Atch 19 AMEND_3 _ 00 01 10 - SPECS - Table Of Contents.pdf
PDF 41 KB Posted
- Solicitation number
- 36C24926R0055
About this file
This document is a Table of Contents for the Department of Veterans Affairs (VA) VHA Master Specifications for the Mt. Home Building 35 Historic Theater Restoration project (VA Project Number 621-24-103, dated 06-01-24).
The specifications are organized into 34 divisions covering all aspects of construction and restoration work required for the historic theater project. Key divisions include: General Requirements (01), Existing Conditions including asbestos and lead abatement (02), Concrete (03), Masonry (04), Metals (05), Wood and Composites (06), Thermal and Moisture Protection including roofing (07), Openings such as doors and windows (08), Finishes including painting and flooring (09), Specialties (10), Equipment including projection screens and theater lighting (11), Furnishings (12), Fire Suppression (21), Plumbing (22), HVAC (23), Electrical (26), Communications (27), Electronic Safety and Security (28), Earthwork (31), and Exterior Improvements (32). The specifications reference individual section numbers with corresponding revision dates, ranging from October 2012 to June 2024, with most sections updated between 2015 and 2024. Two specification appendices are included: a Hazardous Materials Survey Report (Appendix 1) and a Historic Conditions Assessment (Appendix 2). This master specifications document serves as the framework defining all technical requirements, standards, and work scope for the theater restoration project.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mt. Home – Restoration of Building 35 Historic Theater
VA Project Number: 621-24-103
06-01-24
TABLE OF CONTENTS
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
Section 00 01 10
“SEE BELOW FOR SPECIFICATION APPENDICES”
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 01-24
01 33 23 Shop Drawings, Product Data, and Samples 11-23
01 35 26 Safety Requirements 05-24
01 42 19 Reference Standards 11-20
01 45 00 Quality Control 02-21
01 45 29 Testing Laboratory Services 11-18
01 45 35 Special Inspections 06-21
01 57 19 Temporary Environmental Controls 01-21
01 74 19 Construction Waste Management 04-22
01 81 13 Sustainable Construction Requirements 10-17
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 12-23
02 41 20 Selective Demolition
02 82 11 Traditional Asbestos Abatement 01-21
02 82 13.21 Asbestos Roofing Abatement 01-21
02 83 33.13 Lead-Containing Paint Removal and Disposal 01-21
02 83 34 Microbial Remediation
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 01-21
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 01-21
04 05 13 Masonry Mortaring 10-17
04 20 00 Unit Masonry 08-17
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18
05 50 00 Metal Fabrications 08-18
05 51 00 Metal Stairs 01-21
00 01 10-2
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
06 16 63 Cementitious Sheathing 01-21
06 20 00 Finish Carpentry 01-21
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 01-21
07 21 13 Thermal Insulation 01-21
07 22 00 Roof and Deck Insulation 01-21
07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 01-21
07 31 26 Slate Shingles 01-21
07 52 16.11 Cold Adhesive Styrene-Butadiene-Styrene Modified
Bituminous Membrane Roofing
12-21
07 60 00 Flashing and Sheet Metal 01-21
07 71 00 Roof Specialties 01-21
07 72 00 Roof Accessories 01-21
07 84 00 Firestopping 01-21
07 92 00 Joint Sealants 04-22
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21
08 14 00 Interior Wood Doors 01-21
08 31 13 Access Doors and Frames 04-22
08 71 00 Door Hardware 03-24
08 71 13 Automatic Door Operators 01-21
08 80 00 Glazing 01-21
08 90 00 Louvers and Vents 01-21
DIVISION 09 – FINISHES
09 01 90.52 Maintenance Repainting
09 05 16 Subsurface Preparation for Floor Finishes 01-21
09 23 00 Gypsum Plastering 01-21
09 24 00 Portland Cement Plastering 01-21
09 26 00 Veneer Plastering 01-21
09 29 00 Gypsum Board 04-20
09 30 13 Ceramic/Porcelain Tiling 01-21
09 51 00 Acoustical Ceilings 12-18
09 68 00 Carpeting 01-21
09 84 33 Sound-Absorbing Wall Units 01-21
