Attachment- 30 SPCC-PIPP Plan VANTHCS_Bonham.pdf
PDF 1 MB Posted
- Solicitation number
- 36C77624B0007_1
About this file
This solicitation is seeking a general contractor to provide infrastructure improvements at the Bonham VAMC in Texas. Key requirements include upgrading facility fiber and providing redundant fiber runs throughout buildings to TR rooms, designing a new data center and remodeling 20 TR rooms, locating spaces for 3 TE enclosures, and upgrading HVAC and electrical distribution as needed. The contractor will also perform physical security assessments and upgrades along with hazardous material abatement in new TRs and MCR locations.
The solicitation is an invitation for bid conducted according to FAR Parts 14, 19, and 36 and will be evaluated based on the procedures listed. It has been set aside as a total SDVOSB and offers from other than SDVOSB concerns will not be considered. The applicable NAICS code is 236220 with a size standard of $45 million. The period of performance is approximately 365 calendar days from notice to proceed. The magnitude of construction is estimated between $10-20 million. Questions must be submitted in writing by the specified dates to the issuing office points of contact listed.
View the file
Other files
Show 40 more
Latest 50 of 70 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Spill Prevention, Control, and
Countermeasure Plan and
Pollution Incident Prevention Plan
Prepared for:
Department of Veterans Affairs
Sam Rayburn Memorial Veterans
1201 East 9th Street
Bonham, TX 75418
SPCC-PIPP Plan i
Table of Contents
Section Page
Management Approval and Commitment of Resources ............................................................................ iii
SPCC Plan Certification .................................................................................................................................. v
Certification of the Applicability of the Substantial Harm Criteria ............................................................ vii
Introduction
Applicability
Key Facility Information
Roles and Responsibilities
Spill Response
Spill Response Materials and Waste Disposal
Spill Notification Requirements
Non-Reportable Spill Notification Procedures
Reportable Spill Notification Procedures
Imminent Danger Spill Notification Procedures
Written Spill Notification Requirements
DEQ Water Division Chief
USEPA Regional Administrator
Spill Prevention and Controls
Potential Oil Release Sources
General Spill Prevention Measures
Secondary Containment
Impracticability Determination
Oil Transfer Activities
Transfer Procedures
General Secondary Containment in Transfer Areas
Overfill Protection
Inspections and Integrity Testing
Periodic Visual Inspections
Integrity Testing
Personnel Training
Security
Tank Construction Material
Conformance With Applicable State Requirements
Certification Requirements
Records ii
Tables
Table 1. Oil Storage Capacity and Plan Details
Table 2. Spill Classifications
Table 3. Non-Reportable Spill Notification Procedures
Table 4. Reportable Spill Notification Procedures
Table 5. Imminent Danger Spill Notification Procedures
Table 4. Cross-Reference with Spill Contingency Rules
Table 5. Inspection Guidance by Container Type
Table 6. Integrity Testing Guidance by Container Type/Size
Figures
Figure 1. Site Location Map
Figure 2. Facility Site Plan
Attachments
Attachment A Cross-Reference with the SPCC/PIPP Rules
Attachment B Monthly Inspection Checklist
Attachment C Annual Tank Inspection Checklist
Attachment D SPCC Training Record
Attachment E Notice to Petroleum Product Vendors
Attachment F Fuel/Oil Transfer Checklist
Attachment G Annual SPCC Plan Review
Attachment H Spill Incident Report
Attachment I Spill Response Flow Chart
Attachment J Spill Reporting Compliance Documentation Log
Attachment K Oil Spill Disposal Record
Attachment L Secondary Containment Area Storm Water Release Log
Attachment M SPCC Plan Review and Recertification Log
Attachment N SPCC Plan Amendment Certification iii
MANAGEMENT APPROVAL AND COMMITMENT OF RESOURCES
Department of Veterans Affairs is committed to preventing discharges of oil, salts, or other chemicals to navigable waters and the environment through the implementation of this integrated Spill
Prevention, Control, and Countermeasure (SPCC) Plan and Pollution Incident and Prevention Plan
(PIPP). This SPCC-PIPP Plan has the full approval of Department of Veterans Affairs management. By signing this page, Department of Veterans Affairs management commits to provide the personnel, equipment, and materials required to expeditiously control and remove any harmful quantity of oils, salts, or other chemicals discharged.
Jack Jordan
Name Signature
Chief, Safety Service May 5, 2023
Title Date iv v
SPCC PLAN CERTIFICATION
Certification by a Professional Engineer
By means of this certification, I hereby certify and attest that I am familiar with the requirements of the Oil Pollution Act SPCC regulations (Code of Federal Regulations, Title 40, Part 112 [40 CFR
112]), that I or my designated agent has visited and examined the facility, that this SPCC Plan has been prepared in accordance with good engineering practice, including consideration of applicable industry standards, and with the requirements of this Part, that procedures for required inspections and testing have been established, and that the plan is adequate for the facility.
This certification in no way relieves the owner or operator of the facility of his/her duty to prepare and fully implement this SPCC Plan in accordance with the requirements of 40 CFR 112. This SPCC
Plan is valid only to the extent that the facility owner or operator maintains, tests, and inspects equipment, containment, and other devices as prescribed in this SPCC Plan.
Printed Name of Registered Professional Engineer
Signature of Registered Professional Engineer
TX
Registration Number State Date vi
[This page left blank intentionally] vii
CERTIFICATION OF THE APPLICABILITY OF THE SUBSTANTIAL HARM
CRITERIA
Facility Name: Sam Rayburn Memorial
Facility Address: 120 East 9th Street
Facility Location: Bonham, TX 75418
1. Does the facility have a maximum storage capacity greater than or equal to 42,000 gallons and do the operations include over water transfers of oil to or from vessels?
2. Does the facility have a maximum storage capacity greater than or equal to 1,000,000 gallons and does the facility lack secondary containment that is sufficiently large to contain the capacity of the largest aboveground storage tank within the storage area?
3. Does the facility have a maximum storage capacity greater than or equal to 1,000,000 gallons and is the facility located at a distance such that a discharge from the facility could cause injury to an environmentally sensitive area?
