Atch 11_621-24-103 Drawing part 6 of 6.pdf

PDF 27 MB Posted

Attached to
Y1QA--Project 621-24-103 Restoration of B35 Theater
Solicitation number
36C24926R0055
Issued by

About this file

This file is a set of mechanical engineering drawings for the restoration of Building 35 Historic Theater at James H. Quillen VA Medical Center in Mt. Home, Tennessee, issued July 1, 2025 as part of bid documents for Project 621-24-103. The drawings comprise six sheets detailing mechanical demolition and new work plans across basement, first floor, balcony, second floor, attic, and roof levels, with accompanying mechanical sections and details.

The demolition plans specify removal of existing HVAC components including air handling units (AHU-A1, AHU-A2, AHU-S1, AHU-S2, AHU-B, AHU-L1, AHU-L2), variable air volume boxes (VAV-A, VAV-S, VAV-L1, VAV-L2, VAV-B), fan coil units, exhaust fans, ductwork, and associated piping, with notation for retention and salvage of specific components for reuse. The new work plans introduce replacement HVAC systems including new air handling units with sound attenuators, ductwork routing (ranging from 6" to 56" dimensions), chilled water and hot water piping (3/4" to 4" sizes), four-pipe fan coil units (BCU-1 and BCU-2 with 1,050 CFM capacity each), supply diffusers, exhaust grilles, dedicated outdoor air supply (DOAS-1), and a ductless split air conditioning system (ODU-1/IDU-1 with 375 CFM). The mechanical details sheets provide standard construction specifications including fire-rated flexible duct connections, volume damper installations, duct transitions, vane elbow configurations, and fan coil unit control sequences. Equipment schedules specify sound attenuating devices for eight AHU units with insertion loss ratings across octave bands, cooling and heating capacities for fan coil units, and a split-system air conditioner with 18 MBH capacity serving a training room.

View the file

Other files

File Type Posted
Atch 40 AMEND_4 SCA WD 2015-4641.pdf PDF
Atch 39 AMEND_4 Davis-Bacon WD TN20260191.pdf PDF
S02 AMEND_36C24926R0055 0004 B35.pdf PDF
Atch 26 AMEND_3 _10.06_FS100 - SITE PLAN.pdf PDF
Atch 23 AMEND_3 _ 10_32 17 23 - PAVEMENT MARKINGS.pdf PDF
Atch 21 AMEND_3 _09 93 00 Staining - Transparent Finish.pdf PDF
Atch 31 AMEND_3 _ 10.09_FX103 - AUDITORIUM ATTIC- STAGE NEW WORK.pdf PDF
Atch 22 AMEND_3 _ 10_32 12 16 - ASPHALT PAVING.pdf PDF
Atch 20 AMEND_3 _ 09 01 90.52 - Maintenance Repainting.pdf PDF
S02 AMEND_36C24926R0055 0003 B35.pdf PDF
Atch 35 AMEND_3 Worksheet - S ENG AUTOCAD AUTOCADPUBLIC PDC PROJ 7.xlsx XLSX spreadsheet
Atch 36 AMEND_3 Section 01 45 00 Quality Control.docx DOCX document
Atch 17 AMEND_3 Updated Solicitation 36C24926R0055.pdf PDF
Atch 33 AMEND_3 QUES 186 _doc11604520260625102926.pdf PDF
Atch 34 AMEND_3 Section 01 45 35 Schedule of Special Inspections.docx DOCX document
Atch 38 AMEND_3 VA Mtn Home El Walkway_Geotech Rpt.pdf PDF
Atch 24 AMEND_3 _ 10-10_32 90 00 PLANTING.pdf PDF
Atch 28 AMEND_3 _ Q10.07_FX101 - BASEMENT -1st FLOOR.pdf PDF
Atch 19 AMEND_3 _ 00 01 10 - SPECS - Table Of Contents.pdf PDF
Atch 29 AMEND_3 _ 10.07_FX101 - BASEMENT- 1st FLOOR NEW WORK PLAN.pdf PDF
Atch 30 AMEND_3 _ 10.08_FX102 - BALCONY 2nd FLOOR - CEILING.pdf PDF
Atch 32 AMEND_3 _ 210.05_FD901-WET-PIPE FIRE SUPPRESSION ISOMETRIC.pdf PDF
Atch 25 AMEND_3 _ Limited HazMat Report.pdf PDF
Atch 27 AMEND_3_10.06_FS100 - FIRE SUPPRESSION SITE PLAN.pdf PDF
Atch 37 AMEND_3 Past Performance Questionnaire -PPQ Template.docx DOCX document
Atch 18 AMEND_3 FINISH REVISIONS_ Rev 2 06-30-2026.pdf PDF
S02 AMEND_36C24926R0055 0002 B35.pdf PDF
Atch AMEND_1 Site Visit Attendance Sheet of 621-24-103.pdf PDF
S02 AMEND_36C24926R0055 0001 B35.pdf PDF
S02 SOL 36C24926R0055_1 B35 _ R2.pdf PDF
Atch 16 WD TN20260191 01.02.2026.docx DOCX document
Atch 5_BID SPEC ENG_4288 SUBMITTAL REG.pdf PDF
Atch 14 General Conditions Breakout.xlsx XLSX spreadsheet
36C24926R0055_1.docx DOCX document
Atch 3_BID SPEC App1_B35 HazMat Report.pdf PDF
Atch 12 Calc. of Self Performed Work.xlsx XLSX spreadsheet
Atch 9_621-24-103 Drawing part 4 of 6.pdf PDF
Atch 2_BID MAppE_B35 Existing Conditions.pdf PDF
Atch 1_BID SPECIFICATIONS-1.pdf PDF
Atch 4_BID SPEC App2_B35 Historic SHPO.pdf PDF
Atch 13 Contractor EMR Certification Form.docx DOCX document
Atch 6_621-24-103 drawing part 1 of 6.pdf PDF
Atch 8_621-24-103 drawing part 3 of 6.pdf PDF
Atch 15 WD TN20260191 01.02.2026.docx DOCX document
Atch 7_621-24-103 drawing part 2 of 6.pdf PDF
Atch 10_621-24-103 Drawing part 5 of 6.pdf PDF
Atch 15 Price Breakout Schedule.xlsx XLSX spreadsheet
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(E)10"x16" SA (UP)(E)40"x18" OA (UP)

(E )1

2" x8

(E)32"x12"

(E )1

2" x8

(E)22"x16" (E)22"x10" (E)22"x10"

(E) (E) VAV-A

(E) DOAS-1

(E )3

8" x1

2" (E

)3 8" x1 2"

(E )2

0" x1

0"

(E)38"x12" OA (UP)

(E)38"x12"

(E)38"x12"

(E)20"x20" SA (E) AHU-S2

(E) AHU-A2

(E) AHU-D2

(E) AHU-S1

23.04

(E)18"ø SA(E)15"ø SA(E)11"ø SA (E)20"ø SA

2"ø HWS 2"ø HWR

(E) (E) VAV-S

(E)20"x20"

(E) AHU-A1

(E)20"x20"(E)18"x18"(E)15"x15"(E)11"x11"

23.04

23.04

(E)26"x26" RA

(E)18"x10" SA (UP) (E)18"x10" SA (UP)

(E) AHU-D1

(E)38"x18" RA (UP)

(E) 1 1/4"ø CHS

(E) 1 1/4"ø CHR

(E) 1 1/4"ø HWS

(E) 1 1/4"ø HWR

(E)8"x10" (E)12"x6" SA (UP)

(E)6"ø SA (UP)

(E)12"x6" SA (UP)

(E)8"x8" SA

(E)12"x6" SA (UP)

(E)12"x6" SA (UP)

(E) 3/4"ø CHR

(E) 3/4"ø CHS

(E) 3/4"ø HWR

(E) 3/4"ø HWS

23.04

23.04

23.04

23.04

23.04

3/4"ø CHS 3/4"ø CHR

3/4"ø HWS 3/4"ø HWR

(E) 3/4"ø D

(E) CH-1

23.12

(E) 3/4"ø D

(E) FAN

23.13

(E)8"x6" SA (UP)

23.14

23.15

23.16

23.15

23.14

23.16

(E) 3/4"ø HWS UP

(E) 3/4"ø HWR UP

(E)10"x16" SA

4"ø EA (UP)

(E)38"x12" OA

(E) EF-2

(E) EF-1

(E) FCU-2

(E) FCU-1

(E)12"x28" SA

(E)12"x28" SA

(E)12"x22" SA

(E)9"x22" SA(E)6"x12" SA

(E) 2"ø CHR UP & DN

(E) 2"ø CHS UP & DN

(E) 2"ø HWR UP & DN

(E) 2"ø HWS UP & DN

23.05

23.05

(E) SD (E) SD

(E) SD

(E) SD (E) SD (E) SD

(E) RG

(E) RG

(E)40"x18" OA (DN)

(E)28"x12" SA (DN)

(E) SD

(E) SD

(E) RG

(E) SD

(E) SD

(E) SD

23.07

23.08

23.10

(E) RG

(E) SD

(E) SD

(E) SD(E) SD

(E) SD

(E) SD

(E) SD (E) SD (E) SD (E) SD

(E)8"x6" SA (DN)

(E) SD

23.17

(E) EG

(E) EG

23.17

23.18

23.18

23.19

23.04

(E) SD

(E)36"x8" SA (UP)

(E) SD

(E)36"x8" SA (UP)

23.54

23.54

23.54

23.54

23.54

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M t H om e

VA

R es to ra tio n of

B

T he at er

/F

FE

_M t H om e

- T he at er

_B

_M

EP

(2

4) .rv t 7/

1/

:5 3:

P

M

MD101

BASEMENT AND FIRST FLOOR

DEMOLITION PLANS

07/01/2025 KF KG

RESTORATION OF BUILDING 35

HISTORIC THEATER

621-24-403

MT. HOME, TENNESSEE

BID DOCUMENTS

JAMES H.

QUILLEN VA

MEDICAL

CENTER Approved: Owner

1/8" = 1'-0"1 MECHANICAL BASEMENT DEMOLITION PLAN

D R A W I N G N O T E S :

23.04 REMOVE SECTION OF DUCT TO ACCOMMODATE NEW SOUND ATTENUATOR.

23.05 REMOVE SUPPLY DIFFUSER AND DUCT TO BELOW FLOOR. RETAIN SUPPLY DIFFUSER FOR REUSE IN NEW WORK.

23.07 REMOVE SECTION OF DUCT. RETAIN SUPPLY DIFFUSERS FOR REUSE IN NEW WORK.

23.08 REMOVE EXHAUST GRILLE AND DUCT UP TO SECOND FLOOR.

23.10 REMOVE EXHAUST FAN IN WINDOW. COORDINATE WINDOW REPAIR WITH GENERAL CONTRACTOR.

23.12 EXISTING REFRIGERANT PIPING BELOW GRADE OUT TO CH-1.

23.13 REMOVE VERTICAL TO FIRST FLOOR. PREPARE FOR EXTENSION IN NEW WORK. SEE NEW WORK ON M101.

23.14 REMOVE EXISTING CONDENSATE DRAIN PIPING ENTIRELY BACK TO BELOW STAGE.

23.15 REMOVE EXISTING CHILLED WATER AND HEATING HOT WATER PIPING FROM FAN COIL ABOVE TO THIS LOCATION.

PREPARE FOR EXTENSION TO NEW FAN COIL UNIT IN NEW WORK. SEE NEW WORK ON M101.