09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21
10 21 13 Toilet Compartments 01-21
10 28 00 Toilet, Bath, and Laundry Accessories 01-21
00 01 10-3
10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 11 – EQUIPMENT
11 52 13 Projection Screens
11 61 00 Theater and Stage Lighting Equipment
DIVISION 12 – FURNISHINGS
12 32 00 Manufactured Wood Casework 01-21
12 36 00 Countertops 12-23
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 14 – CONVEYING EQUIPEMENT
14 42 16 Vertical Platform Wheelchair Lift
DIVISION 21 - FIRE SUPPRESSION
21 12 00 Wet Standpipe Systems 06-15
21 13 16 Dry-Pipe Sprinkler Systems 01-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 01-23
22 05 19 Meters and Gages for Plumbing Piping 09-20
22 05 23 General-Duty Valves for Plumbing Piping 09-20
22 05 33 Heat Tracing for Plumbing Piping 09-20
22 07 11 Plumbing Insulation 09-19
22 11 00 Facility Water Distribution 05-21
22 11 23 Domestic Water Pumps 09-15
22 13 00 Facility Sanitary and Vent Piping 09-20
22 14 00 Facility Storm Drainage 09-15
22 40 00 Plumbing Fixtures 05-24
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 03-23
23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment
03-23
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
03-23
23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23
23 07 11 HVAC and Boiler Plant Insulation 02-20
23 09 23 Direct-Digital Control System for HVAC 03-23
23 21 13 Hydronic Piping 03-23 23 23 00 Refrigerant Piping 03-24
23 25 00 HVAC Water Treatment 03-23
00 01 10-4
SECTION NO DIVISION AND SECTION TITLES DATE
23 31 00 HVAC Ducts and Casings 03-23
23 34 00 HVAC Fans 03-23
23 37 00 Air Outlets and Inlets 03-23
23 40 00 HVAC Air Cleaning Devices 03-23
23 81 00 Decentralized Unitary HVAC Equipment 03-24
23 82 00 Convection Heating and Cooling Units 03-23
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22
26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22
26 05 26 Grounding and Bonding for Electrical Systems 11-22
26 05 33 Raceway and Boxes for Electrical Systems 11-22
26 05 41 Underground Electrical Construction 11-22
26 05 73 Overcurrent Protective Device Coordination Study 11-22
26 09 23 Lighting Controls 11-22
26 24 16 Panelboards 11-22
26 27 26 Wiring Devices 11-22
26 29 11 Motor Controllers 11-22
26 29 21 Enclosed Switches and Circuit Breakers 11-22
26 32 13 Engine Generators 11-22
26 36 23 Automatic Transfer Switches 11-22
26 41 00 Facility Lightning Protection 11-22
26 43 13 Surge Protective Devices 11-22
26 51 00 Interior Lighting 03-24
26 56 00 Exterior Lighting 11-22
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19
27 05 26i Grounding and Bonding for Communications Systems 12-22
27 05 33i Raceways and Boxes for Communications Systems 10-18
27 05 53i Identification for Communications Systems
27 10 00i Structured Cabling 06-15
27 11 00 Telecommunications Room Fittings 06-15
27 11 16i Communications Cabinets, Racks, Frames, And Enclosures
27 11 19i Communications Termination Blocks And Patch Panels
27 11 26i Communications Rack Mounted Power Protection And Power
Strips
27 13 13.13i Communications Copper Cable Splicing And Terminations
27 13 13i Communications Copper Backbone Cabling
27 13 23.13i Communications Optical Fiber Splicing And Terminations
27 13 23i Communications Optical Fiber Backbone Cabling
27 15 13i Communications Copper Horizontal Cabling
27 16 19i Communications Patch Cords, Station Cords, And Cross
Connect Wire
00 01 10-5
27 41 16 Integrated Audio / Visual System
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18
28 05 13 Conductors and Cables for Electronic Safety and
Security
10-18
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and
Security
09-11
28 13 00 Physical Access Control System 10-11
28 23 00 Video Surveillance 09-11
28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 20 11 Earthwork (Short Form) 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16
32 17 23 Pavement Markings 08-16
DIVISION 33 – UTILITIES
DIVISION 34 – TRANSPORTATION
DIVISION 48 – Electrical Power Generation
SPECIFICATION APPENDICES
Appendix 1 Hazardous Materials Survey Report
Appendix 2 Historic Conditions Assessment