This document outlines the requirements for a federal construction contract opportunity. The Bonham VA Medical Center is seeking a general contractor to provide infrastructure upgrades including upgrading facility fiber, redundant fiber runs, redundant fiber mails, designing a new data center and remodeling 20 telecommunications rooms. Additional requirements include locating spaces for 3 telecommunications enclosures, upgrading HVAC and electrical distribution as needed, and conducting physical security assessments and hazardous material abatement. The solicitation was issued as an Invitation for Bid under FAR Parts 14, 19 and 36 and is a total Service-Disabled Veteran-Owned Small Business set-aside with a NAICS code of 236220 and size standard of $45 million. The period of performance is approximately 365 calendar days from notice to proceed issuance. The estimated magnitude of construction is between $10,000,000 and $20,000,000. Questions must be submitted in writing by the specified deadline to the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files

File Type Posted
Attachment 56 - Abstract of Bids OF 1419 - CONST-Bonham - Signed.pdf PDF
Attachment 57 - Abstract of Bids OF 1419 A - CONST-Bonham.pdf PDF
36C77624B0007 0012.docx DOCX document
Attachment- 54 Sheet GS020 DETAILS.pdf PDF
Attachment- 53 Sheet GS019 EROSION CONTROL DETAILS.pdf PDF
Attachment- 51 TR Matrix Bonham.pdf PDF
Attachment- 55 Solicitation-RFIs-Tech Responses 36C77624B0007.pdf PDF
Attachment- 52 Hydrology Map.pdf PDF
36C77624B0007 0011.pdf PDF
36C77624B0007 0010.pdf PDF
36C77624B0007 0009.pdf PDF
Att 50 CLARIFICATION of Site Visit-Duct banks not available for use.pdf PDF
36C77624B0007 0008.pdf PDF
36C77624B0007 0007.docx DOCX document
Attachment - 49 S04-sign in sheet-pg 1 Site Visit Bonham TX 1.9.24.pdf PDF
36C77624B0007 0006.docx DOCX document
36C77624B0007 0005.pdf PDF
Attachment - 48 S04-sign in sheet Site Visit Bonham TX 1.9.24.pdf PDF
Attachment - 47 Clarifications-Additional Technical Questions.pdf PDF
36C77624B0007 0004.pdf PDF
Attachment - 46 Answers to Solicitation-RFIs-MISSING SECTION-36C77624B0007_1.pdf PDF
36C77624B0007 0003.pdf PDF
Attachment- 29 Bonham VA - Geotech Rpt 3-30-16-For Soil.pdf PDF
Attachment- 35 01 Bonham EHRM- Narrative.pdf PDF
Attachment- 36 01 Environmental Narrative.pdf PDF
Attachment- 44 Station Pictures for electrical.pdf PDF
Attachment- 28 Bonham EHRM- ICRA Form.pdf PDF
Attachment- 41 07 Electrical Narrative.pdf PDF
Attachment- 30 SPCC-PIPP Plan VANTHCS_Bonham.pdf PDF
Attachment- 38 03 Structural Narrative.pdf PDF
Attachment- 27 Answers to Solicitation-RFIs-36C77624B0007_1.pdf PDF
Attachment- 42 08 Telecom Narrative.pdf PDF
Attachment- 43 09 Security Narrative.pdf PDF
36C77624B0007 0002.pdf PDF
Attachment- 37 02 Civil Narrative.pdf PDF
Attachment- 32 V2 549A4-21-700 100 Bid Document Specifications.pdf PDF
Attachment- 45 IT Closet Proposed lay down.pdf PDF
Attachment- 39 05 Fire Protection Narrative.pdf PDF
Attachment- 34 00 General Narrative.pdf PDF
Attachment- 33 AE Physical Security Risk Mitigation Design Guidance.pdf PDF
Attachment- 31 site plan fiber runs Bonham.pdf PDF
36C77624B0007 0001.pdf PDF
36C77624B0007_1-tech questions date updated.pdf PDF
36C77624B0007_1.pdf PDF
Attachment - 13 Asbestos 3_ VA Checklist_Environ.pdf PDF
Attachment - 03 Civil Drawings_100percent Bid Docs.pdf PDF
Attachment - 24 Limitations on Subcontracting - Construction.pdf PDF
Attachment - 16 CABINET DIMENSIONAL DATA.pdf PDF
Attachment - 05 Architectural Drawings_100percent Bid Docs.pdf PDF
Attachment - 18 EHRM Bonham - Simulation Main Computer Rm 2 - CFD Analysis.pdf PDF
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA PROJECT NUMBER