23.16 REMOVE DUCTWORK FROM SUPPLY GRILLE ABOVE MAIN. PREPARE FOR EXTENSION TO NEW SUPPLY GRILLE LOCATION

IN NEW WORK. SEE NEW WORK ON M101.

23.17 REMOVE EXHAUST FAN, DUCT, AND GRILLE.

23.18 REMOVE FAN COIL AND ASSOCIATED PIPING TO BELOW FLOOR.

23.19 REMOVE DUCTWORK FROM BELOW FLOOR AND UP TO SECOND FLOOR.

23.54 RETAIN SUPPLY DIFFUSERS FOR REUSE IN NEW WORK.

1/8" = 1'-0"2 MECHANICAL FIRST FLOOR DEMOLITION PLAN

PLAN

NORTH

BID DOCUMENTS 07/01/2025

LOBBY

MECH/ELEC

BALCONY

(E) AHU-L2

(E) AHU-L1

(E) VAV-L1

(E) SD

(E) SD

(E) SD

(E)12"x14" OA (UP)

(E)14"x14" OA (UP)

2"ø HWS UP 2"ø HWR UP 2"ø CHS UP 2"ø CHR UP

(E)10"x8" SA

(E)10"x10" SA

(E)10"x8" SA

(E)40"x18" OA (DN)

(E)10"x16" SA (DN)

(E)4"ø EA (E)6"ø EA

(E)38"x12" OA (DN)(E) 2"ø HWS DN

(E) 2"ø HWR DN

(E) 2"ø CHS DN

(E) 2"ø CHR DN

23.26 23.08

(E) SD

(E) SD

(E)20"x40" RA

23.26

23.25

PROJECTOR BOOTH

LOBBY

(E) AHU-B

(E) VAV-B

(E) EF-4

(E)12"x14" OA (UP)

23.21

23.04 (E)14"x14" OA (UP)

"x

(E)38"x12" OA (UP)

(E) SD

(E) SD

(E) SD

23.20

(E) VAV-L2 23.22

23.23

(E) 2"ø CHR UP

(E) 2"ø CHS UP

(E) 2"ø HWR UP

(E) 2"ø HWS UP

23.24

23.26

23.26

(E)12"x38" OA

(E)20"x32" RA

(E)20"x32" RA

(E)14"x26" SA (DN)

(E) 2"ø CHR DN

(E) 2"ø CHS DN

(E) 2"ø HWR DN

(E) 2"ø HWS DN

(E )3

8" x1

2" O

A

(E )1

8" x1

2" S

A

(E)36"x8" SA (DN)

(E)20"x8" SA (DN)

(E)27"x8" SA (DN)

(E)10"ø SA (E)8"ø SA

(E)8"ø SA

(E)40"x20" RA (DN)

(E)12"x38" OA (DN)

(E) 2"ø CHR DN

(E) 2"ø CHS DN

(E) 2"ø HWR DN

(E) 2"ø HWS DN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M t H om e

VA

R es to ra tio n of

B

T he at er

/F

FE

_M t H om e

- T he at er

_B

_M

EP

(2

4) .rv t 7/

1/

:5 3:

P

M

MD102

BALCONY, SECOND FLOOR, AND

ATTIC DEMOLITION PLANS

07/01/2025 KF KG

RESTORATION OF BUILDING 35

HISTORIC THEATER

621-24-403

MT. HOME, TENNESSEE

BID DOCUMENTS

JAMES H.

QUILLEN VA

MEDICAL

CENTER Approved: Owner

D R A W I N G N O T E S :

23.04 REMOVE SECTION OF DUCT TO ACCOMMODATE NEW SOUND ATTENUATOR.

23.08 REMOVE EXHAUST GRILLE AND DUCT UP TO SECOND FLOOR.

23.20 REMOVE AHU-B AND CONTROLS. SALVAGE FOR RELOCATION IN NEW WORK. REMOVE SUPPLY DUCTWORK TO ABOVE

CEILING OF LOBBY. SEE NEW WORK PLANS ON M102.

23.21 DISCONNECT CHILLED WATER AND HEATING HOT WATER PIPING FROM AHU-B. REMOVE BACK TO MAIN AND CAP.

23.22 OA SUPPLY VAV TO REMAIN.

23.23 REMOVE OA SUPPLY VAV BOX ALONG WITH CONTROLS AND SALVAGE FOR RELOCATION IN NEW WORK. SEE NEW WORK

PLANS ON M102.

23.24 REMOVE OA DUCTWORK FROM CONNECTION AND RETURN BACK TO MAIN AND CAP.

23.25 REMOVE ALL SUPPLY AIR DUCTWORK DOWN TO FIRST FLOOR.

23.26 REMOVE SECTION OF DUCT. RE-ROUTE IN NEW WORK.

1/8" = 1'-0"1 MECHANICAL BALCONY DEMOLITION PLAN

1/8" = 1'-0"2 MECHANICAL BACK LEVEL 2 DEMOLITION PLAN

1/8" = 1'-0"3 MECHANICAL PROJECTOR BOOTH DEMOLITION PLAN

PLAN

NORTH

1/8" = 1'-0"4 MECHANICAL ATTIC DEMOLITION PLAN

(E) ATTIC VENT (E) ATTIC VENT

(E) THEATER VENT

BLOCKED OFF IN

PREVIOUS PROJECT

(E) ROOF ACCESS HATCH

23.27

(E) ERV-1

(E) ERV-2

(E)20"x40" RA

(E)20"x20" RA (E)18"x20" OA

(E)20"x20" RA

(E)18"x20" OA

(E)20"x20" RA

40"x18" OA (DN)

(E) EF-3

(E) ROOF ACCESS HATCH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M t H om e

VA

R es to ra tio n of

B

T he at er

/F

FE

_M t H om e

- T he at er

_B

_M

EP

(2

4) .rv t 7/

1/

:5 3:

P

M

MD103

ROOF DEMOLITION PLANS

07/01/2025 KF KG

RESTORATION OF BUILDING 35

HISTORIC THEATER

621-24-403

MT. HOME, TENNESSEE

BID DOCUMENTS

JAMES H.

QUILLEN VA

MEDICAL

CENTER Approved: Owner

1/8" = 1'-0"1 MECHANICAL ROOF DEMOLITION PLAN

1/8" = 1'-0"2 MECHANICAL BACK ROOF DEMOLITION PLAN

PLAN

NORTH

D R A W I N G N O T E S :

23.27 REMOVE ATTIC VENT AND CAP ROOF CURB PER NEW WORK PLANS. SEE NEW WORK ON M103.

ELECTRICAL ROOM

MECH/ELEC ROOM

MECH/ELEC ROOM

MECH/ELEC ROOM

M301

(E) AHU-S1

(E) AHU-A1

AHU-A1R23.09

AHU-A123.09

AHU-S1

(E) RG

(E) RG

AHU-A2

(E) AHU-A2

23.09

23.09

(E) AHU-D1

(E) AHU-D2

(E) AHU-S2

(E) DOAS-1

(E) VAV-A

(E) VAV-S

(E)40"x18" OA (UP) (E)38"x18" RA (UP)

(E) 3/4"ø HWS UP

(E) 3/4"ø HWR UP

(E) 2"ø HWS UP

(E) 2"ø HWR UP

(E) 2"ø CHS UP

(E) 2"ø CHR UP

(E)38"x12" OA (UP)

AHU-A2R23.09

(E)26"x26" RA

(E)12"x8" OA

AHU-S1R 23.09

AHU-S223.09

AHU-S2R23.09

(E)34"x14" RA (UP)

(E)32"x12" RA 26"x18" RA

(E)22"x10" SA(E)22"x10" SA

M301

(E) 3/4"ø CHS

(E) 3/4"ø CHR

(E) 3/4"ø HWS

(E) 3/4"ø HWR

23.11

23.11

3/4"ø HWR UP3/4"ø CHR UP 3/4"ø CHS UP 3/4"ø HWS UP

3/4"ø HWR UP 3/4"ø CHS UP 3/4"ø HWS UP 3/4"ø CHR UP

(E) 3/4"ø HWR

(E) 3/4"ø HWS

(E) 3/4"ø CHS

(E) 3/4"ø CHR

6"x46" SA (UP)

6"x46" SA (UP)

(E)11"x11" SA (E)15"x15" SA (E)18"x18" SA (E)20"x20" SA

(E)11"ø SA (E)15"ø SA (E)18"ø SA (E)20"ø SA

(E) CH-1

(E)8"x10" (E)12"x6" SA (UP)

(E)8"x8"

(E)12"x6" SA (UP)

(E) 1"ø RL

(E) 1"ø RL

(E) 2"ø RS

(E) 2"ø RS

23.28

23.28

M301

M301

ODU-1

IU-1

23.37

23.39

23.40

23.38

3/4"ø D

10"x16" SA (UP)

(E)12"x6" SA (UP) (E)8"x6" SA (UP)

(E)8"x10" SA (E)16"x10" SA (E)16"x10" RA

(E) HX-1

(E) 4"ø CHS

(E) 4"ø CHS

(E) 4"ø HWS

(E) 4"ø HWR

(E) FAN

RL

RS

STAGE

STORAGE

DRESSING ROOM

CORRIDOR

TOILET

TOILET

DRESSING ROOM

BOOTH

101B

AUDITORIUM

BOOTH

101D

CORRIDOR

101A

CORRIDOR

101C

WOMEN'S

TOILET

111A

LOBBY

TOILET

110A

MEN'S

(E)9"x22" SA

(E) SD

725 CFM

(E)6"x12" SA

9"x22" SA 12"x22" SA 12"x28" SA

38"x12" OA (UP)

(E)28"x12" SA (UP)

(E) 2"ø CHR UP & DN

(E) 2"ø CHS UP & DN

(E) 2"ø HWR UP & DN

(E) 2"ø HWS UP & DN

M301

6"ø EA ER-2

100 CFM

SD-2

75 CFM6"ø SA

4"ø

SD-1

35 CFM

ER-1

50 CFM

4"ø

"x

8"

20"x8"

9"x9" EA

EF-2

BCU-2

10"x10" 9"x9"

BCU-1

EF-1

SR-1

940 CFM

RG-1

(E) SG

590 CFM

RG-1

ER-1

50 CFM

ER-1

50 CFM

4"x8" EA (UP)(E) SG

590 CFM

SR-1

940 CFM

20"x8" SA

6"ø SA

SD-2

75 CFM ER-2

100 CFM

6"ø EA

ER-1

50 CFM

SD-1

35 CFM

9"x9" EA 4"ø SA

4"ø 10"x10"

9"x9"

(E) SD (E) SD (E) SD

(E) SD (E) SD (E) SD

(E) RG(E) RG

40"x18" OA (DN)

(E) RG

JANITOR

(E) SD

160 CFM

(E) SD

(E) SD

(E) RG

(E) SD

(E) SD

(E) SD(E) SD

(E) SD

(E) SD

3/4"ø HWR 3/4"ø HWS

(E) SD

260 CFM

(E) SD

40 CFM

(E) SD

230 CFM

(E) SD

40 CFM

10"x16" SA (UP)

(E) SD

725 CFM

(E) SD(E) SD

M301

23.29

23.29

23.30

23.30

M101

23.31

23.31

M101

M301

M301

MECHANICAL

110B

MECHANICAL

111B

23.32

23.32

23.33

23.34

23.34

23.34

23.35

23.36

(E)36"x8" SA (UP)

(E)36"x8" SA (UP)

23.34 23.34

M301

M301

BCU-2

EF-2

1 1/4"ø D DN 3/4"ø HWR DN3/4"ø HWS DN

3/4"ø CHS DN 3/4"ø CHR DN

MECHANICAL

111B

TOILET

111A

LOBBY

M301

M301

EF-1

BCU-1

1 1/4"ø D DN 3/4"ø HWR DN

3/4"ø HWS DN 3/4"ø CHS DN 3/4"ø CHR DN

LOBBY

TOILET

110A

MECHANICAL

110B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M t H om e

VA

R es to ra tio n of

B

T he at er

/F

FE

_M t H om e

- T he at er

_B

_M

EP

(2

4) .rv t 7/

1/

:5 3:

P

M

M101

BASEMENT AND FIRST FLOOR

PLANS

07/01/2025 KF KG

RESTORATION OF BUILDING 35

HISTORIC THEATER

621-24-403

MT. HOME, TENNESSEE

BID DOCUMENTS

JAMES H.

