01 - - -

006 LEVEL 02 - CORRIDOR - - TME TME - - GWB P-01 - - - - -

006 LEVEL 02 219 OFFICE - - TME TME - - - - - - GWB P-01 -

006 LEVEL 02 222 TR EXP AST RB-01 4" - P-00 - P-02 GWB P-00 - P-02 GWB P-00 - P-02 GWB P-02 EXP

006 LEVEL 02 223 STORAGE - - TME TME GWB P-01 GWB P-01 - - - - -

011 LEVEL 02 202 PROPERTY MGMT SVC (TE) - - - - - - - - - P-00 - P-02 - - -

011A LEVEL 01 - CONFERENCE - - TME TME - - GWB P-01 - - - - -

011A LEVEL 01 100 CORRIDOR - - TME TME GWB P-01 - - - - - - -

011A LEVEL 01 113 TR EXP AST RB-01 4" - P-00 - P-02 - P-00 - P-02 GWB P-00 - P-02 GWB P-00 - P-02 EXP

012 LEVEL 02 202 OFFICE (TE) - - - - - - - - - P-00 - P-02 - - -

012A LEVEL 01 119 DATA (TE) - - - - - P-00 - P-02 - - - - - - -

014A LEVEL 01 102 TR EXP AST RB-01 4" - P-00 - P-02 - P-00 - P-02 - P-00 - P-02 - P-00 - P-02 EXP

014A LEVEL 01 117 CORRIDOR - - EXST EXST - - - - - - - P-01 -

015 LEVEL 01 - ELEVATOR LOBBY - - TME TME - - - - - - GWB P-01 -

015 LEVEL 01 128 TR EXP AST RB-01 4" - P-00 - P-02 GWB P-00 - P-02 GWB P-00 - P-02 - P-00 - P-02 EXP

015A LEVEL 01 - ROOM - - EXST EXST - P-01 - - - - - - -

015A LEVEL 01 112 TR EXP AST RB-01 4" - P-00 - P-02 GWB P-00 - P-02 GWB P-00 - P-02 - P-00 - P-02 EXP

015A LEVEL 01 113 CONFERENCE ROOM - - TME TME GWB P-01 - - - - GWB P-01 -

021 LEVEL 01 2A DATA CLOSET (TE) - - RB-01 6" - P-00 - P-02 - - - - - - -

022 LEVEL 01 13 REPAIR SHOP-SUPV OF GROUNDS (TE) - - - - - P-00 - P-02 - - - - - - -

024 LEVEL 01 A-1 WARE HOUSE - - TME TME - - - - GWB P-01 GWB P-01 -

024 LEVEL 01 A-1A TR EXP AST RB-01 4" GWB P-00 - P-02 GWB P-00 - P-02 GWB P-00 - P-02 - P-00 - P-02 EXP

024 LEVEL 01 A-2 SYRINGE STORAGE - - TME TME GWB P-01 - - - - - - -

027-034 LEVEL 01 113 CORRIDOR H - - EXST EXST - - - - - - GWB P-01 -

027-034 LEVEL 01 149 STORAGE - TME TME TME - - - - GWB P-01 - - TME

027-034 LEVEL 01 159 TR EXP AST RB-01 6" - P-00 - P-02 - P-00 - P-02 - P-00 - P-02 GWB P-02 EXP

027-034 LEVEL 01 163B CORRIDOR - - TME TME - - GWB P-01 - - - - -

035 LEVEL 00 B18 TR EXP AST RB-01 6" - P-02 - P-00 - P-02 - P-00 - P-02 - P-00 - P-02 EXP

035 LEVEL 00 B24 CORRIDOR - - EXST EXST - - - - - P-01 - - -

035 LEVEL 01 - CORRIDOR - - EXST EXST - P-01 - - - - - - -

035 LEVEL 01 115 TR EXP AST RB-01 4" - P-00 - P-02 - P-00 - P-02 - P-00 - P-02 - P-00 - P-02 EXP

035A LEVEL 01 - CORRIDOR - - EXST EXST - P-01 - - - - - - -

035A LEVEL 01 124 C.E.R.C. PROJECT RESEARCH STAFF - - TME TME - - GWB P-01 - - - - -

