Atch 1_BID SPECIFICATIONS-1.pdf

PDF 14 MB Posted

Attached to
Y1QA--Project 621-24-103 Restoration of B35 Theater
Solicitation number
36C24926R0055
Issued by

About this file

This is a bid specifications document for the restoration of Building 35 Theater at the James H. Quillen Department of Veterans Affairs Medical Center in Mountain Home, Tennessee (Project #621-24-103). The specifications encompass comprehensive construction work including general construction, alterations, restorations, and site work as detailed in the associated drawings and technical specifications.

The project scope includes selective demolition of existing structures, asbestos abatement, structural steel and masonry work, thermal and moisture protection systems, roofing with slate shingles or synthetic tile alternatives, openings (doors, windows, glazing), interior finishes (gypsum board, painting, acoustical ceilings, carpeting), fire suppression systems, plumbing, HVAC systems, electrical installations, communications systems, electronic security systems, and theater-specific equipment including projection screens and stage lighting. The base bid includes selective replacement of broken or failing slate roof tiles, with Alternate No. 1 providing full slate roof replacement with synthetic tiles, and Alternate No. 2 offering complete theater seating replacement. The contractor must develop a Critical Path Method (CPM) schedule within 10 days of Notice to Proceed, maintain as-built drawings, provide photographic documentation with interactive digital indexing, furnish operation and maintenance manuals, and conduct comprehensive training for VA personnel. Warranty management requirements include extended coverage for roofs, HVAC balancing, pumps, motors, transformers, and commissioned systems, with 4-month and 9-month post-acceptance inspections. The project requires compliance with VA security procedures, coordination with ongoing medical center operations, and adherence to historic preservation protocols given the theater's historic significance.

View the file

Other files

File Type Posted
Atch 40 AMEND_4 SCA WD 2015-4641.pdf PDF
Atch 39 AMEND_4 Davis-Bacon WD TN20260191.pdf PDF
S02 AMEND_36C24926R0055 0004 B35.pdf PDF
Atch 26 AMEND_3 _10.06_FS100 - SITE PLAN.pdf PDF
Atch 23 AMEND_3 _ 10_32 17 23 - PAVEMENT MARKINGS.pdf PDF
Atch 21 AMEND_3 _09 93 00 Staining - Transparent Finish.pdf PDF
Atch 31 AMEND_3 _ 10.09_FX103 - AUDITORIUM ATTIC- STAGE NEW WORK.pdf PDF
Atch 22 AMEND_3 _ 10_32 12 16 - ASPHALT PAVING.pdf PDF
Atch 20 AMEND_3 _ 09 01 90.52 - Maintenance Repainting.pdf PDF
S02 AMEND_36C24926R0055 0003 B35.pdf PDF
Atch 35 AMEND_3 Worksheet - S ENG AUTOCAD AUTOCADPUBLIC PDC PROJ 7.xlsx XLSX spreadsheet
Atch 36 AMEND_3 Section 01 45 00 Quality Control.docx DOCX document
Atch 17 AMEND_3 Updated Solicitation 36C24926R0055.pdf PDF
Atch 33 AMEND_3 QUES 186 _doc11604520260625102926.pdf PDF
Atch 34 AMEND_3 Section 01 45 35 Schedule of Special Inspections.docx DOCX document
Atch 38 AMEND_3 VA Mtn Home El Walkway_Geotech Rpt.pdf PDF
Atch 24 AMEND_3 _ 10-10_32 90 00 PLANTING.pdf PDF
Atch 28 AMEND_3 _ Q10.07_FX101 - BASEMENT -1st FLOOR.pdf PDF
Atch 19 AMEND_3 _ 00 01 10 - SPECS - Table Of Contents.pdf PDF
Atch 29 AMEND_3 _ 10.07_FX101 - BASEMENT- 1st FLOOR NEW WORK PLAN.pdf PDF
Atch 30 AMEND_3 _ 10.08_FX102 - BALCONY 2nd FLOOR - CEILING.pdf PDF
Atch 32 AMEND_3 _ 210.05_FD901-WET-PIPE FIRE SUPPRESSION ISOMETRIC.pdf PDF
Atch 25 AMEND_3 _ Limited HazMat Report.pdf PDF
Atch 27 AMEND_3_10.06_FS100 - FIRE SUPPRESSION SITE PLAN.pdf PDF
Atch 37 AMEND_3 Past Performance Questionnaire -PPQ Template.docx DOCX document
Atch 18 AMEND_3 FINISH REVISIONS_ Rev 2 06-30-2026.pdf PDF
S02 AMEND_36C24926R0055 0002 B35.pdf PDF
Atch AMEND_1 Site Visit Attendance Sheet of 621-24-103.pdf PDF
S02 AMEND_36C24926R0055 0001 B35.pdf PDF
S02 SOL 36C24926R0055_1 B35 _ R2.pdf PDF
Atch 16 WD TN20260191 01.02.2026.docx DOCX document
Atch 5_BID SPEC ENG_4288 SUBMITTAL REG.pdf PDF
Atch 14 General Conditions Breakout.xlsx XLSX spreadsheet
36C24926R0055_1.docx DOCX document
Atch 3_BID SPEC App1_B35 HazMat Report.pdf PDF
Atch 12 Calc. of Self Performed Work.xlsx XLSX spreadsheet
Atch 9_621-24-103 Drawing part 4 of 6.pdf PDF
Atch 2_BID MAppE_B35 Existing Conditions.pdf PDF
Atch 4_BID SPEC App2_B35 Historic SHPO.pdf PDF
Atch 13 Contractor EMR Certification Form.docx DOCX document
Atch 6_621-24-103 drawing part 1 of 6.pdf PDF
Atch 11_621-24-103 Drawing part 6 of 6.pdf PDF
Atch 8_621-24-103 drawing part 3 of 6.pdf PDF
Atch 15 WD TN20260191 01.02.2026.docx DOCX document
Atch 7_621-24-103 drawing part 2 of 6.pdf PDF
Atch 10_621-24-103 Drawing part 5 of 6.pdf PDF
Atch 15 Price Breakout Schedule.xlsx XLSX spreadsheet
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT # 621-24-103