QUILLEN VA

MEDICAL

CENTER Approved: Owner

D R A W I N G N O T E S :

23.09 INSTALL NEW SOUND ATTENUATOR.

23.11 EXTEND CHILLED WATER AND HEATING WATER PIPING TO NEW UNIT LOCATION ON FIRST FLOOR.

23.28 CONNECT 46"X6" SA DUCTWORK TO EXISTING.

23.29 CONNECT EXHAUST FAN DISCHARGE DUCT TO NEW WALL LOUVER. SEE ARCHITECTURAL PLANS.

23.30 SUSPEND FAN FROM STAIR STRUCTURE WITH NEOPRENE ISOLATORS.

23.31 SET UNIT ON FLOOR WITH NEOPRENE PAD AND SECONDARY DRAIN PAN BELOW. PROVIDE MOISTURE SENSOR TO SHUT

OFF UNIT WHEN MOISTURE IS SENSED.

23.32 LOCATE EXISTING GRILLE IN FLOOR OF NEW CONSTRUCTION. ROUTE SUPPLY AIR DUCT TO BASEMENT CRAWL SPACE

BELOW FIRST FLOOR.

23.33 ROUTE DUCTWORK TO AVOID NEW STAIR STRUCTURE.

23.34 REINSTALL EXISTING GRILLE AND BALANCE TO CFM INDICATED.

23.35 ROUTE DUCT FROM BASEMENT UP TO SECOND FLOOR. SEE M102 FOR CONTINUATION UP.

23.36 ROUTE DUCT UP TO SECOND FLOOR. SEE M102 FOR CONTINUATION.

23.37 SUPPORT ODU-1 FROM WALL. MOUNT LEVEL. ROUTE REFRIGERANT LINES TO UNIT IN BASEMENT.

23.38 RL AND RS PIPING SIZED BY MANUFACTURER.

23.39 MOUNT UNIT WITH BOTTOM AT 7'-0" MINIMUM.

23.40 TERMINATE CONDENSATE DRAIN OVER NEAREST FLOOR DRAIN.

1/8" = 1'-0"1 MECHANICAL BASEMENT NEW WORK PLAN

1/8" = 1'-0"2 MECHANICAL FIRST FLOOR NEW WORK PLAN

PLAN

NORTH

1/4" = 1'-0"3 MECHANICAL 111B

1/4" = 1'-0"4 MECHANICAL 110B

DRESSING ROOM

TOILET

TOILET

CORRIDOR

DRESSING ROOM

STAGE

(E)40"x18" OA

(E)38"x12" OA (DN)

(E)20"x40" RA

23.06

8"x8" EA

4"x8" EA (DN)

ER-1

50 CFM

ER-1

50 CFM

6"x4" EA

6"x4" EA

8"x8" EA

8"x8" EA (UP)

12"x38" OA

12"x38" OA

(E) SD

170 CFM

(E) SD

170 CFM

(E)8"ø SA (UP)

(E)8"ø SA (UP)

SR-2

185 CFM

SR-2

190 CFM

SR-4

40 CFM

SR-4

40 CFM

SR-3

260 CFM

SR-3

475 CFMTG-1

TG-1

16"x8" SA

20"x40" RA

(E) 2"ø HWS DN

(E) 2"ø HWR DN

(E) 2"ø CHS DN

(E) 2"ø CHR DN

23.41

23.41

23.42

23.43

16"x8" SA

16"x8" SA 10"x16" SA (DN)

23.44

MECH/ELEC

LOBBY

BALCONY

(E) VAV-L1(E)18"x12" RA(E)12"x8" SA

M301

(E)14"x14" OA (UP) (E)20"x20" RA (UP)

(E) AHU-L2

(E) AHU-L1

(E)12"x14" OA (UP)

(E) SD

890 CFM

(E) SD

480 CFM

(E) SD

890 CFM

(E) 2"ø HWS UP

(E) 2"ø HWR UP

(E) 2"ø CHS UP

(E) 2"ø CHR UP

8"ø SA (UP)

(E) SD

170 CFM

(E) RADIATOR

(E) RADIATOR

(E) SD

170 CFM

(E)8"ø SA (UP)

(E) SD

(E) RG

M301

(E)12"x14" OA (UP)

(E) SD

890 CFM

(E) SD

480 CFM

(E) SD

890 CFM

(E) VAV-L2

(E)38"x12" OA (UP)

(E)14"x14" OA (DN)

(E) EF-4

PROJECTOR BOOTH

LOBBY

(E) 2"ø CHR UP

(E) 2"ø CHS UP

(E) 2"ø HWR UP

(E) 2"ø HWS UP

M301

(E)12"x38" OA

(E)20"x32" RA

20"x32" RA

12"x38" OA (DN)

20"x40" RA (DN)

10"ø SA 8"ø SA

8"ø SA

2"ø CHR DN 2"ø CHS DN

2"ø HWS DN 2"ø HWR DN

FD 23.45

FD 23.45

M301

(E) AHU-B

AHU-B

AHU-BR

14"x26" RA

26"x14" SA

(E) VAV-B

10"ø OA

(E)26"x14" SA

(E)38"x12" OA

16"x15" OA

23.09

23.09

1"ø HWS 1"ø HWR 1"ø CHS 1"ø CHR

23.53

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M t H om e

VA

R es to ra tio n of

B

T he at er

/F

FE

_M t H om e

- T he at er

_B

_M

EP

(2

4) .rv t 7/

1/

:5 3:

P

M

M102

BALCONY, SECOND FLOOR, AND

ATTIC PLANS

07/01/2025 KF KG

RESTORATION OF BUILDING 35

HISTORIC THEATER

621-24-403

MT. HOME, TENNESSEE

BID DOCUMENTS

JAMES H.

QUILLEN VA

MEDICAL

CENTER Approved: Owner

D R A W I N G N O T E S :

23.06 8X8 EXHAUST DUCT UP TO ROOF.

23.09 INSTALL NEW SOUND ATTENUATOR.

23.41 ROUTE DUCTWORK TO AVOID THE THEATRICAL CURTAINS AND SUPPORTS. SEE STAGE DUCTWORK FOR ISOMETRIC ON M301.

23.42 ROUTE DUCTWORK FROM FIRST FLOOR TIGHT TO CEILING.

23.43 INSTALL DUCTWORK TIGHT TO CEILING.

23.44 ROUTE DUCTWORK DOWN TO FIRST FLOOR.

23.45 RELOCATE EXISTING FIRE DAMPER.

23.53 SET UNIT ON FLOOR WITH NEOPRENE PAD AND SECONDARY DRAIN PAN BELOW. PROVIDE MOISTURE SENSOR TO SHUT

OFF UNIT WHEN MOISTURE IS SENSED.

1/8" = 1'-0"4 MECHANICAL BACK LEVEL 2 NEW WORK PLAN

1/8" = 1'-0"3 MECHANICAL BALCONY NEW WORK PLAN

PLAN

NORTH

1/8" = 1'-0"2 MECHANICAL PROJECTOR BOOTH NEW WORK PLAN

1/8" = 1'-0"1 MECHANICAL ATTIC NEW WORK PLAN

35-SEF-2

56"ø56"ø

35-SEF-1

M301

56"ø 56"ø 56"x56"

56"x56"

23.01 23.01

23.0123.01

(E) THEATER VENT

BLOCKED OFF IN

PREVIOUS PROJECT

(E) ROOF ACCESS HATCH

(E) ATTIC VENT(E) ATTIC VENT 23.46

23.46

23.47

23.47

23.48 23.48

23.48 23.48

23.49

23.49

23.5023.51

23.51

23.52

M301

56"x56"

56"x56"

(E) ERV-1

(E) ERV-2

(E)20"x20" RA

(E)18"x20" OA

(E)18"x20" OA

(E)20"x20" RA

(E)20"x40" RA

(E)40"x18" OA (DN)

(E) EF-3

ROOF ACCESS HATCH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M t H om e

VA

R es to ra tio n of

B

T he at er

/F

FE

_M t H om e

- T he at er

_B

_M

EP

(2

4) .rv t 7/

1/

:5 3:

P

M

M103

ROOF PLANS

07/01/2025 KF KG

RESTORATION OF BUILDING 35

HISTORIC THEATER

621-24-403

MT. HOME, TENNESSEE

BID DOCUMENTS

JAMES H.

QUILLEN VA

MEDICAL

CENTER Approved: Owner

1/8" = 1'-0"1 MECHANICAL ROOF NEW WORK PLAN

1/8" = 1'-0"2 MECHANICAL BACK ROOF NEW WORK PLAN

PLAN

NORTH

D R A W I N G N O T E S :

23.01 PROVIDE FIRE RATED FLEXIBLE CONNECTIONS AT DUCT CONNECTION TO EACH SIDE OF FAN. FABRIC ASSOCIATED WITH

THE DUCT CONNECTION SHALL MEET ASTM E119-20 AND A TEMPERATURE RATING OF 155 DEG F.

23.46 PROVIDE 56"X56" MOTORIZED DAMPER INTERLOCK WITH SMOKE EXHAUST FAN.

23.47 PROVIDE BIRD SCREEN OVER OPENING.

23.48 PROVIDE EQUIPMENT RAILS AND UNI-STRUT SUPPORT FOR DUCTWORK.

23.49 INTERLOCK FAN TO FIRE ALARM SYSTEM.

23.50 POSITION DUCTWORK, WALL OPENING AND FAN TO ALLOW ROOF ACCESS HATCH TO OPEN FULLY.

23.51 PROVIDE EQUIPMENT RAILS FOR FAN SUPPORT. PROVIDE HOUSED SPRING ISOLATORS FOR FAN.

23.52 CAP CURB WITH A INSULATED PANEL SUITABLE FOR WALKING ON. DISABLE DAMPER AND SECURE IN CLOSED POSITION.

CONTRACTOR TO VERIFY CURB DIMENSIONS IN THE FIELD.