4. Does the facility have a maximum storage capacity greater than or equal to 1,000,000 gallons and is the facility located at a distance such that a discharge from the facility would shut down a public drinking water intake?
5. Does the facility have a maximum storage capacity greater than or equal to 1,000,000 gallons and within the past 5 years, has the facility experienced a reportable spill in an amount greater than or equal to 10,000 gallons?
Yes No
X
Certification
I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document, and that based on my inquiry of those individuals responsible for obtaining this information, I believe that the submitted information is true, accurate, and complete.
Jack Jordan
Name (please type or print) Signature
Chief, Safety Service May 5, 2023
Note: If an alternative formula is used in questions 3 and 4, documentation of the reliability and analytical soundness of the alternative formula must be attached to this form.
viii
INTRODUCTION
This document is the Spill Prevention, Control, and Countermeasure (SPCC) Plan and Pollution
Incident Prevention Plan (PIPP) for Sam Rayburn Memorial Veterans Center, part of VA North Texas
Health Care System (VANTHCS). The VANTHCS previous hospital complex was constructed in 1948 and consists of the main outpatient building, a boiler plant/maintenance garage, a nursing home and domiciliary, and a few support buildings. Petroleum products, salt storage, and other chemicals applicable to the SPCC and PIPP requirements are primarily stored at the boiler plant/maintenance garage.
APPLICABILITY
The Clean Water Act Oil Pollution Prevention (SPCC) regulation (Code of Federal Regulations, Title 40, Part 112 [40 CFR 112]), as issued by the U.S. Environmental Protection Agency (USEPA), aims to prevent the discharge of oil into or upon the navigable waters or adjoining shorelines of the United
States. Additionally, Texas Administrative Code (TAC) regulations (R 324.2001 – R 324.2009) aim to provide additional countermeasures to prevent releases to the environment.
A cross-reference checklist identifying how this plan complies with the SPCC and PIPP regulation is provided in Attachment A.
The SPCC regulation applies to all oil products, including, but not limited to:
• Fats, oils, or greases of animal, fish, or marine mammal origin
• Vegetable oils, including oils from seeds, nuts, fruits, or kernels
• Other oils and greases including petroleum, fuel oil, sludge, synthetic oils, mineral oils, oil refuse, or oil mixed with wastes other than dredged spoil.
The PIPP regulation applies to polluting materials including:
• Oil products as described above
• Salt (solid or brine storage)
• Any material stored above the threshold management quantity (TMQ)
A facility is subject to SPCC regulation if, due to its location, the facility could reasonably be expected to discharge oil in quantities that may be harmful into or upon navigable waters or adjoining shorelines of the United States and the aggregate:
• Aboveground oil storage capacity exceeds 1,320 gallons in containers with volumes of
55 gallons or greater, or
• Underground oil storage capacity of the facility exceeds 42,000 gallons—excluding sources that are currently subject to all technical requirements of 40 CFR 280 or all technical requirements of state programs approved under 40 CFR 281.
A facility is subject to PIPP regulation if it manages polluting materials (described above) more than threshold management quantities:
• Salt in solid form more than 5 tons
• Salt in liquid form more than 1,000 gallons
• Aboveground oil storage capacity exceeding 1,320 gallons or a single storage container exceeding 660 gallons
• Materials listed in Rule 9 stored outdoors more than 440 pounds
• Materials listed in Rule 9 stored indoors more than 2,200 pounds
Because the facility has more than 1,320 gallons of oil (see Table 1 on page 5) in containers with a capacity of 55 gallons or greater (sources) and manages over 5 tons of salt in solid form, this SPCC-
PIPP Plan was prepared and will be implemented consistent with the current version of 40 CFR 112 and MAC R 324.2001 – R 324.2009.
This SPCC-PIPP Plan is used as a:
• Reference for proper oil and other polluting material storage
• Tool for spill or release prevention
• Guide for facility inspections and tank testing
• Resource during emergency response to control, contain, and clean up a release
KEY FACILITY INFORMATION
Name of the Facility: Sam Rayburn Memorial Veterans Center
Facility Owner: Department of Veterans Affairs
Facility/Mailing Address: 120 E. 9th Street
Bonham, Texas 75418 (Fannin County)
Facility Phone Number: 903-583-6692
Latitude/Longitude: 33.58495, -96.16658
Name, Direction, and Distance to the Nearest Body of Water:
Facility Emergency
Coordinator:
Alternate Emergency
Storm sewer on the facility routes toward East 9th Street and toward the Seven Oaks Road (FM 2906) Northeast, east of the State
Veterans Home Area. The local Wastewater Treatment Plan is approximately 500 feet from the VA campus to the North. Pig
Branch is located approximately 1,500 feet west of the facility. Pig
Branch feeds into Bosi d’Arc Creek. The Site Location Map on Figure
1 shows the location of the facility relative to these nearby waterways.
Michael Hoffman, Emergency Manager
Program Manager Work: ( 2 1 4 ) 3 7 2 - 8 8 1 4
Cell: ( 2 1 4 ) 5 6 4 - 5 9 0 6
Associate Chief Engineer
Work: 214-857-1028 Cell: 469-545-8185
Location of SPCC-PIPP Plan: A complete copy of this SPCC-PIPP Plan is maintained in the VA North Texas
Health Care System – Safety Office (Building TT-49) and Boiler Plant
(Building 11), 1201 E. 9th Street, Bonham, TX; and is available for on-site review by the USEPA Regional Administrator. This SPCC- PIPP Plan is not filed with the USEPA.
Next Review Due: October 2027 (or after any release requiring implementation of the plan)
Last Review Completed: September 2022
Facility Oil Sources: See Table 1 on page 5.
Other Oil Sources at Facility
Not Managed Under this
SPCC/PIPP Plan:
None
Facility Salt Storage: No liquid form salt is stored on the facility. No solid salt is stored on the facility more than 5 tons.
Other Polluting Materials at
Facility:
Other materials managed at the facility are below the threshold management quantity.
Spill History: The facility has had no reportable oil spills to date.