Restoration of Building 35 Theater

JAMES H. QUILLEN DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER

LAMONT STREET AND VETERANS WAY

MOUNTAIN HOME, TENNESSEE

SPECIFICATIONS

BID DOCUMENTS

07/01/2025

PREPARED BY

Mt. Home – Restoration of Building 35 Historic Theater VA Project Number: 621-24-103

06-01-24

TABLE OF CONTENTS

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

“SEE BELOW FOR SPECIFICATION APPENDICES”

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 01-24 01 33 23 Shop Drawings, Product Data, and Samples 11-23 01 35 26 Safety Requirements 05-24 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 06-21 01 57 19 Temporary Environmental Controls 01-21 01 74 19 Construction Waste Management 04-22 01 81 13 Sustainable Construction Requirements 10-17

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys 12-23 02 41 20 Selective Demolition 02 82 11 Traditional Asbestos Abatement 01-21 02 82 13.21 Asbestos Roofing Abatement 01-21 02 83 33.13 Lead-Containing Paint Removal and Disposal 01-21 02 83 34 Microbial Remediation

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 01-21 04 05 13 Masonry Mortaring 10-17 04 20 00 Unit Masonry 08-17

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18 05 50 00 Metal Fabrications 08-18 05 51 00 Metal Stairs 01-21

06-01-24

TABLE OF CONTENTS

00 01 10-2

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17 06 16 63 Cementitious Sheathing 01-21 06 20 00 Finish Carpentry 01-21

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50.19 Preparation for Re-Roofing 01-21 07 21 13 Thermal Insulation 01-21 07 22 00 Roof and Deck Insulation 01-21 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 01-21 07 31 26 Slate Shingles 01-21 07 52 16.11 Cold Adhesive Styrene-Butadiene-Styrene Modified

Bituminous Membrane Roofing 12-21

07 60 00 Flashing and Sheet Metal 01-21 07 71 00 Roof Specialties 01-21 07 72 00 Roof Accessories 01-21 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 04-22

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 31 13 Access Doors and Frames 04-22 08 71 00 Door Hardware 03-24 08 71 13 Automatic Door Operators 01-21 08 80 00 Glazing 01-21 08 90 00 Louvers and Vents 01-21

DIVISION 09 – FINISHES

09 01 90.52 Maintenance Repainting 09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 23 00 Gypsum Plastering 01-21 09 24 00 Portland Cement Plastering 01-21 09 26 00 Veneer Plastering 01-21 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 01-21 09 51 00 Acoustical Ceilings 12-18 09 68 00 Carpeting 01-21 09 84 33 Sound-Absorbing Wall Units 01-21 09 91 00 Painting 01-21 09 93 00 Staining and Transparent Finishing