02.1-BACK LEVEL 2

1728' - 4

02.3 BOH T.O. ROOF

1737' - 4

04.2-ATTIC

1756' - 0

01.2-FIRST FLOOR

1718' - 6"

01.2-FIRST FLOOR

1718' - 6"

04.3-T.O. ROOF

1768' - 10 1/4"

04.2-ATTIC

1756' - 0"

35-SEF-2 35-SEF-1

(E)10"ø SA

2"ø CHR 2"ø CHS 2"ø HWR 2"ø HWS

(E)12"x38" OA (E)32"x20" RA

M301

(E)20"x32" RA

(E)20"x20" RA (E)18"x20" OA

(E)28"x12" SA

12"x28" SA

(E)38"x12" OA

12"x38" OA

(E)12"x38" OA

FD

12"x22" SA

9"x22" SA

(E)20"x40" RA

(E)20"x20" RA

(E)18"x20" OA

(E)40"x18" OA SA FROM BASEMENT

(E)OA TO BASEMENT

(E)RA TO ERV

(E)OA FROM ERV

(E)OA FROM ERV

(E)RA TO ERV

(E)OA FROM BASEMENT

(E)RA FROM AUDITORIUM

(E)OA TO PROJECTOR ROOM

(E)9"x22" SA (E)6"x12" SA

FD

20"x40" RA

20"x40" RA

20"x32" RA

(E)20"x40" RA

AHU-S1

01.2-FIRST FLOOR

1718' - 6"

M301

EF-2

10"x10" EA

8"x20" SA9"x9" EA

SD-1

35 CFM

ER-1

50 CFM

BCU-2

3/4"ø CHR 3/4"ø CHS 3/4"ø HWS 3/4"ø HWR

1 1/4"ø D

TOILET

111A

MECHANICAL

111B

01.2-FIRST FLOOR

1718' - 6"

M301

RG-1

8"x20" SA

BCU-2

3/4"ø CHR

3/4"ø HWS 3/4"ø HWR

1 1/4"ø D3/4"ø CHS

MECHANICAL

111B

01.2-FIRST FLOOR

1718' - 6"

M301

SD-1

35 CFM

ER-1

50 CFM

9"x9" EA8"x20" SA

EF-1

BCU-1

10"x10" EA

1 1/4"ø D

3/4"ø CHR 3/4"ø CHS

3/4"ø HWS 3/4"ø HWR

TOILET

110A

MECHANICAL

110B

01.2-FIRST FLOOR

1718' - 6"

M301

3/4"ø CHR

3/4"ø HWS 3/4"ø HWR

3/4"ø CHS 1 1/4"ø D

RG-1

BCU-1

8"x20" SA

MECHANICAL

110B

04.3-T.O. ROOF

1768' - 10 1/4"

05-RAFTERS

1772' - 5"

04.2-ATTIC

1756' - 0"

M301

35-SEF-2

56"ø 56"ø

56"x56"

(E) ATTIC VENT

(E) THEATER VENT

BLOCKED OFF IN

PREVIOUS PROJECT

(E)10"ø SA

(E)8"ø SA

(E)8"ø SA

23.01 23.01

23.52

BCU-1

3/4"ø CHR 3/4"ø CHS 3/4"ø HWS

3/4"ø HWR

RG-1

20"x8" SA SR-1

SD-2

ER-2

6"ø EA

9"x9" EA 4"ø EA

10"x10" EA

EF-1

6"ø SA

4"ø SASD-1

1 1/4"ø D

BCU-2

RG-1

20"x8" SA

10"x10" EA

EF-2

4"ø EA9"x9" EA 6"ø EA

4"ø SA

6"ø SA

SD-2

SR-1

ER-2

3/4"ø CHR 3/4"ø CHS3/4"ø HWS

3/4"ø HWR 1 1/4"ø D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M t H om e

VA

R es to ra tio n of

B

T he at er

/F

FE

_M t H om e

- T he at er

_B

_M

EP

(2

4) .rv t 7/

1/

:5 3:

P

M

M301

MECHANICAL SECTIONS

07/01/2025 KF KG

RESTORATION OF BUILDING 35

HISTORIC THEATER

621-24-403

MT. HOME, TENNESSEE

BID DOCUMENTS

JAMES H.

QUILLEN VA

MEDICAL

CENTER Approved: Owner

1/4" = 1'-0"1 ROOF SMOKE EXHAUST SECTION

3 STAGE DUCTWORK ISOMETRIC

1/4" = 1'-0"4 MECHANICAL ROOM BELOW STAIRS - SOUTH

1/4" = 1'-0"5 MECHANICAL ROOM BELOW STAIRS - EAST

1/4" = 1'-0"6 MECHANICAL ROOM BELOW STAIRS - NORTH

1/4" = 1'-0"7 MECHANICAL ROOM BELOW STAIRS - EAST

1/4" = 1'-0"8 ROOF SECTION - SMOKE EXHAUST - NORTH

2 BCU-1 ISOMETRIC 9 BCU-2 ISOMETRIC

D R A W I N G N O T E S :

23.01 PROVIDE FIRE RATED FLEXIBLE CONNECTIONS AT DUCT CONNECTION TO EACH SIDE OF FAN. FABRIC ASSOCIATED WITH

THE DUCT CONNECTION SHALL MEET ASTM E119-20 AND A TEMPERATURE RATING OF 155 DEG F.

23.52 CAP CURB WITH A INSULATED PANEL SUITABLE FOR WALKING ON. DISABLE DAMPER AND SECURE IN CLOSED POSITION.

CONTRACTOR TO VERIFY CURB DIMENSIONS IN THE FIELD.

DRAW THRU

BLOW THRU

2" [50mm]

PLUS X

1" [25mm]

MINIMUM

X

2X

UNIT TYPE A B

WHERE X = STATIC PRESSURE IN PAN

DRAIN LINE SHALL BE AT LEAST THE SAME SIZE

AS THE NIPPLE ON THE DRAIN PAN PIPING SHALL

BE RIGID COPPER TYPE L OR TYPE M UNLESS

NOTE BELOW IS MET

PITCH DOWN

TOWARD DRAIN

CLEAN OUT

FLOOR SINK

DRAIN

PAN

DIELECTRIC

FITTING

1.

2.

NOTE:

CPVC PIPE MAY BE USED ONLY IF APPROVED BYLOCAL VA AND IS

INDOORS AND DOES NOT PASS THROUGHRATED BARRIERS.

DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILARMETALS ARE

TO BE CONNECTED.

B A

1" [2

5m m]

MV

COIL

TEST PLUG (TYP.)

REDUCER, IF REQUIRED

WATER RETURN

MANUAL AIR VENT

UNION CONNECTIONS (TYP.)

WATER SUPPLY

SHUT OFF VALVE

DRAIN WITH HOSE CONNECTION

MODULATION CONTROL VALVE

1.

2.

3.

4.

NOTE:

ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.

WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE REGARDLESS OF W DIMENSION.

ALL SINGLE THICKNESS VANES SHALL HAVE A 2" [50mm] RADIUS, 1 1/2" [40mm] MAXIMUM SPACE BETWEEN VANES AND A 3/4" [20mm] TRAILING EDGE.

WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" [500mm] VANES SHALL BE DOUBLE VANE TYPE.

W

W1

VANE VANE

R SHALL

EQUAL OR

BE

GREATER

THAN W.

R SHALL

EQUAL OR

BE

GREATER

THAN 1/3W.

R SHALL

EQUAL OR

BE

GREATER

THAN 1/6W.

STANDARD RADIUS OR

LONG RADIUS ELBOW

SHORT RADIUS ELBOW

WITH ONE VANE SHORT RADIUS ELBOW

WITH TWO VANES

R

R

W

W

1/3 W

2/3 W

W

R 1/6 W

1/2 W

1/3 W

1.

2.

NOTE:

THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.

ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS. ALL

SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE CONSTRUCTED, SUPPORTED

AND FASTENED AS RECOMMENDED BY SMACNA.

EQ

UI

PM

EN

T

TYPICAL DUCTWORK TRANSITION

PLAN OR SIDE VIEW

TYPICAL DUCTWORK TRANSITION WITH

EQUIPMENT MOUNTED IN DUCT

PLAN OR SIDE VIEW

15° M

AX.

° M

AX

30° M

AX.15

° M

AX

AIR FLOW AIR FLOW

° M

AX

15° M

AX.

NOTE:

UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY. AIR SPLIT DUCT TAKE-OFF PLAN VIEW BRANCH DUCT TAKE-OFF PLAN VIEW

SUPPLY REGISTER OR

BRANCH DUCT

TURNING VANES

MAIN SUPPLY DUCT

SEE FLOOR PLAN FOR SPLIT

DIMENSION

PROVIDE VOLUME

DAMPER

PROVIDE

VOLUME

DAMPER

1/4 W OR 4" [100mm] MIN.

AIR FLOW

MAIN SUPPLY

DUCT

AI

R

FL

OW

W

AI

R

FL

OW

AIR FLOW

AIR FLOW

MAIN EXHAUST OR RETURN

PLAN VIEW

AIR FLOW

AIR FLOW

PROVIDE VOLUME DAMPER AT

EACH BRANCH DUCT

1/4W OR 4"

[100mm] MIN.

BRANCH DUCT

VD

AI

R

FL

OW

W

1.

2.

3.

NOTE:

DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.

DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR MULTI-BLADE DAMPERS

& ROUND DAMPERS.

SEE GENERAL NOTES ON MECHANICAL NEW WORK SHEETS REGARDING VOLUME DAMPER LOCATIONS AND

ABOUT REMOTE ADJUSTMENT DEVICE OPTION FOR INACCESSIBLE CEILINGS.

INSULATION SEE

SPECIFICATION

DAMPER BLADE

1/8" [6mm]

CLEARANCE ALL

AROUND

OUTSIDE END BEARING

INSIDE END BEARING

HANDLE WITH

LOCKING

QUADRANT

INSULATION

STAND-OFF

1/2" [15mm] ROUND ROD PIN

DUCT

STIFFEN BLADE AS

REQUIRED

SIDE ELEVATION SECTION

1/2" 1/2" 1 1/2"

ROUND FLEXIBLE CONNECTION

RECTANGULAR FLEXIBLE CONNECTION

FLANGED

CONNECTION

ON FAN SIDE

WASHER

1 1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL TAUT

FLEXIBLE

MATERIAL AS

SPECIFIED

1"x1/8" [25x3mm] DRAW BAND

1"x1/8" [25x3mm] BAND IRON

BOLT ON 4" [100mm] CENTERS

5/16" [8mm] FLANGE

DUCT

SHEET METAL SCREWS ON 12"

[300mm] CENTERS

RIVET ON 4" [100mm]

CENTERS

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

1"x1/8" [25x3mm] BAND IRON

BOLT ON 4" [100mm] CENTERS

1" [25mm] FLANGE & HEM

ALTERNATE

POSITION OF

BOLT

1 1/2" [40mm] POCKET SLIP

DUCT

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

[15mm] [15mm] [40mm]

1 1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL TAUT

FLANGED CONNECTION ON FAN

SIDE

WASHER

FLEXIBLE MATERIAL AS

SPECIFIED

1"

SLEEVE, NOTE 2

DUCT

CONNECTION

NOTE 4

DAMPER,

NOTE 1

DAMPER COLLAR

EXTENSION INTEGRAL

PART OF SLEEVE

SLEEVE, NOTE 2

NOTE 6

FIRE BARRIER

PARTITION OR CHASE

TYPICAL DUCT

INSULATION

PERIMETER ANGLE, NOTE 3

(NOTE FASTENED TO PARTITION)

ACCESS PANEL

NOTE 5

[25 mm

1.

2.

3.

4.

5.

6.

7.

NOTE:

A VERTICAL DAMPER IS SHOWN. HORIZONTAL DAMPER INSTALLATION, 1S SIMILAR. FOLLOW DAMPER MANUFACTURER'S INSTRUCTIONS, INCLUDING FASTENER OPTIONS AND GAGES FOR SLEEVE AND PERIMETER ANGLES. FIRE DAMPERS MUST BE INSTALLED IN THE PARTITION OR FLOOR AND NOT

OUTSIDE THE PENETRATION.

GALVANIZED SLEEVE: GAGE NOT LESS THAN CONNECTING DUCT. FASTEN SLEEVE TO DAMPER FRAME AND TO PERIMETER ANGLES.

