Attachment 57 - Abstract of Bids OF 1419 A - CONST-Bonham.pdf

PDF 1 MB Posted

Attached to
Z2DA--EHRM Bonham, TX Construction 549A4-21-700 EHRM Construction (VA-23-00092679)
Solicitation number
36C77624B0007_1
Issued by

About this file

This document is an Abstract of Offers for a construction contract solicitation for the Department of Veterans Affairs (VA). The solicitation number is 36C77624B0007 and the project title is "EHRM-Infrastructure-Construction - Bonham 4B". The contract involves upgrading the fiber infrastructure, data center design, and other infrastructure improvements at the Bonham VA Medical Center in Texas. The estimated value of the contract is between $10 million and $20 million. The solicitation has been issued as an Invitation for Bid (IFB) and is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The period of performance is approximately 365 calendar days from the issuance of the Notice to Proceed. The Abstract of Offers provides details on the offers received, including the offeror names, bid security amounts, and acknowledgment of amendments.

View the file

Other files

File Type Posted
Attachment 56 - Abstract of Bids OF 1419 - CONST-Bonham - Signed.pdf PDF
36C77624B0007 0012.docx DOCX document
Attachment- 54 Sheet GS020 DETAILS.pdf PDF
Attachment- 53 Sheet GS019 EROSION CONTROL DETAILS.pdf PDF
Attachment- 51 TR Matrix Bonham.pdf PDF
Attachment- 55 Solicitation-RFIs-Tech Responses 36C77624B0007.pdf PDF
Attachment- 52 Hydrology Map.pdf PDF
36C77624B0007 0011.pdf PDF
36C77624B0007 0010.pdf PDF
36C77624B0007 0009.pdf PDF
Att 50 CLARIFICATION of Site Visit-Duct banks not available for use.pdf PDF
36C77624B0007 0008.pdf PDF
36C77624B0007 0007.docx DOCX document
Attachment - 49 S04-sign in sheet-pg 1 Site Visit Bonham TX 1.9.24.pdf PDF
36C77624B0007 0006.docx DOCX document
36C77624B0007 0005.pdf PDF
Attachment - 48 S04-sign in sheet Site Visit Bonham TX 1.9.24.pdf PDF
Attachment - 47 Clarifications-Additional Technical Questions.pdf PDF
36C77624B0007 0004.pdf PDF
Attachment - 46 Answers to Solicitation-RFIs-MISSING SECTION-36C77624B0007_1.pdf PDF
36C77624B0007 0003.pdf PDF
Attachment- 29 Bonham VA - Geotech Rpt 3-30-16-For Soil.pdf PDF
Attachment- 35 01 Bonham EHRM- Narrative.pdf PDF
Attachment- 36 01 Environmental Narrative.pdf PDF
Attachment- 44 Station Pictures for electrical.pdf PDF
Attachment- 28 Bonham EHRM- ICRA Form.pdf PDF
Attachment- 41 07 Electrical Narrative.pdf PDF
Attachment- 30 SPCC-PIPP Plan VANTHCS_Bonham.pdf PDF
Attachment- 38 03 Structural Narrative.pdf PDF
Attachment- 27 Answers to Solicitation-RFIs-36C77624B0007_1.pdf PDF
Attachment- 42 08 Telecom Narrative.pdf PDF
Attachment- 43 09 Security Narrative.pdf PDF
36C77624B0007 0002.pdf PDF
Attachment- 37 02 Civil Narrative.pdf PDF
Attachment- 32 V2 549A4-21-700 100 Bid Document Specifications.pdf PDF
Attachment- 45 IT Closet Proposed lay down.pdf PDF
Attachment- 39 05 Fire Protection Narrative.pdf PDF
Attachment- 34 00 General Narrative.pdf PDF
Attachment- 33 AE Physical Security Risk Mitigation Design Guidance.pdf PDF
Attachment- 31 site plan fiber runs Bonham.pdf PDF
Attachment- 40 06 Mechanical Narrative.pdf PDF
36C77624B0007 0001.pdf PDF
36C77624B0007_1-tech questions date updated.pdf PDF
36C77624B0007_1.pdf PDF
Attachment - 13 Asbestos 3_ VA Checklist_Environ.pdf PDF
Attachment - 03 Civil Drawings_100percent Bid Docs.pdf PDF
Attachment - 24 Limitations on Subcontracting - Construction.pdf PDF
Attachment - 16 CABINET DIMENSIONAL DATA.pdf PDF
Attachment - 05 Architectural Drawings_100percent Bid Docs.pdf PDF
Attachment - 18 EHRM Bonham - Simulation Main Computer Rm 2 - CFD Analysis.pdf PDF
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION SHEET

1. SOLICITATION NUMBER

PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)

2. PROJECT TITLE

NO.:

NO.:

NO.:

NO.:

A. OFFEROR

A. OFFEROR

A. OFFEROR

A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

A. ITEM NO.

B. ESTIMATED QUANTITY

C. UNIT

D. UNIT PRICE

E. ESTIMATED AMOUNT

E. ESTIMATED AMOUNT

D. UNIT PRICE

E. ESTIMATED AMOUNT

D. UNIT PRICE

E. ESTIMATED AMOUNT

D. UNIT PRICE

AUTHORIZED FOR LOCAL REPRODUCTION Previous edition is usable

OPTIONAL FORM 1419A (11-88)

8.2.1.3144.1.471865.466429

1. SOLICITATION NUMBER: 36C77624B0007
2. PROJECT TITLE:

EHRM-Infrastructure-Construction - Bonham

4B. OFFERS (Continued) BID SECURITY (Type and amount): Bid Bond 20% NTE 3M
4B. OFFERS (Continued) BID SECURITY (Type and amount): Bid Bond 20% NTE 3M
4B. OFFERS (Continued) BID SECURITY (Type and amount): Bid Bond 20% NTE 3M
4B. OFFERS (Continued) BID SECURITY (Type and amount): Bid Bond 20% NTE 3M
4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: YES
4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: YES
4C. OFFERORS (Continued) AMENDMENTS ACKNOWLEDGED.: YES
4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: YES
3A. CONTRACT ITEMS. ITEM NUMBER. Line 1 of 13.: 1.00000000
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:
3B. ESTIMATED QUANTITY:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13.:
3C. CONTRACT ITEMS. UNIT:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 13 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 12 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 11 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 10 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 9 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 8 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 7 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 6 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 5 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 4 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 3 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 2 of 13.:
3B. ESTIMATED QUANTITY: 1.00000000
3C. CONTRACT ITEMS. UNIT: JB
4D. OFFERS (Continued) UNIT PRICE. Line 1 Of 13.: 20143200.00000000
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: 22176820.00000000
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: 19151014.00000000
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: 12316777.00000000
4E. OFFERS (Continued) ESTIMATED.:
PAGE OF: 2.00000000
PAGES: 2.00000000
Offeror number. Column 1 of 4.: 3
Offeror number. Column 2 of 4.: 4
Offeror number. Column 3 of 4.: 5
Offeror number. Column 4 of 4.: 6
A. OFFEROR: The Trevino Group, Inc
A. OFFEROR: Briston Construction, LLC
A. OFFEROR: Richard Group, LLC
A. OFFEROR: Delco,LLC

File details come from the government source that posted it. Updated .