Attachment - 02 Hazmat Drawings_100percent Bid Docs.pdf

PDF 2 MB Posted

Attached to
Z2DA--EHRM Bonham, TX Construction 549A4-21-700 EHRM Construction (VA-23-00092679)
Solicitation number
36C77624B0007_1
Issued by

About this file

This solicitation is for an EHRM construction project at the Bonham VA Medical Center in Bonham, Texas. The solicitation number is 36C77624B0007_1 and is being issued by the Department of Veterans Affairs Technology Acquisition Center Austin.

The project involves asbestos abatement and infrastructure upgrades at various buildings on the medical center campus. Hazardous materials identified include asbestos pipe insulation, floor tiles, mastics, transite panels, roofing materials, glazed block walls, and lead-based paint. The work requires removal of these materials using appropriate methods like glovebags, negative pressure enclosures, manual means, and chemical treatments. It also includes repairs, renovations and new construction activities to support upgrades.

The response due date is not provided. Pricing does not appear to be included in this document, which focuses on identifying hazardous materials and required abatement work rather than solicitation details. The incumbent is not specified.

View the file

Other files

File Type Posted
Attachment 56 - Abstract of Bids OF 1419 - CONST-Bonham - Signed.pdf PDF
Attachment 57 - Abstract of Bids OF 1419 A - CONST-Bonham.pdf PDF
36C77624B0007 0012.docx DOCX document
Attachment- 54 Sheet GS020 DETAILS.pdf PDF
Attachment- 53 Sheet GS019 EROSION CONTROL DETAILS.pdf PDF
Attachment- 51 TR Matrix Bonham.pdf PDF
Attachment- 55 Solicitation-RFIs-Tech Responses 36C77624B0007.pdf PDF
Attachment- 52 Hydrology Map.pdf PDF
36C77624B0007 0011.pdf PDF
36C77624B0007 0010.pdf PDF
36C77624B0007 0009.pdf PDF
Att 50 CLARIFICATION of Site Visit-Duct banks not available for use.pdf PDF
36C77624B0007 0008.pdf PDF
36C77624B0007 0007.docx DOCX document
Attachment - 49 S04-sign in sheet-pg 1 Site Visit Bonham TX 1.9.24.pdf PDF
36C77624B0007 0006.docx DOCX document
36C77624B0007 0005.pdf PDF
Attachment - 48 S04-sign in sheet Site Visit Bonham TX 1.9.24.pdf PDF
Attachment - 47 Clarifications-Additional Technical Questions.pdf PDF
36C77624B0007 0004.pdf PDF
Attachment - 46 Answers to Solicitation-RFIs-MISSING SECTION-36C77624B0007_1.pdf PDF
36C77624B0007 0003.pdf PDF
Attachment- 29 Bonham VA - Geotech Rpt 3-30-16-For Soil.pdf PDF
Attachment- 35 01 Bonham EHRM- Narrative.pdf PDF
Attachment- 36 01 Environmental Narrative.pdf PDF
Attachment- 44 Station Pictures for electrical.pdf PDF
Attachment- 28 Bonham EHRM- ICRA Form.pdf PDF
Attachment- 41 07 Electrical Narrative.pdf PDF
Attachment- 30 SPCC-PIPP Plan VANTHCS_Bonham.pdf PDF
Attachment- 38 03 Structural Narrative.pdf PDF
Attachment- 27 Answers to Solicitation-RFIs-36C77624B0007_1.pdf PDF
Attachment- 42 08 Telecom Narrative.pdf PDF
Attachment- 43 09 Security Narrative.pdf PDF
36C77624B0007 0002.pdf PDF
Attachment- 37 02 Civil Narrative.pdf PDF
Attachment- 32 V2 549A4-21-700 100 Bid Document Specifications.pdf PDF
Attachment- 45 IT Closet Proposed lay down.pdf PDF
Attachment- 39 05 Fire Protection Narrative.pdf PDF
Attachment- 34 00 General Narrative.pdf PDF
Attachment- 33 AE Physical Security Risk Mitigation Design Guidance.pdf PDF
Attachment- 31 site plan fiber runs Bonham.pdf PDF
Attachment- 40 06 Mechanical Narrative.pdf PDF
36C77624B0007 0001.pdf PDF
36C77624B0007_1-tech questions date updated.pdf PDF
36C77624B0007_1.pdf PDF
Attachment - 13 Asbestos 3_ VA Checklist_Environ.pdf PDF
Attachment - 03 Civil Drawings_100percent Bid Docs.pdf PDF
Attachment - 24 Limitations on Subcontracting - Construction.pdf PDF
Attachment - 16 CABINET DIMENSIONAL DATA.pdf PDF
Attachment - 05 Architectural Drawings_100percent Bid Docs.pdf PDF
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

CONSULTANTS:

CIVIL ENGINEER

OLSSON

550 ST LOUIS ST,

SPRINGFIELD, MO 65806

(417) 885-1736

MECH / ELEC ENGINEER

SPUR DESIGN

2519 MADISON AVE., STE. 100

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

RATED ENGINEERING

609 S. KELLY AVENUE, SUITE H2

EDMOND, OK 73003

(405) 856-2965

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

TECH ENGINEER

ASPEN COMMUNICATIONS, LLC

7 KIJI-DAVA CIRCLE, SUITE A

PRESCOTT, AZ 86301

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STRUCT ENGINEER

STAND STRUCTURAL ENGINEERING

8234 ROBINSON STREET

OVERLAND PARK, KS 66204

(913) 214-2169

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. BR 2171 EXP. 09/30/2023

ENGR REG. NO. F-17591 EXP. 02/29/2024

STAMP:

Drawing Number

Building Number

COMMISSIONING

ES2

13401 N. SANTA FE AVE

OKLAHOMA CITY, OK 73114

(405) 528-4500

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

P

M

BUILDING 1 - BASEMENT -

ENVIRONMENTAL HAZARDS

CD

JR

BONHAM EHRM

INFRASTRUCTURE

UPGRADES

07/07/2023

549A4-21-700

BONHAM VA MEDICAL CENTER

1201 E. 9TH STREET

BONHAM, TX 75418

HA010

SPUR #: 2216

No. REVISION DESCRIPTION DATE

HAZARDOUS MATERIALS KEYNOTES

REMOVE ASBESTOS PIPE INSULATION USING GLOVEBAG AND OUTDOOR METHODS, 15 LF AND 1

OUTDOOR WET HYGIENE STATION.

FLOOR TILES WITH UNDERLYING ASBESTOS BLACK MASTIC THROUGHOUT MANY AREAS, PROTECT AS

NECESSARY.

POTENTIAL FOR ASBESTOS TAR WATERPROOFING SYSTEM TAR (PACM), PROTECT AS NECESSARY.

ASSUMED PRESENT INTERMITTENTLY ON LOWER AREAS OF PERIMETER WALLS.

ASBESTOS PIPE INSULATION AND FITTINGS SUCH AS FIBERGLASS WITH ASBESTOS WHITE SEALANT, CAL-MAG, AIRCELL OR TAR/ CORK, PROTECT AS NECESSARY.

USE EXISTING WALL PENETRATIONS FOR FIBER CABLE PATHWAY TO AVOID PACM WATERPROOFING, PROTECT AS NECESSARY.

UNKNOWN ASBESTOS PIPE INSULATION CONDITIONS, DO NOT ENTER UTILITY TUNNEL.

ASBESTOS DEBRIS AND ASSUMED CONTAMINATED SOILS (PACM), DO NOT ENTER CRAWLSPACES.

ON NIGHTS AND WEEKENDS, PRE-CLEAN AND REMOVE SIGNIFICANTLY DAMAGED ASBESTOS AIR CELL

PIPE INSULATION USING GLOVE BAG METHODS WITHIN A NEGATIVE PRESSURE ENCLOSURE, 50LF AND 1

ENCLOSURE.

PRE-CLEAN AND MANUALLY TRIM LOOSE PIECES ON ASBESTOS TARRED FIBERBOARD USING LIBERAL

AMOUNTS OF AMENDED WATER, AND MANUALLY CLEAN WATERPROOFING SYSTEM SURFACE. APPLY

TWO COATS OF BRIDGING ENCAPSULANT ON EXPOSED SYSTEM SURFACE ALL PERFORMED WITHIN

EXISTING NEGATIVE PRESSURE ENCLOSURE, 64 SF OF WATERPROOFING SYSTEM TO CLEAN AND

SELECTIVELY TRIM AND PRE-CLEAN CLOSET.

DAMAGED AND SIGNIFICANTLY DAMAGED LOCATIONS OF ASBESTOS PIPE INSULATION, FITTINGS, AND/OR OPEN JOINTS. ON NIGHTS AND WEEKENDS, PRIOR TO WORK ABOVE LEVEL OF CEILING GRID, REMOVE CONTAMINATED CEILING TILES, PRE-CLEAN AND APPLY TWO LAYERS OF COVERING LAG CLOTH

OVER PIPE INSULATION DAMAGE/DEFECTS AND REMOVE SIGNIFICANTLY DAMAGED LOCATIONS USING

GLOVEBAG METHODS ALL WORK WITHIN A NEGATIVE PRESSURE ENCLOSURE, 10 DEFECTS WITHIN

ENCLOSURE, 25 LF GLOVEBAG ABATEMENT, 350 SF CONTAMINATED CEILING TILE AND 1 NEGATIVE

PRESSURE ENCLOSURE.