PERIMETER ANGELS: GALVANIZED STEEL, NOT LESS THAN 1 1/2"x1 1/2" [40x40mm], 14 GAGE, TO PROVIDE 1" [25mm] MINIMUM OVERLAP OF OPENING

ON ALL 4 SIDES.

BREAKAWAY DUCT CONNECTION: CONTRACTOR'S OPTION OF TYPES SHOWN IN SMACNA. ACCESS PANELS: SIZE AND LOCATION TO PERMIT

SERVICING THE FUSIBLE LINK OR LINKS.

PROVIDE 1/4" TO 1/2" [6 TO 15mm] CLEARANCE ON HEIGHT AND WIDTH. FILL OPEN SPACE WITH ROCK WOOL FIRESTOP FIBER.

ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC FLOORS AND MECHANICAL ROOM FLOORS, SHALL BE PROVIDED WITH 3" [75mm] HIGH CONCRETE CURB AROUND OPENING FOR DUCT.

PLACE ACTUATOR IN ROOM WITH LAY-IN CEILING.

FLEXIBLE DUCT SIZE

SAME AS DIFFUSER

INLET: 5'-0" MAX LENGTH.

12"

CEILING

SUPPORT SADDLE

FROM STRUCTURE

VOLUME DAMPER

W/LOCKING QUAD

SHEET METAL

SADDLE

CONICAL OUTLET

BRANCH DUCT

USE RIGID ELBOWS FOR

CHANGE OF DIRECTION

GREATER THAN 45°

[300mm]

SEE SPECIFICATIONS FOR CLAMPS AND

SEALANT (TYP.)

NOTE:

THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR THE

DEDICATED AHU SERVING THE SURGICAL SUITE.

TYPICAL

DIFFUSER OR

REGISTER IN

LAY-IN CLG.

THERMAL INSULATION SEE

SPECIFICATIONS

FAN COIL SEQUENCE OF OPERATION (PATIENT ROOMS)

FAN COIL UNIT SHALL OPERATE ON A SCHEDULE AS SET BY THE ECC. FAN SHALL

RUN CONTINUOUSLY. FAN STATUS SHALL BE MONITORED AND AN ALARM MESSAGE SHALL

BE GENERATED IN THE EVENT THE UNIT FAILS TO RUN. THE ADJUSTABLE FROM TEMP

SET POINT WILL BE 70* - 75* WITH 0.5* HEATING/COOLING OFFSETS. VALVE V-1 & V-2

WILL NOT BE OPEN SIMULTANEOUSLY. ROOM OCCUPANT WILL HAVE ABILITY OF ADJUSTING

ROOM TEMPERATURE BETWEEN 70* - 75*.

FAN COIL SEQUENCE OF OPERATION (OUTPATIENT ROOMS)

FAN COIL SHALL OPERATE ON A SCHEDULE AS SET BY ECC. FAN SHALL RUN CONTINUOUSLY

IN OCCUPIED MODE. FAN STATUS SHALL BE MONITORED AND AN ALARM MESSAGE SHALL BE

GENERATED IN THE EVENT THE UNIT FAILS TO RUN BETWEEN THE RANGE OF 70* _75* SPACE

TEMPERATURE BOTH V-1 & V-2 SHALL BE CLOSED. UPON RISE IN TEMPERATURE ABOVE 75*

V-2 SHALL MODULATE OPEN TO MAINTAIN 75* F. UPON FALL IN TEMPERATURE BELOW 70*F.

HEATING VALVE V-1 SHALL MODULATE TO OPEN TO MAINTAIN 70* F.

RA

HEATING COIL COOLING COIL

FAN

CS

TTFILTER

V - 1

HWR

HWS

V - 2

CHR

CHS

PC

T T - 1

HS SST

ROOM TEMPERATURE SENSOR WITH SPACE ADJUSTABLE WALL MOUNTED

48" [1200mm] AFF.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M t H om e

VA

R es to ra tio n of

B

T he at er

/F

FE

_M t H om e

- T he at er

_B

_M

EP

(2

4) .rv t 7/

1/

:5 3:

P

M

M501

MECHANICAL DETAILS

07/01/2025 KF KG

RESTORATION OF BUILDING 35

HISTORIC THEATER

621-24-403

MT. HOME, TENNESSEE

BID DOCUMENTS

JAMES H.

QUILLEN VA

MEDICAL

CENTER Approved: Owner

NTS1 AIR HANDLING UNIT DRAIN TRAP DETAIL

NTS2 TERMINAL UNIT WATER COILS - PIPING CONNECTIONS

NTS3 DUCTWORK SQUARE VANE ELBOWS

NTS4 DUCTWORK RADIUS ELBOWS

NTS5 DUCTWORK TRANSITIONS (WITH EQUIPMENT MOUNTED IN DUCT)

NTS6 SUPPLY DUCTWORK TAKE-OFFS

NTS7 EXHAUST OR RETURN BRANCH DUCTWORK

NTS8 VOLUME DAMPER DETAIL

NTS9 FLEXIBLE DUCT CONNECTIONS

NTS10 SECTION THROUGH FIRE DAMPER INSTALLATION

NTS11 FLEXIBLE AIR DUCT CONNECTOR

NTS12 FOUR PIPE FAN COIL UNIT CONTROLS

SOUND ATTENUATING DEVICE SCHEDULE

MARK LOCATION SYSTEM AND/OR

SERVICE TYPE

AIRFLOW APD INLET SIZE LENGTH

DYNAMIC INSERTION LOSS DB OCTAVE BAND AND MID-FREQUENCY [CPS]

REMARKS63 125 250 500 1000 2000 4000 8000

CFM [L/s] IN WG [Pa] IN [mm] IN [mm] 1 2 3 4 5 6 7 8

AHU-A1 BASEMENT AHU-A1 (SUPPLY) RECTANGULAR 2600 [ 1200 ] 0.17 [ 43 ] 20 x 20 490 X 490 48 [ 1200 ] 7 11 15 23 18 14 11 9 ----

AHU-A1R BASEMENT AHU-A1 (RETURN) RECTANGULAR ELBOW -2600 [ -1000 ] 0.09 [ 23 ] 26 x 16 640 x 400 40 [ 1000 ] 5 10 19 24 33 31 25 22 ----

AHU-A2 BASEMENT AHU-A2 (SUPPLY) CIRCULAR 2600 [ 1200 ] 0.16 [ 40 ] 20 [ 490 ] 120 [ 3000 ] 10 16 44 55 55 54 47 46 ----

AHU-A2R BASEMENT AHU-A2 (RETURN) RECTANGULAR ELBOW -2600 [ -1000 ] 0.09 [ 23 ] 26 x 16 640 x 400 40 [ 1000 ] 5 10 19 24 33 31 25 22 ----

AHU-B BOOTH AHU-B (SUPPLY) RECTANGULAR 2600 [ 1200 ] 0.14 [ 35 ] 26 x 14 640 x 340 48 [ 1200 ] 6 9 15 24 20 16 12 10 ----

AHU-BR BOOTH AHU-B (RETURN) RECTANGULAR ELBOW -2600 [ -1000 ] 0.09 [ 23 ] 20 x 20 490 X 490 36 [ 900 ] 6 10 17 21 27 24 21 18 ----

AHU-S1 STAGE AHU-S1 (SUPPLY) RECTANGULAR 2900 [ 1400 ] 0.2 [ 50 ] 28 x 12 690 x 300 60 [ 1500 ] 6 11 18 31 27 20 13 10 ----

AHU-S1R BASEMENT AHU-S1 (RETURN) RECTANGULAR ELBOW -2900 [ -1000 ] 0.05 [ 13 ] 36 x 14 880 x 340 50 [ 1300 ] 6 11 19 24 30 28 23 20 ----

AHU-S2 BASEMENT AHU-S2 (SUPPLY) RECTANGULAR 2900 [ 1400 ] 0.22 [ 55 ] 22 x 16 540 x 400 72 [ 1800 ] 7 12 21 35 32 24 17 13 ----

AHU-S2R BASEMENT AHU-S2 (RETURN) RECTANGULAR ELBOW -2900 [ -1000 ] 0.07 [ 18 ] 26 x 18 640 x 440 40 [ 1000 ] 5 10 19 24 33 31 25 22 ----

FOUR PIPE FAN COIL UNIT SCHEDULE

MARK LOCATION TYPE

FAN AIR FLOW EXTERNAL APD

COOLING REQUIREMENTS HEATING REQUIREMENTS

FILTER

FAN MOTOR

MIN SENS CAPACITY MIN TOTAL CAPACITY

EAT

FLOW EWT WPD RUNOUT SIZE MIN CAPACITY EAT Db FLOW EWT WPD RUNOUT SIZE POWER

PHASE VOLT RPM SPEED

CONTROL REMARKSDb Wb

CFM [L/s] IN WG [Pa] BTUH [W] BTUH [W] °F [°C] °F [°C] GPM [L/s] °F [°C] FT [kPa] IN [mm] BTUH W °F [°C] GPM [L/m] °F [°C] FT [kPa] IN [mm] MERV

RATING HP [W]

BCU-1 111A VERTICAL 1050 [ 500 ] 0.5 [ 130 ] 16800 [ 4900 ] 23200 [ 6800 ] 75 [ 24 ] 65 [ 18 ] 3.1 [ 41 ] 44 [ 7 ] 6.27 [ 19 ] 0.75 [ 19 ] 29400 [ 8600 ] 68 [ 20 ] 1.9 [ 7 ] 155 [ 68 ] 0.08 [ ] 1 [ 25 ] 8 0.5 [ 370 ] 1 115 1332 ECM 1, 2

BCU-2 110A VERTICAL 1050 [ 500 ] 0.5 [ 130 ] 16800 [ 4900 ] 23200 [ 6800 ] 75 [ 24 ] 65 [ 18 ] 3.1 [ 41 ] 44 [ 7 ] 6.27 [ 19 ] 0.75 [ 19 ] 29400 [ 8600 ] 68 [ 20 ] 1.9 [ 7 ] 155 [ 68 ] 0.08 [ ] 1 [ 25 ] 8 0.5 [ 370 ] 1 115 1332 ECM 1, 2

REMARK:

1. 2" MERV 8 FILTER, MOTOR SPEED SHALL BE MANUAL ADJUSTED AT THE UNIT.

2. PROVIDE SECONDARY DRAIN PAN WITH MOISTURE SENSOR TO SHUT COOLING VALVE ON THE UNIT. BASIS OF DESIGN TITUS TVBD SIZE 12 (TITUS SQ 50517)

SPLIT SYSTEM AIR CONDITIONER GAS/ELECTRIC SCHEDULE

MARK LOCATION

AREA

AND/OR

BLDG

SERVED

TYPE

TOTAL SUPPLY AIR

FLOW

MIN. OUTSIDE AIR

FLOW

EXT STATIC

PRESSURE

COOLING CAPACITY

AIR FILTER

MARK NO

ELECTRICAL DATA

REMARKSMIN TOTAL

CAPACITY MIN SENS CAPACITY MIN

SEER

EAT

OSA DESIGN TEMP

COMP Kw

INDOOR FAN OUTDOOR UNIT (FAN/COMP)

Db Wb

CFM [L/s] CFM [L/s] IN [Pa] MBH [kW] MBH [kW] °F [°C] °F [°C] °F [°C] HP [W] CONTROL MCA [W] CONTROL

ODU-1/IDU-1 OUTSIDE/INSIDE TR ROOM DUCTLESS SPLIT 375 [ 180 ] 0 [ ] 1.5 [ 380 ] 18 [ 61 ] [ ] 19.5 75 [ 24 ] 64 [ 18 ] [ 95 ] [ 35 ] -- MERV 7 0.04 [ 30 ] TEMPERATURE SENSOR 16 [ 12000 ] BACnet 1, 2, 3, 4

REMARKS:

1. PROVIDE WALL MOUNTED INDOOR UNIT (IDU-1) WITH WALL MOUNTED THERMOSTAT FOR CONTROL OF THE UNIT AND BACnet INTEGRATION TO BAS SYSTEM.

