This solicitation seeks a general contractor to provide infrastructure upgrades at the Bonham Veterans Affairs Medical Center in Texas. The selected contractor will be responsible for upgrading facility fiber and communications rooms, designing a new data center and remodeling communications rooms, locating telecommunications enclosures, and upgrading HVAC, electrical, physical security, and abating hazardous materials. The solicitation has been issued as a total Service-Disabled Veteran-Owned Small Business set-aside with a response due date of TBD. The period of performance is approximately 365 calendar days and the magnitude of construction is estimated between $10,000,000 to $20,000,000.

View the file

Other files

File Type Posted
Attachment 56 - Abstract of Bids OF 1419 - CONST-Bonham - Signed.pdf PDF
Attachment 57 - Abstract of Bids OF 1419 A - CONST-Bonham.pdf PDF
36C77624B0007 0012.docx DOCX document
Attachment- 54 Sheet GS020 DETAILS.pdf PDF
Attachment- 53 Sheet GS019 EROSION CONTROL DETAILS.pdf PDF
Attachment- 51 TR Matrix Bonham.pdf PDF
Attachment- 55 Solicitation-RFIs-Tech Responses 36C77624B0007.pdf PDF
Attachment- 52 Hydrology Map.pdf PDF
36C77624B0007 0011.pdf PDF
36C77624B0007 0010.pdf PDF
36C77624B0007 0009.pdf PDF
Att 50 CLARIFICATION of Site Visit-Duct banks not available for use.pdf PDF
36C77624B0007 0008.pdf PDF
36C77624B0007 0007.docx DOCX document
Attachment - 49 S04-sign in sheet-pg 1 Site Visit Bonham TX 1.9.24.pdf PDF
36C77624B0007 0006.docx DOCX document
36C77624B0007 0005.pdf PDF
Attachment - 48 S04-sign in sheet Site Visit Bonham TX 1.9.24.pdf PDF
Attachment - 47 Clarifications-Additional Technical Questions.pdf PDF
36C77624B0007 0004.pdf PDF
Attachment - 46 Answers to Solicitation-RFIs-MISSING SECTION-36C77624B0007_1.pdf PDF
36C77624B0007 0003.pdf PDF
Attachment- 29 Bonham VA - Geotech Rpt 3-30-16-For Soil.pdf PDF
Attachment- 35 01 Bonham EHRM- Narrative.pdf PDF
Attachment- 36 01 Environmental Narrative.pdf PDF
Attachment- 44 Station Pictures for electrical.pdf PDF
Attachment- 28 Bonham EHRM- ICRA Form.pdf PDF
Attachment- 41 07 Electrical Narrative.pdf PDF
Attachment- 30 SPCC-PIPP Plan VANTHCS_Bonham.pdf PDF
Attachment- 38 03 Structural Narrative.pdf PDF
Attachment- 27 Answers to Solicitation-RFIs-36C77624B0007_1.pdf PDF
Attachment- 42 08 Telecom Narrative.pdf PDF
Attachment- 43 09 Security Narrative.pdf PDF
36C77624B0007 0002.pdf PDF
Attachment- 32 V2 549A4-21-700 100 Bid Document Specifications.pdf PDF
Attachment- 45 IT Closet Proposed lay down.pdf PDF
Attachment- 39 05 Fire Protection Narrative.pdf PDF
Attachment- 34 00 General Narrative.pdf PDF
Attachment- 33 AE Physical Security Risk Mitigation Design Guidance.pdf PDF
Attachment- 31 site plan fiber runs Bonham.pdf PDF
Attachment- 40 06 Mechanical Narrative.pdf PDF
36C77624B0007 0001.pdf PDF
36C77624B0007_1-tech questions date updated.pdf PDF
36C77624B0007_1.pdf PDF
Attachment - 13 Asbestos 3_ VA Checklist_Environ.pdf PDF
Attachment - 03 Civil Drawings_100percent Bid Docs.pdf PDF
Attachment - 24 Limitations on Subcontracting - Construction.pdf PDF
Attachment - 16 CABINET DIMENSIONAL DATA.pdf PDF
Attachment - 05 Architectural Drawings_100percent Bid Docs.pdf PDF
Attachment - 18 EHRM Bonham - Simulation Main Computer Rm 2 - CFD Analysis.pdf PDF
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA PROJECT NUMBER

PROJECT NAME

549A4-21-700 (Spur 2216) EHRM Infrastructure Upgrades – Bonham, TX

SUBMITTAL 100% Bid Documents SUBJECT Site Narrative

Site 1

Project Overview and Background

This narrative provides supplemental information to further define the infrastructure upgrades for the EHRM Bonham, Texas project. This narrative is intended to provide additional guidance for 100% Bid Documents level pricing to be provided by the design team. Also, these plans and narrative will be reviewed by the VA. The information provided herein was obtained from conversations with the VA, surveys provided by the VA, GIS data, and visual site reconnaissance. Buildings 1-4, 8-12, 24A, 24B, 24C, 29, and 34 have been determined to be in the scope of work.

Geotechnical

No subsurface exploration has been completed, nor is planned to be completed, for this project.

Pavement

The contractor shall replace all sidewalks, curbs, and pavement damaged during construction of the new duct banks.

Sanitary Sewer

No sanitary sewer service or sanitary main extensions are required as part of this project.

Storm Drainage

No storm sewer service or storm sewer main extensions are required as part of this project.

General Utilities

There will not be any water, fire, or gas line extensions as part of this project. Refer to the plans for additional information. It was determined that new communication duct banks and communication manholes will be required as shown on sheet GS011-GS014. Reference Technology plans for additional information and communication duct bank rehabilitations that may be needed.

Detention and Water Quality and Sediment Basin

No Detention or Water Quality improvements are anticipated as a part of this project.

Contractor will be responsible for installing erosion control measures as needed to control sediment migration and sediment tracking off the site. See erosion control plans and details as shown on sheets GS015-GS019.