DAMAGED AND SIGNIFICANTLY DAMAGED LOCATIONS OF ASBESTOS PIPE INSULATION, FITTINGS, AND/OR OPEN JOINTS. ON NIGHTS AND WEEKENDS, PRIOR TO WORK ABOVE LEVEL OF CEILING GRID, REMOVE AND STORE CEILING TILES, PRE-CLEAN, AND APPLY TWO LAYERS OF COVERING LAG CLOTH

OVER PIPE INSULATION DAMAGE/DEFECTS AND REMOVE SIGNIFICANTLY DAMAGED LOCATIONS USING

GLOVEBAG METHODS ALL WORK WITHIN A NEGATIVE PRESSURE ENCLOSURE, 10 DEFECTS WITHIN

ENCLOSURE, 30 LF GLOVEBAG ABATEMENT, 575 SF CEILING TILES AND 1 NEGATIVE PRESSURE

ENCLOSURE.

DAMAGED AND SIGNIFICANTLY DAMAGED LOCATIONS OF ASBESTOS PIPE INSULATION, FITTINGS, AND/OR OPEN JOINTS. ON NIGHTS AND WEEKENDS, PRIOR TO WORK ABOVE LEVEL OF CEILING GRID, REMOVE CONTAMINATED CEILING GRID, PRE-CLEAN, AND APPLY TWO LAYERS OF COVERING LAG CLOTH

OVER PIPE INSULATION DAMAGE/DEFECTS AND REMOVE SIGNIFICANTLY DAMAGED LOCATIONS USING

GLOVEBAG METHODS ALL WORK WITHIN A NEGATIVE PRESSURE ENCLOSURE, 10 DEFECTS WITHIN

ENCLOSURE, 40 LF GLOVEBAG ABATEMENT, 545 SF CONTAMINATED CEILING GRID AND 1 NEGATIVE

PRESSURE ENCLOSURE. PROVIDE AIR TUNNEL WHERE NECESSARY FOR OPERATIONAL EQUIPMENT.

ON NIGHTS AND WEEKENDS, USING MANUAL MEANS AND CHEMICAL METHODS, REMOVE RAISED FLOOR

SYSTEM WITH ASBESTOS PEDESTAL MASTIC (PACM) AND UNDERLYING FLOOR TILE WITH ASBESTOS

BLACK MASTIC ON CONCRETE ALL WITHIN A NEGATIVE PRESSURE ENCLOSURE, 545 SF RAISED FLOOR

SYSTEM WITH ASBESTOS PEDESTALS, 545 SF FLOOR TILE AND 545 SF ASBESTOS BLACK MASTIC AND 1

NEGATIVE PRESSURE ENCLOSURE.

DAMAGED AND SIGNIFICANTLY DAMAGED LOCATIONS OF ASBESTOS PIPE INSULATION, FITTINGS, AND/OR OPEN JOINTS. ON NIGHTS AND WEEKENDS, PRE-CLEAN, AND APPLY TWO LAYERS OF COVERING

LAG CLOTH OVER PIPE INSULATION DAMAGE/DEFECTS AND REMOVE SIGNIFICANTLY DAMAGED

LOCATIONS USING GLOVEBAG METHODS ALL WORK WITHIN A NEGATIVE PRESSURE ENCLOSURE, 8

DEFECTS WITHIN ENCLOSURE, 30 LF GLOVEBAG REMOVAL AND 1 NEGATIVE PRESSURE ENCLOSURE.

LEAD CONTAINING GLAZED BLOCK WALLS (PACM) EXTENDING UP TO 5' FROM FLOOR TYPICALLY AT

HALLWAY WALLS AND MAY BE PRESENT BEHIND DRYWALL COVERING, PROTECT AS NECESSARY.

A1

NOT TO SCALE

BLDG 1 - BASEMENT

N

OF 229

BUILDING 34 NOT SPRINKLERED. ALL OTHER BUILDINGS FULLY SPRINKLERED.

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

A12

A13

A14

L1

A4

A7

A4

A7

A14

A14

A7

A6

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

A12

A13

A12

A13

A7

A2

A12

A11

L1

A2

A4

A2

A4

A2

A10

A10

A10

L1

A2

A11

A8

A9

A5

A3

A4

A4

A4

A4

A4

A4

A4

A4

A4

A4 L1A4 L1

A3

GENERAL LEAD NOTE

MATERIALS CONTAINING LEAD ARE GENERALLY PRESENT

THROUGHOUT THE PROJECT PATHWAYS. LEAD BASED

MATERIALS OR PAINT FILMS (LBP) KNOWN TO EXCEED

THE EPA/HUD THRESHOLD OF 1.0 MG/CM2 AS MEASURED

BY XRF WILL BE PRESENT IN ASSUMED PROJECT

PATHWAYS. COMPLY WITH OSHA LEAD STANDARD FOR

CONSTRUCTION 1926.62.

A1

100% BID DOCUMENTS

r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

CONSULTANTS:

CIVIL ENGINEER

OLSSON

550 ST LOUIS ST,

SPRINGFIELD, MO 65806

(417) 885-1736

MECH / ELEC ENGINEER

SPUR DESIGN

2519 MADISON AVE., STE. 100

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

RATED ENGINEERING

609 S. KELLY AVENUE, SUITE H2

EDMOND, OK 73003

(405) 856-2965

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

TECH ENGINEER

ASPEN COMMUNICATIONS, LLC

7 KIJI-DAVA CIRCLE, SUITE A

PRESCOTT, AZ 86301

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STRUCT ENGINEER

STAND STRUCTURAL ENGINEERING

8234 ROBINSON STREET

OVERLAND PARK, KS 66204

(913) 214-2169

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. BR 2171 EXP. 09/30/2023

ENGR REG. NO. F-17591 EXP. 02/29/2024

STAMP:

Drawing Number

Building Number

COMMISSIONING

ES2

13401 N. SANTA FE AVE

OKLAHOMA CITY, OK 73114

(405) 528-4500

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

P

M

BUILDING 1 - FLOOR 1 -

ENVIRONMENTAL HAZARDS

CDJR

BONHAM EHRM

INFRASTRUCTURE

UPGRADES

07/07/2023

549A4-21-700

BONHAM VA MEDICAL CENTER

1201 E. 9TH STREET

BONHAM, TX 75418

HA011

SPUR #: 2216

No. REVISION DESCRIPTION DATE

NOT TO SCALE

BLDG 1 - LEVEL 1

HAZARDOUS MATERIALS KEYNOTES

REMOVE NON-ASBESTOS ACT CEILING GRID AND 1' X 1' SPLINED CEILING GRID AND

ASBESTOS PIPE INSULATION (PRESUMED AIRCELL) AND MUDDED FITTINGS USING

GLOVEBAG METHODS WITHIN A NEGATIVE PRESSURE ENCLOSURE, 100 SF ACT

CEILING GRID, 100 SF SPLINED CEILING, 10 LF PIPE INSULATION AND FITTINGS AND 1

ENCLOSURE.

FLOOR TILES WITH UNDERLYING ASBESTOS BLACK MASTIC THROUGHOUT MANY

AREAS, PROTECT AS NECESSARY.

ASBESTOS PIPE INSULATION AND FITTINGS SUCH AS FIBERGLASS WITH ASBESTOS

WHITE SEALANT, CAL-MAG, AIRCELL AND TAR/ CORK WITHIN AND OUTSIDE CHASES,

PROTECT AS NECESSARY.

RECESSED WALL RADIATOR WITH ASBESTOS TRANSITE BACKERBOARD, TYPICALLY

PRESENT, PROTECT AS NECESSARY.

ASBESTOS AND LEAD COMPONENTS (PACM) UNDERLYING NEWER ALUMINUM WINDOW

ASSEMBLY CLADDING AS TYPICAL, PROTECT AS NECESSARY. WHERE IMPACT TO

MATERIALS CANNOT BE AVOIDED REMOVAL IS TO BE PERFORMED USING MANUAL

METHODS AND WITHIN A NEGATIVE PRESSURE ENCLOSURE.

ON NIGHTS AND WEEKENDS, REMOVE FIBERGLASS PIPE INSULATION AND FITTINGS

WITH ASBESTOS WHITE SEALANT USING GLOVEBAG METHODS WITHIN A NEGATIVE

PRESSURE ENCLOSURE, 40 LF PIPE INSULATION AND 1 ENCLOSURE.

ON NIGHTS AND WEEKENDS, REMOVE ASBESTOS (PACM) FIRE DOOR INTACT AND

DOUBLE WRAP AND LABEL FOR TRANSPORT WITHIN EXISTING NEGATIVE PRESSURE

ENCLOSURE, 1 FIRE DOOR.

REMOVE NON-ASBESTOS ACT CEILING GRID AND FIBERGLASS PIPE INSULATION AND

FITTINGS WITH ASBESTOS WHITE SEALANT USING GLOVEBAG METHODS WITHIN A

NEGATIVE PRESSURE ENCLOSURE, 150 SF ACT CEILING GRID AND 20 LF PIPE

INSULATION AND FITTINGS AND 1 ENCLOSURE.