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21 10 21 13 Toilet Compartments 01-21

06-01-24

TABLE OF CONTENTS

00 01 10-3

SECTION NO DIVISION AND SECTION TITLES DATE

10 28 00 Toilet, Bath, and Laundry Accessories 01-21 10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 – EQUIPMENT

11 52 13 Projection Screens 11 61 00 Theater and Stage Lighting Equipment

DIVISION 12 – FURNISHINGS

12 32 00 Manufactured Wood Casework 01-21 12 36 00 Countertops 12-23

DIVISION 13 - SPECIAL CONSTRUCTION

DIVISION 14 – CONVEYING EQUIPEMENT

14 42 16 Vertical Platform Wheelchair Lift

DIVISION 21 - FIRE SUPPRESSION

21 12 00 Wet Standpipe Systems 06-15 21 13 16 Dry-Pipe Sprinkler Systems 01-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 01-23 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 05 33 Heat Tracing for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 05-21 22 11 23 Domestic Water Pumps 09-15 22 13 00 Facility Sanitary and Vent Piping 09-20 22 14 00 Facility Storm Drainage 09-15

22 40 00 Plumbing Fixtures 05-24

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 03-23 23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment 03-23

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

03-23

23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 09 23 Direct-Digital Control System for HVAC 03-23 23 21 13 Hydronic Piping 03-23 23 23 00 Refrigerant Piping 03-24

06-01-24

TABLE OF CONTENTS

00 01 10-4

SECTION NO DIVISION AND SECTION TITLES DATE

23 25 00 HVAC Water Treatment 03-23 23 31 00 HVAC Ducts and Casings 03-23 23 34 00 HVAC Fans 03-23 23 37 00 Air Outlets and Inlets 03-23 23 40 00 HVAC Air Cleaning Devices 03-23 23 81 00 Decentralized Unitary HVAC Equipment 03-24 23 82 00 Convection Heating and Cooling Units 03-23

DIVISION 25 – INTEGRATED AUTOMATION

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 11-22 26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22 26 05 26 Grounding and Bonding for Electrical Systems 11-22 26 05 33 Raceway and Boxes for Electrical Systems 11-22 26 05 41 Underground Electrical Construction 11-22

26 05 73 Overcurrent Protective Device Coordination Study 11-22

26 09 23 Lighting Controls 11-22 26 24 16 Panelboards 11-22

26 27 26 Wiring Devices 11-22 26 29 11 Motor Controllers 11-22 26 29 21 Enclosed Switches and Circuit Breakers 11-22 26 32 13 Engine Generators 11-22

26 36 23 Automatic Transfer Switches 11-22

26 41 00 Facility Lightning Protection 11-22 26 43 13 Surge Protective Devices 11-22 26 51 00 Interior Lighting 03-24 26 56 00 Exterior Lighting 11-22

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19 27 05 26i Grounding and Bonding for Communications Systems 12-22 27 05 33i Raceways and Boxes for Communications Systems 10-18 27 05 53i Identification for Communications Systems 27 10 00i Structured Cabling 06-15 27 11 00 Telecommunications Room Fittings 06-15 27 11 16i Communications Cabinets, Racks, Frames, And Enclosures 27 11 19i Communications Termination Blocks And Patch Panels 27 11 26i Communications Rack Mounted Power Protection And Power

Strips 27 13 13.13i Communications Copper Cable Splicing And Terminations 27 13 13i Communications Copper Backbone Cabling 27 13 23.13i Communications Optical Fiber Splicing And Terminations 27 13 23i Communications Optical Fiber Backbone Cabling 27 15 13i Communications Copper Horizontal Cabling

06-01-24

TABLE OF CONTENTS

00 01 10-5

SECTION NO DIVISION AND SECTION TITLES DATE

27 16 19i Communications Patch Cords, Station Cords, And Cross Connect Wire

27 41 16 Integrated Audio / Visual System

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and

Security 10-18

28 05 26 Grounding and Bonding for Electronic Safety and Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security

09-11

28 13 00 Physical Access Control System 10-11

28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 11 Earthwork (Short Form) 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 12 16 Asphalt Paving 09-15 32 17 23 Pavement Markings 08-16 32 90 00 Planting 08-16