Underground Oil Storage
Capacity:
VAMC has approximately 6,500 gallons of underground storage capacity. All underground storage tanks (USTs), aboveground and underground piping, and ancillary equipment at the facility conform to the technical requirements of 40 CFR 280 and are therefore exempt from the requirements of the SPCC program. As required, the location and contents of these tanks are included on the Facility
Site Plan, Figure 2.
Table 1. Oil Storage Capacity and Plan Details
Sam Rayburn Memorial Veterans Center
Bonham, Texas
Storage
Symbol
Oil Source
Volume
(gal)
Location
Container
Construction
Contents
Transfer Activities
Distance and Direction to Nearest Receptor
Spill Prevention and Leak
Detection
Secondary
Containment
Overfill Protection
Spill
Countermeasures and Response
Materials
Security
Inspection and Integrity
Testing Schedule
Underground and Aboveground Storage Tanks
UST1
TCEQ1
4,000 Outdoors, Building 1 Double-Walled
Fiberglass
Reinforced
Plastic (DWFRP)
Diesel Fuel, Red Filled by a tanker truck and transferred to facility vehicles
Northwest approximately 70 ft to site storm drain
Spill Prevention: Level gauge, emergency shutoff switch, and prudent practices of oil transfer
Leak Detection: Routine inspections of tank containment units
(4.5' x 7' x 2.6') 605-gallon HDPE tank containment unit
Visual level gauge Spill kit in Building 2 -
Maintenance
Garage
Located in restricted access area that is fenced with locked gates, facility well lit
Inspections:
Monthly, annually, (see
Attachments B and C).
Integrity Testing: No required integrity testing.
UST8
TCEQ8
2,000 Outdoors, Building 24 Double-Walled
Fiberglass
Reinforced
Plastic (DWFRP)
Diesel Fuel, Red Filled by a tanker truck and transferred to facility vehicles
Northwest approximately 80 ft to site storm drain
Spill Prevention: Level gauge, emergency shutoff switch, and prudent inspections of tank containment units
(4.5' x 7' x 2.6') 605-gallon HDPE tank containment unit
Visual level gauge Spill kit in Building 2 -
Maintenance
Garage
Located in restricted access area that is fenced with locked gates, facility well lit
Inspections:
UST9
TCEQ9
500 Outdoors, Building 29 Double-Walled
Fiberglass
Reinforced
Plastic (DWFRP)
Diesel
Fuel, Red
Filled by a tanker truck and transferred to facility vehicles
Northwest approximately 90 ft to site storm drain
Spill Prevention: Level gauge, emergency shutoff switch, fuel shutoff valve, and prudent practices of oil transfer
Double-walled tank Visual level gauge, fuel shutoff valve
Spill kit in Building 2 -
Maintenance
Garage
Located in restricted access area that is fenced with locked gates, facility well lit
Inspections:
Leak Detection: Interstitial monitoring, routine inspections, and located on a concrete pad
AST1
TCEQ
FS-1
2,000 Outdoors, Fuel Station Double-Walled
Steel (DWS)
Gasoline Filled by a tanker truck, fuel for
Emergency
Generators
South then east approximately 250 ft total to site storm drain
Spill Prevention: Level gauge, overfill box, and prudent practices of oil transfer
Leak Detection: Interstitial monitoring (with alarm), routine inspections, and located above a concrete pad
Tank construction
(Concrete enclosing
HDPE membrane enclosing steel tank)
Level gauge, overfill box on fill port, overfill alarm (high fuel alarm)
Spill kit in Building 2
Generator Room
Located in restricted access area that is fenced with locked gates, facility well lit
Inspections:
Bonham, Texas
Oil
Source
Countermeasures
AST2
TCEQ
FS-2
10,000 Outdoors, Fuel Station Double-Walled
Steel (DWS)
Ethanol Filled by a tanker truck, fuel for
Emergency
Generators
South then east approximately 250 ft total to site storm drain
Spill Prevention: Level gauge, overfill box, and routine inspections, and located above a concrete pad
Tank construction
(Concrete enclosing
HDPE membrane enclosing steel tank)
Level gauge, overfill box on fill port, overfill alarm (high fuel alarm)
Spill kit in Building 2
Generator Room
Located in restricted access area that is fenced with locked gates, facility well lit
Inspections:
Attachments B, and C).
Integrity Testing: Formal external inspection by certified inspector every
20 years. Tank installed
July 2012.
AST3
TCEQ
FS-3
2,000 Outdoors, Fuel Station Double-Walled
Steel (DWS)
Diesel fuel Filled by an tanker truck, fuel for
Emergency
Generators
South then east approximately 250 ft total to site storm drain
Spill Prevention: Level gauge, overfill box, and routine inspections, and located above a concrete pad
Tank construction
(Concrete enclosing
HDPE membrane enclosing steel tank)
Level gauge, overfill box on fill port, overfill alarm (high fuel alarm)
Spill kit in Building 2
Generator Room
Located in restricted access area that is fenced with locked gates, facility well lit
Inspections:
external inspection by certified inspector every 20 years. Tank installed July
2012.