035A LEVEL 01 124A TR EXP AST RB-01 4" - P-00 - P-02 - P-00 - P-02 - P-00 - P-02 GWB P-00 - P-02 EXP

035A LEVEL 02 - CORRIDOR - - EXST EXST - P-01 - - - - - - -

035A LEVEL 02 225 RESEARCH ASSISTANTS - - TME TME - - GWB P-01 - - - - -

035A LEVEL 02 225A TR EXP AST RB-01 4" - P-00 - P-02 - P-00 - P-02 - P-00 - P-02 GWB P-00 - P-02 EXP

036 LEVEL 01 - CORRIDOR - - EXST EXST - - - P-01 - - - - -

036 LEVEL 01 105 TR EXP AST RB-01 4" - P-00 - P-02 - P-02 - P-00 - P-02 - P-00 - P-02 EXP

36A LEVEL 01 117 CORRIDOR - - TME TME - - - - GWB P-01 - - -

036A LEVEL 01 112 PRINTER/FAX - - EXST EXST - - - - - P-01 - - -

036A LEVEL 01 114 IT / ELECT (TE) - - - - GWB P-02 - - - - - P-00 - P-02 -

ROOM FINISH SCHEDULE ABBREVIATIONS

AST

EXP

GWB

RB-01

TME

EXT

PAINT CODES

ANTI-STATIC COATING

EXPOSED

GYPSUM WALL BOARD

RUBBER BASE

TO MATCH EXISTING

EXTERIOR

ROOM FINISH SCHEDULE - DATA CENTER

BLDG # LEVEL ROOM NO. ROOM NAME

FLOOR BASE WALLS

CLG COMMENTSMAT FIN MAT HT

NORTH EAST SOUTH WEST

MAT FIN MAT FIN MAT FIN MAT FIN

041 LEVEL 01 104 CORRIDOR EXP - N/A - - P-02 - P-02 - P-02 - P-02 EXP

041 LEVEL 01 105 ENTRANCE ROOM #1 EXP AST N/A - - P-02 - P-02 - P-02 - P-02 EXP

041 LEVEL 01 106 SECURE STORAGE EXP - N/A - - P-02 - P-02 - P-02 - P-02 EXP

041 LEVEL 01 107 ENTRANCE ROOM #2 EXP AST N/A - - P-02 - P-02 - P-02 - P-02 EXP

041 LEVEL 01 108 MECH EXP - N/A - - P-02 - P-02 - P-02 - P-02 EXP

041 LEVEL 01 109 ELEC EXP - N/A - - P-02 - P-02 - P-02 - P-02 EXP

041 LEVEL 01 110 FIRE RISER EXP - N/A - - P-02 - P-02 - P-02 - P-02 EXP

041 LEVEL 01 111 ROOF ACCESS EXP - N/A - - P-02 - P-02 - P-02 - P-02 EXP

041 LEVEL 01 112 UNPACKING/ PACKING EXP - N/A - - - - P-02 - P-02 - P-02 EXP

041 LEVEL 01 113 VEST EXP - N/A - - P-02 - P-02 - P-02 - P-02 EXP

041 LEVEL 01 114 DATA CENTER EXP AST RB 4" - P-02 - P-02 - P-02 - P-02 EXP

042 LEVEL 01 121 GENERATOR ENCLOSURE EXP - N/A - - P-02 - P-02 - P-02 - P-02 EXP

042 LEVEL 01 122 FUEL YARD EXP - N/A - - P-02 - P-02 - P-02 - P-02 -

P-01

P-02

MATCH EXISTING

SW7005 PURE WHITE

P-00 FIRE RATED PLYWOOD

CAULK ALL

AROUND

ADJUSTABLE

ANCHOR

STANDARD FRAME

EXPOSED MASONRY OR BRICK

1/2"

S.F.T.U.

NOMINAL

CMU OR 1/2"

FRAMES IN MASONRY PARTITION

CASING BEAD

ADJUSTABLE

ANCHOR

STANDARD FRAME

MASONRY BLOCK PLASTERED

GROUT

5/8"

S.F.T.U.

NOMINAL

CMU OR 7/8"

PLASTER ON

METAL LATH

CAULK ALL

AROUND

GROUT

CERAMIC TILE

ADJUSTABLE

ANCHOR

STANDARD FRAME

MASONRY BLOCK WITH CERAMIC TILE FINISH

GROUT

SETTING BED

CAULK ALL

AROUND

1/2"

S.F.T.U.