DIVISION 33 – UTILITIES

DIVISION 34 – TRANSPORTATION

DIVISION 48 – Electrical Power Generation

SPECIFICATION APPENDICES

Appendix 1 Hazardous Materials Survey Report

Appendix 2 Historic Conditions Assessment

05-01-20

LIST OF DRAWINGS

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

GI000 COVER SHEET

GI001 SYMBOLS AND ABBREVIATIONS

GI002 PARTITION TYPES AND NOTES

GI003 ACCESSIBILITY REQUIREMENTS

GI004 ACCESSIBILITY REQUIREMENTS

GI005 LIFE SAFETY PLAN

GI006 SITE AND CONSTRUCTION LAYDOWN PLAN

GI007 EXTERIOR 3D VIEWS

CIVIL

C-001 GENERAL NOTES, LEGEND, AND ABBREVIATIONS

VF101 EXISTING SITE CONDITIONS

CD101 SITE DEMOLITION PLAN

CD501 SITE DEMOLITION DETAILS

CS101 SITE PLAN

CS501 SITE DETAILS

CG101 SITE GRADING PLAN

CG401 ROOF DRAIN PROFILES

CG501 SITE GRADING DETAILS

STRUCTURAL

S-001 LEGEND

S-002 GENERAL NOTES

S-003 GENERAL NOTES

S-101 BASEMENT FOUNDATION PLAN

S-102 FIRST FLOOR PLAN

S-103 STAGE PLANS

S-104 CHANNEL GRID FRAMING PLANS

S-105 ATTIC LEVEL FRAMING PLAN

S-301 BUILDING SECTIONS

S-302 BUILDING SECTIONS

S-401 ENLARGED PLANS

S-501 FRAMING DETAILS

05-01-20

LIST OF DRAWINGS

00 01 15 - 2

S-502 FRAMING DETAILS

S-503 FRAMING DETAILS

S-504 FRAMING DETAILS

S-505 TYPICAL DETAILS

ARCHITECTURE

AD101 BASEMENT AND FIRST FLOOR DEMOLITION PLAN

AD102 BALCONY, SECOND FLOOR, BOOTH, ATTIC & RAFTERS DEMO PLAN

AD103 DEMOLITION ELEVATIONS

AD104 DEMOLITION REFLECTED CEILING PLANS

AE101 BASEMENT AND FIRST FLOOR PLAN

AE102 BALCONY, SECOND FLOOR, BOOTH, ATTIC & RAFTERS PLANS

AE131 ROOF PLAN

AC142 REFLECTED CEILING PLANS

AE201 BUILDING ELEVATIONS

AE202 BUILDING ELEVATIONS

AE311 WALL SECTIONS

AE321 ENLARGED PLAZA PLAN AND DETAILS

AE322 ENLARGED RAMP AND STAIR PLAN AND SECTION DETAILS

AE401 ENLARGED PLANS

AE402 ENLARGED PLANS

AE403 ENLARGED SECTIONS

AE404 ENLARGED PLANS AND SECTION DETAILS

AE405 ENLARGED SECTION DETAILS

AE410 INTERIOR ELEVATIONS

AE411 INTERIOR SECTIONS & ELEVATIONS - LOBBY

AE412 INTERIOR SECTIONS & ELEVATIONS - LOBBY & BASEMENT

AE413 INTERIOR ELEVATIONS - STAGE

AE414 INTERIOR ELEVATIONS - STAGE

AE420 BUILDING SECTION - AUDITORIUM

AE421 BUILDING SECTION - AUDITORIUM

AE422 BUILDING SECTION - AUDITORIUM

AE423 BUILDING SECTION - AUDITORIUM

AE501 ENLARGED DETAILS

AE601 SCHEDULES

AE602 HEAD, JAMB & SILL DETAILS

AE603 TYPICAL DOOR ELEVATIONS

AE604 TYPICAL WINDOW ELEVATIONS

AE605 TYPICAL CURTAIN ELEVATIONS

05-01-20

LIST OF DRAWINGS

00 01 15 - 3

AE700 PHOTOS - EXISTING CONDITIONS - P1-20

AE701 PHOTOS - EXISTING CONDITIONS - P21-41

AE702 PHOTOS - EXISTING CONDITIONS - P42-46

AE801 BASEMENT AND FIRST FLOOR FINISH & SIGNAGE PLAN

AE802 BALCONY, SECOND FLOOR, CATWALK & SIGNAGE PLANS

AE803 FINISH DETAILS

FIRE SUPPRESSION

F001 ABBREVIATIONS, LEGEND & DESIGN NOTES

FD101 BASEMENT AND FIRST FLOOR DEMOLITION PLANS

FD102 BALCONY, SECOND FLOOR AND CEILING DEMOLITION PLANS

FD103 AUDITORIUM ATTIC AND STAGE ATTIC DEMOLITION PLANS

FD901 WET-PIPE FIRE SUPPRESSION ISOMETRIC

FS100 SITE PLAN

FX101 BASEMENT AND FIRST FLOOR NEW WORK PLANS

FX102 BALCONY, SECOND FLOOR AND CEILING NEW WORK PLANS

FX103 AUDITORIUM ATTIC AND STAGE ATTIC NEW WORK PLAN

F201 SECTIONS

PLUMBING

P001 ABBREVIATIONS, LEGEND & GENERAL NOTES

PD101 FOUNDATION AND BASEMENT DEMOLITION PLANS

PD102 FIRST AND SECOND FLOOR DEMOLITION PLANS

PS100 SITE PLAN

PP101 FOUNDATION AND BASEMENT NEW WORK PLANS

PP102 FIRST AND SECOND FLOOR NEW WORK PLANS

P401 ENLARGED PLANS

P601 DETAILS AND SCHEDULES

P901 DRAINAGE ISOMETERIC

P902 DISTRIBUTION ISOMETERIC

AUDIO-VISUAL

AV001 AUDIO VISUAL SYMBOLS & NOTES

AV002 AUDIO VISUAL SCHEDULES

AV101 ENLARGED PLANS

AV102 ENLARGED PLANS

AV103 ENLARGED PLANS

AV104 ENLARGED PLANS

AV201 REFLECTED CEILING PLANS

AV202 REFLECTED CEILING PLANS

AV203 REFLECTED CEILING PLANS

05-01-20

LIST OF DRAWINGS

00 01 15 - 4

AV301 SECTIONS

AV302 SECTIONS

AV401 BLOCK DIAGRAMS

AV402 BLOCK DIAGRAMS

AV403 BLOCK DIAGRAMS

AV404 BLOCK DIAGRAMS

AV405 BLOCK DIAGRAMS

AV406 BLOCK DIAGRAMS

AV501 AUDIO-VISUAL DETAILS

AV502 AUDIO-VISUAL DETAILS

THEATER

TE001 THEATER SYSTEMS SYMBOLS & NOTES

TE002 THEATER SYSTEMS SCHEDULES

TE101 ENLARGED PLANS

TE102 ENLARGED PLANS

TE103 ENLARGED PLANS

TE104 ENLARGED PLANS

TE201 REFLECTED CEILING PLANS

TE301 SECTIONS

TE302 SECTIONS

TE303 SECTIONS

TE304 RIGGING ELEVATIONS

TE305 RIGGING ELEVATIONS

TE306 RIGGING ELEVATIONS

TE307 RIGGING ELEVATIONS

TE308 RIGGING ELEVATIONS

TE309 RIGGING ELEVATIONS

TE310 RIGGING ELEVATIONS

