Atch 12 Calc. of Self Performed Work.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C24926R0055
About this file
This file is a calculation template for self-performed work used in the context of a construction project bid submission. The spreadsheet is designed to document and calculate the labor, materials, equipment, and overhead costs associated with work that will be directly performed by the contractor's own workforce, rather than subcontracted to third parties. The template appears to be a standard accounting tool required by the contracting officer to substantiate pricing for self-performed portions of the work and ensure compliance with federal contracting requirements for cost estimation and transparency.
The template functions as an appendix to support the contractor's pricing proposal for the Y1QA Project 621-24-103 Restoration of B35 Theater, a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside solicitation issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 for work at the TN Valley Healthcare System Alvin C. York Campus in Murfreesboro, Tennessee. This calculation worksheet is essential for contractors submitting quotes under RFQ solicitation 36C24926R0055 to demonstrate the detailed breakdown of costs for any work they intend to self-perform rather than subcontract, supporting the overall pricing structure of their bid response.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK | ||||||
| Offerors for All Other Specialty Trade Contractors (NAICS code 23xxxxx) must provide | ||||||
| at least 25 percent of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format. | ||||||
| Specification Division | SB Vendor (Y or N) | Personnel Cost | Material/Equipment Costs | |||
| Prime | Y | $0.00 | $0.00 | Change SB Vendor to Y or N based on vendor size. Add costs to gray areas only. | ||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| (Add additional lines as necessary for each Division applicable to this project) | $ | $ | ||||
| $ - 0 | $0.00 |
| $ | $ | ||||
| Sub Total (Personnel Costs, Material/Equipment Costs) | $ | 0.00 | Add percentage to gray areas only. | ||
| Percentage | 0 | Profit | $ | 0.00 | |
| Percentage | 0 | Home Office Overhead | $ | 0.00 | |
| Percentage | 0 | Bond | $ | 0.00 | |
| Grand Total | $ | 0.00 | |||
| Calculation of self-performed personnel costs: | |||||
| 1. Total personnel costs * both prime and all subcontractors: | $0.00 | ||||
| 2. Subtract all subcontractor personnel costs* companies that will perform work | |||||
| on this contract: | $0.00 | ||||
| 3. Remainder is ‘Total amount of work to be self-performed under the | |||||
| Contract’: | $0.00 | ||||
| 4. Self-performed work = Line 3/Line 1 x 100 = | ERROR:#DIV/0! |
| *personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to |
| the project (includes project manager, job superintendent, administrative, estimators, etc.) |
| I certify the above representations are true and correct to the best of my knowledge. |
(Signature and Typed Name of Authorized Representative) Date
(Title of Authorized Representative)
File details come from the government source that posted it. Updated .