2. PROVIDE WALL MOUNTING BRACKETS FOR THE OUTDOOR UNIT.

3. PROVIDE 1/2" TWIN TUBE LINESET WITH INSULATION. SUITABLE FOR THE LENGTH REQUIRED FOR INDOOR TO OUTDOOR UNIT.

4. PROVIDE ADVANCED MINI CONDENSATE PUMP WITH RESERVOIR AND SENSOR. BASIS OF DESIGN MITSUBISHI PUY-AK18NL / PKA-AL18NL

AIR DEVICE SCHEDULE (SUPPLY)

MARK TYPE

AIR FLOW

MAX APD

MOUNTING

PANEL/FRAME SIZE NECK SIZE

NC DAMPER FINISH REMARKSMIN MAX

IN x IN [mm x mm] IN [mm ] CFM [L/s] CFM [L/s] IN WG [Pa]

SD-1 LOUVERED FACE 35 [ 17 ] 75 [ 35 ] 0.046 [ 12 ] CEILING 12 x 12 [ 300 x 300 ] 4 [ 100 ] <15 OBD WHITE 1

SD-2 LOUVERED FACE 75 [ 35 ] 150 [ 71 ] 0.105 [ 26 ] CEILING 12 x 12 [ 300 x 300 ] 6 [ 150 ] 23 OBD WHITE 1

SR-1 SUPPLY REGISTER 600 [ 280 ] 1000 [ 470 ] 0.150 [ 38 ] WALL 22 x 10 [ 540 x 250 ] 20 x 8 [ 490 x 200 ] 35 OBD -- 2

SR-2 SUPPLY REGISTER 170 [ 80 ] 275 [ 130 ] 0.131 [ 33 ] WALL, DUCT 12 x 8 [300 x 200 ] 10 x 6 [ 250 x 150 ] 30 OBD -- 2

SR-3 SUPPLY REGISTER 260 [ 120 ] 500 [ 240 ] 0.100 [ 25 ] WALL, DUCT 18 x 10 [ 440 x 250 ] 16 x 8 [400 x 200 ] 26 OBD -- 2

SR-4 SUPPLY REGISTER 35 [ 17 ] 115 [ 54 ] 0.074 [ 19 ] WALL, DUCT 8 x 8 [200 x 200 ] 6 x 6 [ 150 x 150 ] 26 OBD -- 2

REMARKS:

1. PROVIDE SQUARE TO ROUND ADAPTER.

2. SEE SPECIFICATION 23 37 00 FOR FINISH INFORMATION.

AIR DEVICE SCHEDULE (RETURN)

MARK TYPE

AIR FLOW

MAX APD

MOUNTING

PANEL/FRAME SIZE NECK SIZE

NC DAMPER FINISH REMARKSMIN MAX

CFM [L/s] CFM [L/s] IN WG [Pa] IN x IN [mm x mm] IN x IN [mm x mm]

RG-1 LOUVERED HEAVY

DUTY 1000 [ 470 ] 2000 [ 940 ] 0.023 5.800 WALL 26 x 42 [ 600 x 980 ] 24 x 40 [ 600 x 980 ] 20 NONE -- 2

TG-1 LOUVERED HEAVY

DUTY 260 [ 120 ] 475 [ 220 ] 0.051 13.000 WALL 32 x 8 [ 790 x 200 ] 30 x 6 [ 740 x 150 ] 12 NONE -- 2

ER-1 EXHAUST REGISTER 50 [ 24 ] -- [ ] 0.016 4.000 CEILING / WALL 8 x 8 [ 200 x 200 ] 6 x 6 [ 150 x 150 ] <15 OBD -- 1, 2

ER-2 EXHAUST REGISTER 100 [ 47 ] -- [ ] 0.016 4.000 CEILING 12 x 12 [ 305 x 305 ] 8 x 8 [ 203 x 203 ] <15 OBD WHITE 1

REMARKS:

1. PROVIDE SQUARE TO ROUND ADAPTOR WHERE NECESSARY ON PLANS.

2. SEE SPECIFICATION 23 37 00 FOR FINISH INFORMATION.

FAN SCHEDULE

MARK LOCATION AREA AND/OR

BLDG SERVED

SYSTEM

AND/OR

SERVICE

AIR FLOW TSP

FAN MOTOR ELECTRICAL

CONTROL

SEQUENCE REMARKS

TYPE WHEEL CLASS

ARRANGEMENT,

ROTATION, AND

DISCHARGE

DIAMETER MIN %

EFF DRIVE FAN MAX

RPM

NOMINAL POWER

PHASE VOLT RPM SPEED

CONTROLCFM [L/s] IN [Pa] IN [mm] BHP HP [kW]

35-SEF-1 ROOF STAGE SMOKE EXHAUST 38750 [ 18000 ] 1.8 [ 450 ] TUBULAR CENTRIFUGAL MIXED FLOW II ARR 9, CLOCKWISE, HORIZONTAL 40 [ 1000 ] 63% BELT 1304 23.79 30 [ 22 ] 3 208 1725 CONSTANT ON/OFF 1, 2

35-SEF-2 ROOF STAGE SMOKE EXHAUST 38750 [ 18000 ] 1.8 [ 450 ] TUBULAR CENTRIFUGAL MIXED FLOW II ARR 9, CLOCKWISE, HORIZONTAL 40 [ 1000 ] 63% BELT 1304 23.79 30 [ 22 ] 3 208 1725 CONSTANT ON/OFF 1, 2

EF-1 110A RESTROOM GENERAL

EXHAUST 150 [ 71 ] 0.4 [ 100 ] SQUARE INLINE FAN PLENUM -- -- 8 [ 200 ] 24% DIRECT 1750 0.04 0.067 [ ] 1 115 1750 ECM ON/OFF 3, 4

EF-2 111A RESTROOM GENERAL

EXHAUST 150 [ 71 ] 0.4 [ 100 ] SQUARE INLINE FAN PLENUM -- -- 8 [ 200 ] 24% DIRECT 1750 0.04 0.067 [ ] 1 115 1750 ECM ON/OFF 3, 4

REMARKS:

1. UL LISTED FOR SMOKE CONTROL (300F/5 HRS, 392 F/2 HRS, 572F/1 HR) (CLASS F INSULATED MTR.)

2. PROVIDE UTILITY RAILS AND HOUSED SPRING ISOLATORS FOR MOUNTING TO THE ROOF.

3. SIDE DISCHARGE HOUSING WITH MOTOR SPEED ADJUSTED MANUAL ON THE MOTOR.

4. PROVIDE NEOPRENE ISOLATORS FOR SUSPENDED SUPPORT. BASIS OF DESIGN GREENHECK SQ-70-VG, QEI-44

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

Au to de sk

D oc s:

//M t H om e

VA

R es to ra tio n of

B

T he at er

/F

FE

_M t H om e

- T he at er

_B

_M

EP

(2

4) .rv t 7/

1/

:5 3:

P

M

M600

MECHANICAL SCHEDULES

07/01/2025 KF KG

RESTORATION OF BUILDING 35

HISTORIC THEATER

621-24-403

MT. HOME, TENNESSEE

BID DOCUMENTS

JAMES H.

QUILLEN VA

MEDICAL

CENTER Approved: Owner

F

F

F

F

F

S F

KF

S

H

C

D

FS

V

R W

SD

FT

PS

AM

C/I

PIV

K S

H

S S/R

S/R

FACP

ABBREVIATIONS

AAP - AREA ALARM PANEL - MEDICAL GAS

ACC - ACCESS

ADJ - ADJUSTABLE

AF - ARC FAULT CIRCUIT INTERRUPTER

AFCI - ARC FAULT CIRCUIT INTERRUPTER

AFF - ABOVE FINISHED FLOOR TO BOTTOM OF ITEM

AFG - ABOVE FINISHED GRADE TO BOTTOM OF ITEM

ALT - ALTERNATE

AP - ACCESS PANEL

APPROX - APPROXIMATE

ARCH - ARCHITECT OR ARCHITECTURAL

ASSY - ASSEMBLY

ATS - AUTOMATIC TRANSFER SWITCH

BLDG - BUILDING

BOE - BOTTOM OF EQUIPMENT

BOT - BOTTOM

BTWN - BETWEEN

CFCI - CONTRACTOR FURNISHED CONTRACTOR INSTALLED

CKT - CIRCUIT

CLG - CEILING

CMU - CONCRETE MASONRY UNIT

CONN - CONNECT OR CONNECTION

CONTR - CONTRACTOR

CORR - CORRIDOR

CTR - CENTER

D - DEPTH

DET - DETAIL

DIA - DIAMETER

DIM - DIMENSION

DIV - DIVISION

DN - DOWN

DWG - DRAWING

EA - EACH

EC - ELECTRICAL (DIVISION 26)

EJ - EXPANSION JOINT

ELEC - ELECTRICAL

ELEV - ELEVATION OR ELEVATOR

EM - EMERGENCY

EQ - EQUAL

EQS - EQUIPMENT SUPPLIER

EQUIP - EQUIPMENT

E/R - EXISTING TO BE RELOCATED

EX - EXISTING TO REMAIN

EXP - EXPANSION

EXT - EXTERIOR

FCE - FIRE CONTROL EQUIPMENT

FF - FINISHED FLOOR ELEVATION

FLR - FLOOR

FSC - FIRE SUPPRESSION (DIVISION 21)

FT - FEET

FTG - FOOTING

GC - GENERAL TRADES (DIVISION 01)

GF - GROUND FAULT CIRCUIT INTERRUPTER

GFCI - GROUND FAULT CIRCUIT INTERRUPTER OR

GOVERNMENT FURNISHED CONTRACTOR INSTALLED

GFFT - GROUND FAULT FEED THRU

HC - HVAC (DIVISION 23)

HP - HORSE POWER OR HIGH POINT

HVAC - HEATING, VENTILATING, AND AIR CONDITIONING

ID - INSIDE DIAMETER

IN - INCHES

KEC - KITCHEN EQUIPMENT CONTRACTOR

L - LENGTH

LBS - POUNDS

MAP - MASTER ALARM PANEL (MEDICAL GAS)

MAX - MAXIMUM

MEZZ - MEZZANINE

MFR - MANUFACTURER

MH - MANHOLE OR MOUNTING HEIGHT TO CENTER LINE OF

ITEM

MIN - MINIMUM OR MINUTE

MISC - MISCELLANEOUS

MTD - MOUNTED

MTG - MOUNTING

NIC - NOT IN CONTRACT

NOM - NOMINAL

NTS - NOT TO SCALE

OD - OUTSIDE DIAMETER

OFCI - OWNER FURNISHED CONTRACTOR INSTALLED

OFOI - OWNER FURNISHED OWNER INSTALLED

PC - PLUMBING (DIVISION 22)

PLBG - PLUMBING

RAD - RADIUS

REC - RECESSED

REQD - REQUIRED

RI - ROUGH-IN

S - SURFACE MOUNTED

SC - SECURITY (DIVISION 28)

SCH - SCHEDULE

SHT - SHEET

SMS - SECURITY MANAGEMENT SYSTEM

SPEC - SPECIFICATIONS

SQ - SQUARE

SS - STAINLESS STEEL

STD - STANDARD

STRUC - STRUCTURAL OR STRUCTURE

SUC - SITE UTILITY CONTRACTOR

TC - TECHNOLOGY CONTRACTOR

TEMP - TEMPERATURE

TOE - TOP OF EQUIPMENT

TYP - TYPICAL

UNO - UNLESS NOTED OTHERWISE

VFD - VARIABLE FREQUENCY DRIVE

VOL - VOLUME

W/ - WITH

W/O - WITHOUT

WC - WATER COOLER

WP - WEATHERPROOF

ZVC - ZONE VALVE CABINET

E2

B

E2

LUMINAIRE SYMBOLS

LIGHTING FIXTURE. CAPITAL LETTER DENOTES FIXTURE TYPE, LOWER CASE LETTER DENOTES

SWITCHING ARRANGEMENT.