ON NIGHTS AND WEEKENDS, REMOVE PIPE INSULATION WITH WHITE ASBESTOS SEAM

SEALANT USING GLOVEBAG PROCEDURES WITHIN A NEGATIVE PRESSURE ENCLOSURE

(CFU PIPE DEMOLITION), 10 LF PIPE INSULATION.

ASBESTOS DRYWALL SYSTEM AROUND ENTRANCE COLUMNS, PROTECT AS

NECESSARY.

REMOVE NON-ASBESTOS CEILING TILES AND NON-ASBESTOS WALL BLOCK AND

PLASTER AT CHASE POSITION ABOVE CEILING GRID LEVEL. REMOVE ASBESTOS PIPE

INSULATION USING GLOVEBAG PROCEDURES WITHIN A NEGATIVE PRESSURE

ENCLOSURE, 10 LF PIPE INSULATION AND 1 NEGATIVE PRESSURE MINI-ENCLOSURE.

ALL WORK IS TO BE PERFORMED ON NIGHTS AND WEEKENDS AND WITHIN A NEGATIVE

PRESSURE ENCLOSURE. COORDINATE LOCATION AND EXTENTS FOR NEW VERTICAL

FIBER PATHWAY TO UPPER FLOORS.

LEAD CONTAINING CERAMIC WALL TILES AND LBP HAND RAILS, PROTECT AS

NECESSARY.

LEAD CONTAINING GLAZED BLOCK WALLS EXTENDING UP TO 5' FROM FLOOR

TYPICALLY AT HALLWAY WALLS AND MAY BE PRESENT BEHIND DRYWALL COVERING,

PROTECT AS NECESSARY.

A1

A2

A2

A2 A1

A3

A2

A2

A2

A2

A2

A3

A3

A3

A3

A2

A2

A2

A2

A2

A2

A2

A2

A4

A2

A2

A2

A2 A2 A2 A2 A2

A3

A2

A2

A2 A3

A2

A2

A2

A2

A2

A2

A2

A2

A4

A7

A4

A3

L2

A5

L2

L2

N

BUILDING 34 NOT SPRINKLERED. ALL OTHER BUILDINGS FULLY SPRINKLERED.

A2

A3

A4

A5

A6

A7

A8

A9

A10

A3

A6

A7

A5

A8

A9

L2

L1

A11

L1

L2

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

A10

GENERAL LEAD NOTE

MATERIALS CONTAINING LEAD ARE GENERALLY PRESENT

THROUGHOUT THE PROJECT PATHWAYS. LEAD BASED

MATERIALS OR PAINT FILMS (LBP) KNOWN TO EXCEED

THE EPA/HUD THRESHOLD OF 1.0 MG/CM2 AS MEASURED

BY XRF WILL BE PRESENT IN ASSUMED PROJECT

PATHWAYS. COMPLY WITH OSHA LEAD STANDARD FOR

CONSTRUCTION 1926.62.

r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

CONSULTANTS:

CIVIL ENGINEER

OLSSON

550 ST LOUIS ST,

SPRINGFIELD, MO 65806

(417) 885-1736

MECH / ELEC ENGINEER

SPUR DESIGN

2519 MADISON AVE., STE. 100

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

RATED ENGINEERING

609 S. KELLY AVENUE, SUITE H2

EDMOND, OK 73003

(405) 856-2965

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

TECH ENGINEER

ASPEN COMMUNICATIONS, LLC

7 KIJI-DAVA CIRCLE, SUITE A

PRESCOTT, AZ 86301

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STRUCT ENGINEER

STAND STRUCTURAL ENGINEERING

8234 ROBINSON STREET

OVERLAND PARK, KS 66204

(913) 214-2169

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. BR 2171 EXP. 09/30/2023

ENGR REG. NO. F-17591 EXP. 02/29/2024

STAMP:

Drawing Number

Building Number

COMMISSIONING

ES2

13401 N. SANTA FE AVE

OKLAHOMA CITY, OK 73114

(405) 528-4500

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

P

M

BUILDING 1 - FLOOR 2 -

ENVIRONMENTAL HAZARDS

CDJR

BONHAM EHRM

INFRASTRUCTURE

UPGRADES

07/07/2023

549A4-21-700

BONHAM VA MEDICAL CENTER

1201 E. 9TH STREET

BONHAM, TX 75418

HA012

SPUR #: 2216

No. REVISION DESCRIPTION DATE

HAZARDOUS MATERIALS KEYNOTES

REMOVE NON-ASBESTOS CARPET TILE AND UNDERLYING 9"X 9" ASBESTOS FLOOR

TILE WITH UNDERLYING ASBESTOS BLACK MASTIC USING MANUAL MEANS AND

CHEMICAL METHODS WITHIN A NEGATIVE PRESSURE ENCLOSURE, 100 SF EACH

MATERIAL AND 1 ENCLOSURE.

REMOVE NON-ASBESTOS 12" X 12" FLOOR TILE AND UNDERLYING ASBESTOS

BLACK MASTIC USING MANUAL MEANS AND CHEMICAL METHODS WITHIN EXISTING

NEGATIVE PRESSURE ENCLOSURE, 75 SF EACH MATERIAL AND 1 ENCLOSURE.

PROVIDE AIR TUNNEL WHERE NECESSARY FOR OPERATING EQUIPMENT

TEMPERATURE CONTROL.

REMOVE FIBERGLASS PIPE INSULATION WITH WHITE ASBESTOS SEAM SEALANT

USING GLOVEBAG PROCEDURES WITHIN THE EXISTING NEGATIVE PRESSURE

ENCLOSURE, 12 LF PIPE INSULATION.

DAMAGED ASBESTOS PIPE INSULATION, DO NOT ENTER PIPE CLOSET AND

PROTECT AS NECESSARY.

ASBESTOS FLOOR TILES AND/OR FLOOR TILES WITH UNDERLYING ASBESTOS

BLACK MASTIC THROUGHOUT MANY AREAS, PROTECT AS NECESSARY.

ASBESTOS PIPE INSULATION AND FITTINGS SUCH AS FIBERGLASS WITH

ASBESTOS WHITE SEALANT, CAL-MAG, AIRCELL AND TAR/ CORK, PROTECT AS

NECESSARY. FOUND BOTH WITHIN AND WITHOUT CHASES

RECESSED WALL RADIATOR WITH ASBESTOS TRANSITE BACKERBOARD,

TYPICALLY PRESENT, PROTECT AS NECESSARY.

ASBESTOS LAB COUNTERTOP AND/OR VENT SYSTEMS, PROTECT AS NECESSARY.

ASBESTOS SINK SOUNDPROOFING, PROTECT AS NECESSARY.

ASBESTOS TRANSITE WINDOW SYSTEM, PROTECT AS NECESSARY.

ASBESTOS AND LEAD COMPONENTS (PACM) UNDERLYING NEWER ALUMINUM

WINDOW ASSEMBLY CLADDING AS TYPICAL, PROTECT AS NECESSARY.IF IMPACT

TO MATERIALS CANNOT BE AVOIDED THEN REMOVAL MUST USE MANUAL

METHODS WITHIN A NEGATIVE PRESSURE ENCLOSURE.

ON NIGHTS AND WEEKENDS, REMOVE PIPE INSULATION WITH WHITE ASBESTOS

SEAM SEALANT USING GLOVEBAG PROCEDURES WITHIN A NEGATIVE PRESSURE

ENCLOSURE (CFU PIPE DEMOLITION), 20 LF PIPE INSULATION.

ON NIGHTS AND WEEKENDS, REMOVE ASBESTOS FLOOR TILE AND UNDERLYING

ASBESTOS MASTIC USING MANUAL MEANS AND CHEMICAL METHODS WITHIN A

NEGATIVE PRESSURE MINI-ENCLOSURE, 3 SF EACH AT 1 LOCATION AND 1

NEGATIVE PRESSURE MINI-ENCLOSURE. COORDINATE LOCATION AND EXTENTS.

LEAD CONTAINING CERAMIC WALL TILES AND/OR HANDRAIL, PROTECT AS

NECESSARY.

LEAD CONTAINING GLAZED BLOCK WALLS EXTENDING UP TO 5' FROM FLOOR

TYPICALLY AT HALLWAY WALLS AND MAY BE PRESENT BEHIND DRYWALL

COVERING, PROTECT AS NECESSARY.

REMOVE NON-ASBESTOS CEILING GRID AND REMOVE SECTION OF WALL WITH

DYRWALL, PLASTER AND LEAD CONTAINING GLAZE FACED WALL BLOCK USING

MANUAL MEANS WITHIN A NEGATIVE PRESSURE ENCLOSURE, 100 SF ACT GRID

AND 40 SF WALL. COORDINATE EXTENTS AND CLEAN CUT FOR NEW DOOR

OPENINGS.

A1

NOT TO SCALE

BLDG 1 - LEVEL 2

N

BUILDING 34 NOT SPRINKLERED. ALL OTHER BUILDINGS FULLY SPRINKLERED.

