This solicitation is seeking a general contractor to provide infrastructure improvements at the Bonham VA Medical Center in Bonham, Texas. The scope of work includes upgrading facility fiber throughout buildings to each telecommunications room, providing redundant fiber runs, designing a new data center and remodeling 20 telecommunications rooms. Additional requirements consist of locating three telecommunications enclosures and upgrading HVAC and electrical distribution as necessary. The solicitation also involves physical security assessments and hazardous material abatement in selected areas. The total period of performance is approximately 365 calendar days with a magnitude of construction between $10-20 million. The solicitation was issued as an invitation for bid by the Department of Veterans Affairs Technology Acquisition Center Austin and will be evaluated using IFB procedures outlined in the document. The opportunity is set aside as a total SDVOSB and offers from other than SDVOSB concerns will be excluded. Questions must be submitted in writing to the issuing office by the specified deadline.
View the file
Other files
Show 40 more
Latest 50 of 70 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0005 549A4-21-700
36C776
Department of Veterans Affairs Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131
36C776
Department of Veterans Affairs Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131
To all Offerors/Bidders
36C77624B0007
12-20-2023
X
X X
X 1 (ONE)
This amendment is to post the sign-in list for the site visit and RFI clarifications.
SEE CONTINUATION PAGE
Dean Flanders Contracting Officer
DATE SIGNED PAGE OF PAGES
AMENDMENT OF SOLICITATION
SEE BLOCK 16C 2 3
SOLICITATION NUMBER: 36C77624B0007
AMENDMENT NUMBER: 0003
CONTRACT TITLE: “EHRM - Infrastructure - Construction - Bonham”
LOCATION: Bonham VA Medical Center (VAMC), 1201 East 9th Street, Bonham Texas 75418
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Continued)
A. SCOPE OF WORK:
i. Additional Attachments
The VA hereby submits the following for consideration:
1. Attachment- 47 Clarifications-Additional Technical Questions
2. Attachment- 48 S04-sign in sheet Site Visit Bonham TX 1.9.24
A COMPREHENSIVE LIST OF ALL ATTACHMENTS FOLLOWS:
3. Attachment - 01 General Drawings_100percent Bid Docs
4. Attachment - 02 Hazmat Drawings_100percent Bid Docs
5. Attachment - 03 Civil Drawings_100percent Bid Docs
6. Attachment - 04 Structural Drawings_100percent Bid Docs
7. Attachment - 05 Architectural Drawings_100percent Bid Docs
8. Attachment - 06 Fire Protection Drawings_100percent Bid Docs
9. Attachment - 07 Mechanical Drawings_100percent Bid Docs
10. Attachment - 08 Electrical Drawings_100percent Bid Docs
11. Attachment - 09 Telecom Drawings_100percent Bid Docs
12. Attachment - 10 Security Drawings_100percent Bid Docs
13. Attachment - 11 Asbestos 1 - Environmental Narrative
14. Attachment - 12 Asbestos 2 - Table 1 -Asbestos-Historical Materials
15. Attachment - 13 Asbestos 3_ VA Checklist_Environ
16. Attachment - 14 Asbestos 4 -Table 2 - Sample Log
17. Attachment - 15 Asbestos Analysis 5--AppA
18. Attachment - 16 CABINET DIMENSIONAL DATA
19. Attachment - 17 EHRM Bonham -Simulation Main Computer Rm 1- CFD Analysis
20. Attachment - 18 EHRM Bonham - Simulation Main Computer Rm 2 - CFD Analysis
21. Attachment - 19 Structural Calculations
22. Attachment - 20 AE Update 1.3 -Attachment 20 V1 549A4-21-700 100 Bid Doc
Specs
23. Attachment - 21 V2 549A4-21-700 100 Bid Doc Specs
24. Attachment - 22 Specs 549A4-21-700 Bonham EHRM Add 01
25. Attachment - 23 549A4-21-700 Bonham EHRM Add 02
26. Attachment - 24 Limitations on Subcontracting – Construction
27. Attachment - 25 Wage Determination – Bonham
28. Attachment - 26 General SOW Narrative Bonham
29. Attachment - 27 Answers to Solicitation-RFIs-36C77624B0007_1
30. Attachment - 28 Bonham EHRM- ICRA Form
31. Attachment - 29 Bonham VA - Geotech Rpt 3-30-16-For Soil
32. Attachment - 30 SPCC-PIPP Plan VANTHCS_Bonham
33. Attachment - 31 site plan fiber runs Bonham
34. Attachment - 32 V2 549A4-21-700 100 Bid Document Specifications
35. Attachment - 33 AE Physical Security Risk Mitigation Design Guidance
36. Attachment - 34 00 General Narrative
37. Attachment - 35 01 Bonham EHRM- Narrative
38. Attachment - 36 01 Environmental Narrative
39. Attachment - 37 02 Civil Narrative
40. Attachment - 38 03 Structural Narrative
41. Attachment - 39 05 Fire Protection Narrative
42. Attachment - 40 06 Mechanical Narrative
43. Attachment - 41 07 Electrical Narrative
44. Attachment - 42 08 Telecom Narrative
45. Attachment - 43 09 Security Narrative
46. Attachment - 44 Station Pictures for electrical
47. Attachment - 45 IT Closet Proposed lay down
48. Attachment - 46 Answers to Solicitation-RFIs-Missing section-36C77624B0007_1
49. Attachment- 47 Clarifications-Additional Technical Questions
50. Attachment- 48 S04-sign in sheet Site Visit Bonham TX 1.9.24
B. CLOSING STATEMENT:
The changes represented in this amendment constitute a change to the solicitation.
Changes to the solicitation are limited to the terms expressed herein.
All other terms and conditions of the solicitation remain the same.
End of Document