LIGHTING FIXTURE ON NIGHT LIGHT OR EMERGENCY CIRCUIT.

EXIT LIGHTING FIXTURE, ARROWS AS INDICATED.

A a

NOTE:

ALL SYMBOLS AND ABBREVIATIONS ARE SUBJECT TO

MODIFICATIONS ON OTHER DRAWINGS.

ALL SYMBOLS OR ABBREVIATIONS MIGHT NOT

NECESSARILY BE USED ON THIS PROJECT.

FIRE ALARM SYMBOLS

FIRE ALARM BELL & SIGNAL LIGHT (88" AFF). # WHEN SHOWN INDICATES CANDELA RATING OF STROBE. WHEN A # IS NOT SHOWN, THE STROBE SHALL BE RATED 15 CANDELA IN CORRIDORS AND 30 CANDELA FOR ALL OTHER LOCATIONS.

FIRE ALARM SPEAKER & SIGNAL LIGHT (88" AFF). # WHEN SHOWN INDICATES CANDELA RATING OF STROBE. WHEN A # IS NOT SHOWN, THE STROBE SHALL BE RATED 15 CANDELA IN CORRIDORS AND 30 CANDELA FOR ALL OTHER LOCATIONS.

FIRE ALARM CHIME & SIGNAL LIGHT (88" AFF). # WHEN SHOWN INDICATES CANDELA RATING OF STROBE. WHEN A # IS NOT SHOWN, THE STROBE SHALL BE RATED 15 CANDELA IN CORRIDORS AND 30 CANDELA FOR ALL OTHER LOCATIONS.

FIRE ALARM HORN & SIGNAL LIGHT (88" AFF). # WHEN SHOWN INDICATES CANDELA RATING OF STROBE. WHEN A # IS NOT SHOWN, THE STROBE SHALL BE RATED 15 CANDELA IN CORRIDORS AND 30 CANDELA FOR ALL OTHER LOCATIONS.

FIRE ALARM SIGNAL LIGHT (88" AFF). # WHEN SHOWN INDICATES CANDELA RATING OF STROBE. WHEN A # IS NOT SHOWN, THE STROBE SHALL BE RATED 15 CANDELA IN CORRIDORS AND 30 CANDELA FOR ALL OTHER LOCATIONS.

CEILING MOUNTED FIRE ALARM SPEAKER.

FIRE ALARM CONTROL PANEL.

CEILING MOUNTED FIRE ALARM SPEAKER & SIGNAL LIGHT. # WHEN SHOWN INDICATES CANDELA RATING OF STROBE.

WHEN A # IS NOT SHOWN, THE STROBE SHALL BE RATED 15 CANDELA IN CORRIDORS AND 30 CANDELA FOR ALL OTHER

LOCATIONS.

FIRE ALARM MANUAL STATION (46" MH UNLESS NOTED OTHERWISE). SUBSCRIPT "K" INDICATES KEY OPERATED.

CEILING MOUNTED SMOKE DETECTOR.

CEILING MOUNTED HEAT DETECTOR.

DUCT MOUNTED SMOKE DETECTOR. SUBSCRIPT "S" INDICATES SUPPLY. SUBSCRIPT "R" INDICATES RETURN.

DUCT MOUNTED HEAT DETECTOR. SUBSCRIPT "S" INDICATES SUPPLY. SUBSCRIPT "R" INDICATES RETURN.

ELECTRIC RELEASE DOOR CLOSER.

ELECTRO-MAGNETIC DOOR HOLDER.

WATER FLOW SWITCH.

VALVE SUPERVISORY SWITCH.

CEILING MOUNTED REMOTE TEST STATION AND ALARM INDICATOR LIGHT FOR DUCT DETECTOR. SUBSCRIPT "W" INDICATES

WALL MOUNTED.

SMOKE DAMPER.

FIRE FIGHTER'S TELEPHONE (60" MH UNLESS NOTED OTHERWISE).

PRESSURE SWITCH.

ADDRESSABLE MODULE. SUBSCRIPT "I" INDICATES INPUT. SUBSCRIPT "C" INDICATES CONTROL.

POST INDICATOR VALVE.

KNOX BOX (46" MH UNLESS NOTED OTHERWISE). SUBSCRIPT "S" INDICATES SUPERVISED UNIT.

FIRE ALARM BELL (88" AFF UNLESS NOTED OTHERWISE). SUBSCRIPT "W" INDICATES EXTERIOR WEATHERPROOF UNIT.

BEAM DETECTOR. SUBSCRIPT "T" INDICATES TRANSMITTER FUNCTION. SUBSCRIPT "R" INDICATES RECEIVER FUNCTION.

AIR SAMPLING SMOKE DETECTOR SAMPLING PORT.

REMOTE ANNUNCIATOR PANEL.

NOTIFICATION APPLIANCE CIRCUIT EXTENDER PANEL.

AIR SAMPLING SMOKE DETECTOR BASE UNIT.

SURFACE MOUNTED FIRE ALARM SPEAKER (88" AFF). SUBSCRIPT "R" INDICATES RECESSED MOUNTING.

DETAIL: B = DETAIL DESIGNATION

E2 = SHEET WHERE DETAIL IS LOCATED

SECTION: 1 = SECTION DESIGNATION

E2 = SHEET WHERE SECTION IS LOCATED

PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN.

DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.

GENERAL FLOOR PLAN NOTES

WIRE & CONDUIT IN WALL OR ABOVE CEILING.

WIRE & CONDUIT IN OR BELOW SLAB OR GRADE.

EACH ARROWHEAD REPRESENTS ONE COMPLETE CIRCUIT; "X" DENOTES PANEL NAME; NUMBER(S)

DENOTES CIRCUIT(S).

LADDER TRAY, 12" x 4" DEEP UNLESS NOTED OTHERWISE.

CONDUIT FOR DATA CIRCUITRY.DAT

WIRE & CONDUIT FOR FIRE ALARM CIRCUITRY.FA

WIRE & CONDUIT FOR NURSE CALL CIRCUITRY.NC

EXISTING WIRE & CONDUIT TO REMAIN.EX

CONDUIT TO BE REMOVED.

WIRE & CONDUIT FOR NIGHT LIGHT CIRCUITRY.NL

CONDUIT FOR PHONE CIRCUITRY.PHO

WIRE & CONDUIT FOR SECURITY SYSTEM CIRCUITRY.SEC

WIRE RUN IN SURFACE WIREWAY.W

CABLE MANAGEMENT SYSTEM PATHWAY.CM

X - 1,2

WIRE & CONDUIT FOR EMERGENCY CIRCUITRY.EM

WIRE & CONDUIT FOR SOUND SYSTEM CIRCUITRY.S

WIRE & CONDUIT FOR INTERCOM SYSTEM CIRCUITRY.I

WIRE & CONDUIT FOR TELEVISION SYSTEM CIRCUITRY.TV

CABLE TRAY, 12" x 4" DEEP UNLESS NOTED OTHERWISE.

4"

4"

4"

T2 1 ELEVATION: 1 = ELEVATION DESIGNATION

T2 = SHEET WHERE ELEVATION IS LOCATED

RAP

NAC

ASSD

F W

S F

S R

A

B T/R

CEILING MOUNTED FIRE ALARM SIGNAL LIGHT. # WHEN SHOWN INDICATES CANDELA RATING OF STROBE. WHEN A # IS NOT SHOWN, THE STROBE SHALL BE RATED 15 CANDELA IN CORRIDORS AND 30 CANDELA FOR ALL OTHER LOCATIONS.

F

LIGHTING CONTROL DETAIL NOTE. APPLIES TO THE LIGHTING CONTROL SEQUENCE OF OPERATIONS

SCHEDULE FOR ROOM CONTROL.

3 DEVICE QUANTITY - POWER NOTE. REFER TO DEVICE QUANTITIES - POWER SCHEDULE.

CEILING MOUNTED FIRE ALARM HORN & SIGNAL LIGHT. # WHEN SHOWN INDICATES CANDELA RATING OF STROBE. WHEN A # IS NOT SHOWN, THE STROBE SHALL BE RATED 15 CANDELA IN CORRIDORS AND 30 CANDELA FOR ALL OTHER LOCATIONS.

F

ELECTRICAL SYMBOLS

EXISTING OUTLET OR DEVICE TO REMAIN. MAINTAIN EXISTING CIRCUITING.

DASH SYMBOL INDICATES PARTICULAR OUTLET OR DEVICE TO BE REMOVED AND CIRCUITRY MADE CONTINUOUS WHERE

REQUIRED.

ELECTRICAL CONNECTION.

20A-125V SINGLE RECEPTACLE, NEMA 5-20R (18" MH UNLESS NOTED OTHERWISE).

SPECIAL PURPOSE RECEPTACLE. REFER TO NOTE ON PLAN.

20A-125V DOUBLE DUPLEX RECEPTACLE. NEMA 5-20R, (18" MH UNLESS NOTED OTHERWISE) TWO GANG ASSEMBLY.

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R WITH BOTTOM OUTLET CONTROLLED BY WALL SWITCH. (18" MH UNLESS

NOTED OTHERWISE).

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R, WITH GROUND FAULT CIRCUIT INTERRUPTER (18" MH UNLESS NOTED

OTHERWISE).

20A-125V WEATHERPROOF DUPLEX RECEPTACLE, NEMA 5-20R (HORIZONTAL 18" MH UNLESS NOTED OTHERWISE) WITH

TAYMAC #MM420G EXTRA DUTY GRAY COVER, VERTICAL MOUNT.

20A-125V WEATHERPROOF DUPLEX RECEPTACLE, NEMA 5-20R WITH GROUND FAULT CIRCUIT INTERRUPTER (18" MH UNLESS NOTED OTHERWISE), WITH TAYMAC #MM420G EXTRA DUTY GRAY COVER, VERTICAL MOUNT.

20A-125V POWERLOCK GROUNDING TYPE RECEPTACLE, HOSPITAL USE (66" MH UNLESS NOTED OTHERWISE).

20A-125V DUPLEX PEDESTAL TYPE FLOOR RECEPTACLE, NEMA 5-20R, IN HUBBELL BA-2527 FLOOR BOX WITH SA-2525

COVERPLATE AND SC-3091 HOUSING. PROVIDE CARPET FLANGE WHERE REQUIRED.

20-125V DUPLEX RECEPTACLE, NEMA 5-20R, WITH ISOLATED GROUND (18" MH UNLESS NOTED OTHERWISE).

20A-125/250V-1PH-4W SINGLE RECEPTACLE, NEMA 14-20R (18" MH UNLESS NOTED OTHERWISE).