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

A12

A8

A5

A5

A6

L2

A5

L1

L2

A5

A2 A3

A11

A4

A1 L3

A12

L1

A5

A8

A8

L1

A8

L2

A8

A5

A5

A5

A5

A5

A5

L1

A5

A5

L1

A5

A5

L1

A5

A5 A10

A9

A5

A5

L2

A6

A13

L1

L2

L3

A13

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

A7

A7

A7

A7

GENERAL LEAD NOTE

MATERIALS CONTAINING LEAD ARE GENERALLY PRESENT

THROUGHOUT THE PROJECT PATHWAYS. LEAD BASED

MATERIALS OR PAINT FILMS (LBP) KNOWN TO EXCEED

THE EPA/HUD THRESHOLD OF 1.0 MG/CM2 AS MEASURED

BY XRF WILL BE PRESENT IN ASSUMED PROJECT

PATHWAYS. COMPLY WITH OSHA LEAD STANDARD FOR

r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

CONSULTANTS:

CIVIL ENGINEER

OLSSON

550 ST LOUIS ST,

SPRINGFIELD, MO 65806

(417) 885-1736

MECH / ELEC ENGINEER

SPUR DESIGN

2519 MADISON AVE., STE. 100

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

RATED ENGINEERING

609 S. KELLY AVENUE, SUITE H2

EDMOND, OK 73003

(405) 856-2965

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

TECH ENGINEER

ASPEN COMMUNICATIONS, LLC

7 KIJI-DAVA CIRCLE, SUITE A

PRESCOTT, AZ 86301

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STRUCT ENGINEER

STAND STRUCTURAL ENGINEERING

8234 ROBINSON STREET

OVERLAND PARK, KS 66204

(913) 214-2169

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. BR 2171 EXP. 09/30/2023

ENGR REG. NO. F-17591 EXP. 02/29/2024

STAMP:

Drawing Number

Building Number

COMMISSIONING

ES2

13401 N. SANTA FE AVE

OKLAHOMA CITY, OK 73114

(405) 528-4500

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

P

M

BUILDING 1 - FLOOR 3 -

ENVIRONMENTAL HAZARDS

CDJR

BONHAM EHRM

INFRASTRUCTURE

UPGRADES

07/07/2023

549A4-21-700

BONHAM VA MEDICAL CENTER

1201 E. 9TH STREET

BONHAM, TX 75418

HA013

SPUR #: 2216

No. REVISION DESCRIPTION DATE

NOT TO SCALE

BLDG 1 - LEVEL 3

HAZARDOUS MATERIALS KEYNOTES

REMOVE NON-ASBESTOS CARPET TILE AND UNDERLYING 9"X 9" ASBESTOS FLOOR

TILE WITH UNDERLYING ASBESTOS BLACK MASTIC ON CONCRETE USING MANUAL

MEANS AND CHEMICAL METHODS WITHIN A NEGATIVE PRESSURE ENCLOSURE, 200

SF EACH MATERIAL AND 1 NEGATIVE PRESSURE ENCLOSURE.

REMOVE NON-ASBESTOS 12" X 12" FLOOR TILE AND UNDERLYING ASBESTOS BLACK

MASTIC ON CONCRETE USING MANUAL MEANS AND CHEMICAL METHODS WITHIN

EXISTING NEGATIVE PRESSURE ENCLOSURE, 100 SF EACH MATERIAL AND 1

NEGATIVE PRESSURE ENCLOSURE. PROVIDE AIR TUNNEL WHERE NECESSARY FOR

OPERATING EQUIPMENT TEMPERATURE CONTROL.

REMOVE FIBERGLASS PIPE INSULATION AND FITTINGS WITH WHITE ASBESTOS SEAM

SEALANT USING GLOVEBAG PROCEDURES WITHIN THE EXISTING NEGATIVE

PRESSURE ENCLOSURE, 12 LF PIPE INSULATION.

DAMAGED ASBESTOS PIPE INSULATION, DO NOT ENTER PIPE CLOSET AND PROTECT

AS NECESSARY.

REMOVE NON-ASBESTOS CEILING GRID AND WALL SECTIONS FOR NEW DOORWAYS

(INCLUDES CHASES) AND ASBESTOS PIPE INSULATION (AIR CELL AND TARRED

CORK) WITH MUDDED FITTINGS USING GLOVEBAG METHODS WITHIN EXISTING

NEGATIVE PRESSURE ENCLOSURE, 45 LF PIPE INSULATION AND FITTINGS AND 80 SF

DRYWALL AND PLASTER BLOCK CHASE AND 200 SF CEILING GRID. REFER TO

KEYNOTE L3 AS LEAD CONTAINING WALL BLOCKS ARE PRESENT AT CORRIDOR WALL

SECTION. REFER TO ARCHITECTURAL DEMOLITION DRAWINGS AND COORDINATE

LOCATIONS AND EXTENTS OF WALL SECTION REMOVAL.

FLOOR COVERINGS WITH POTENTIAL UNDERLYING ASBESTOS BLACK MASTIC

THROUGHOUT ALL AREAS, PROTECT AS NECESSARY.

ASBESTOS PIPE INSULATION AND FITTINGS SUCH AS FIBERGLASS WITH ASBESTOS

WHITE SEALANT, CAL-MAG, AIRCELL AND TAR/ CORK, PROTECT AS NECESSARY.

FOUND BOTH WITHIN AND WITHOUT CHASES

RECESSED WALL RADIATOR WITH ASBESTOS TRANSITE BACKERBOARD, TYPICALLY

PRESENT, PROTECT AS NECESSARY.

ASBESTOS AND LEAD COMPONENTS (PACM) UNDERLYING NEWER ALUMINUM

WINDOW ASSEMBLY CLADDING AS TYPICAL, PROTECT AS NECESSARY.IF IMPACT TO

MATERIALS CANNOT BE AVOIDED THEN REMOVAL MUST USE MANUAL METHODS

WITHIN A NEGATIVE PRESSURE ENCLOSURE.

ON NIGHTS AND WEEKENDS, REMOVE PIPE INSULATION WITH WHITE ASBESTOS

SEAM SEALANT USING GLOVEBAG PROCEDURES WITHIN A NEGATIVE PRESSURE

ENCLOSURE (CFU PIPE DEMOLITION), 20 LF PIPE INSULATION AND 1 ENCLOSURE.

ON NIGHTS AND WEEKENDS, REMOVE ASBESTOS FLOOR TILE AND UNDERLYING

ASBESTOS MASTIC USING MANUAL MEANS AND CHEMICAL METHODS WITHIN A

NEGATIVE PRESSURE MINI-ENCLOSURE, 3 SF EACH AT 1 LOCATION AND 1 NEGATIVE

PRESSURE MINI-ENCLOSURE. COORDINATE LOCATION AND EXTENTS.

LEAD CONTAINING CERAMIC WALL TILES, PROTECT AS NECESSARY.

LEAD CONTAINING GLAZED BLOCK WALLS EXTENDING UP TO 5' FROM FLOOR

TYPICALLY AT HALLWAY WALLS AND MAY BE PRESENT BEHIND DRYWALL COVERING,

PROTECT AS NECESSARY.

REMOVE CORRIDOR WALL SECTIONS OF LEAD CONTAINING BLOCK BEHIND

DRYWALL USING MANUAL MEANS WITHIN A NEGATIVE PRESSURE ENCLOSURE, 120

SF WALL BLOCK AND PLASTER AND 75 SF DRYWALL. COORDINATE EXTENTS AND

CLEAN CUT FOR NEW DOOR OPENINGS.

A1

N

BUILDING 34 NOT SPRINKLERED. ALL OTHER BUILDINGS FULLY SPRINKLERED.

A2

A3

A4

A5

A6

A7

A8

A9

A10

L2

A8

A9

A6

A7

L2

A6 A7 A6 A7

L1

L1

A8 A9

A4

A3A2

A9A5

L3

A5A1

L3A9

A10

A11

L1

L2

L3

A11

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

GENERAL LEAD NOTE

MATERIALS CONTAINING LEAD ARE GENERALLY PRESENT

THROUGHOUT THE PROJECT PATHWAYS. LEAD BASED

MATERIALS OR PAINT FILMS (LBP) KNOWN TO EXCEED

THE EPA/HUD THRESHOLD OF 1.0 MG/CM2 AS MEASURED

BY XRF WILL BE PRESENT IN ASSUMED PROJECT

PATHWAYS. COMPLY WITH OSHA LEAD STANDARD FOR

r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

CONSULTANTS:

CIVIL ENGINEER

OLSSON

550 ST LOUIS ST,

SPRINGFIELD, MO 65806

(417) 885-1736

MECH / ELEC ENGINEER

SPUR DESIGN

2519 MADISON AVE., STE. 100

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

RATED ENGINEERING

609 S. KELLY AVENUE, SUITE H2

EDMOND, OK 73003

(405) 856-2965

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

TECH ENGINEER

ASPEN COMMUNICATIONS, LLC

7 KIJI-DAVA CIRCLE, SUITE A

PRESCOTT, AZ 86301

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STRUCT ENGINEER

STAND STRUCTURAL ENGINEERING

8234 ROBINSON STREET

OVERLAND PARK, KS 66204

(913) 214-2169

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. BR 2171 EXP. 09/30/2023

ENGR REG. NO. F-17591 EXP. 02/29/2024

STAMP:

Drawing Number

Building Number

COMMISSIONING

ES2

13401 N. SANTA FE AVE

OKLAHOMA CITY, OK 73114

(405) 528-4500

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

P

M

BUILDING 1 - FLOOR 4 -

ENVIRONMENTAL HAZARDS

CDJR

BONHAM EHRM

INFRASTRUCTURE

UPGRADES

07/07/2023

549A4-21-700

BONHAM VA MEDICAL CENTER

1201 E. 9TH STREET

BONHAM, TX 75418

HA014

SPUR #: 2216

No. REVISION DESCRIPTION DATE

HAZARDOUS MATERIALS KEYNOTES

REMOVE NON-ASBESTOS 12" X 12" FLOOR TILE AND UNDERLYING

ASBESTOS BLACK MASTIC ON CONCRETE USING MANUAL MEANS AND

CHEMICAL METHODS WITHIN EXISTING NEGATIVE PRESSURE ENCLOSURE,

155 SF EACH MATERIAL AND 1 NEGATIVE PRESSURE ENCLOSURE. PROVIDE

AIR TUNNEL WHERE NECESSARY FOR OPERATING EQUIPMENT

TEMPERATURE CONTROL.