AST6
TCEQ3
3,000 Outdoors, Building 2 Double-Walled
Steel (DWS)
Diesel fuel, Red Day tanks for generators, automatic recirculation system between
AST4 and AST5
Self-Contained Room Spill Prevention: Level gauge and prudent inspections and located on concrete floor
(5' x 3' x 4') 450-gallon steel secondary containment structure
Level alarm (high fuel alarm), emergency shutoff switch
Spill kit in Building 2
Generator Room
Inside locked building
Inspections:
AST5
TCEQ4
2,000 Outdoors, Building 11 Double-Walled
Steel (DWS)
Diesel fuel, Red Day tanks for generators, automatic recirculation system between
AST4 and AST5
Self-Contained Room Spill Prevention: Level gauge, and prudent on concrete floor
(5' x 3' x 4') 450-gallon steel secondary containment structure
Level alarm (high fuel alarm), emergency shutoff switch
Spill kit in Building 2
Generator Room
Inside locked building
Inspections:
AST4
TCEQ5
25,000 Outdoors, Building 11 Double-Walled
Steel (DWS)
Diesel fuel, Red Day tanks for generators, automatic recirculation system between
AST4 and AST5
Self-Contained Room Spill Prevention: Level gauge, and prudent on concrete floor
(5’ x 3’ x 4’) 450-gallon steel secondary containment structure
Level alarm (high fuel alarm), emergency shutoff switch
Spill kit in Building 2
Generator Room
Inside locked building
Inspections:
AST7
TCEQ6
10,000 Outdoors, Fuel
Station
Double-Walled
Steel (DWS)
Ethanol
Bonham, Texas
100 Outdoors, Building 3 Single-walled steel
Generator
60 Outdoors, Building 24 Single-walled steel
Generator
50 Outdoors, Building 29 Single-walled steel
Generator
50 Outdoors, Building 1 Single-walled steel
Generator
50 Outdoors, Building 11 Single-walled steel
Generator
2 Each
(xxx gals)
Outdoors, Building 20 Single-walled steel
Transformer
Bonham, Texas
Oil Source
Countermeasures
Used Cooking Oil and Grease Containers
275 Outdoors, Building 3 Double-walled steel
Waste cooking oil and grease
Filled by hand and emptied by a third-party vendor
South approximately
30 feet to storm drain inlet
Spill Prevention: Prudent on concrete
See Section 4.3 in
Report Text
Procedure to follow:
1.) Verify container has sufficient free capacity for the transfer; 2.)
Visually monitor the product level throughout the transfer operation
No Room Locked tank Inspections:
external inspections every
10 years by a certified inspector, and leak testing every 10 years.
Miscellaneous Drum Storage
D1 55 total Indoors, Building 2 -
Maintenance
Garage, North Area
One 55-gallon steel drum
Used Oil Transferred manually
Northwest approximately 15 ft to floor drain (to oil water separator)
Leak Detection: Concrete floor and routine inspections
Stored on secondary containment pallets
Procedure to follow:
1.) Verify container has sufficient free capacity for the transfer; 2.)
Visually monitor the product level throughout the transfer operation
No Garage Inside locked building
Inspections: Monthly (see
Attachment D) required integrity testing
Hydraulic Elevator Reservoirs/Oil Filled Equipment
EQ1 <55 Building 1 - Main
Hospital Building, Loading Dock Area
Compactor
Reservoir
Hydraulic Oil Filled manually South approximately feet to storm drain inlet
Leak Detection: Concrete pad and routine inspections
Not applicable (oil-filled equipment)
Not applicable (oil-filled equipment) No spill kit Routine security inspections, in a well-light area
Inspections: Routine inspections by a third-party refuse contractor
TOTAL ABOVEGROUND OIL STORAGE (SPCC REGULATED): 48,810 GALLONS
ROLES AND RESPONSIBILITIES
Facility Emergency Coordinator / Alternate Facility Emergency
Coordinator
For purposes of implementing this plan, the IH/GEMS Program Manager) and Alternate are responsible for the following items:
General Implementation:
• Obtain all applicable signatures for the SPCC/PIPP Plan
• Distribute, post, and collect (upon completion) the applicable forms from the SPCC/PIPP
Plan (e.g., Monthly, and Annual Inspection Checklists, Notice to Petroleum Product
Vendors, and the Fuel Transfer Checklist)
• Execute or coordinate the routine daily, monthly, and annual inspections on the respective oil storage containers
• Coordinate or provide loading/unloading oil transfer oversight for transfers completed by outside tank vendors
• Maintain SPCC/PIPP records for a minimum of 5 years
• Coordinate and conduct annual SPCC/PIPP training
• Coordinate SPCC/PIPP amendments or required 3-year reviews for the SPCC/PIPP Plan
Spill Response:
• Implement the appropriate spill response operations and ensure the use of appropriate personal protective equipment
• Lead/coordinate emergency oil/fuel spill response team efforts
• Perform spill reporting, as necessary, following the procedures provided in this
SPCC/PIPP Plan
• Ensure the proper disposal of contaminated material
Polluting Material Handling Employees
Polluting material handling employees at the facility are responsible for operating and maintaining the oil and other storage containers at the facility. In relation to the SPCC and PIPP regulations, these responsibilities are as follows:
• Attend annual SPCC-PIPP training (all polluting material handling employees)
• Execute routine daily, monthly, and annual inspections (as assigned)
• Notify the Facility Emergency Coordinator of observed spills to start the emergency spill response procedure
• Place initial spill countermeasure materials (from facility spill kit(s))
SPILL RESPONSE
This portion of the SPCC-PIPP Plan covers this facility’s countermeasures to a potential spill and includes actions such as spill notification requirements, spill contents recovery, response, and cleanup.
All pollutant material spills, regardless of size, must be contained and cleaned up in a safe and effective manner. In general, the following steps should be taken to address a discharge, if possible and safe to do so:
1. Contact the FEC or the Alternate FEC.
2. Secure the site and eliminate potential spark sources.
3. Identify and stop the source of the discharge.
4. Contain the discharge with sorbent materials, berms, boom, or other materials.
5. Collect and dispose of recovered products according to regulation.
6. Complete reporting process according to regulations.
To determine the proper response procedures, this plan classifies spills as “Non-Reportable,”
”Reportable,” or “Imminent Danger,” depending on the following characteristics:
Table 2. Spill Classifications
Non-Reportable Spills Reportable Spills Imminent Danger Spills
• The spill is:
▪ <~6 gallons of oil product
(~50 pounds),
▪ <50 pounds of solid salt, or
▪ <50 gallons of liquid salt
OR
• The spill can be easily contained and cleaned up within 24 hours by facility personnel.
AND
• The spill did not reach the surface waters or groundwater of the state or public sanitary/sewer system
• The spill is:
▪ >~6 gallons of oil product
(~50 pounds),
▪ >50 pounds of solid salt, or
▪ >50 gallons of liquid salt
OR
• The spill reaches the surface waters or groundwater of the state or public sanitary/sewer system
• The spill poses an immediate hazard to human health or the environment.
OR
• There is danger of fire or explosion.
