Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf

Standard Form PDF 1 MB Posted

Attached to
EAGLE Fort Eisenhower, GA W519TC-23-R-0095
Solicitation number
W519TC23R0095
Issued by

About this file

This document is a preaward survey of a prospective contractor's accounting system used by federal agencies to evaluate whether a company's accounting practices are suitable for receiving a government contract award. The survey assesses whether the company's accounting system complies with generally accepted accounting principles and can properly segregate direct and indirect costs, accumulate direct costs by contract, allocate indirect costs to cost objectives, and exclude unallowable costs from charges to the government. It finds the system is currently in full operation and able to support requests for progress payments. However, it notes the records are not maintained in a way that can develop reliable pricing data for future acquisitions. The related federal contract opportunity is for maintenance, supply, and transportation services at Fort Eisenhower in Georgia from the Department of the Army Materiel Command Contracting Command located at Rock Island Arsenal. The solicitation number is W519TC23R0095.

View the file

Other versions and copies of SF 1408

File Revision Posted Attached to
B08 - Attachment 0006 - Preaward Survey of Prospective KTR Accounting Sys (SF 1408) - 11SEP2025.pdf Same revision and size as this file Sep 11, 2025 EAGLE Fort Irwin, CA W519TC-25-R-0009
B08 Attachment 0006 Preaward Survey of Prospective KTR Accounting Sys (SF 1408).pdf Revision not stated EAGLE Fort Riley KS W519TC-26-R-A054
Standard Form 1408 - Pre-Award Survey.pdf Revision not stated Next Generation Ammunition & Munitions Equipment (NGAME) for MMHE RFP/Solicitation
Attachment 10-SF1408-14f.pdf Revision not stated Mid-Atlantic Regional Maintenance Center (MARMC) Technical and Professional Services
Attachment 11 - SF1408-14f.pdf Revision not stated Submarine Peculiar Special and Support Equipment (PSSE) Support Services for the Mid-Atlantic Regional Maintenance Center
47QFHA25R0017_T10_08_PRISM MATOC Attachment 4_Modified Preaward Survey (SF 1408).pdf Revision not stated Personnel & Readiness Infrastructure Support Management Services (PRISM) MDoDS Pool Small Business On-Ramp
B08 - Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Picatinny Arsenal, NJ W519TC-25-R-0023
Attachment 7 Pre-Award Survey (SF1408).pdf Revision not stated Joint Safety Health Institutional Facilities Team (JSHIFT) 80LARC25R7001
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Dugway Proving Ground, UT: W519TC-25-R-0008
Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf Same revision and size as this file Revision not stated EAGLE Ft. Bliss, TX, W519TC-25-R-0007
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Fort Huachuca, AZ W519TC-24-R-0027
1305M325R0002 - Attachment 6 - SF1408-14f.pdf Revision not stated Phased Array Radar (PAR) Test Article
SF1408-14e.pdf Revision not stated PNW Regional Planning Facilitator
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Fort McCoy, WI - W519TC-23-R-0119
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Fort Knox, KY W519TC-23-R-0088
Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf Same revision and size as this file Revision not stated EAGLE Fort Jackson, SC W519TC-24-R-0026
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Fort Cavazos, TX W519TC-23-R-0102
Attach 4a - SF 1408.pdf Revision not stated USSOCOM Intelligence Support Services -- DRAFT RFP (H92402-24-R-0001)
J.1.b.3 - SF1408-14e.pdf Revision not stated NASA Ames Research Center - Request for Proposal - Aerospace Research Technology and Simulations (ARTS)
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Presidio of Monterey, CA, W519TC-23-R-0104
Show all 20