REMOVE NON-ASBESTOS CARPET TILE AND 12" X 12" FLOOR TILE WITH

UNDERLYING ASBESTOS BLACK MASTIC ON CONCRETE USING MANUAL

MEANS AND CHEMICAL METHODS WITHIN EXISTING NEGATIVE PRESSURE

ENCLOSURE, 150 SF EACH MATERIAL.

REMOVE FIBERGLASS PIPE INSULATION WITH WHITE ASBESTOS SEAM

SEALANT USING GLOVEBAG PROCEDURES WITHIN THE EXISTING NEGATIVE

PRESSURE ENCLOSURE, 30 LF PIPE INSULATION.

REMOVE NON-ASBESTOS CEILING GRID AND CORRIDOR WALL SECTIONS

FOR NEW DOORWAYS (INCLUDES CHASE) AND ASBESTOS PIPE INSULATION

(AIR CELL AND TARED CORK) WITH MUDDED FITTINGS USING GLOVEBAG

METHODS WITHIN EXISTING NEGATIVE PRESSURE ENCLOSURE, 45 LF PIPE

INSULATION AND FITTINGS, 40 SF DRYWALL AND BLOCK CHASE AND 150 SF

CEILING GRID. REFER TO KEYNOTE L3 AS LEAD CONTAINING WALL BLOCKS

ARE PRESENT AT CORRIDOR WALL SECTION. REFER TO ARCHITECTURAL

DEMOLITION DRAWINGS AND COORDINATE LOCATIONS AND EXTENTS OF

WALL SECTION REMOVAL.

ON NIGHTS AND WEEKENDS, REMOVE PIPE INSULATION AND FITTINGS WITH

WHITE ASBESTOS SEAM SEALANT USING GLOVEBAG PROCEDURES WITHIN

A NEGATIVE PRESSURE ENCLOSURE (CFU PIPE DEMOLITION), 20 LF PIPE

INSULATION AND 1 ENCLOSURE.

ASBESTOS FLOOR TILES AND/OR FLOOR TILES WITH UNDERLYING

ASBESTOS BLACK MASTIC THROUGHOUT MANY AREAS, PROTECT AS

NECESSARY.

ASBESTOS PIPE INSULATION AND FITTINGS SUCH AS FIBERGLASS WITH

ASBESTOS WHITE SEALANT, CAL-MAG, AIRCELL AND TAR/ CORK, PROTECT

AS NECESSARY. FOUND BOTH WITHIN AND WITHOUT CHASES

RECESSED WALL RADIATOR WITH ASBESTOS TRANSITE BACKERBOARD,

TYPICALLY PRESENT, PROTECT AS NECESSARY.

ASBESTOS AND LEAD COMPONENTS (PACM) UNDERLYING NEWER

ALUMINUM WINDOW ASSEMBLY CLADDING AS TYPICAL, PROTECT AS

NECESSARY.IF IMPACT TO MATERIALS CANNOT BE AVOIDED THEN REMOVAL

MUST USE MANUAL METHODS WITHIN A NEGATIVE PRESSURE ENCLOSURE.

ON NIGHTS AND WEEKENDS, REMOVE CEILING TILES AND ASBESTOS PIPE

INSULATION AND MUDDED FITTINGS (RELATED TO CONVECTOR REMOVAL

ON FLOOR ABOVE) USING GLOVE BAG METHODS WITHIN A NEGATIVE

PRESSURE ENCLOSURE, 17 LF PIPE INSUALTION & 1 NEGATIVE PRESSURE

ENCLOSURE. STORE CEILINGS TILES FOR REPLACEMENT AFTER

CLEARANCE. COORDINATE AS APPROPRIATE.

ON NIGHTS AND WEEKENDS, REMOVE ASBESTOS FLOOR TILE AND

UNDERLYING ASBESTOS MASTIC USING MANUAL MEANS AND CHEMICAL

METHODS WITHIN A NEGATIVE PRESSURE MINI-ENCLOSURE, 3 SF EACH AT 1

LOCATION AND 1 NEGATIVE PRESSURE MINI-ENCLOSURE. COORDINATE

LOCATION AND EXTENTS.

LEAD CONTAINING CERAMIC WALL TILES AND/OR HANDRAIL, PROTECT AS

NECESSARY.

LEAD CONTAINING GLAZED BLOCK WALLS EXTENDING UP TO 5' FROM FLOOR

TYPICALLY AT HALLWAY WALLS AND MAY BE PRESENT BEHIND DRYWALL

COVERING, PROTECT AS NECESSARY.

REMOVE SECTION OF WALL WITH DRYWALL, PLASTER AND LEAD

CONTAINING GLAZE FACED WALL BLOCK USING MANUAL MEANS WITHIN A

NEGATIVE PRESSURE ENCLOSURE, 150 SF ACT GRID AND 120 SF OF

DRYWALL AND LEAD CONTAINING BLOCK WALL. COORDINATE EXTENTS AND

CLEAN CUT FOR NEW DOOR OPENINGS.

A1

NOT TO SCALE

BLDG 1 - LEVEL 4

N

BUILDING 34 NOT SPRINKLERED. ALL OTHER BUILDINGS FULLY SPRINKLERED.

A2

A3

A4

A5

A6

A7

A8

A9

A10

L2

A6

A7

A8

A9

A6 A7

A6 A7

L2

L2

A8 A9

A10

L1

A3A1

A5A4

A9 L3

A3A1

A5A4

A9 L3

A11

L1

L2

L3

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

A11

A2

A2

GENERAL LEAD NOTE

MATERIALS CONTAINING LEAD ARE GENERALLY PRESENT

THROUGHOUT THE PROJECT PATHWAYS. LEAD BASED

MATERIALS OR PAINT FILMS (LBP) KNOWN TO EXCEED

THE EPA/HUD THRESHOLD OF 1.0 MG/CM2 AS MEASURED

BY XRF WILL BE PRESENT IN ASSUMED PROJECT

PATHWAYS. COMPLY WITH OSHA LEAD STANDARD FOR

r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

CONSULTANTS:

CIVIL ENGINEER

OLSSON

550 ST LOUIS ST,

SPRINGFIELD, MO 65806

(417) 885-1736

MECH / ELEC ENGINEER

SPUR DESIGN

2519 MADISON AVE., STE. 100

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

RATED ENGINEERING

609 S. KELLY AVENUE, SUITE H2

EDMOND, OK 73003

(405) 856-2965

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

TECH ENGINEER

ASPEN COMMUNICATIONS, LLC

7 KIJI-DAVA CIRCLE, SUITE A

PRESCOTT, AZ 86301

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STRUCT ENGINEER

STAND STRUCTURAL ENGINEERING

8234 ROBINSON STREET

OVERLAND PARK, KS 66204

(913) 214-2169

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. BR 2171 EXP. 09/30/2023

ENGR REG. NO. F-17591 EXP. 02/29/2024

STAMP:

Drawing Number

Building Number

COMMISSIONING

ES2

13401 N. SANTA FE AVE

OKLAHOMA CITY, OK 73114

(405) 528-4500

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

P

M

BUILDING 1 - FLOOR 5 -

ENVIRONMENTAL HAZARDS

CDJR

BONHAM EHRM

INFRASTRUCTURE

UPGRADES

07/07/2023

549A4-21-700

BONHAM VA MEDICAL CENTER

1201 E. 9TH STREET

BONHAM, TX 75418

HA015

SPUR #: 2216

No. REVISION DESCRIPTION DATE

HAZARDOUS MATERIALS KEYNOTES

REMOVE NON-ACM 12" X 12" FLOOR TILE AND UNDERLYING ASBESTOS BLACK MASTIC

USING MANUAL MEANS AND CHEMICAL METHODS WITHIN EXISTING NEGATIVE

PRESSURE ENCLOSURE, 135 SF EACH MATERIAL AND 1 ENCLOSURE. PROVIDE AIR

TUNNEL WHERE NECESSARY FOR OPERATING EQUIPMENT TEMPERATURE CONTROL.

REMOVE NON-ACM 12" X 12" FLOOR TILE WITH UNDERLYING ASBESTOS BLACK MASTIC

ON CONCRETE USING MANUAL MEANS AND CHEMICAL METHODS WITHIN A NEGATIVE

PRESSURE ENCLOSURE, 360 SF EACH MATERIAL AND 1 ENCLOSURE. DEMO SECTIONS

OF INTERIOR DRYWALL AND PLASTER WALLS TO FACILITATE CONTAINMENT.