Response by facility personnel possible
Requires coordination with
Emergency
Management (EM) or
Alternate EM
Requires coordination with the Bonham Fire
Department – Call 911
See the flowchart in Attachment I for spill response steps to respond to each spill most appropriately.
SPILL RESPONSE MATERIALS AND WASTE DISPOSAL
Spill Response Materials
Location: Spill kit storage locations for the facility are listed in Table 1 and shown on Figure 2.
Approach: Place at locations central to the oil storage containers and near oil/fuel transfer areas.
Use: Control, contain, and clean up an oil spill.
Response Materials Needed: Materials to contain and absorb incidental spills (up to
20 gallons of oil).
Maintaining Response Materials: Inspect the spill response kits at least monthly to ensure sufficient supply.
Disposal of Used Sorbents and Contaminated Soil
• Record used sorbents and contaminated soil reclaimed after a spill in the Oil Spill
Disposal Record (Attachment K).
• Dispose used sorbents and contaminated soil in a manner consistent with local, state, and federal regulations, as well as VAMC policy.
• Contain absorbent materials separately from contaminated soil/granular clay (Oil-Dri) in drums or non-leaking containers.
• Work with your regulated waste vendor to determine if the spilled product may be considered a hazardous waste.
Note: Oil absorbents that are not hazardous waste may be placed in the trash if there is no free-flowing oil remaining in the absorbents. A licensed waste disposal company can help with removal and treatment of hazardous wastes and absorbents with free-flowing oil.
Safety Data Sheets
Safety data sheets for all potentially polluting materials are stored online at http://vaww.hefp.va.gov/ and accessed by qualified users.
http://vaww.hefp.va.gov/
SPILL NOTIFICATION REQUIREMENTS
Depending on the nature and quantity of the product released, several individuals and organizations must be contacted in the event of a spill. When there is a release, determining if, when, and to whom it should be reported can be a daunting task, even if you are familiar with the reporting requirements. There is NO PENALTY for over-reporting.
Non-Reportable Spill Notification Procedures
In the event of a non-Reportable spill as described in Section 3.0, facility personnel will contact the
FEC or Alternate FEC. After response and containment of the spill are complete, the FEC or designee will fill out the Spill or Release Report form provided in Attachments H and K. The FEC or Alternate
FEC, will not need to notify or submit the documentation to local, state, or federal agencies.
Table 3. Non-Reportable Spill Notification Procedures
Non-Reportable Spills Agency/
Organization
Contact #
When to Notify
▪ <6 gallons of oil product
(~50 pounds),
▪ <50 pounds of solid salt, or
▪ <50 gallons of liquid salt
OR
• The spill can be easily contained and cleaned up within 24 hours by facility personnel.
AND
• The spill did not reach the surface waters or groundwater of the state or public sanitary/sewer system
Site Contacts
Facility Emergency
Mike Hoffman
1-214-564-5906
Immediately
(verbal)
Alternate Facility
Emergency
Dennis Pollard
1-214-392-2728
Local Agencies ➔ Notification is Not Required
State Agencies ➔ Notification is Not Required
Federal Agencies ➔ Notification is Not Required
Reportable Spill Notification Procedures
In the event of a Reportable spill as described in Section 3.0, facility personnel will contact the FEC or
Alternate FEC. After response and containment of the spill are complete, the FEC or designee will fill out the Spill or Release Report form provided in Attachments H, J, and K. The FEC or Alternate FEC, will need to notify/submit the documentation to local, state, or federal agencies. See Section 3.2.
Table 4. Reportable Spill Notification Procedures
Reportable Spills Agency/ Organization Contact # When to Notify
▪ >~6 gallons of oil product (~50 pounds)
▪ >50 pounds of solid salt, or
▪ >50 gallons of liquid salt
OR
• The spill reaches the surface waters of the state or public sanitary/sewer system
Local Agencies
Bonham Water Treatment
Plant
1-972-442-5405 Immediately
(verbal) – for spills reaching public sanitary sewer system
Bonham Fire Department 1-903-640-0408
(non-emergency)
Immediately
(verbal) – for spills reaching public storm sewer system
Fannin County Emergency
Management
1-903-640-8484 Immediately (verbal)
State Agencies
First Contact:
Texas Commission on
Environment Quality
1-817-588-5800
(Emergency)
Immediately (verbal)
VISN 17: VA Heart of Texas
Health Care Network
1-817-385-1111
(Business Hours)
Immediately (verbal)
Texas Commission on
Environment Quality
Use their online form.
Call them at (888)
777-3186 (24 hours).
Written notification within 10 days
(See Section 3.2.1)
Federal Agencies
National Response Center
(NRC)
1-800-424-8802 www.nrc.uscg.mil
Immediately (verbal)
EPA Region 6 (hotline) 1-800-887-6063 Immediately (verbal)
EPA Region 6 Regional
Administrator
US EPA Region 6
1201 Elm Street, Suite 500
Dallas, TX 75270
Written notification within 60 days (see
Section 3.2.2)
Imminent Danger Spill Notification Procedures
In the event of an Imminent Danger spill as described in Section 3.0, facility personnel will contact
911 and the FEC or Alternate FEC. After evaluation, the FEC or Alternate FEC will determine the appropriate level of response and containment of the spill as either a Non-Reportable Spill or a
Reportable Spill as previously described.
http://www.nrc.uscg.mil/
Table 5. Imminent Danger Spill Notification Procedures
Imminent Danger Spills Agency/
Organization
Contact #
When to Notify
• The spill poses an immediate hazard to human health or the environment.
OR
• There is danger of fire or explosion.
Site Contacts
Facility Emergency
Mike Hoffman
1-214-857-5906
Alternate Facility
Emergency
Dennis Pollard
1-214-392-2728
Local Agencies
First Contact:
Bonham
Fire/Police
Department
911 Immediately
WRITTEN SPILL NOTIFICATION REQUIREMENTS
TCEQ Water Division Chief
A written notification to the TCEQ Water Division Chief is required after a reportable polluting material release. This report must be made within 10 days of the release and must include the following information:
1. Cause of the release.
2. Discovery of the release.
3. Response measures taken and/or schedule for completion of measures to be taken.
4. Measures to prevent recurrence of similar releases.
The Spill or Release Report (DEQ EQP3465 “Spill or Release Report”) form can be used for this written notification requirement and is provided in Attachment H.
