Attachment 0027 - PWS - Annex C Transportation PRS_16 MAR 23.pdf
PDF 180 KB Posted
- Attached to
- EAGLE Fort Eisenhower, GA W519TC-23-R-0095
- Solicitation number
- W519TC23R0095
About this file
This document outlines performance work statement requirements and standards for transportation, personal property, passenger movement, motor pool operations, unit movements, cargo movements, and arrival/departure airfield control group services at Fort Eisenhower, GA. Key requirements include providing reports and statistical data on transportation; processing incentive payments, reimbursements, and customer counseling for personal property operations; routing military cargo and equipment; monitoring airfield arrivals and departures; and assisting with unit movements and joint inspections. Services must meet defined timeliness and quality standards, with acceptance quality levels ranging from 90 to 100 percent. Random sampling will be used to inspect completed work against these standards.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task/Requirement Standard Sampling Method, Lot & Acceptable Quality Level (AQL)
TRANSPORTATION - GENERAL
5.26.3 Provide reports and statistical data
Timeliness: Reports and statistical data delivered by the due date.
Quality: IAW DLRS ITD-01 Accurate and complete
Surveillance activity report
Lot: Inspect reports submitted per quarter.
AQL: 95%
PERSONAL PROPERTY OPERATIONS
5.27.1 Process Incentive Payments and Reimbursements.
Timeliness: Payments and reimbursements will be submitted to the Government rep, within 3 business days of receipt.
Approved payments and reimbursements will be forward to BMO daily and to DFAS weekly.
Quality: Incentive payments and reimbursements will be accurately prepared using applicable government rates in effect at the time of the move and a complete copy will be provided to QAE upon request.
Weights will be entered accurately and completely into
AIS.
Random sampling
Each reimbursement completed at time of surveillance.
AQL: 100%
5.27.2 Counsel customers
Timeliness: In conjunction with shipment application and/or movement request.
Quality: Customers will be counseled IAW DTR Part IV, and/or service guidance. Copy will be provided to QAE on request.
Random sampling
Lot: Counseling completed at the time of surveillance.
AQL: 99%
Annex C: Transportation
5.27.2 Counsel personnel on entitlements and procedures for pickup, delivery and/or storage of personal property/household goods
Timeliness: Personnel counseled with 3 hours of arrival/walk-in time and/or 1 hour of appointment time
Quality: Customer will be counselled IAW DTR Part IV, and/or service guidance. A copy will be provided to QAE upon request.
Random sampling
Lot: Percent of personnel counseled within 3 hours of arrival/walk-in time; percent counseled within 1 hour of appointment time.
AQL: 99%
5.27.3 Provide Specialized, Expedited Assistance for Sensitive circumstances
Timeliness: To meet member/family member’s needs.
Quality: Blue Bark shipments will be handled IAW DTR Part IV, 410-E, and a complete copy will be provided to QAE on request.
Random sampling
Lot: Blue Bark/Sensitive shipments Completed at the time of surveillance.
AQL: 100%
5.27.6 Prepare shipment applications and personally procured movement (PPM) Requests.
Timeliness: Assist DPS customers when required.
Quality: Will be completed IAW DTR Part IV and governing service regulations and a complete copy will be provided to QAE on request.
Random sampling
Lot: Shipments applications and self-movement requests completed at the time of surveillance.
AQL: 95%
5.27.9 Collect Excess Costs.
Timeliness: DD 139 prepared within the same week excess costs are discovered / determined; approved 139 will be submitted to DFAS as required. DD1131 prepared in the same week monies are received; submitted to Government rep, for deposit weekly.
Quality: Accurately prepare & maintain DD Form 139 or DD Form 1131 and provide a copy to QAE upon request.
Random sampling
Lot: Collection forms completed at time of surveillance.
AQL: 100%
5.27.9 Process request for extension of travel and transportation entitlements.
Timeliness: Review and forward to Government rep, within 5 business days of receipt.
Approved requests will be returned to the requestor the next business day.
Quality: Requests will be reviewed for eligibility. Requests forwarded to ITO will be complete, accurate, and contain all appropriate supporting documents/copies required by the JTR and an approval/ recommendation letter for ITO signature and provide a copy to QAE upon request.
Random sampling
Lot: Each extension in process or completed at time of surveillance.