REMOVE TRANSITE LIKE PANEL (PACM) BEHIND HVAC CONVECTOR WITHIN WALL

POCKET USING MANUAL MEANS WITHIN EXISTING NEGATIVE PRESSURE ENCLOSURE,

20 SF.

FLOOR COVERINGS WITH UNDERLYING ASBESTOS TILES AND/OR BLACK MASTIC

THROUGHOUT MANY AREAS, PROTECT AS NECESSARY.

RECESSED WALL RADIATOR WITH ASBESTOS TRANSITE BACKERBOARD, TYPICALLY

PRESENT, PROTECT AS NECESSARY.

ASBESTOS AND LEAD COMPONENTS (PACM) UNDERLYING NEWER ALUMINUM WINDOW

ASSEMBLY CLADDING AS TYPICAL, PROTECT AS NECESSARY.IF IMPACT TO MATERIALS

CANNOT BE AVOIDED THEN REMOVAL MUST USE MANUAL METHODS WITHIN A

NEGATIVE PRESSURE ENCLOSURE.

ASBESTOS PIPE INSULATION AND FITTINGS SUCH AS FIBERGLASS WITH ASBESTOS

WHITE SEALANT, CAL-MAG, AIRCELL AND TAR/ CORK, PROTECT AS NECESSARY. FOUND

BOTH WITHIN AND WITHOUT CHASES

LOW POTENTIAL FOR ASBESTOS PIPE INSULATION ABOVE PLASTER AND DRYWALL

CEILINGS, PROTECT AS NECESSARY.

REMOVE SPOT LOCATIONS OF ASBESTOS ROOF (PACM) WIYH UNDERLYING MASTICS

AND TARS USING MANUAL MEANS, CHEMICAL AND OUTDOOR METHODS IN A

REGULATED AREA. COORDINATE SPOT AREAS AND SIZES OF PENETRATIONS FOR

MINI-SPLIT CONDENSER BASE AND ASSOCIATED ELECTRICAL & FREON TUBING SYSTEM

PENETRATIONS AND ATTACHMENTS, 9 MINISPLIT ASSEMBLIES AT 10 SF EACH AND 5

MOBILIZATIONS. USE CLEAR BRIDGING ENCAPSULANT ON EXPOSED SURFACES.

REMOVE ASBESTOS ROOF AND UNDERLYING MASTICS OR TARS USING MANUAL MEANS

AND CHEMICAL METHODS IN A REGULATED AREA. COORDINATE SPOT AREAS OF

REMOVAL AND EXACT SIZES OF ROOF AND/OR PARAPET PENETRATIONS , 4 ROOF

AREAS FOR FALL PREVENTION SYSTEM, 40 SF TOTAL AND 3 MOBILIZATIONS. USE

CLEAR BRIDGING ENCAPSULANT ON EXPOSED SURFACES.

REMOVE LEAD CONTAINING 4" GROUTED CERAMIC WALL TILE SYSTEM USING MANUAL

MEANS AND MINIMAL FRACTURE AND REMOVE NON-ASBESTOS DRYWALL COVERING

OR WALLS TO ACCESS TILES WHERE NECESSARY ALL WORK WITHIN A NEGATIVE

PRESSURE ENCLOSURE, 1000 SF, 1 ENCLOSURE, AND 5OO SF OF DRYWALL COVERING

OR WALLS TO ACCESS TILES.

LEAD CONTAINING GLAZED BLOCK WALLS EXTENDING UP TO 5' FROM FLOOR

TYPICALLY AT HALLWAY WALLS AND MAY BE PRESENT BEHIND DRYWALL COVERING,

PROTECT AS NECESSARY.

REMOVE NON-ASBESTOS CEILING TILES AND REMOVE SECTION OF WALL WITH

DRYWALL, PLASTER AND LEAD CONTAINING GLAZE FACED WALL BLOCK USING

MANUAL MEANS WITHIN A NEGATIVE PRESSURE ENCLOSURE, 64 SF ACT CEILING TILES

AND 46 SF DRYWALL AND 46 SF GLAZED BLOCK. COORDINATE EXTENTS AND CLEAN

CUT FOR NEW DOOR OPENINGS.

LEAD CONTAINING CERAMIC WALL TILES AND OR DOOR FRAME, PROTECT AS

NECESSARY.

LEAD CONTAINING CERAMIC WINDOW SILL, PROTECT AS NECESSARY.

A1

NOT TO SCALE

BLDG 1 - LEVEL 5

N

BUILDING 34 NOT SPRINKLERED. ALL OTHER BUILDINGS FULLY SPRINKLERED.

A2

A3

A4

A5

A6

A7

A8

A5

A6

A7

L2

A4

A4

A4

A4

A4

A4

A4

L4

L2

L4

A4

A4

A7

L1

L1

L1

A6

A8

A6

L3

L1

L1

A6

L1

A3

A6

A2

A8

A2

A8 A2

A8

L5

A6

L5

A6

A2

A4

L2

A7

A9

A10

L1

L2

L3

L4

L5

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

A9A10

A9A10

A9A10

A9A10

A9A10

A1

GENERAL LEAD NOTE

MATERIALS CONTAINING LEAD ARE GENERALLY PRESENT

THROUGHOUT THE PROJECT PATHWAYS. LEAD BASED

MATERIALS OR PAINT FILMS (LBP) KNOWN TO EXCEED

THE EPA/HUD THRESHOLD OF 1.0 MG/CM2 AS MEASURED

BY XRF WILL BE PRESENT IN ASSUMED PROJECT

PATHWAYS. COMPLY WITH OSHA LEAD STANDARD FOR

r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

CONSULTANTS:

MECH / ELEC ENGINEER

SPUR DESIGN

2519 MADISON AVE., STE. 100

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

RATED ENGINEERING

609 S. KELLY AVENUE, SUITE H2

EDMOND, OK 73003

(405) 856-2965

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

TECH ENGINEER

ASPEN COMMUNICATIONS, LLC

7 KIJI-DAVA CIRCLE, SUITE A

PRESCOTT, AZ 86301

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STRUCT ENGINEER

STAND STRUCTURAL ENGINEERING

8234 ROBINSON STREET

OVERLAND PARK, KS 66204

(913) 214-2169

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. BR 2171 EXP. 09/30/2023

ENGR REG. NO. F-17591 EXP. 02/29/2024

STAMP:

Drawing Number

Building Number

CIVIL ENGINEER

OLSSON

550 ST LOUIS ST,

SPRINGFIELD, MO 65806

(417) 885-1736

COMMISSIONING

ES2

13401 N. SANTA FE AVE

OKLAHOMA CITY, OK 73114

(405) 528-4500

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

P

M

BUILDING 2 - FLOOR 1 -

ENVIRONMENTAL HAZARDS

CDJR

BONHAM EHRM

INFRASTRUCTURE

UPGRADES

07/07/2023

549A4-21-700

BONHAM VA MEDICAL CENTER

1201 E. 9TH STREET

BONHAM, TX 75418

HA021

SPUR #: 2216

No. REVISION DESCRIPTION DATE

HAZARDOUS MATERIALS KEYNOTES

REMOVE NON-ASBESTOS SHEET FLOORING AND UNDERLYING ASBESTOS FLOOR TILE WITH

ASBESTOS BLACK MASTIC ON CONCRETE USING MANUAL MEANS AND CHEMICAL METHODS

WITHIN A NEGATIVE PRESSURE ENCLOSURE, 200 SF EACH MATERIAL AND 1 ENCLOSURE.

REMOVE ASBESTOS CONTAMINATED ACT CEILING GRID, PRECLEAN, AND REMOVE

DAMAGED ASBESTOS AIR CELL, TAR AND CORK AND FIBERGLASS PIPE INSULATION AND

MUDDED FITTINGS LOCATED OUT OF CHASE USING GLOVEBAG METHODS WITHIN A

NEGATIVE PRESSURE ENCLOSURE, 140 LF ASBESTOS PIPE INSULATION AND FITTINGS, 1

ENCLOSURE AND 575 SF OF CONTAMINATED CEILING TILES. CHASES TO REMAIN.

ASBESTOS PIPE INSULATION WITHIN CHASES TO REMAIN, PROTECT AS NECESSARY. OTHER

LOCATIONS NOT SHOWN FOR CLARITY.

ON NIGHTS AND WEEKENDS, REMOVE FIBERGLASS PIPE INSULATION AND FITTINGS WITH

ASBESTOS SEALANT USING GLOVEBAG METHODS WITHIN EXISTING NEGATIVE PRESSURE

ENCLOSURE, 40 LF PIPE INSULATION AND 1 ENCLOSURE.

FLOOR TILES AND/OR ASBESTOS FLOOR TILES WITH UNDERLYING ASBESTOS BLACK

MASTIC THROUGHOUT MOST AREAS OF THE BUILDING, PROTECT AS NECESSARY.

REMOVE NON-ASBESTOS CEILING GRID AND ASBESTOS AIR CELL PIPE INSULATION AND

MUDDED FITTINGS USING GLOVEBAG METHODS WITHIN A NEGATIVE PRESSURE

ENCLOSURE, 17 LF PIPE INSUALATION AND 195 SF CEILING GRID AND 1 ENCLOSURE.

FIBERGLASS PIPE INSULATION WITH ASBESTOS WHITE SEALANT AND MUDDED FITTINGS

THOUGHOUT ALL BUILDING AREAS. OTHER TYPES OF ASBESTOS PIPE INSULATION

PRESENT WITHIN CHASE ENCLOSURES AND OTHER INACCESSIBLE AREAS, PROTECT AS

NECESSARY.