TE311 RIGGING DETAILS

TE312 RIGGING DETAILS

TE401 THEATER SYSTEMS CONTROL RISER

TE402 THEATER SYSTEMS CIRCUIT SCHEDULES

TE403 POWER & CONTROL DISTRIBUTION

TE404 POWER & CONTROL DISTRIBUTION

MECHANICAL

M001 MECHANICAL LEGEND

MD101 BASEMENT AND FIRST FLOOR DEMOLITION PLANS

MD102 BALCONY, SECOND FLOOR, AND ATTIC DEMOLITION PLANS

05-01-20

LIST OF DRAWINGS

00 01 15 - 5

MD103 ROOF DEMOLITION PLANS

M101 BASEMENT AND FIRST FLOOR PLANS

M102 BALCONY , SECOND FLOOR, AND ATTIC PLANS

M103 ROOF PLANS

M301 MECHANICAL SECTIONS

M501 MECHANICAL DETAILS

M600 MECHANICAL SCHEDULES

ELECTRICAL

E001 ABBREVIATIONS, LEGEND & GENERAL NOTES

E002 SINGLE LINE

E100 SITE PLAN

ED101 DEMOLITION PLANS

EP101 BASEMENT NEW WORK PLANS

EP102 FIRST FLOOR NEW WORK PLANS

EP103 SECOND FLOOR NEW WORK PLANS

EP104 ATTIC, RAFTERS, & ROOF NEW WORK PLANS

E200 PANEL SCHEDULES

E300 SCHEDULES

TECHNOLOGY

T001 ABBREVIATIONS, LEGEND & GENERAL NOTES

TD101 DEMOLITION PLANS

TD401 DATA/TELECOM ELEVATION

T101 NEW WORK PLANS

T102 ATTIC AND RAFTERS NEW WORK PLANS

T401 ENLARGED IT ROOM 003A AND ELEVATIONS

T601 DETAILS

T602 DETAILS

T603 PACS DETAILS

- - - E N D - - -

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 1

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the restoration of the Building 35 theater as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer.

Offices of FFE | Heapy JV, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by

Contracting Officer or his duly authorized representative.

C. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. BASE BID: Work includes general construction, alterations, restorations, and site work as shown within the Drawings and Specifications.

B. ALTERNATE NO.1: BASE BID except in lieu of selective replacement of existing broken, cracked, or failing slate

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 2 roof tiles, replace entire slate tile roof with synthetic tile.

ALTERNATE NO.2: ALTERNATE NO.1 except in lieu of remove, reupholster, reinstall existing theater seating, full replacement of all theater seating.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees.

This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 3 the premises in the event of a national emergency. The

General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation.

See Section 08 71 00, DOOR HARDWARE and coordinate.

D. Document Control:

1. Before starting any work, the General Contractor/Sub

Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or

“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 4

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of

“sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an

Engineering Document Management Software (EDMS).

a) Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

b) “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access.

Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of permits shall be issued for General

Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical

Center Facility Manager.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The

Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 5

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the

Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the

Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 6 operations of utility services, fire protection systems and any existing equipment, and with work being done by others.

1. Do not store materials and equipment in other than assigned areas.

2. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of

Contractor's materials and equipment will be permitted subject to fire and safety requirements.

H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR . All such actions shall be coordinated with the COR or Utility Company involved:

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the

Contractor.

I. Building No. 35 will be vacated by Government in accordance with above phasing beginning immediately after date of receipt of Notice to Proceed and turned over to Contractor.

J. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 7 tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade.

Remove the fence when directed by COR.

K. When a building and/or construction site is turned over to

Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 68 degrees F at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or

Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