PROJECT NAME

549A-21-700 EHRM Infrastructure Upgrades - Bonham, TX

SUBMITTAL 100% Bid Documents SUBJECT HVAC Narrative

Heating, Ventilating, and Air Conditioning 1

HEATING, VENTILATING AND AIR CONDITIONING (HVAC)

1. GENERAL

A. Spur Design is providing professional A/E services to design a compliant and complete construction and activation of a new Electronic Health Record Modernization (EHRM) system at the North Texas VA Health Care Center – Bonham, TX. The mechanical design work encompasses the addition of new HVAC equipment and upgrades to existing HVAC equipment serving new or relocated Telecommunications Rooms (TR).

The existing HVAC equipment serving TRs that are to remain will be evaluated to determine if the equipment meets the EHRM requirements and if any upgrades and remedies will be provided. There are currently 21 existing TRs in this project’s scope.

New Telecom rooms with telecom racks installed will have indoor units, served by an outdoor condensing unit. Condensing units are located on a case-by-case basis, with some being on rooftops, and some being located on the ground. Rooms with telecom enclosures only are to have their existing HVAC systems assessed on a case-by-case basis. If a new HVAC system is to be installed, it will be a single indoor unit served by its own condensing unit.

B. Selective Demolition

1. Telecommunication Rooms – reference demolition sheets for specific information.

a. Existing fan coil units serving the rooms will be demolished.

b. All existing ducts, air devices, and accessories that are within the new TR room boundaries and not served from a dedicated AC unit will be demolished back to the main branch and capped. If ductwork or piping is serving another space, it will be rerouted. In the event a duct or pipe cannot be rerouted, drip trays, fire/smoke dampers, and security bars will be installed where necessary.

c. Existing radiators, unit heaters, and associated piping serving the TRs will be demolished.

549A-21-700 EHRM Infrastructure Upgrades - Bonham, TX

Heating, Ventilating, and Air Conditioning 2

2. Telecommunication Enclosures – reference demolition sheets for specific information.

a. Existing room air conditioning systems to remain in place where possible.

3. Main Computer Rooms – reference demolition sheets for specific information.

a. Scope to be determined based on DCIE recommendations and scope of existing projects underway in rooms. Existing systems are expected to remain in place.

C. New System Description

1. Telecommunication Rooms

a. Basis of Design – Variable Refrigerant Flow DX heat pump system with ductless wall mounted indoor units. Indoor units will be served by associated outdoor condensing units. Condensing units will be roof mounted when necessary.

b. Units will be sized to account for the heat gain from the telecom racks (1 rack =

5kw, 2 = 7kw, 3 = 8.5kw, 4 =10kw), lighting load, heat load from walls/roofs/windows/etc., and electrical panels throughout the room. In rooms with telecom racks, two indoor units are used to prevent freeze up of the units.

The DX split unit sizing will take derating into account. New units will be tied to the existing BAS system.

Auxiliary drain pans are being installed underneath all existing to remain mechanical, domestic, and sanitary piping as well as new refrigerant piping being installed in the rooms. The purpose of these drip trays is to protect the racks and various electrical equipment in the room. These drip trays will be connected to new drain lines with leak detection sensors (sensing cable type) that are tied to the BAS monitoring the fill levels within each tray. The condensate lines will be routed to the nearest mop sink, floor drain, or outside to a condensate pit.