30A-125/250V-1PH-4W SINGLE RECEPTACLE, NEMA 14-30R (18" MH UNLESS NOTED OTHERWISE).

50A-125/250V-1PH-4W SINGLE RECEPTACLE, NEMA 14-50R (18" MH UNLESS NOTED OTHERWISE).

20A-250V-3PH-4W SINGLE RECEPTACLE, NEMA 15-20R (18" MH UNLESS NOTED OTHERWISE).

30A-250V-3PH-4W SINGLE RECEPTACLE, NEMA 15-30R (18" MH UNLESS NOTED OTHERWISE).

50A-250V-3PH-4W SINGLE RECEPTACLE, NEMA 15-50R (18" MH UNLESS NOTED OTHERWISE).

JUNCTION BOX. SQUARE DEVICE INDICATES A CONNECTION TO CRITICAL POWER.

MULTI-OUTLET RECEPTACLES ASSEMBLY, NEMA 5-15R (SINGLE OUTLETS ON 18" CENTERS) (46" MH UNLESS NOTED

OTHERWISE).

CLOCK HANGER OUTLET, SINGLE NEMA 5-15R RECESSED IN COVER PLATE (84" MH UNLESS NOTED OTHERWISE).

SINGLE POLE SWITCH (46" MH UNLESS NOTED OTHERWISE).

TWO POLE WALL SWITCH (46" MH UNLESS NOTED OTHERWISE).

MULTI-WAY WALL SWITCH, # INDICATES NUMBER OF WAYS (46" MH UNLESS NOTED OTHERWISE).

SWITCH WITH NEON PILOT LIGHT. ONE-GANG ASSEMBLY (46" MH UNLESS NOTED OTHERWISE).

KEY OPERATED WALL SWITCH (46" MH UNLESS NOTED OTHERWISE).

LIGHTING DIMMER SWITCH (46" MH UNLESS NOTED OTHERWISE) 1000 WATTS UNLESS OTHERWISE INDICATED.

SWITCH WITH RECEPTACLE (46" MH UNLESS NOTED OTHERWISE) STANDARD TWO-GANG ASSEMBLY OF SWITCH AND

RECEPTACLE.

FLUSH FRACTIONAL HORSEPOWER MOTOR STARTER WITH NEON PILOT LIGHT. ONE-GANG ASSEMBLY (46" MH UNLESS

NOTED OTHERWISE).

HP RATED WALL SWITCH (46" MH UNLESS NOTED OTHERWISE).

DISCONNECT SWITCH.

MOTOR STARTER.

COMBINATION MOTOR STARTER AND DISCONNECT SWITCH.

ELECTRIC MOTOR.

ELECTRICAL PANEL OR SWITCHBOARD PER DRAWINGS.

PULL BOX.

LINE VOLTAGE THERMOSTAT.

UNIT HEATER.

FAN COIL.

ELECTRIC BASEBOARD HEATER.

AIR CONDITIONER.

CONDENSING UNIT.

UNIT VENTILATOR.

CORD REEL.

POWER POLE.

PHOTOELECTRIC SENSOR.

LIGHTING CONTACTOR.

CEILING MOUNTED OCCUPANCY SENSOR.

WALL MOUNTED OCCUPANCY SENSOR.

CEILING MOUNTED DAYLIGHT SENSOR.

OCCUPANCY SENSOR POWER PACK.

PUSHBUTTON (46" MH UNLESS NOTED OTHERWISE) EDWARDS 852 (120 VOLT).

BUZZER (90" MH UNLESS NOTED OTHERWISE) EDWARDS 340-A (120 VOLT).

4" DIAMETER (90" MH UNLESS NOTED OTHERWISE) EDWARDS "ADAPTABEL" (120 VOLT).

GF

WP

WP/GF

T

IG

20A

30A

50A

20A

50A

30A

J

P

K

DM

R

H

UH

FC

AC

CU

UV

PP

OS

OS

DS

OP

PC

T

B

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R (46" MH UNLESS NOTED OTHERWISE).

C

M

CR

LC

P/B

ELAPSED TIME INDICATOR CLOCK (90" MH UNLESS NOTED OTHERWISE) WITH RESET SWITCH (46" MH UNLESS NOTED

OTHERWISE).

INTERCOM SYSTEM DESK MOUNTED MASTER CONTROL STATION. SUBSCRIPT "W" INDICATES WALL MOUNT (46" MH

UNLESS NOTED OTHERWISE).

INTERCOM STAFF STATION (46" MH UNLESS NOTED OTHERWISE).

INTERCOM HORN TYPE SPEAKER (84" MH UNLESS NOTED OTHERWISE).

INTERCOM SPEAKER FLUSH MOUNT IN CEILING.

I

M

H

S

DUCT HEATER.H

DH

H

EB

LOW-VOLTAGE MOMENTARY WALL SWITCH (46" MH UNLESS NOTED OTHERWISE).

L

WIREMOLD RACEWAY, AS NOTED ON PLANS.

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R WITH 2 INTEGRAL USB CHARGERS (18" MH UNLESS NOTED OTHERWISE).

SQUARE DEVICE INDICATES A CONNECTION TO CRITICAL POWER. SPECIFICATION IS SAME AS RESPECTIVE ROUND DEVICE.

J

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R, IN HUBBELL BA-2527 FLUSH FLOOR BOX WITH ROUND SA-3925 COVERPLATE.

PROVIDE CARPET FLANGE WHERE REQUIRED.

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R (18" MH UNLESS NOTED OTHERWISE). WHEN SHOWN, RECEPTACLE TO HAVE

"CONTROLLED" MARKINGS.

CEILING MOUNTED VACANCY SENSOR.

WALL MOUNTED VACANCY SENSOR.

VS

VS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Date:Revisions:No.

PROJECT NO.

A u to d e s k D o c s /M t H o m e V

A

R e s to ra ti o n o f B

T h e a te r/

-0

-M

E P

-C e n tr a l.

rv t

/1 /2

:1

:4

P M

E001

ABBREVIATIONS, LEGEND &

GENERAL NOTES

07/01/2025 MSG SAP

RESTORATION OF BUILDING 35

HISTORIC THEATER

621-24-103

MT. HOME, TENNESSEE

BID DOCUMENTS

JAMES H.

QUILLEN VA

MEDICAL

CENTER

Approved: VAMC

2024-05141

1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE, INTERNATIONAL BUILDING CODES,AND OTHER CODES AS IDENTIFIED IN VA PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS, TECHNICAL

INFORMATION LIBRARY WEBSITE.

2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13 WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS TECHNICAL INFORMATION LIBRARY WEBSITE.

3. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.

4. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT

SURFACES TO REMAIN.

5. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO ORDERING, FABRICATING OR INSTALLING NEW MATERIALS.

6. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO

FIT THROUGH FINISHED OPENINGS.

7. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR SHALL INCLUDE SAID PART OR

ELEMENT AS PART OF THE WORK.

8. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED WALLS SHALL BE SMOKE/FIRESTOPPED AS REQUIRED BY THE RATING OF THE WALL. WHERE CONDUIT IS REMOVED THROUGH

RATED WALLS, SMOKE/FIRESTOP PENETRATION.

9. FIRESTOP ALL FLOOR PENETRATIONS AT THE END OF EACH WORKING SHIFT.

10. CONTRACTOR SHALL ENGAGE A SUB-SURFACE UTILITY MARKING COMPANY TO LOCATE ALL UNDERGROUND

LINES PRIOR TO EXCAVATION.

11. REMOVAL OF ELECTRICAL ITEMS SHALL INCLUDE REMOVALS BACK TO THE EXISTING ELECTRICAL DISTRIBUTION

CENTER, PANEL OR LAST ACTIVE OUTLET, FIXTURE OR DEVICE REMAINING.

12. ALL CONDUIT AND WIRING LOCATED INSIDE DEMO WALLS SHALL BE RE-ROUTED TO ENSURE A COMPLETE AND

FUNCTIONAL SYSTEM WHILE ACCOMMODATING THE WALL REMOVAL.

13. ALL ABANDONED EXTRANEOUS CONDUITS, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.

14. REMOVALS OF RECEPTACLES, TELEPHONE, DATA OUTLETS, ETC. INCLUDE REMOVAL OF THE DEVICE, BACKBOX, CONDUIT, WIRING, ETC.

15. ALL EXISTING FLUORESCENT LAMPS AND BALLASTS REMOVED ARE TO BE PUT INTO CONTAINERS AND DISPOSED

OF BY A QUALIFIED PARTY AT AN APPROVED DISPOSAL FACILITY.

16. ALL ELECTRICAL DEVICES, LIGHTING FIXTURES, RECEPTACLES, SPEAKERS, MISCELLANEOUS EQUIPMENT, JUNCTION BOXES, WIRE, CONDUITS, ETC. WITHIN THE RENOVATION AREAS ARE TO BE REMOVED UNLESS

OTHERWISE INDICATED.

17. ALL EXISTING CONDUIT, EQUIPMENT, CONTROLS, ETC. SHOWN DASHED SHALL BE REMOVED. THE MAJORITY OF ELECTRICAL WORK TO BE REMOVED IS SHOWN. REMOVE ALL INCIDENTAL ITEMS ASSOCIATED WITH THE

DEMOLITION WORK.

18. ALL EXISTING FIRE ALARM EQUIPMENT AND DEVICES SHALL BE REMOVED AS NOTED. CONTRACTOR SHALL SALVAGE EQUIPMENT AS DIRECTED BY THE COR AND STORE IN A LOCATION DESIGNATED BY THE COR. ALL OTHER EQUIPMENT AND DEVICES NOT SALVAGED SHALL BE REMOVED AS DIRECTED FROM THE PREMISE.

19. CONTRACTOR SHALL COORDINATE WITH THE COR IN REGARD TO REMOVALS. CONTRACTOR SHALL SALVAGE EQUIPMENT AS DIRECTED BY THE OWNER AND STORE IN A LOCATION DESIGNATED BY THE COR. ALL OTHER

EQUIPMENT AND MATERIALS NOT SALVAGED SHALL BE REMOVED FROM THE PREMISE.

20. WHERE EQUIPMENT IS SHOWN TO BE REMOVED, DISCONNECT ELECTRICAL SOURCE TO EQUIPMENT AND

REMOVE FEEDER BACK TO SOURCE.

21. THE EXISTING THEATER SPACE WILL BE RENOVATED UNDER THIS CONTRACT; REFER TO ARCHITECTURAL DRAWINGS FOR AREAS WHERE NEW WORK RENOVATIONS WILL OCCUR, REMOVE (AND RELOCATE AS REQUIRED) ANY EXISTING ELECTRICAL PATHWAYS AND/OR UTILITIES ASSOCIATED WITH DIVISION 26, 27, AND 28

TO ACCOMMODATE ALL NEW CONSTRUCTION IN THESE AREAS.

22. ALL EQUIPMENT, LIGHT FIXTURES, CONDUIT, CONDUCTORS, FIRE ALARM WIRING, AND ANY OTHER ELECTRICAL RELATED EQUIPMENT BEING MOUNTED IN THE CEILING OR ABOVE THE CEILING SHALL BE PLENUM RATED.

23. CLOSELY COORDINATE ALL NEW WORK ABOVE CEILING WITH H.C. AND P.C. PRIOR TO ROUGH-IN TO

ACCOMMODATE ALL NEW DUCT WORK AND PLUMBING. IF REQUIRED, RELOCATE ANY EXISTING

CONDUIT/BRANCH CIRCUITS TO ACCOMMODATE HVAC AND PLUMBING.

24. PROVIDE EXTERIOR MOUNTED…