L. Utilities Services: Maintain existing utility services for the Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems

(including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of the COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 8 accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the

Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11

REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and 28 05

00, COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND

SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to the COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of the Medical Center. Interruption time approved by

Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of the COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the

Contractor.

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 9

M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions;

so that they are completely behind the finished surfaces.

N. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

O. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 10

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the

Government are identified by attached tags or noted on drawings or in specifications as items to be stored.

Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the

Contractor and be removed by Contractor from Medical

Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government.

When rooms and spaces are vacated by the Department of

Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 11

Government in advance of work to avoid interfering with

Contractor's operation.

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS (FAR 52.236-9)

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting

Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The

Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL

CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, 11-01-21

GENERAL REQUIREMENTS

01 00 00 - 12

"Alterations", "Restoration", and "Operations and Storage

Areas" for additional instructions concerning repair of damage to structures and site improvements.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by

Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 13 covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).

1.11 PROFESSIONAL SURVEYING SERVICES

A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the

Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.

1.12 LAYOUT OF WORK

A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting

Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

(FAR 52.236-17)

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 14

B. Establish and plainly mark the walls, ramps, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure, are in accordance with lines and elevations shown on contract drawings.

C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:

1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer.

Furnish such certification to the COR before any work

(such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.

D. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.

E. Upon completion of the work, the Contractor shall furnish the COR one electronic copy and reproducible drawings at the scale of the contract drawings, showing the finished grade on the grid developed for constructing the work, including burial monuments and fifty foot stationing along

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 15 new road centerlines. These drawings shall bear the seal of the registered land surveyor or registered civil engineer.

F. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of Article "Professional Surveying

Services".

1.13 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.14 WARRANTY MANAGEMENT

A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21

Warranty of Construction in at least 30 days before the planned pre-warranty conference, submit two sets of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 16 this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting

Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the

Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:

1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the

Contractor, subcontractors, manufacturers or suppliers involved.

2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.

3. Listing and status of delivery of all Certificates of

Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.