AQL: 90%
5.27.9.2 Counsel deploying personnel on entitlements.
Timeliness: Documents from counseling will be processed to JPPSO-SE within 3 government business days for routing, booking and storage of deploying personnel HHGs.
Quality: DD Form 1857 and DD Form 1299 must be correct with zero errors.
Random sampling
Lot: Each deploying personnel counseling at time of surveillance.
AQL: 90%
5.27.9.1 Process changes in destination Requests.
Timeliness: Initiate tracer action Diversions: Initiate diversion immediately upon notice of change in destination.
Delivery from SIT/DPM Warehouse: Coordinate the release from warehouse within 5 days of receipt of request for shipment.
Quality: Certificates of Diversion, Certificates for Long Delivery-Out-of-SIT, and DPM reshipment instructions prepared, completed, approved, and distributed accurately and
Random sampling
Lot: Each change In destination in process or completed at time of surveillance.
AQL: 95%
completely and a complete copy will be provided to QAE on request.
PASSENGER MOVEMENTS
5.28.1 Process Commercial Invoices.
Timeliness: Approved invoices and supporting documents will be submitted to the COR within 3 business days of receipt from
TSP.
Quality: TSP charges will be complete and verified correctly before submitted to COR completely reviewed before submission to COR.
Random sampling
Lot: Each commercial ticket invoices in process or completed at time of surveillance.
AQL: 100%
5.28.1 Process Individual/Family passenger movement requests.
Timeliness: Requests will be processed and completed to meet passenger’s departure and arrival requirements.
Quality: Mode of travel will be based on individual/family travel requirements and entitlements.
Random sampling
Lot: Passenger movement requests in process, or completed at time of surveillance.
AQL: 97%
5.28.1 Process overseas travel requests.
Timeliness: Port calls and changes processed to meet customers travel requirements.
Quality: Port call request or orders processed accurately and completely.
Random sampling
Lot: Each port call request being processed, or completed at time of surveillance.
AQL: 97%
5.28.1 Prepare port call request
Timeliness: Port call requests processed to meet customers travel requirements.
Quality: Port call requests to CTO for commercial airline travel will be processed completely and accurately.
Random sampling
Lot: Each port call request In process or completed at time of surveillance.
AQL: 97%
5.28.2 The contractor shall coordinate commercial bus support utilizing GOPAX System.
Timeliness: Within 3 business days to the from customer.
Quality: All charges will be verified for completeness by
COR.
Random sampling
Lot: All request are completed as requested by customer
AQL: 97%
5.28.5 Reconcile centralized billing accounts and certify payment by
DFAS
Timeliness: Reconcile and submit to DFAS within 15 calendar days. NOTE: Certify CBAs within 5 working days of hard copy receipt for DTS Accounts, and 10 days for manual accounts. FMR standard of 30 days still applies for processing.
Random sampling
Lot: Percent of CBAs reconciled and submitted to DFAS within 15 calendar days
AQL: 90%
MOTOR POOL OPERATIONS
5.29.1 Control & Account for GSA vehicles, keys, and credit cards report loss/abuse
Timeliness: By COB daily notify COR upon discovery.
Quality: Complete & accurate
Random sampling
Lot: Each GSA vehicle hand receipt completed at time of surveillance.
AQL: 99%
5.29.1 Maintain a copy of justification on each motor vehicle utilized for official use and notify users when it is due to expire excluding LSEV.
Timeliness: Annually
Quality: Justification must meet the requirements of AR 58-1.
Random sampling
Lot: GSA vehicle justifications prepared each year.
AQL: 100%
5.29.2 Provide GSA vehicles accident reports
Timeliness: As each accident occurs.
Quality: Follow all accident reporting procedures IAW 385- 10, local supplements and GSA Reporting Requirements
Lot: As GSA vehicle accidents occur at time of
AQL: 98%
5.29.1 Inspect & dispatch GSA vehicles and GSA credit cards
Timeliness: Vehicle inspected at time of dispatch and upon return. LSEV inspected and dispatch quarterly. FORSCOM decal affixed prior to initial dispatch
Quality: Inspection shall be performed accurately
Random sampling
Lot: Each GSA vehicle dispatch in process or completed at time of surveillance.
AQL: 100%
5.29.4 Operate buses and other non-tactical vehicles
Timeliness: To meet mission requirements.