USEPA Regional Administrator
A written notification to the TCEQ to a navigable waterway or adjoining shoreline waterway, for any discharge greater than 1,000 gallons, or for two discharges of 42 gallons or more of oil to navigable waters in any 12-month period. This report must be made within 60 days of the discharge and must include the following information:
1. Name of the facility.
2. Name of the individual submitting the information.
3. Location of the facility.
4. Maximum storage or handling capacity of the facility and normal daily throughput.
5. The corrective actions and/or countermeasures taken, including adequate description of equipment repairs and/or replacements.
6. An adequate description of the facility, including maps, flow diagrams, and topographical maps.
7. A complete copy of the SPCC Plan with any amendments.
8. The cause(s) of such discharge(s), including a failure analysis of the system or subsystem in which the failure(s) occurred.
9. Additional preventative measures taken or contemplated to minimize the possibility of recurrence.
SPILL PREVENTION AND CONTROLS
This section of the SPCC/PIPP Plan covers this facility’s prevention and control measures in place to help this facility limit its potential for spills.
POTENTIAL OIL RELEASE SOURCES
The oil sources at this facility, specific discharge volumes, direction of flow, and potential spill receptors for individual tanks and containers are listed in Table 1. An oil release could occur due to any of the following situations:
• During loading/unloading activities, such as:
– Overflow or spillage during tank or container filling:
▪ Potential rate of flow is dependent on fill rate of mobile tanker truck (typically ranges between 60 gallons per minute (gpm) and 300 gpm).
▪ Total volume released is dependent on how quickly the filling technician or facility representative (If observing transfer process) is able to press the emergency shutoff button on the truck and size/remaining product in the mobile tanker truck
(typically ranges from nil to hundreds of gallons).
– Spillage during tank or container emptying:
▪ Potential rate of flow is dependent on the empty rate of the pump (typically ranges from 5 to 10 gpm).
▪ Total volume released is dependent on how quickly the filling technician or facility representative (If observing transfer process) is able turn off/unplug the pump or press the emergency shutoff button on the truck and size/remaining product in the mobile tanker truck (typically ranges from nil to hundreds of gallons).
• Due to equipment failure, such as:
– Tank rupture because of nature, human error, or vandalism:
▪ Potential release rate is instantaneous (entire container contents released immediately) and total volume released is equal to the volume of the container
(see Table 1).
– Leaks due to corrosion or partial failure of tank or container seams, pipes, valves, or connections:
▪ Potential release rate is nil to 10 gpm and total volume released is equal to the volume of the container (see Table 1).
GENERAL SPILL PREVENTION MEASURES
Implement the following measures to prevent an oil spill during the handling, use, or transfer of oil products at the facility:
• Verify that tanks and containers are constructed of material compatible with the oil being stored (Section 4.8).
• Provide a functioning liquid level sensing device for bulk storage containers, such as a visual gauge, an electronic high-level alarm, or automatic pump cutoff (Section 4.4.3).
• Practice good housekeeping to ensure that oil storage areas are kept clear of debris.
• Promptly correct all visible spills (Section 3.0).
• Provide appropriate secondary containment (Section 4.3).
• Practice proper unloading/loading procedures during oil transfer activities
(Section 4.4/Attachment E).
• Conduct as-used, daily, monthly, and annual inspections on all SPCC/PIPP applicable tanks and containers (Section 4.5.1).
• Conduct integrity testing, or a practice that is environmentally equivalent, on tanks and containers as required (Section 4.5.2).
• Store sufficient spill response materials near oil sources (Section 3.3).
• Train personnel at least annually in proper oil-handling procedures (Section 4.2).
• Provide adequate security measures on and around all oil sources (Section 4.7).
• Maintain inspection and maintenance records for 3 years (Section 4.5.1/Section 7.0).
SECONDARY CONTAINMENT
All oil source areas listed in Table 1 at this facility are required to be designed with appropriate containment and/or diversionary structures. Common examples of secondary containment include double-wall tank construction, concrete containment berms, spill pallets for portable drums, nearby sorbent materials, oil/water separators, and self-contained concrete-floored rooms. Specific information regarding secondary containment measures provided for each tank and container is included in Table 1.
Oil storage containers at the facility generally have sufficient secondary containment with being double walled, inside steel or HDPES containment structure, in a self-contained room, or stored on secondary containment pallets. Bulk storage containers (tanks, drums) meet the requirements for sized containment in 40 CFR 112.8(c)(2). Elevator reservoirs and oil-filled equipment meet the general secondary containment requirements in 40 CFR 112.7(c).
Impracticability Determination
These oil sources are covered under this SPCC-PIPP Plan’s inspection and monitoring program
(Section 4.5.1 and Attachment B) and the SPCC-PIPP Plan’s written commitment of resources (page iii). Requirements for an oil spill contingency plan are satisfied by this SPCC-PIPP Plan as demonstrated in the following table:
Table 4. Cross-Reference with Spill Contingency Rules
Provision Rule Coverage Plan Section
109.5(a) Definition of the authorities, responsibilities, and duties of all persons Sections 1.2 and 2.0
109.5(b) Establishment of notification procedures Section 3.1
109.5(b)(1) Identification of critical water use areas Section 1.2
109.5(b)(2) Current list of names, telephone numbers, and addresses Sections 1.2 and 3.1
109.5(b)(3) Provisions for access to a reliable communications system Sections 1.2 and 3.1
109.5(b)(4) An established, prearranged procedure for requesting assistance Section 3.1
109.5(c) (1-
3)
Provisions to assure that full resource capability is known Section 3.1
109.5(d) (1-
5)
Provisions for well-defined and specific actions to be taken Section 3.0
OIL TRANSFER ACTIVITIES
Transfer Procedures
Oil transfer at the facility may include the filling and emptying of tanks by a tanker truck, the dispensing of oil from tanks into smaller containers or vehicles, or the transfer of used oil into tanks or containers. Specific oil transfer activities related to individual oil sources for this facility are included in Table 1. All petroleum product vendors and VAMC employees who deliver, load, unload, or pick up petroleum products must review and comply with the requirements set forth in
Attachment E, the Notice to Petroleum Product Vendors. During oil transfer activities, follow these measures to prevent a spill:
• Temporarily cover or block nearby storm or sanitary sewer drains.