ASBESTOS AND LEAD COMPONENTS (PACM) UNDERLYING NEWER ALUMINUM WINDOW

ASSEMBLY CLADDING AS TYPICAL, PROTECT AS NECESSARY.IF IMPACT TO MATERIALS

CANNOT BE AVOIDED THEN REMOVAL MUST USE MANUAL METHODS WITHIN A NEGATIVE

PRESSURE ENCLOSURE.

ASBESTOS AIR CELL PIPE INSULATION WITHIN CHASES IS TYPICAL, PROTECT AS

NECESSARY.

RECESSED WALL RADIATOR WITH ASBESTOS TRANSITE BACKERBOARD, TYPICALLY

PRESENT, PROTECT AS NECESSARY.

ASBESTOS PIPE INSULATION ASSUMED PRESENT IN ALL CRAWLSPACES, DO NOT ENTER

AND PROTECT AS NECESSARY.

LEAD CONTAINING CERAMIC WALL TILES, WALLS OR HANDRAILS, PROTECT AS NECESSARY.

LEAD CONTAINING GLAZED BLOCK WALLS EXTENDING UP TO 5' FROM FLOOR TYPICALLY AT

HALLWAY WALLS AND MAY BE PRESENT BEHIND DRYWALL COVERING, PROTECT AS

NECESSARY.

A1

NOT TO SCALE

BLDG 2 - LEVEL 1

N

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

L1

L2

A7

L1

A5

A5

A5

A11

A8

L2

A7

A5

A5

A5

A5 A5

A5

A5

A5 A5

A5 A5 A5

L2

A4

A6

A8

A5

L1

A9

A5

A5

A5

A5

A5

A5 A5

A5 A5

A5

A5

A5

L2

A7

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

A1 A2 A3 A7

BUILDING 34 NOT SPRINKLERED. ALL OTHER BUILDINGS FULLY SPRINKLERED.

GENERAL LEAD NOTE

MATERIALS CONTAINING LEAD ARE GENERALLY PRESENT

THROUGHOUT THE PROJECT PATHWAYS. LEAD BASED

MATERIALS OR PAINT FILMS (LBP) KNOWN TO EXCEED

THE EPA/HUD THRESHOLD OF 1.0 MG/CM2 AS MEASURED

BY XRF WILL BE PRESENT IN ASSUMED PROJECT

PATHWAYS . COMPLY WITH OSHA LEAD STANDARD FOR

CONSTRUCTION 1926.62.

A3

A11

A5 A7 A7

A8

A9

A10

A7

A8

A9

A10

A7

A8

A9

A10

A7

A8

A9

A10 r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

CONSULTANTS:

MECH / ELEC ENGINEER

SPUR DESIGN

2519 MADISON AVE., STE. 100

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

RATED ENGINEERING

609 S. KELLY AVENUE, SUITE H2

EDMOND, OK 73003

(405) 856-2965

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

TECH ENGINEER

ASPEN COMMUNICATIONS, LLC

7 KIJI-DAVA CIRCLE, SUITE A

PRESCOTT, AZ 86301

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STRUCT ENGINEER

STAND STRUCTURAL ENGINEERING

8234 ROBINSON STREET

OVERLAND PARK, KS 66204

(913) 214-2169

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. BR 2171 EXP. 09/30/2023

ENGR REG. NO. F-17591 EXP. 02/29/2024

STAMP:

Drawing Number

Building Number

CIVIL ENGINEER

OLSSON

550 ST LOUIS ST,

SPRINGFIELD, MO 65806

(417) 885-1736

COMMISSIONING

ES2

13401 N. SANTA FE AVE

OKLAHOMA CITY, OK 73114

(405) 528-4500

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

P

M

BUILDING 2 - FLOOR 2 -

ENVIRONMENTAL HAZARDS

CDJR

BONHAM EHRM

INFRASTRUCTURE

UPGRADES

07/07/2023

549A4-21-700

BONHAM VA MEDICAL CENTER

1201 E. 9TH STREET

BONHAM, TX 75418

HA022

SPUR #: 2216

No. REVISION DESCRIPTION DATE

HAZARDOUS MATERIALS KEYNOTES

ON NIGHTS AND WEEKENDS, REMOVE FIBERGLASS PIPE INSULATION AND

FITTINGS WITH ASBESTOS SEALANT USING GLOVEBAG METHODS WITHIN

EXISTING NEGATIVE PRESSURE ENCLOSURE, 30 LF PIPE INSULATION AND 1

ENCLOSURE.

FLOOR TILES AND/OR ASBESTOS FLOOR TILES WITH UNDERLYING ASBESTOS

BLACK MASTIC THROUGHOUT MOST AREAS OF THE BUILDING, PROTECT AS

NECESSARY.

FIBERGLASS PIPE INSULATION WITH ASBESTOS WHITE SEALANT AND MUDDED

FITTINGS THROUGHOUT ALL BUILDING AREAS. OTHER TYPES OF ASBESTOS

PIPE INSULATION PRESENT WITHIN CHASE ENCLOSURES AND OTHER

INACCESSIBLE AREAS, PROTECT AS NECESSARY.

ASBESTOS DUCT SEAM SEALANT OR INSULATION MAY BE PRESENT, PROTECT

AS NECESSARY.

ASBESTOS SINK SOUNDPROOFING BLACK, PROTECT AS NECESSARY.

ASBESTOS AND LEAD COMPONENTS (PACM) UNDERLYING NEWER ALUMINUM

WINDOW ASSEMBLY CLADDING AS TYPICAL, PROTECT AS NECESSARY.IF

IMPACT TO MATERIALS CANNOT BE AVOIDED THEN REMOVAL MUST USE

MANUAL METHODS WITHIN A NEGATIVE PRESSURE ENCLOSURE.

RECESSED WALL RADIATOR WITH ASBESTOS TRANSITE BACKERBOARD,

TYPICALLY PRESENT, PROTECT AS NECESSARY.

LEAD CONTAINING CERAMIC WALL TILES, WALLS OR HANDRAILS, PROTECT AS

NECESSARY.

ON NIGHTS AND WEEKENDS, REMOVE LEAD CONTAINING CERAMIC COVE

BASE AND RELATED GROUT/MORTAR USING MANUAL MEANS WITHIN EXISTING

NEGATIVE PRESSURE ENCLOSURE, 12 LF.

LEAD CONTAINING GLAZED BLOCK WALLS EXTENDING UP TO 5' FROM FLOOR

TYPICALLY AT HALLWAY WALLS AND MAY BE PRESENT BEHIND DRYWALL

COVERING, PROTECT AS NECESSARY.

A1

NOT TO SCALE

BLDG 2 - LEVEL 2

N

A6

A7

A3

A4

L3

A5

L1

A3 A4 L3 A3 L3

A3 A4 L3

A3

A3

A3

A2

A3

A4

A5

A6

A7

L1

L2

L3

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

BUILDING 34 NOT SPRINKLERED. ALL OTHER BUILDINGS FULLY SPRINKLERED.

GENERAL LEAD NOTE

MATERIALS CONTAINING LEAD ARE GENERALLY PRESENT

THROUGHOUT THE PROJECT PATHWAYS. LEAD BASED

MATERIALS OR PAINT FILMS (LBP) KNOWN TO EXCEED

THE EPA/HUD THRESHOLD OF 1.0 MG/CM2 AS MEASURED

BY XRF WILL BE PRESENT IN ASSUMED PROJECT

PATHWAYS . COMPLY WITH OSHA LEAD STANDARD FOR

CONSTRUCTION 1926.62.

A3 A4 L3

A6 A7

A6 A7

A6 A7

A6 A7

A6 A7

A6 A7 r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

CONSULTANTS:

MECH / ELEC ENGINEER

SPUR DESIGN

2519 MADISON AVE., STE. 100

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

RATED ENGINEERING

609 S. KELLY AVENUE, SUITE H2

EDMOND, OK 73003

(405) 856-2965

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

TECH ENGINEER

ASPEN COMMUNICATIONS, LLC

7 KIJI-DAVA CIRCLE, SUITE A

PRESCOTT, AZ 86301

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STRUCT ENGINEER

STAND STRUCTURAL ENGINEERING

8234 ROBINSON STREET

OVERLAND PARK, KS 66204

(913) 214-2169

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. BR 2171 EXP. 09/30/2023

ENGR REG. NO. F-17591 EXP. 02/29/2024

STAMP:

Drawing Number

Building Number

CIVIL ENGINEER

OLSSON

550 ST LOUIS ST,

SPRINGFIELD, MO 65806

(417) 885-1736

COMMISSIONING

ES2

13401 N. SANTA FE AVE

OKLAHOMA CITY, OK 73114

(405) 528-4500

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

P

M

BUILDING 2 - FLOOR 3 -

ENVIRONMENTAL HAZARDS

CDJR

BONHAM EHRM

INFRASTRUCTURE

UPGRADES

07/07/2023

549A4-21-700

BONHAM VA MEDICAL CENTER

1201 E. 9TH STREET

BONHAM, TX 75418

HA023

SPUR #: 2216

No. REVISION DESCRIPTION DATE

HAZARDOUS MATERIALS KEYNOTES

REMOVE NON-ASBESTOS SHEET FLOORING AND UNDERLYING ASBESTOS FLOOR TILE WITH

ASBESTOS BLACK MASTIC ON CONCRETE USING MANUAL MEANS AND CHEMICAL METHODS

WITHIN A NEGATIVE PRESSURE ENCLOSURE, 325 SF EACH MATERIAL AND 1 ENCLOSURE.