NOMINAL

CMU OR 3/4"

*** FRAME WIDTH FOR NOMINAL MASONRY

4 3/4" W/ 4" CMU

6 3/4" W/ 6" CMU

8 3/4" W/ 8" CMU

METAL STUD AND PLASTER FINISH

FRAMES WITH METAL STUD

AND PLASTER PARTITIONS

GAUGE AS

SPECIFIED

ADD RETURN ON

FRAME WHERE

DRYWALL FINISH

IS REQUIRED

STANDARD DOOR FRAME

FRAMES IN METAL STUD PARTITIONS

CERAMIC TILE

FINISH WHERE

REQUIRED

CAULK ALL

AROUND BOTH

SIDES

STANDARD FRAME

FOR DRYWALL

JAMB ANCHORS

DOUBLE STUDS

BACK TO BACK

DRYWALL, THICKNESS

SINGLE OR DOUBLE AS

REQUIRED

FRAMES IN MASONRY PARTITION

FACED WITH GWB

STANDARD FRAME

ADJUSTABLE

ANCHORS

GROUT

CAULK ALL

AROUND

CERAMIC TILE

FINISH WHERE

REQUIRED

TILE FINISH

FRAME AT CONCRETE WALLS

DOUBLE EGRESS DOOR FRAME

PLAN

JAMB 'B'

HEAD 'A'

NOTE: SHOWING SWING OF

DOUBLE EGRESS DOORS

A B

C

A C

B

NOTE: SHOWING SWING OF

DOUBLE EGRESS DOORS

DOOR

DOOR

DOOR STOP (BEYOND)

PLATE WELDED

TO FRAME

/2

"2 1/2" MIN

+/- 1/4"

/4

7/8"

08 11 13-01

METAL STUDS

PER STD DTL 3/4"

1/4"

7/8"

08 11 13-01

MTL STUDS

PER STD DTL 11/16"

1/4"

1/4"

1/4"

CAULK ALL

AROUND

CASING BEAD

WHERE PLASTER

IS REQUIRED

CONCRETE

GROUT

VENEER

PLASTER ON

PLASTER BASE

TROWEL CUT

AT FRAME

EDGES

ANCHOR

STANDARD

FRAME

CONVENTIONAL

PLASTER

GYP LATH

CERAMIC TILE

CAULK BOTH

SIDES

ANCHOR

STANDARD

FRAME

CERAMIC TILE

GWB

CEMENT

BACKER BOARD

PIPE SEPARATORS

WELDED TO PLATE

F.H. CSK.

EXP. BOLT

THROAT OPENING = PARTITION

WIDTH + 1/8" MIN

1/2" 1/2"

/8

1 15/16"VARIESVARIES

UNDERSIDE OF STRUCTURE OR

INTERSTITIAL FLOOR

MTL STUD HEADER, TYPICAL

MTL RUNNER, TYPICAL

MTL STUD, TYPICAL

HM DOOR FRAME, TYPICAL

JAMB ANCHOR TYPICAL

EXISTING GB &

MTL STUD WALL

TO REMAIN

EXISTING GB &

MTL STUD WALL

TO REMAIN

HEIGHT SHALL VARY

0' - 4" TYPICAL 0' - 4" TYPICAL

DOOR WIDTH AS

SCHEDULED

MTL DOOR

FRAME

SHIM AS

REQ'D

RUNNER

BETWEEN

STUDS

1/2"

CONST

JOINT

SEE NOTE 1

VERTICAL STUDS @ 2'-0" MAX. W/

GYPSUM WALL BOARD. 1'-4" W/ GYPSUM

LATH & PLASTER DOUBLE STUDS FOR

SUPPORTING CONC. BACKER BOARD

PROVIDE CONTINUOUS BRACING

WHEN STUDS EXCEED 10'-0" AND

ARE FINISHED BOTH SIDES

JAMB ANCHOR CLIPS 3 PER

SIDE - COORDINATE W/

HINGE REINFORCEMENT

NOTE 1: OMIT BRACE WHEN 'D' DIMENSION

IS LESS THAN 2'-0" FOR GYP. WALL BOARD

OR 16" FOR PLASTER PARTITION

ELEVATION AT DOOR FRAME

DETAIL D

JAMB ANCHORS

(FURNISHED W/ FRAME)