• Know the location of the closest spill kit containing oil absorbent materials in case of a spill.
• Check to make sure the drivers understand the amount of product to be transferred and that they are constantly monitoring for potential oil storage container overfills.
• Ensure drivers are monitoring the transfer of oil full-time while the product is being transferred.
• Use wheel chocks or other similar barriers to prevent premature movement of transfer vehicles.
• Inspect around and below oil transfer vehicles for leaks before and after loading or unloading.
• For transfers not involving filling and emptying of tanks by a tanker truck, use a funnel or pump when adding or removing smaller quantities of oil to tanks, containers, or filling oil-filled electrical equipment reservoirs.
The Fuel/Oil Transfer Checklist (Attachment F) is recommended as a BMP for completion for each oil transfer conducted by a third-party vendor for tanks listed within this SPCC-PIPP Plan. Post the Notice to Petroleum Product Vendors (Attachment E) prominently in key oil transfer areas, to ensure these practices are followed by vendors and VAMC employees.
General Secondary Containment in Transfer Areas
Since other oil/fuel transfers at the facility are conducted on impervious surfaces and have nearby spill kits readily available for use if needed, they meet general secondary containment requirements in 40 CFR 112.7(c).
For the facility’s drum storage (D1), the facility is following the environmentally equivalent procedure below in lieu of the procedure in 40 CFR 112.8 (C)(8).
1. Verify container has sufficient free capacity for the transfer
2. Visually monitor the product level during transfer
INSPECTIONS AND INTEGRITY TESTING
Periodic Visual Inspections
The purpose of visual inspections is to determine if an oil release has occurred; evaluate the general condition of tanks, containers, and piping; and determine the suitability for continued oil storage until the next inspection. The inspection program for the facility includes routine daily observations for leakage from equipment as it is used, as well as documented monthly and annual scheduled inspections. Routine daily inspections are not required to be documented as part of this SPCC-PIPP
Plan.
Checklists used to document the inspections are included as Attachments B and C. Completed inspection forms must be kept for a minimum of 3 years. The visual inspections do not require a
Certified Inspector.
Table 1 lists the required inspection frequency for each oil source. Inspection criteria and schedules outlined in this plan are based on the Steel Tank Institute (STI) SP 001-18 (2018, 6th edition). This standard is applicable to shop-fabricated tanks (less than 30,000 gallons in capacity) and portable containers.
Conduct routine daily inspections by checking:
• Tanks, containers, and associated piping for evidence of leakage or spillage
• Tanks and containers for water or oil in the tank, interstice, or secondary containment
• Pumps and valves are locked or secured
• Manholes and sumps for any petroleum constituent or buildup
Conduct documented monthly inspections using Attachment B by checking:
• Storage areas for signs of debris that may block access
• Storage areas for unlabeled or outdated containers
• Tanks, containers, and associated piping for evidence of leakage or spillage
• Tanks and containers for water or oil in the tank, interstice, or secondary containment
• Pumps and valves are locked or secured
• Outdoor secondary containment structures that may require drainage (Attachment L)
• Manholes, sumps, and oil/water separator for any petroleum constituent or buildup
• Spill response materials for replacement or replenishment of spill response materials
Conduct documented annual inspections using Attachment C by checking:
• Secondary containment structures for evidence of damage
• Tank foundation and support structures for signs of settlement, corrosion, or damage
• Tank or container exterior coatings for needed cleaning or maintenance
• Tank normal and emergency vents for needed cleaning or maintenance
• Tank or container liquid level and overfill prevention sensing devices
Additional inspections and/or additional inspection items may be warranted if the facility incurs damaging severe weather events (e.g., lightning strikes, wind damage, flooding). The inspection frequency for the oil/fuel storage containers at this facility is summarized in the table below.
Table 5. Inspection Guidance by Container Type
Tank or Container Type Guidance Visual Inspection Frequency
Aboveground storage tanks STI SP-001-18 Monthly and annually
Used cooking oil containers STI SP-001-18 Monthly and annually
Portable drums STI SP-001-18 Monthly
The facility personnel performing these inspections are knowledgeable of the facility operations, characteristics of the oil stored, the type of container, and its associated components. The scope of inspections and procedures are covered in the training provided to employees involved in handling oil at the facility. The routine inspections focus specifically on detecting changes in conditions or evidence of oil leakage from the container, piping system, or appurtenances.
If non-conforming items important to the tank or containment integrity are identified, an evaluation by an engineer experienced in AST design, a certified inspector, or a tank manufacturer is required to determine the appropriate corrective action. As an alternative, the facility owner may replace the tank/container with a new tank/container.
Maintain copies of tank permits, licenses, records of inspections, and integrity tests.
Integrity Testing
The purpose of integrity testing is to measure the tank or container’s structural imperviousness and its soundness in containing oil, ensuring its suitability for continued use under current and anticipated operating conditions. Integrity testing may also help a facility determine whether corrosion has reached a point where repairs or replacement of the container is needed, and thus avoid unplanned interruptions in facility operations.
Compliance recommendations for the SPCC rule’s integrity testing requirements are based on the
STI Standard for the Inspection of Aboveground Storage Tanks (SP-001-18). The following table summarizes general integrity testing requirements.
Table 6. Integrity Testing Guidance by Container Type/Size
Tank Type Tank Volume
(gallons)
Secondary Containment
Guidance
Integrity
Testing
Frequency
Shop-built aboveground storage tanks
0 – 1,100
Spill control1 with or without a continuous release detection method2
STI SP-001-18
Not required
0 – 1,100 No Spill control1 STI SP-001-18 E&L (10)3
1,101 – 5,000
Spill control1 with a continuous release detection method2
5,001 – 30,000
Spill control1 with continuous release
E (20)3
Portable
Containers
Drums/Totes
Spill control1 with or without continuous release
1 Spill control is a means of preventing a release of liquid to the environment (e.g., secondary containment berm, dual-walled AST, or other secondary containment system).