Who attaches SF 1408

Other files

File Type Posted
B08 Amendment 0004 FEGA W519TC23R0095.pdf PDF
B08 Amendment 0003 FEGA W519TC23R0095.pdf PDF
B08 Amendment 0002 FEGA W519TC23R0095.pdf PDF
B08 Amendment 0001 FEGA W519TC23R0095.pdf PDF
Attachment 0028 - PWS - Annex D Environmental Requirements_22 Nov 2022.pdf PDF
Attachment 0027 - PWS - Annex C Transportation PRS_16 MAR 23.pdf PDF
Exhibit B - CDRL Listing 19OCT2023.xlsx XLSX spreadsheet
Attachment 0011 - Contract References Spreadsheet_27Oct23.xlsx XLSX spreadsheet
Attachment 0007 - Department of Labor Wage Determinations (2015-4465).pdf PDF
Exhibit A - DD 1423-1.pdf PDF
Exhibit C - CD-02 Burn Rate Report.xlsx XLSX spreadsheet
Attachment 0009 - Purchasing Invoicing Guide (PIG)_29 Jan 21.pdf PDF
Attachment 0014 - NOT APPLICABLE.pdf PDF
Exhibit J- PM-12 KTR Accident Reporting Format.xlsx XLSX spreadsheet
Exhibit G- PM-08 Scheduled Government Furnished Property (SGFP).xlsx XLSX spreadsheet
Attachment 0025 - PWS - Annex A Maintenance PRS_27 DEC 2022.pdf PDF
Attachment 0002 - Staffing and Labor Mix.xlsx XLSX spreadsheet
Attachment 0029 - PWS - Annex E Definitions Acronyms Abbreviations.pdf PDF
Exhibit K - SS-01 Supply and Services Report Format.xlsx XLSX spreadsheet
Attachment 0005 - Cost Price Matrix 30Oct2023.xlsx XLSX spreadsheet
Exhibit F - PM-01 Contractor Employee Information Format.xlsx XLSX spreadsheet
Attachment 0013 - Mission Essential Services Memo.pdf PDF
Attachment 0004 - Letter of Consent_1 Feb 21.pdf PDF
Attachment 0003 - Performance Questionnaire_29 Jan 21.pdf PDF
Attachment 0024 - PWS Appendices A-P for Non-ASC Customers.pdf PDF
Attachment 0010 - Blocked File Extensions_1 DEC 22.pdf PDF
Exhibit E- MMD-01 Maintenance Report Format.xlsx XLSX spreadsheet
Attachment 0001 - Performance Work Statement (PWS) 19OCT2023.pdf PDF
Solicitation Fort Eisenhower W519TC23R0095 - 08JAN2023.pdf PDF
Attachment 0026 - PWS - Annex B Supply PRS_27 DEC 2022.pdf PDF
Attachment 0015 - Subcontractor Cost Information Submission_1 FEB 21.pdf PDF
Attachment 0030 - PWS - Annex F Publications and Forms.pdf PDF
Exhibit H - PM-09 Performance Management Review Format.pptx PPTX presentation
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION I - RECOMMENDATION

YES

YES, WITH A RECOMMENDATION THAT A FOLLOW ON ACCOUNTING SYSTEM REVIEW BE PERFORMED AFTER CONTRACT AWARD (Explain in 2. NARRATIVE)

NO (Explain in 2. NARRATIVE)

PREAWARD SURVEY OF PROSPECTIVE

CONTRACTOR

ACCOUNTING SYSTEM

SERIAL NUMBER (For surveying activity use)

PROSPECTIVE CONTRACTOR

OMB Control Number: 9000-0011 Expiration Date: 6/30/2020

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0011. We estimate that it will take 24 hours to read the instructions, gather the facts, and answer the questions.

Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S.

General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT

2. NARRATIVE (Clarification of deficiencies and other pertinent comments. If additional space is required, continue on plain sheets of paper.)

IF CONTINUATION SHEETS

ATTACHED - MARK HERE

b. TELEPHONE NUMBER (include area code)

b. TELEPHONE NUMBER (include area code)

c. DATE SIGNED

c. DATE REVIEWED

3. SURVEY

MADE BY

4. SURVEY

REVIEWING

OFFICIAL

a. SIGNATURE AND OFFICE (Include, typed or printed name)

a. SIGNATURE AND OFFICE (Include typed or printed name)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition usable

STANDARD FORM 1408 (REV. 1/2014)

Prescribed by GSA FAR (48 CFR) 53.209 -1(f)

SECTION II - EVALUATION CHECKLIST

MARK "X" IN THE APPROPRIATE COLUMN (Explain any deficiencies in SECTION I NARRATIVE) YES NO

NOT

APPLIC-

CABLE

1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED

ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. ACCOUNTING SYSTEM PROVIDES FINANCIAL INFORMATION:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments

(FAR 52.216-16).

b. Required to support requests for progress payments.

4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS?

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION?

(If not, describe in Section I Narrative which portions are

(1) in operation, (2) set up, but not yet in operation,

(3) anticipated, or (4) nonexistent.)

STANDARD FORM 1408 (REV. 1/2014) BACK

SECTION I - RECOMMENDATION

YES

YES, WITH A RECOMMENDATION THAT A FOLLOW ON ACCOUNTING SYSTEM REVIEW BE PERFORMED AFTER CONTRACT AWARD (Explain in 2. NARRATIVE) NO (Explain in 2. NARRATIVE)

PREAWARD SURVEY OF PROSPECTIVE CONTRACTOR

ACCOUNTING SYSTEM

SERIAL NUMBER (For surveying activity use)

PROSPECTIVE CONTRACTOR

OMB Control Number: 9000-0011 Expiration Date: 6/30/2020 Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0011. We estimate that it will take 24 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT

2. NARRATIVE (Clarification of deficiencies and other pertinent comments. If additional space is required, continue on plain sheets of paper.)

