36C77624B0007 0006.docx
DOCX document 30 KB Posted
- Solicitation number
- 36C77624B0007_1
About this file
This solicitation is for infrastructure improvements and data center construction services at the Bonham VA Medical Center in Bonham, Texas. The scope of work includes upgrading facility fiber throughout buildings to telecommunications rooms, providing redundant fiber runs, designing a new data center and 20 telecommunications rooms, locating three telecommunications enclosures, and upgrading HVAC and electrical distribution. The solicitation also requires physical security assessments and hazardous material abatement. The total period of performance is 365 calendar days with a magnitude of construction between $10-20 million. The solicitation was issued as an invitation for bid under FAR Parts 14, 19, and 36 and will be evaluated accordingly. It is a total SDVOSB set-aside with a NAICS code of 236220 and size standard of $45 million. All questions must be submitted in writing to the issuing office by the specified deadlines.
View the file
Other files
Show 40 more
Latest 50 of 70 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) February 16,2024 549A4-21-700 36C776 Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 36C776 Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 To all Offerors/Bidders
36C77624B0007
X X X
X 1 (One) This amendment is to add additional sign in page from the site visit.
See continuation page
Dean Flanders Contracting Officer
| AMENDMENT OF SOLICITATION |
| DATE SIGNED |
| PAGE OF PAGES |
| SEE BLOCK 16C |
| 2 |
| 3 |
SOLICITATION NUMBER: 36C77624B0007
AMENDMENT NUMBER: 0006
CONTRACT TITLE: “EHRM - Infrastructure - Construction - Bonham”
LOCATION: Bonham VA Medical Center (VAMC), 1201 East 9th Street, Bonham Texas 75418
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Continued)
A. SCOPE OF WORK:
i. Additional Attachments
The VA hereby submits the following for consideration:
1. Attachment- 49 S04-sign in sheet Site pg 1 Visit Bonham TX 1.9.24
A COMPREHENSIVE LIST OF ALL ATTACHMENTS FOLLOWS:
2. Attachment - 01 General Drawings_100percent Bid Docs
3. Attachment - 02 Hazmat Drawings_100percent Bid Docs
4. Attachment - 03 Civil Drawings_100percent Bid Docs
5. Attachment - 04 Structural Drawings_100percent Bid Docs
6. Attachment - 05 Architectural Drawings_100percent Bid Docs
7. Attachment - 06 Fire Protection Drawings_100percent Bid Docs
8. Attachment - 07 Mechanical Drawings_100percent Bid Docs
9. Attachment - 08 Electrical Drawings_100percent Bid Docs
10. Attachment - 09 Telecom Drawings_100percent Bid Docs
11. Attachment - 10 Security Drawings_100percent Bid Docs
12. Attachment - 11 Asbestos 1 - Environmental Narrative
13. Attachment - 12 Asbestos 2 - Table 1 -Asbestos-Historical Materials
14. Attachment - 13 Asbestos 3_ VA Checklist_Environ
15. Attachment - 14 Asbestos 4 -Table 2 - Sample Log
16. Attachment - 15 Asbestos Analysis 5--AppA
17. Attachment - 16 CABINET DIMENSIONAL DATA
18. Attachment - 17 EHRM Bonham -Simulation Main Computer Rm 1- CFD Analysis
19. Attachment - 18 EHRM Bonham - Simulation Main Computer Rm 2 - CFD Analysis
20. Attachment - 19 Structural Calculations
21. Attachment - 20 AE Update 1.3 -Attachment 20 V1 549A4-21-700 100 Bid Doc Specs
22. Attachment - 21 V2 549A4-21-700 100 Bid Doc Specs
23. Attachment - 22 Specs 549A4-21-700 Bonham EHRM Add 01
24. Attachment - 23 549A4-21-700 Bonham EHRM Add 02
25. Attachment - 24 Limitations on Subcontracting – Construction
26. Attachment - 25 Wage Determination – Bonham
27. Attachment - 26 General SOW Narrative Bonham
28. Attachment - 27 Answers to Solicitation-RFIs-36C77624B0007_1
29. Attachment - 28 Bonham EHRM- ICRA Form
30. Attachment - 29 Bonham VA - Geotech Rpt 3-30-16-For Soil
31. Attachment - 30 SPCC-PIPP Plan VANTHCS_Bonham
32. Attachment - 31 site plan fiber runs Bonham
33. Attachment - 32 V2 549A4-21-700 100 Bid Document Specifications
34. Attachment - 33 AE Physical Security Risk Mitigation Design Guidance
35. Attachment - 34 00 General Narrative
36. Attachment - 35 01 Bonham EHRM- Narrative
37. Attachment - 36 01 Environmental Narrative
38. Attachment - 37 02 Civil Narrative
39. Attachment - 38 03 Structural Narrative
40. Attachment - 39 05 Fire Protection Narrative
41. Attachment - 40 06 Mechanical Narrative
42. Attachment - 41 07 Electrical Narrative
43. Attachment - 42 08 Telecom Narrative
44. Attachment - 43 09 Security Narrative
45. Attachment - 44 Station Pictures for electrical
46. Attachment - 45 IT Closet Proposed lay down
47. Attachment -46 Answers to Solicitation-RFIs-Missing section-36C77624B0007_1
48. Attachment- 47 Clarifications-Additional Technical Questions
49. Attachment- 48 S04-sign in sheet Site Visit Bonham TX 1.9.24
50. Attachment -49 S04-sign in sheet pg 1 Site Visit Bonham TX 1.9.24
B. CLOSING STATEMENT:
The changes represented in this amendment constitute a change to the solicitation. Changes to the solicitation are limited to the terms expressed herein.
All other terms and conditions of the solicitation remain the same.
End of Document