FLOOR TILES AND/OR ASBESTOS FLOOR TILES WITH UNDERLYING ASBESTOS BLACK MASTIC

THROUGHOUT MOST AREAS OF THE BUILDING, PROTECT AS NECESSARY.

FIBERGLASS PIPE INSULATION WITH ASBESTOS WHITE SEALANT AND MUDDED FITTINGS

THROUGHOUT ALL BUILDING AREAS. OTHER TYPES OF ASBESTOS PIPE INSULATION PRESENT

WITHIN CHASE ENCLOSURES AND OTHER INACCESSIBLE AREAS, PROTECT AS NECESSARY.

ON NIGHTS AND WEEKENDS, REMOVE NON-ASBESTOS 12" X 12" FLOOR TILE WITH UNDERLYING

ASBESTOS BLACK MASTIC USING MANUAL MEANS AND CHEMICAL METHODS WITHIN A NEGATIVE

PRESSURE ENCLOSURE, 50 SF EACH MATERIAL AND 1 ENCLOSURE. PROVIDE AIR TUNNEL

WHERE NECESSARY FOR HEAT GENERATED BY OPERATING EQUIPMENT.

ON NIGHTS AND WEEKENDS, REMOVE FIBERGLASS PIPE INSULATION AND FITTINGS WITH

ASBESTOS SEALANT USING GLOVEBAG METHODS WITHIN EXISTING NEGATIVE PRESSURE

ENCLOSURE, 30 LF PIPE INSULATION.

REMOVE NON-ASBESTOS ACT CEILING GRID AND PLASTER CEILING AND ASBESTOS AIR CELL

PIPE INSULATION AND MUDDED FITTINGS ABOVE USING GLOVEBAG METHODS ALL WITHIN

EXISTING NEGATIVE PRESSURE ENCLOSURE, 750 SF CEILING SYSTEM AND 50 LF PIPE

INSULATION AND FITTINGS.

REMOVE TRANSITE LIKE PANEL (PACM) BEHIND HVAC CONVECTOR WITHIN WALL POCKET USING

MANUAL MEANS WITHIN EXISTING NEGATIVE PRESSURE ENCLOSURE, 20 SF.

ASBESTOS AND LEAD COMPONENTS (PACM) UNDERLYING NEWER ALUMINUM WINDOW

ASSEMBLY CLADDING AS TYPICAL, PROTECT AS NECESSARY.IF IMPACT TO MATERIALS CANNOT

BE AVOIDED THEN REMOVAL MUST USE MANUAL METHODS WITHIN A NEGATIVE PRESSURE

ENCLOSURE.

ASBESTOS AIR CELL PIPE INSULATION WITHIN CHASES, PROTECT AS NECESSARY.

RECESSED WALL RADIATOR WITH ASBESTOS TRANSITE BACKERBOARD, TYPICALLY PRESENT,

PROTECT AS NECESSARY.

LEAD CONTAINING CERAMIC WALL TILES, WALLS OR HANDRAILS, PROTECT AS NECESSARY.

ON NIGHTS AND WEEKENDS, REMOVE LEAD CONTAINING CERAMIC COVE BASE AND RELATED

GROUT/MORTAR USING MANUAL MEANS WITHIN EXISTING NEGATIVE PRESSURE ENCLOSURE, 12

LF.

LEAD CONTAINING GLAZED BLOCK WALLS EXTENDING UP TO 5' FROM FLOOR TYPICALLY AT

HALLWAY WALLS AND MAY BE PRESENT BEHIND DRYWALL COVERING, PROTECT AS NECESSARY.

LEAD CONTAINING CERAMIC WINDOW SILL TILES, PROTECT AS NECESSARY.

A1

DN

NOT TO SCALE

BLDG 2 - LEVEL 3

A3

L1

N

A2

A3

A2

A3

A2

A3

A2

A3

A2

A3

L3

A3

A10

A8

A2

A3

A2

A3

A2

A3

A2

A3

A2

A3

A2

A3

A2

A3

A2

A3

A2

A3

A2

A3

A2

A3

A2

A3

L3

A2

A3

A2

A3

A2

A3

A2

A3

A3

A3

A2 A3 L3

A2 A3 L3

A1 A6 A7

A9 L3 L4

A8

A4 A5

L2 L3

A2

A3

A4

A5

A6

A7

A8

A9

A10

L1

L2

L3

L4

VISUAL KEY

NEGATIVE PRESSURE ENCLOSURE

THREE STAGE DECON AND TWO STAGE LOAD OUT IN ACCORDANCE WITH

SPECIFICATION

NEGATIVE AIR MACHINE WITH THREE STAGE HEPA FILTRATION SYSTEM

IN ACCORDANCE WITH SPECIFICATION WITH SUGGESTED TUBING

DIRECTION

BUILDING 34 NOT SPRINKLERED. ALL OTHER BUILDINGS FULLY SPRINKLERED.

GENERAL LEAD NOTE

MATERIALS CONTAINING LEAD ARE GENERALLY PRESENT

THROUGHOUT THE PROJECT PATHWAYS. LEAD BASED

MATERIALS OR PAINT FILMS (LBP) KNOWN TO EXCEED

THE EPA/HUD THRESHOLD OF 1.0 MG/CM2 AS MEASURED

BY XRF WILL BE PRESENT IN ASSUMED PROJECT

PATHWAYS . COMPLY WITH OSHA LEAD STANDARD FOR

CONSTRUCTION 1926.62.

100% BID DOCUMENTS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 302A

AutoCAD SHX Text

AutoCAD SHX Text 301A

AutoCAD SHX Text 300C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 300J

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 330B

AutoCAD SHX Text 300H

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 328D

AutoCAD SHX Text 328C

AutoCAD SHX Text

AutoCAD SHX Text 327B

AutoCAD SHX Text 328A

AutoCAD SHX Text 300F

AutoCAD SHX Text

AutoCAD SHX Text 327A

AutoCAD SHX Text

AutoCAD SHX Text 326B

AutoCAD SHX Text 326A

AutoCAD SHX Text 300B

AutoCAD SHX Text 300A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 300E

AutoCAD SHX Text 320A

AutoCAD SHX Text

AutoCAD SHX Text 320B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 300D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 316A

AutoCAD SHX Text

AutoCAD SHX Text 313A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 311A

AutoCAD SHX Text

AutoCAD SHX Text 327C

AutoCAD SHX Text 327D

AutoCAD SHX Text 327E

AutoCAD SHX Text 324A

AutoCAD SHX Text 324B

AutoCAD SHX Text 324C

AutoCAD SHX Text 323A

AutoCAD SHX Text 323B

AutoCAD SHX Text 323C

AutoCAD SHX Text 330A

AutoCAD SHX Text 330C

AutoCAD SHX Text r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

CONSULTANTS:

MECH / ELEC ENGINEER

SPUR DESIGN

2519 MADISON AVE., STE. 100

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

RATED ENGINEERING

609 S. KELLY AVENUE, SUITE H2

EDMOND, OK 73003

(405) 856-2965

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

TECH ENGINEER

ASPEN COMMUNICATIONS, LLC

7 KIJI-DAVA CIRCLE, SUITE A

PRESCOTT, AZ 86301

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STRUCT ENGINEER

STAND STRUCTURAL ENGINEERING

8234 ROBINSON STREET

OVERLAND PARK, KS 66204

(913) 214-2169

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Drawing #

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. BR 2171 EXP. 09/30/2023

ENGR REG. NO. F-17591 EXP. 02/29/2024

STAMP:

Drawing Number

Building Number

CIVIL ENGINEER

OLSSON

550 ST LOUIS ST,

SPRINGFIELD, MO 65806

(417) 885-1736

COMMISSIONING

ES2

13401 N. SANTA FE AVE

OKLAHOMA CITY, OK 73114

(405) 528-4500

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

P

M

BUILDING 2 - FLOOR 4 -

ENVIRONMENTAL HAZARDS

CDJR

BONHAM EHRM

INFRASTRUCTURE

UPGRADES

07/07/2023

549A4-21-700

BONHAM VA MEDICAL CENTER

1201 E. 9TH STREET

BONHAM, TX 75418

HA024

SPUR #: 2216

No. REVISION DESCRIPTION DATE

HAZARDOUS MATERIALS KEYNOTES

REMOVE NON-ASBESTOS CARPET AND UNDERLYING ASBESTOS FLOOR TILE WITH ASBESTOS

BLACK MASTIC ON CONCRETE USING MANUAL MEANS AND CHEMICAL METHODS WITHIN A

NEGATIVE PRESSURE ENCLOSURE, 325 SF EACH MATERIAL AND 1 ENCLOSURE.

FLOOR TILES AND/OR ASBESTOS FLOOR TILES WITH UNDERLYING ASBESTOS BLACK MASTIC

THROUGHOUT MOST AREAS OF THE BUILDING, PROTECT AS NECESSARY.

FIBERGLASS PIPE INSULATION WITH ASBESTOS WHITE SEALANT AND MUDDED FITTINGS

THROUGHOUT ALL BUILDING…