IF CONTINUATION SHEETS

ATTACHED - MARK HERE

b. TELEPHONE NUMBER (include area code)

b. TELEPHONE NUMBER (include area code)

c. DATE SIGNED

c. DATE REVIEWED

3. SURVEY MADE BY

4. SURVEY REVIEWING OFFICIAL

a. SIGNATURE AND OFFICE (Include, typed or printed name)

a. SIGNATURE AND OFFICE (Include typed or printed name)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition usable

STANDARD FORM 1408 (REV. 1/2014)

Prescribed by GSA FAR (48 CFR) 53.209 -1(f)

SECTION II - EVALUATION CHECKLIST

MARK "X" IN THE APPROPRIATE COLUMN (Explain any deficiencies in SECTION I NARRATIVE)

YES

NO

NOT APPLIC-CABLE

1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. ACCOUNTING SYSTEM PROVIDES FINANCIAL INFORMATION:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments

(FAR 52.216-16).

b. Required to support requests for progress payments.

4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS?

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION?(If not, describe in Section I Narrative which portions are

(1) in operation, (2) set up, but not yet in operation,

(3) anticipated, or (4) nonexistent.)

STANDARD FORM 1408 (REV. 1/2014) BACK

8.2.1.3144.1.471865.466429

IF CONTINUATION SHEETS ATTACHED - MARK HERE: 0
1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT. YES: 0
1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT. YES, WITH A RECOMMENDATION THAT A FOLLOW ON ACCOUNTING SYSTEM REVIEW BE PERFORMED AFTER CONTRACT AWARD (Explain in 2. NARRATIVE): 0
1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT. NO (Explain in 2. NARRATIVE): 0
SERIAL NUMBER (For surveying activity use):
PROSPECTIVE CONTRACTOR:
2. NARRATIVE (Clarification of deficiencies, and other pertinent comments,. If additional space is required, continue on plain sheets of paper.):
4. SURVEY REVIEWING OFFICIAL. a. SIGNATURE AND OFFICE (include, typed or printed name) (Typed name):
3. SURVEY MADE BY. a. SIGNATURE AND OFFICE (include, typed or printed name) (Typed name):
4. SURVEY REVIEWING OFFICIAL. a. SIGNATURE AND OFFICE (include, typed or printed name):
3. SURVEY MADE BY. a. SIGNATURE AND OFFICE (include, typed or printed name):
4. SURVEY REVIEWING OFFICIAL. a. SIGNATURE AND OFFICE (include, typed or printed name):
c. DATE REVIEWED. Enter 2 digit month, 2 digit day and 4 digit year.:
c. DATE SIGNED. Enter 2 digit month, 2 digit day and 4 digit year.:
b. TELEPHONE NUMBER (include area code):
b. TELEPHONE NUMBER (include area code):
1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES? YES.: 0
a. Proper segregation of direct costs from indirect costs. YES.: 0
b. Identification and accumulation of direct costs by contract. YES.: 0
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) YES.: 0
1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES? NO.: 0
a. Proper segregation of direct costs from indirect costs. NO.: 0
b. Identification and accumulation of direct costs by contract. NO.: 0
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) NO.: 0
1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES? NOT APPLICABLE.: 0
a. Proper segregation of direct costs from indirect costs. NOT APPLICABLE.: 0
b. Identification and accumulation of direct costs by contract. NOT APPLICABLE. : 0
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) NOT APPLICABLE. : 0
d. Accumulation of costs under general ledger control. YES.: 0
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. NOT APPLICABLE.: 0
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. YES.: 0
g. Interim (at least monthly) determination of cost charged to a contract through routine posting of books of account. NOT APPLICABLE.: 0
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions. YES.: 0
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. NOT APPLICABLE.: 0
j. Segregation of preproduction costs from production costs. YES.: 0
a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16). NOT APPLICABLE.: 0
b. Required to support request for progress payments. YES : 0
4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS? NOT APPLICABLE.:
5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION? YES

(If not, describe in Section I Narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.): 0

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION? NO

(If not, describe in Section I Narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.) : 0

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION? NOT APPLICABLE

(If not, describe in Section I Narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.) : 0

4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS? NO.: 0
4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS? YES: 0
b. Required to support request for progress payments. NO.: 0
b. Required to support request for progress payments. NOT APPLICABLE.: 0
a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16). NO.: 0
a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16). YES.: 0
j. Segregation of preproduction costs from production costs. NO.: 0
j. Segregation of preproduction costs from production costs. NOT APPLICABLE.: 0
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. NO.: 0
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. YES.: 0
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions. NO.: 0
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions. NOT APPLICABLE.: 0
g. Interim (at least monthly) determination of cost charged to a contract through routine posting of books of account. NO. : 0
g. Interim (at least monthly) determination of cost charged to a contract through routine posting of books of account. YES.: 0
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. NO.: 0
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. NOT APPLICABLE.: 0
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. NO.: 0
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. YES.: 0
d. Accumulation of costs under general ledger control. NO.: 0
d. Accumulation of costs under general ledger control. NOT APPLICABLE. : 0

File details come from the government source that posted it. Updated .