2. Telecommunication Enclosures

a. Basis of Design – While not generally required, places where a new system is necessary, a Variable Refrigerant Flow heat pump system with ductless wall mounted indoor unit. Indoor unit will be served by associated outdoor condensing unit. Condensing units will be installed outside at ground level on a dedicated concrete pad and securely fastened, unless otherwise noted.

549A-21-700 EHRM Infrastructure Upgrades - Bonham, TX

Heating, Ventilating, and Air Conditioning 3

3. Data Center

a. Basis of Design – Existing systems do not meet the OIT Design Guide requirements for n+1 redundancy. Existing systems will be demolished and replaced with suitable downflow Liebert CRAC units for the new space requirements. The new space is to be capable of cooling 49.7 kW generated by equipment housed in the space and 8.2 kW from environmental load.

Humidification and dehumidification to be monitored and controlled by CRAC units. Rack sensors shall be installed and monitoring system to function as prescribed by ISTS 4.3.7 Monitoring. DCIE recommendations outside of this, specific to Data Centers, will be adhered to. Existing ductwork located above ceiling to be demolished.

D. Testing, Adjusting, and Balancing for HVAC

1. Pre-testing is not required for this project.

2. Final testing of systems will be performed and reviewed during the commissioning functional performance testing of the systems.

E. Vibration Control

1. New equipment will be mounted with spring or in-shear isolation restraints as required by VA AHJ and local codes.

F. Seismic Requirements

1. Seismic mounting, if required shall comply with VA Publication H-18-8 Seismic

Design Requirements. Seismic scope to be determined by civil.

2. APPLICABLE CODES AND STANDARDS

A. IMC – International Mechanical Code – 2021

B. IPC – International Plumbing Code – 2021

C. NFPA – National Fire Protection Association – 90A, 96, 99, 101 – 2021

D. ASHRAE 90.1 – Energy Standard – 2019

E. ASHRAE 170 – Ventilation for Healthcare Facilities – 2021

F. VA HVAC Design Manual – 2021

G. Physical Security & Resiliency Design Manual (PSRDM) – July 2022 Rev

549A-21-700 EHRM Infrastructure Upgrades - Bonham, TX

Heating, Ventilating, and Air Conditioning 4

H. Office of Information & Technology (OIT) Design Guide – 2021

3. OUTDOOR CLIMATE CONDITIONS

A. ASHRAE Climate Zone 3A (Moist)

B. ASHRAE 2021 Fundamentals – Location: Grayson County, TX (WMO: 720287)

1. Heating: 21.0 (99.6% °F DB); Extreme annual: 15.1 / 13.4 (°F DB/WB)

2. Cooling: 100.1 / 73.2 (0.4% °F DB/WB); Extreme annual: 103 / 78.4 (°F DB/WB)

3. Dehumidification: 74.9 °F / 134.7 / 81.2 °F (0.4% DP/HR/MCDB)

4. INDOOR DESIGN CONDITIONS

A. Per VA Design Guide/Manual:

1. HVAC Design Manual – 2021 – Room Data Sheets

2. OEHRM Site Infrastructure and End User Device Requirements V2.0 – 2021

3. Infrastructure Standard for Telecommunications Spaces V3.1 – 2021

4. Telecom Room Temperature Requirements:

a. Heating DB – 81 °F

b. Cooling DB – 64 °F

c. Max. RH% – 60%

d. Min. RH% – 30%

e. Room Air Balance - (+)

5. ENERGY SUPPLY

A. Electrical power supply available: Varies by building.

B. No Central Plan utilities will be utilized for this project.

6. CONTROLS

A. New unitary HVAC controls will be integrated into the current ECC system platform as part of this work.

END HVAC DESIGN NARRATIVE