36C77624B0007 0011.pdf
PDF 162 KB Posted
- Solicitation number
- 36C77624B0007_1
About this file
This document is an amendment to a federal solicitation for the EHRM - Infrastructure - Construction - Bonham project. The amendment adds several new attachments to the solicitation, including updated RFI responses, a TR matrix, hydrology map, erosion control details, and other technical drawings and specifications.
The solicitation is for a general contractor to provide infrastructure improvements at the Bonham VA Medical Center, including upgrading facility fiber, designing a new data center, remodeling 20 TR rooms, upgrading HVAC and electrical, and performing hazardous material abatement. The solicitation is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, with a NAICS code of 236220 and an estimated contract value between $10-20 million. The period of performance is approximately 365 calendar days from the notice to proceed. The proposal due date is April 16, 2024 at 1 PM EST.
View the file
Other files
Show 40 more
Latest 50 of 70 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0011 4/5/2024
549A4-21-700
36C776
Department of Veterans Affairs Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131
36C776
Department of Veterans Affairs Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131
To all Offerors/Bidders
36C77624B0007
X
X X
X 1 (ONE)
This amendment is to post updated RFI responses. The previous RFI responses are rescinded and replaced with the RFI responses in this amendment.
Reminder Proposal Due Date is April 16, 2024 at 1 PM EST.
CONFERENCE CALL IN NUMBER: 1 872-701-0185, UPDATED CONFERENCE ID: 249 927 65#
CLOSING STATEMENT: The changes represented in this amendment constitute a change to the solicitation. Changes to the solicitation are limited to the terms expressed herein. All other terms and conditions of the solicitation remain the same.
Dean Flanders Contracting Officer
AMENDMENT OF SOLICITATION
DATE SIGNED PAGE OF PAGES
SEE BLOCK 16C 2 3
SOLICITATION NUMBER: 36C77624B0007
AMENDMENT NUMBER: 0011
CONTRACT TITLE: “EHRM - Infrastructure - Construction - Bonham”
LOCATION: Bonham VA Medical Center (VAMC), 1201 East 9th Street, Bonham Texas 75418
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Continued)
A. SCOPE OF WORK:
i. Additional Attachments
The VA hereby submits the following for consideration:
1. Attachment - 51 TR Matrix Bonham
2. Attachment - 52 Hydrology Map
3. Attachment - 53 Sheet GS019 EROSION CONTROL DETAILS
4. Attachment - 54 Sheet GS020 DETAILS
A COMPREHENSIVE LIST OF ALL ATTACHMENTS FOLLOWS:
5. Attachment - 01 General Drawings_100percent Bid Docs
6. Attachment - 02 Hazmat Drawings_100percent Bid Docs
7. Attachment - 03 Civil Drawings_100percent Bid Docs
8. Attachment - 04 Structural Drawings_100percent Bid Docs
9. Attachment - 05 Architectural Drawings_100percent Bid Docs
10. Attachment - 06 Fire Protection Drawings_100percent Bid Docs
11. Attachment - 07 Mechanical Drawings_100percent Bid Docs
12. Attachment - 08 Electrical Drawings_100percent Bid Docs
13. Attachment - 09 Telecom Drawings_100percent Bid Docs
14. Attachment - 10 Security Drawings_100percent Bid Docs
15. Attachment - 11 Asbestos 1 - Environmental Narrative
16. Attachment - 12 Asbestos 2 - Table 1 -Asbestos-Historical Materials
17. Attachment - 13 Asbestos 3_ VA Checklist Environ
18. Attachment - 14 Asbestos 4 -Table 2 - Sample Log
19. Attachment - 15 Asbestos Analysis 5—App A
20. Attachment - 16 CABINET DIMENSIONAL DATA
21. Attachment - 17 EHRM Bonham -Simulation Main Computer Rm 1- CFD Analysis
22. Attachment - 18 EHRM Bonham - Simulation Main Computer Rm 2 - CFD Analysis
23. Attachment - 19 Structural Calculations
24. Attachment - 20 AE Update 1.3 -Attachment 20 V1 549A4-21-700 100 Bid Doc
Specs
25. Attachment - 21 V2 549A4-21-700 100 Bid Doc Specs
26. Attachment - 22 Specs 549A4-21-700 Bonham EHRM Add 01
27. Attachment - 23 549A4-21-700 Bonham EHRM Add 02
28. Attachment - 24 Limitations on Subcontracting – Construction
29. Attachment - 25 Wage Determination – Bonham
30. Attachment - 26 General SOW Narrative Bonham
31. Attachment - 27 Answers to Solicitation-RFIs-36C77624B0007_1
32. Attachment - 28 Bonham EHRM- ICRA Form
33. Attachment - 29 Bonham VA - Geotech Rpt 3-30-16-For Soil
34. Attachment - 30 SPCC-PIPP Plan VANTHCS_Bonham
35. Attachment - 31 site plan fiber runs Bonham
36. Attachment - 32 V2 549A4-21-700 100 Bid Document Specifications
37. Attachment - 33 AE Physical Security Risk Mitigation Design Guidance
38. Attachment - 34 00 General Narrative
39. Attachment - 35 01 Bonham EHRM- Narrative
40. Attachment - 36 01 Environmental Narrative
41. Attachment - 37 02 Civil Narrative
42. Attachment - 38 03 Structural Narrative
43. Attachment - 39 05 Fire Protection Narrative
44. Attachment - 40 06 Mechanical Narrative
45. Attachment - 41 07 Electrical Narrative
46. Attachment - 42 08 Telecom Narrative
47. Attachment - 43 09 Security Narrative
48. Attachment - 44 Station Pictures for electrical
49. Attachment - 45 IT Closet Proposed lay down
50. Attachment - 46 Answers to Solicitation-RFIs-Missing section-36C77624B0007_1
51. Attachment - 47 Clarifications-Additional Technical Questions
52. Attachment - 48 S04-sign in sheet Site Visit Bonham TX 1.9.24
53. Attachment - 49 S04-sign in sheet pg 1 Site Visit Bonham TX 1.9.24
54. Attachment - 50 CLARIFICATION of Site Visit-Duct banks not available for use
55. Attachment - 51 TR Matrix Bonham
56. Attachment - 52 Hydrology Map
57. Attachment - 53 Sheet GS019 EROSION CONTROL DETAILS
58. Attachment - 54 Sheet GS020 DETAILS
59. Attachment - 55 Solicitation-RFIs-Tech Responses 36C77624B0007
B. CLOSING STATEMENT:
The changes represented in this amendment constitute a change to the solicitation.
Changes to the solicitation are limited to the terms expressed herein.
All other terms and conditions of the solicitation remain the same.
End of Document
File details come from the government source that posted it. Updated .