DETAIL C

FRAME FACE

MIN

US 3/16"

E Q

E Q

D

E Q

E Q

V A

R

IE

S S

E E

D O

O R

S C

H E

D

VARIES SEE DOOR SCHED

DETAIL B

A A

1/2" M

IN

5/8" M

AX

FRAME FACE

MIN

US 3/16"

/4

M

IN

STUD

W

IDTH

/4

M

IN

JAMB DEPTH

MINUS 3/16"

STUD

W

IDTH

1/2"

DETAIL D, TYP

M A

X

DETAIL B

PROVIDE SOUND

DEADENING WHERE

REQUIRED

/8

SECTION A

DOUBLE STUDS JAMB ANCHOR

GYPSUM WALL

BOARD PANELS

CONTROL JOINT

ISOMETRIC OF CONSTRUCT JOINT

/4

M

IN

DETAIL C

SANITARY

STOP

MTL DOOR FRAME

MTL ANCHOR CLIP

SHIM AS

REQ'D

CRIPPLE STUD, DO NOT

ANCHOR TO BEARING STUD

1/2" M

IN

1A/2A

4A

SEE SCHED.

S E

E S

C H

E D

SEE SCHED.

S E

E S

C H

E D

DOOR HEIGHTS AND WIDTHS PER SCHEDULE

5A

SEE SCHED.

S E

E S

C H

E D

REMOVABLE

CENTER

MULLION

SEE SCHED.

S E

E S

C H

E D

3A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/ DISCIPLINE

321 4 5 6 7 8 9 10

DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

08/05/2026 7:14:52 am

Autodesk Docs://689-22-700 VA CT West Haven EHRM

IU/VAWH_GEN

SHEETS_SDB.rvt

A-602

DOOR TYPES & DETAILS

JS/JRS RB

100% CONSTRUCTION

DOCUMENTS

04/20/2026

689-22-700EHRM INFRASTRUCTURE

UPGRADES - WEST HAVEN

VA CT WEST HAVEN

950 CAMPBELL AVENUE, WEST HAVEN, CT 06516

NTS

DOOR FRAME - DETAILS

3/4" = 1'-0"

DOOR FRAME - DETAIL

NTS

PARTITION FRAMING AT DOORS

1" = NTS

DOOR TYPES

GENERAL NOTES

1. SEE SPECIFICATION SECTION 08 71 00 - DOOR HARDWARE

FOR HW SETS.

2. CONTRACTOR TO VERIFY DOOR SIZE AND WALL THICKNESS

PRIOR TO ORDERING DOORS AND FRAMES. ALL DOOR

FRAMES ARE TO HAVE A POSITIVE RELIEF TO EXISTING

WALLS.

3. DATA CENTER AND GENERATOR ENCLOSURE EXTERIOR

DOORS, FRAMES, AND ANCHORAGE SHALL BE IN

ACCORDANCE WITH SPEC 08 11 13.

UNDERSIDE OF

STRUCTURE ABOVE

(OR INTERSTITIAL

FLOOR, WHERE

OCCURS)

DEMOLISH EXISTING ACT

ON TR SIDE ONLY,

TYPICAL

EXISTING ACT TO

REMAIN IN ADJ ROOMS,

TYPICAL

EXISTING MTL STUD, TYPICAL

EXISTING TOP PLATES

NOTE: EXTEND WALLS AT

NEW TR LOCATIONS

ONLY: B349, B400 AND

B334. ALSO WITH RFP-001

PROPOSAL.

NO. 9 3/4-INCH 10-GAUGE FLATTENED EXPANDED

STEEL SECURITY MESH. MECHANICALLY

ANCHORED TO WINDOW FRAME.

RIGID INSULATION.

INSPECT EXIST. GLAZING LITES FOR BREAKS &/

OR MULLION WATER LEAKS & BRING TO THE

ATTENTION OF THE VA'S C.O.R. FOR POSSIBLE

REPAIR OR LITE REPLACEMENT

- REPLACED LITES &/ OR REPAINT ARE NOT IN

CONTRACT.

FRT PLYWOOD IN TR'S / TYPE X GYP IN ADJACENT

SPACES

INTERIOREXTERIOR

NOTE:

1. PERFORMANCE OF THE SELECTED SYSTEM MUST BE DEMONSTRATED

WITH GLAZING…