4. A list for each warranted equipment item, feature of construction or system indicating:

a. Name of item.

b. Model and serial numbers.

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 17

c. Location where installed.

d. Name and phone numbers of manufacturers and suppliers.

e. Name and phone numbers of manufacturers or suppliers.

f. Names, addresses and phone numbers of sources of spare parts.

g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.

h. Starting point and duration of warranty period.

i. Summary of maintenance procedures required to continue the warranty in force.

j. Cross-reference to specific pertinent Operation and

Maintenance manuals.

k. Organizations, names and phone numbers of persons to call for warranty service.

l. Typical response time and repair time expected for various warranted equipment.

5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.

6. Procedure and status of tagging of all equipment covered by extended warranties.

7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.

B. Performance & Payment Bonds: The Performance & Payment

Bonds must remain effective throughout the construction period.

1. In the event the Contractor fails to commence and diligently pursue any construction warranty work

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 18 required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.

2. In the event sufficient funds are not available to cover the construction warranty work performed by the

Government at the contractor’s expenses, the Contracting

Officer will have the right to recoup expenses from the bonding company.

3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the

Contractor.

C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the

Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for

Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for Contractor response, and other details deemed necessary by the Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 19 work action on behalf of the Contractor. This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the

Contractor of any of its responsibilities in conjunction with other portions of this provision.

D. Contractor’s Response to Construction Warranty Service

Requirements:

E. Following oral or written notification by the Contracting

Officer, the Contractor shall respond to construction warranty service requirements in accordance with the

“Construction Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period. Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.

1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within

4 hours, initiate work within 6 hours and work continuously to completion or relief.

2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within

8 hours, initiate work within 24 hours and work continuously to completion or relief.

3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 20

4. The “Construction Warranty Service Priority List” is as follows:

a) Code 1-Life Safety Systems

1) Fire suppression systems.

2) Fire alarm system(s).

b) Code 1-Air Conditioning Systems

1) Air conditioning leak in part of the building, if causing damage.

2) Air conditioning system not cooling properly.

c) Code 1 Doors

1) Overhead doors not operational, causing a security, fire or safety problem.

1) Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.

d) Code 3-Doors

1) Overhead doors not operational.

2) Interior/exterior personnel doors or hardware not functioning properly.

e) Code 1-Electrical

1) Power failure (entire area or any building operational after 1600 hours).

2) Security lights.

3) Smoke detectors.

f) Code 2-Electrical

1) Power failure (no power to a room or part of building). Receptacle and lights not operational (in a room or part of building).

g) Code 3-Electrical

1) Exterior lights not operational.

h) Code 1-Gas

1) Leaks and pipeline breaks.

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 21

i) Code 1-Heat

1) Power failure affecting heat.

j) Code 1-Plumbing

1) Hot water heater failure.

2) Leaking water supply pipes

k) Code 2-Plumbing

1) Flush valves not operating properly

2) Fixture drain, supply line or any water pipe leaking.

3) Toilet leaking at base.

l) Code 3- Plumbing

1) Leaky faucets.

m) Code 3-Interior

1) Floors damaged.

2) Paint chipping or peeling.

3) Casework damaged.

n) Code 1-Roof Leaks

1) Damage to property is occurring.

o) Code 2-Water (Exterior)

1) No water to facility.

p) Code 2-Water (Hot)

1) No hot water in portion of building listed.

q) Code 3

1) All work not listed above.

F. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the Contracting Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating.

Also submit two record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the project is accepted

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 22 for beneficial occupancy. Show the following information on the tag.

Warranty Tags

Type of product/material

Model number

Serial number

Contract number

Warranty period from/to

Inspector’s signature

Construction Contractor

Address

Telephone number

Warranty Contact

Address

Telephone number

Warranty response time priority code

1.15 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on

Medical Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

B. When new permanent roads are to be a part of this contract, Contractor may construct them immediately for use to facilitate building operations. These roads may be used by all who have business thereon within zone of building operations.

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 23

1.16 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system must be given by

COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted. Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014 Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.

3. Units shall be properly lubricated, balanced, and aligned. Vibrations must be eliminated.

4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.

11-01-21

GENERAL REQUIREMENTS

01 00 00 - 24

5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.

6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the

Government.

B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the

Government.

C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.

1.17 TEMPORARY TOILETS

A. Provide where directed, (for use of all Contractor's workers) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by COR,…

This is the start of the file's text. The full file is on GovTribe.