Quality: Vehicles operated safely.
Random sampling
Lot: Each special mission requirement completed at time of surveillance.
AQL: 99%
5.29.11 Schedule for Maintenance of GSA vehicles.
Timeliness: Users notified 5 business days prior to scheduled maintenance date
Quality: Scheduled maintenance performed.
Surveillance activity checklist
Lot: Each GSA vehicle requiring maintenance completed at time of surveillance.
AQL: 95%
UNIT MOVEMENTS
5.30.1 Provide necessary assistance to the Unit Movement Coordinator (UMC) with unit movement data maintenance and movement planning.
Timeliness: Meet UMC’s processing times.
Quality: All unit moves completed as required.
Surveillance activity checklist
Lot: Each unit move
AQL: 97%
5.30.1 Document loaded equipment Properly
Timeliness: Upon completion of loading.
Quality: Load data will be obtained complete and accurate.
Random sampling
Lot: Each piece of equipment loaded in process or completed at time of surveillance
AQL: 99%
5.30.2 Assist and advise unit movement planning and coordination
Timeliness: Meet UMC’s processing times.
Quality: Assist and advise UMO training 100 percent of the time
Random sampling
Lot: Each unit move
CARGO MOVEMENTS
5.31.1 Route military cargo and equipment.
Timeliness: To meet mission requirements
Quality: Shipment will be routed IAW DTR PART II. Data entry into ETA/FAST/GFM CMOS will be accurate and complete.
Random sampling
Lot: Each shipment competed at time of surveillance.
AQL: 100%
5.31.2 Hazardous materials, oversized, sensitive items properly identified, documented, marked, labeled, and/or placarded
Timeliness: Prior to preparation of GBL/CBL.
Quality: Certified HazMat preparers are verified;
documents are complete and accurate.
Random sampling
Lot: Each hazardous materials, oversized, sensitive shipments in process or completed at time of surveillance.
AQL: 100%
ARRIVAL/DEPARTURE AIRFIELD CONTROL GROUP (A/DACG)
5.32.1 Monitor & report airfield arrivals and departures
Timeliness: Notified same day.
Quality: Convoys, equipment, buses, baggage trucks, and personnel accurately, and completely reported.
Random sampling
Lot: Each arrival & departure at completed at time of surveillance.
AQL: 100%
5.32.2 Generate wheels up/wheels down reports
Timeliness: Generate reports within 1 hour of wheels up/wheels down
Lot: Percentage of wheels up/wheels down reports generated within 1 hour
5.32.2 Operate tactical and non-tactical support vehicles
Timeliness: To meet mission requirements.
Quality: Vehicles & equipment will be operated safely by authorized licensed personnel.
Random sampling
Lot: Vehicle & equipment operations completed at time of surveillance.
AQL: 100%
5.32.2 Direct loading/Off-loading of passengers and cargo
Timeliness: In conjunction with mission timelines.
Quality: Safely direct & escort to designated location.
Random sampling
Lot: Each mission completed at time of
Assist with Air Force Joint inspections as required/requested
Timeliness: To meet mission requirements.
Quality: Vehicles will be properly weighed, marked, placarded, loaded, placed, and tied down.
Surveillance activity checklist
Lot: Inspect aircraft mission joint inspection.
Conduct Technical oversight
Timeliness: IAW mission requirements.
Quality: Vehicles will be properly weighed, marked, placarded, loaded, placed, and tied down.
Random sampling
Lot: Inspect aircraft mission joint inspection.
AQL: 100%
5.32.2 Perform aircraft boarding requirements.
Timeliness: To meet mission requirements.
Quality: Equipment will be properly weighed, marked, labeled, placarded, and documented prior to loading.
Equipment will be safely loaded IAW approved load plans.
Equipment tie-down, blocking, and bracing will be IAW industry practice.
Surveillance activity report
Lot: Inspect deployment/training exercise.
AQL: 100%
5.32.3 Provide technical assistance, guidance and customer service in support of unit movements.
Timeliness: Upon request, during the preparation, loading, unloading, blocking bracing, and tie-down of vehicle, cargo, and equipment.
Quality: Competent, correct, and helpful assistance provided.
Random sampling
Lot: Inspect Deployment/Training exercise.
AQL: 99%
File details come from the government source that posted it. Updated .