2 Continuous release detection method (CRDM) refers to a means of detecting a release of liquid where releases are visually detectable by facility operators (e.g., dual-walled AST with interstitial monitoring port, elevated AST, AST on a concrete floor).
3 E&L (10) = Formal external inspections every 10 years by a certified inspector, and leak testing every
10 years by owner or owner’s designee.
E (20) = Formal external inspections every 20 years by a certified inspector
Formal integrity testing is not required for the steel drums in the drum storage area (D1), provided the containers have spill control in place, by means of containment pallets or other form of appropriate secondary containment.
Transformers are oil-filled operational equipment and are not considered bulk storage containers.
All transformers located on the facility are utility-owned and are therefore inspected and maintained by the Utility.
PERSONNEL TRAINING
All oil-handling personnel receive at least annual training to properly respond to spills in their work areas. The Facility Emergency Coordinator determines who is trained, and the content and training method (e.g., hands-on, classroom, computer-based). A training documentation form is provided as
Attachment D. Update the form each time the on-site staff receive training. Training needs to cover the following information:
• The contents of the facility SPCC Plan, including the specific locations of oil tanks and containers.
• The frequency and procedures of inspections and record keeping.
• The operation and maintenance of equipment to prevent spills.
• Spill response procedures.
• Applicable oil pollution prevention laws, rules, and regulations.
• General facility operations; and
• Discharge prevention briefings highlighting and describing discharges or failures, malfunctioning components, and any recently developed precautionary measures.
SECURITY
To ensure the safety of the facility personnel and to minimize the potential for releases of oil and other polluting materials, various security measures are in place. Moist polluting material are located within locked buildings or rooms eliminating access to indoor oil storage off-hours. The facility is fully fenced and the outdoor areas around the facility are well-lit to discourage vandalism during non-working hours. Specific security information related to individual tanks and containers is listed in Table 1.
TANK CONSTRUCTION MATERIAL
The facility’s oil-filled containers are compatible with the contents they store and the conditions they are stored in. See Table 1 for specific container construction information.
CONFORMANCE WITH APPLICABLE STATE REQUIREMENTS
This SPCC-PIPP Plan was prepared and is implemented consistent with the current version of 40 CFR
112 and the Texas Commission of Environmental Quality, Surface Water Resources Division
Regulations R 324.2001 – R 324.2009 of the Texas Administrative Code (TAC). Refer to Attachment
A for a summary of how this Plan complies with applicable portions of MAC.
CERTIFICATION REQUIREMENTS
The facility has approximately 48,910 gallons of aboveground oil storage capacity in containers 55 gallons or greater. Since the facility has over 10,000 gallons of aboveground oil storage capacity, a
Professional Engineer must certify the mandatory 5-year SPCC review and future amendments to this
SPCC/PIPP Plan.
RECORDS
Maintain inspection checklists, recertification logs, spill/release reports, fuel delivery notice and storm water release logs, and fuel transfer checklists in Attachments A through N for a minimum of
5 years.
Figures
1 Site Location Map
2 Facility Site Plan
SITE LOCATION
Bonham.zip
BONHAM TOPO SITE
MAP STORAGE TANKS.pdf site locations.pdf
Fuel Tanks.pdf
Attachments
A Cross-Reference with the SPCC Rule
B Monthly Inspection Checklist
C Annual Tank Inspection Checklist
D SPCC Training Record
E Notice to Petroleum Product Vendors
F Fuel/Oil Transfer Checklist
G Annual SPCC Plan Review
H Spill Incident Report
I Spill Response Flow Chart
J Spill Reporting Compliance Documentation Log
K Oil Spill Disposal Record
L Secondary Containment Area Storm Water Release
Log
M SPCC Plan Review and Recertification Log
N SPCC Plan Amendment Certification
Attachment A
Cross Reference with the SPCC Rule
Sam Rayburn Memorial Veterans
Center
40 CFR Part 112 Description SPCC Plan/PIPP Location
Subpart A: Applicability, Definitions, and General Requirements for All Facilities and All Types of
Oils
§ 112.1 General applicability Section 1.1
§ 112.2 Definitions See 40 CFR 112
§ 112.3(d) Professional Engineer Review & Certification Section 1.0, Page v
§ 112.3(e) Plan location and availability Section 1.2
§ 112.4 Regional Administrator Submittal Section 3.3
§ 112.5 Amendment of SPCC Plan by owners or operators
Cover letter, Section 6.0, and Attachments M and N
§ 112.6(a)(1) Qualified Facilities Plan requirements Not applicable
§ 112.6(a)(2) Technical Amendments Attachment N
§ 112.7 General requirements for SPCC Plans
§ 112.7(a)(1) Conformance with applicable parts of § 112.7 Sections 1.0 and 5.0
§ 112.7(a)(2) Compliance with applicable parts of § 112.7 See the other cross-references in this table
§ 112.7(a)(3) Physical layout and facility diagram Figure 2
(a)(3)(i) Oil storage type and capacity Table 1
(a)(3)(ii) Discharge prevention measures Section 4.0 and Table 1
(a)(3)(iii) Discharge or drainage controls Section 4.0 and Table 1
(a)(3)(iv) Countermeasures for discharge discovery, response, and cleanup Section 3.0
(a)(3)(v) Recovered material disposal Section 3.4
(a)(3)(vi) Contact list Section 1.2 and 3.2
§ 112.7(a)(4) Response plan or spill reporting procedures Section 3.0, and
Attachments H and I
§ 112.7(a)(5) Discharge procedures to use in emergency Section 3.0, and
Attachments H and I
§ 112.7(b) Spill direction, rate of flow and total quantity of oil during failures
Section 4.1, Table 1 and Figure 2
§ 112.7(c) General Secondary Containment Section 4.3
§ 112.7(d)(1) Secondary containment impracticability determination Section 4.3.1
§ 112.7(d)(2) Written commitment of manpower, equipment, and materials Page…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .