Atch 1_BID SPECIFICATIONS-1.pdf
PDF 14 MB Posted
- Solicitation number
- 36C24926R0055
About this file
This is a bid specifications document for the restoration of Building 35 Theater at the James H. Quillen Department of Veterans Affairs Medical Center in Mountain Home, Tennessee (Project #621-24-103). The specifications encompass comprehensive construction work including general construction, alterations, restorations, and site work as detailed in the associated drawings and technical specifications.
The project scope includes selective demolition of existing structures, asbestos abatement, structural steel and masonry work, thermal and moisture protection systems, roofing with slate shingles or synthetic tile alternatives, openings (doors, windows, glazing), interior finishes (gypsum board, painting, acoustical ceilings, carpeting), fire suppression systems, plumbing, HVAC systems, electrical installations, communications systems, electronic security systems, and theater-specific equipment including projection screens and stage lighting. The base bid includes selective replacement of broken or failing slate roof tiles, with Alternate No. 1 providing full slate roof replacement with synthetic tiles, and Alternate No. 2 offering complete theater seating replacement. The contractor must develop a Critical Path Method (CPM) schedule within 10 days of Notice to Proceed, maintain as-built drawings, provide photographic documentation with interactive digital indexing, furnish operation and maintenance manuals, and conduct comprehensive training for VA personnel. Warranty management requirements include extended coverage for roofs, HVAC balancing, pumps, motors, transformers, and commissioned systems, with 4-month and 9-month post-acceptance inspections. The project requires compliance with VA security procedures, coordination with ongoing medical center operations, and adherence to historic preservation protocols given the theater's historic significance.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT # 621-24-103
Restoration of Building 35 Theater
JAMES H. QUILLEN DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER
LAMONT STREET AND VETERANS WAY
MOUNTAIN HOME, TENNESSEE
SPECIFICATIONS
BID DOCUMENTS
07/01/2025
PREPARED BY
Mt. Home – Restoration of Building 35 Historic Theater VA Project Number: 621-24-103
06-01-24
TABLE OF CONTENTS
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
“SEE BELOW FOR SPECIFICATION APPENDICES”
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 01-24 01 33 23 Shop Drawings, Product Data, and Samples 11-23 01 35 26 Safety Requirements 05-24 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 06-21 01 57 19 Temporary Environmental Controls 01-21 01 74 19 Construction Waste Management 04-22 01 81 13 Sustainable Construction Requirements 10-17
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 12-23 02 41 20 Selective Demolition 02 82 11 Traditional Asbestos Abatement 01-21 02 82 13.21 Asbestos Roofing Abatement 01-21 02 83 33.13 Lead-Containing Paint Removal and Disposal 01-21 02 83 34 Microbial Remediation
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 01-21
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 01-21 04 05 13 Masonry Mortaring 10-17 04 20 00 Unit Masonry 08-17
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18 05 50 00 Metal Fabrications 08-18 05 51 00 Metal Stairs 01-21
06-01-24
TABLE OF CONTENTS
00 01 10-2
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17 06 16 63 Cementitious Sheathing 01-21 06 20 00 Finish Carpentry 01-21
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 01-21 07 21 13 Thermal Insulation 01-21 07 22 00 Roof and Deck Insulation 01-21 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 01-21 07 31 26 Slate Shingles 01-21 07 52 16.11 Cold Adhesive Styrene-Butadiene-Styrene Modified
Bituminous Membrane Roofing 12-21
07 60 00 Flashing and Sheet Metal 01-21 07 71 00 Roof Specialties 01-21 07 72 00 Roof Accessories 01-21 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 04-22
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 31 13 Access Doors and Frames 04-22 08 71 00 Door Hardware 03-24 08 71 13 Automatic Door Operators 01-21 08 80 00 Glazing 01-21 08 90 00 Louvers and Vents 01-21
DIVISION 09 – FINISHES
09 01 90.52 Maintenance Repainting 09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 23 00 Gypsum Plastering 01-21 09 24 00 Portland Cement Plastering 01-21 09 26 00 Veneer Plastering 01-21 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 01-21 09 51 00 Acoustical Ceilings 12-18 09 68 00 Carpeting 01-21 09 84 33 Sound-Absorbing Wall Units 01-21 09 91 00 Painting 01-21 09 93 00 Staining and Transparent Finishing
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21 10 21 13 Toilet Compartments 01-21
06-01-24
TABLE OF CONTENTS
00 01 10-3
SECTION NO DIVISION AND SECTION TITLES DATE
10 28 00 Toilet, Bath, and Laundry Accessories 01-21 10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 11 – EQUIPMENT
11 52 13 Projection Screens 11 61 00 Theater and Stage Lighting Equipment
DIVISION 12 – FURNISHINGS
12 32 00 Manufactured Wood Casework 01-21 12 36 00 Countertops 12-23
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 14 – CONVEYING EQUIPEMENT
14 42 16 Vertical Platform Wheelchair Lift
DIVISION 21 - FIRE SUPPRESSION
21 12 00 Wet Standpipe Systems 06-15 21 13 16 Dry-Pipe Sprinkler Systems 01-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 01-23 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 05 33 Heat Tracing for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 05-21 22 11 23 Domestic Water Pumps 09-15 22 13 00 Facility Sanitary and Vent Piping 09-20 22 14 00 Facility Storm Drainage 09-15
22 40 00 Plumbing Fixtures 05-24
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 03-23 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 03-23
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
03-23
23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 09 23 Direct-Digital Control System for HVAC 03-23 23 21 13 Hydronic Piping 03-23 23 23 00 Refrigerant Piping 03-24
06-01-24
TABLE OF CONTENTS
00 01 10-4
SECTION NO DIVISION AND SECTION TITLES DATE
23 25 00 HVAC Water Treatment 03-23 23 31 00 HVAC Ducts and Casings 03-23 23 34 00 HVAC Fans 03-23 23 37 00 Air Outlets and Inlets 03-23 23 40 00 HVAC Air Cleaning Devices 03-23 23 81 00 Decentralized Unitary HVAC Equipment 03-24 23 82 00 Convection Heating and Cooling Units 03-23
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22 26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22 26 05 26 Grounding and Bonding for Electrical Systems 11-22 26 05 33 Raceway and Boxes for Electrical Systems 11-22 26 05 41 Underground Electrical Construction 11-22
26 05 73 Overcurrent Protective Device Coordination Study 11-22
26 09 23 Lighting Controls 11-22 26 24 16 Panelboards 11-22
26 27 26 Wiring Devices 11-22 26 29 11 Motor Controllers 11-22 26 29 21 Enclosed Switches and Circuit Breakers 11-22 26 32 13 Engine Generators 11-22
26 36 23 Automatic Transfer Switches 11-22
26 41 00 Facility Lightning Protection 11-22 26 43 13 Surge Protective Devices 11-22 26 51 00 Interior Lighting 03-24 26 56 00 Exterior Lighting 11-22
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19 27 05 26i Grounding and Bonding for Communications Systems 12-22 27 05 33i Raceways and Boxes for Communications Systems 10-18 27 05 53i Identification for Communications Systems 27 10 00i Structured Cabling 06-15 27 11 00 Telecommunications Room Fittings 06-15 27 11 16i Communications Cabinets, Racks, Frames, And Enclosures 27 11 19i Communications Termination Blocks And Patch Panels 27 11 26i Communications Rack Mounted Power Protection And Power
Strips 27 13 13.13i Communications Copper Cable Splicing And Terminations 27 13 13i Communications Copper Backbone Cabling 27 13 23.13i Communications Optical Fiber Splicing And Terminations 27 13 23i Communications Optical Fiber Backbone Cabling 27 15 13i Communications Copper Horizontal Cabling
06-01-24
TABLE OF CONTENTS
00 01 10-5
SECTION NO DIVISION AND SECTION TITLES DATE
27 16 19i Communications Patch Cords, Station Cords, And Cross Connect Wire
27 41 16 Integrated Audio / Visual System
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and
Security 10-18
28 05 26 Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-11
28 13 00 Physical Access Control System 10-11
28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 20 11 Earthwork (Short Form) 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 12 16 Asphalt Paving 09-15 32 17 23 Pavement Markings 08-16 32 90 00 Planting 08-16
DIVISION 33 – UTILITIES
DIVISION 34 – TRANSPORTATION
DIVISION 48 – Electrical Power Generation
SPECIFICATION APPENDICES
Appendix 1 Hazardous Materials Survey Report
Appendix 2 Historic Conditions Assessment
05-01-20
LIST OF DRAWINGS
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
GI000 COVER SHEET
GI001 SYMBOLS AND ABBREVIATIONS
GI002 PARTITION TYPES AND NOTES
GI003 ACCESSIBILITY REQUIREMENTS
GI004 ACCESSIBILITY REQUIREMENTS
GI005 LIFE SAFETY PLAN
GI006 SITE AND CONSTRUCTION LAYDOWN PLAN
GI007 EXTERIOR 3D VIEWS
CIVIL
C-001 GENERAL NOTES, LEGEND, AND ABBREVIATIONS
VF101 EXISTING SITE CONDITIONS
CD101 SITE DEMOLITION PLAN
CD501 SITE DEMOLITION DETAILS
CS101 SITE PLAN
CS501 SITE DETAILS
CG101 SITE GRADING PLAN
CG401 ROOF DRAIN PROFILES
CG501 SITE GRADING DETAILS
STRUCTURAL
S-001 LEGEND
S-002 GENERAL NOTES
S-003 GENERAL NOTES
S-101 BASEMENT FOUNDATION PLAN
S-102 FIRST FLOOR PLAN
S-103 STAGE PLANS
S-104 CHANNEL GRID FRAMING PLANS
S-105 ATTIC LEVEL FRAMING PLAN
S-301 BUILDING SECTIONS
S-302 BUILDING SECTIONS
S-401 ENLARGED PLANS
S-501 FRAMING DETAILS
05-01-20
LIST OF DRAWINGS
00 01 15 - 2
S-502 FRAMING DETAILS
S-503 FRAMING DETAILS
S-504 FRAMING DETAILS
S-505 TYPICAL DETAILS
ARCHITECTURE
AD101 BASEMENT AND FIRST FLOOR DEMOLITION PLAN
AD102 BALCONY, SECOND FLOOR, BOOTH, ATTIC & RAFTERS DEMO PLAN
AD103 DEMOLITION ELEVATIONS
AD104 DEMOLITION REFLECTED CEILING PLANS
AE101 BASEMENT AND FIRST FLOOR PLAN
AE102 BALCONY, SECOND FLOOR, BOOTH, ATTIC & RAFTERS PLANS
AE131 ROOF PLAN
AC142 REFLECTED CEILING PLANS
AE201 BUILDING ELEVATIONS
AE202 BUILDING ELEVATIONS
AE311 WALL SECTIONS
AE321 ENLARGED PLAZA PLAN AND DETAILS
AE322 ENLARGED RAMP AND STAIR PLAN AND SECTION DETAILS
AE401 ENLARGED PLANS
AE402 ENLARGED PLANS
AE403 ENLARGED SECTIONS
AE404 ENLARGED PLANS AND SECTION DETAILS
AE405 ENLARGED SECTION DETAILS
AE410 INTERIOR ELEVATIONS
AE411 INTERIOR SECTIONS & ELEVATIONS - LOBBY
AE412 INTERIOR SECTIONS & ELEVATIONS - LOBBY & BASEMENT
AE413 INTERIOR ELEVATIONS - STAGE
AE414 INTERIOR ELEVATIONS - STAGE
AE420 BUILDING SECTION - AUDITORIUM
AE421 BUILDING SECTION - AUDITORIUM
AE422 BUILDING SECTION - AUDITORIUM
AE423 BUILDING SECTION - AUDITORIUM
AE501 ENLARGED DETAILS
AE601 SCHEDULES
AE602 HEAD, JAMB & SILL DETAILS
AE603 TYPICAL DOOR ELEVATIONS
AE604 TYPICAL WINDOW ELEVATIONS
AE605 TYPICAL CURTAIN ELEVATIONS
05-01-20
LIST OF DRAWINGS
00 01 15 - 3
AE700 PHOTOS - EXISTING CONDITIONS - P1-20
AE701 PHOTOS - EXISTING CONDITIONS - P21-41
AE702 PHOTOS - EXISTING CONDITIONS - P42-46
AE801 BASEMENT AND FIRST FLOOR FINISH & SIGNAGE PLAN
AE802 BALCONY, SECOND FLOOR, CATWALK & SIGNAGE PLANS
AE803 FINISH DETAILS
FIRE SUPPRESSION
F001 ABBREVIATIONS, LEGEND & DESIGN NOTES
FD101 BASEMENT AND FIRST FLOOR DEMOLITION PLANS
FD102 BALCONY, SECOND FLOOR AND CEILING DEMOLITION PLANS
FD103 AUDITORIUM ATTIC AND STAGE ATTIC DEMOLITION PLANS
FD901 WET-PIPE FIRE SUPPRESSION ISOMETRIC
FS100 SITE PLAN
FX101 BASEMENT AND FIRST FLOOR NEW WORK PLANS
FX102 BALCONY, SECOND FLOOR AND CEILING NEW WORK PLANS
FX103 AUDITORIUM ATTIC AND STAGE ATTIC NEW WORK PLAN
F201 SECTIONS
PLUMBING
P001 ABBREVIATIONS, LEGEND & GENERAL NOTES
PD101 FOUNDATION AND BASEMENT DEMOLITION PLANS
PD102 FIRST AND SECOND FLOOR DEMOLITION PLANS
PS100 SITE PLAN
PP101 FOUNDATION AND BASEMENT NEW WORK PLANS
PP102 FIRST AND SECOND FLOOR NEW WORK PLANS
P401 ENLARGED PLANS
P601 DETAILS AND SCHEDULES
P901 DRAINAGE ISOMETERIC
P902 DISTRIBUTION ISOMETERIC
AUDIO-VISUAL
AV001 AUDIO VISUAL SYMBOLS & NOTES
AV002 AUDIO VISUAL SCHEDULES
AV101 ENLARGED PLANS
AV102 ENLARGED PLANS
AV103 ENLARGED PLANS
AV104 ENLARGED PLANS
AV201 REFLECTED CEILING PLANS
AV202 REFLECTED CEILING PLANS
AV203 REFLECTED CEILING PLANS
05-01-20
LIST OF DRAWINGS
00 01 15 - 4
AV301 SECTIONS
AV302 SECTIONS
AV401 BLOCK DIAGRAMS
AV402 BLOCK DIAGRAMS
AV403 BLOCK DIAGRAMS
AV404 BLOCK DIAGRAMS
AV405 BLOCK DIAGRAMS
AV406 BLOCK DIAGRAMS
AV501 AUDIO-VISUAL DETAILS
AV502 AUDIO-VISUAL DETAILS
THEATER
TE001 THEATER SYSTEMS SYMBOLS & NOTES
TE002 THEATER SYSTEMS SCHEDULES
TE101 ENLARGED PLANS
TE102 ENLARGED PLANS
TE103 ENLARGED PLANS
TE104 ENLARGED PLANS
TE201 REFLECTED CEILING PLANS
TE301 SECTIONS
TE302 SECTIONS
TE303 SECTIONS
TE304 RIGGING ELEVATIONS
TE305 RIGGING ELEVATIONS
TE306 RIGGING ELEVATIONS
TE307 RIGGING ELEVATIONS
TE308 RIGGING ELEVATIONS
TE309 RIGGING ELEVATIONS
TE310 RIGGING ELEVATIONS
TE311 RIGGING DETAILS
TE312 RIGGING DETAILS
TE401 THEATER SYSTEMS CONTROL RISER
TE402 THEATER SYSTEMS CIRCUIT SCHEDULES
TE403 POWER & CONTROL DISTRIBUTION
TE404 POWER & CONTROL DISTRIBUTION
MECHANICAL
M001 MECHANICAL LEGEND
MD101 BASEMENT AND FIRST FLOOR DEMOLITION PLANS
MD102 BALCONY, SECOND FLOOR, AND ATTIC DEMOLITION PLANS
05-01-20
LIST OF DRAWINGS
00 01 15 - 5
MD103 ROOF DEMOLITION PLANS
M101 BASEMENT AND FIRST FLOOR PLANS
M102 BALCONY , SECOND FLOOR, AND ATTIC PLANS
M103 ROOF PLANS
M301 MECHANICAL SECTIONS
M501 MECHANICAL DETAILS
M600 MECHANICAL SCHEDULES
ELECTRICAL
E001 ABBREVIATIONS, LEGEND & GENERAL NOTES
E002 SINGLE LINE
E100 SITE PLAN
ED101 DEMOLITION PLANS
EP101 BASEMENT NEW WORK PLANS
EP102 FIRST FLOOR NEW WORK PLANS
EP103 SECOND FLOOR NEW WORK PLANS
EP104 ATTIC, RAFTERS, & ROOF NEW WORK PLANS
E200 PANEL SCHEDULES
E300 SCHEDULES
TECHNOLOGY
T001 ABBREVIATIONS, LEGEND & GENERAL NOTES
TD101 DEMOLITION PLANS
TD401 DATA/TELECOM ELEVATION
T101 NEW WORK PLANS
T102 ATTIC AND RAFTERS NEW WORK PLANS
T401 ENLARGED IT ROOM 003A AND ELEVATIONS
T601 DETAILS
T602 DETAILS
T603 PACS DETAILS
- - - E N D - - -
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the restoration of the Building 35 theater as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer.
Offices of FFE | Heapy JV, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by
Contracting Officer or his duly authorized representative.
C. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. BASE BID: Work includes general construction, alterations, restorations, and site work as shown within the Drawings and Specifications.
B. ALTERNATE NO.1: BASE BID except in lieu of selective replacement of existing broken, cracked, or failing slate
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 2 roof tiles, replace entire slate tile roof with synthetic tile.
ALTERNATE NO.2: ALTERNATE NO.1 except in lieu of remove, reupholster, reinstall existing theater seating, full replacement of all theater seating.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees.
This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 3 the premises in the event of a national emergency. The
General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation.
See Section 08 71 00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor/Sub
Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or
“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 4
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of
“sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an
Engineering Document Management Software (EDMS).
a) Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
b) “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access.
Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of permits shall be issued for General
Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical
Center Facility Manager.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The
Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 5
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the
Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the
Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as determined by the COR.
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 6 operations of utility services, fire protection systems and any existing equipment, and with work being done by others.
1. Do not store materials and equipment in other than assigned areas.
2. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of
Contractor's materials and equipment will be permitted subject to fire and safety requirements.
H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR . All such actions shall be coordinated with the COR or Utility Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the
Contractor.
I. Building No. 35 will be vacated by Government in accordance with above phasing beginning immediately after date of receipt of Notice to Proceed and turned over to Contractor.
J. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 7 tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade.
Remove the fence when directed by COR.
K. When a building and/or construction site is turned over to
Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 68 degrees F at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or
Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from
Contractor's employee or watchman.
L. Utilities Services: Maintain existing utility services for the Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems
(including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of the COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 8 accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the
Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11
REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and 28 05
00, COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND
SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to the COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of the Medical Center. Interruption time approved by
Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of the COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the
Contractor.
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 9
M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions;
so that they are completely behind the finished surfaces.
N. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
O. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
1.7 ALTERATIONS
A. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 10
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the
Government are identified by attached tags or noted on drawings or in specifications as items to be stored.
Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the
Contractor and be removed by Contractor from Medical
Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government.
When rooms and spaces are vacated by the Department of
Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 11
Government in advance of work to avoid interfering with
Contractor's operation.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS (FAR 52.236-9)
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting
Officer.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The
Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL
CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, 11-01-21
GENERAL REQUIREMENTS
01 00 00 - 12
"Alterations", "Restoration", and "Operations and Storage
Areas" for additional instructions concerning repair of damage to structures and site improvements.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by
Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 13 covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).
1.11 PROFESSIONAL SURVEYING SERVICES
A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the
Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.
1.12 LAYOUT OF WORK
A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting
Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.
(FAR 52.236-17)
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 14
B. Establish and plainly mark the walls, ramps, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure, are in accordance with lines and elevations shown on contract drawings.
C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:
1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer.
Furnish such certification to the COR before any work
(such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.
D. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.
E. Upon completion of the work, the Contractor shall furnish the COR one electronic copy and reproducible drawings at the scale of the contract drawings, showing the finished grade on the grid developed for constructing the work, including burial monuments and fifty foot stationing along
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 15 new road centerlines. These drawings shall bear the seal of the registered land surveyor or registered civil engineer.
F. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of Article "Professional Surveying
Services".
1.13 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.14 WARRANTY MANAGEMENT
A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21
Warranty of Construction in at least 30 days before the planned pre-warranty conference, submit two sets of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 16 this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting
Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the
Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:
1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the
Contractor, subcontractors, manufacturers or suppliers involved.
2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.
3. Listing and status of delivery of all Certificates of
Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.
4. A list for each warranted equipment item, feature of construction or system indicating:
a. Name of item.
b. Model and serial numbers.
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 17
c. Location where installed.
d. Name and phone numbers of manufacturers and suppliers.
e. Name and phone numbers of manufacturers or suppliers.
f. Names, addresses and phone numbers of sources of spare parts.
g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.
h. Starting point and duration of warranty period.
i. Summary of maintenance procedures required to continue the warranty in force.
j. Cross-reference to specific pertinent Operation and
Maintenance manuals.
k. Organizations, names and phone numbers of persons to call for warranty service.
l. Typical response time and repair time expected for various warranted equipment.
5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.
6. Procedure and status of tagging of all equipment covered by extended warranties.
7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.
B. Performance & Payment Bonds: The Performance & Payment
Bonds must remain effective throughout the construction period.
1. In the event the Contractor fails to commence and diligently pursue any construction warranty work
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 18 required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.
2. In the event sufficient funds are not available to cover the construction warranty work performed by the
Government at the contractor’s expenses, the Contracting
Officer will have the right to recoup expenses from the bonding company.
3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the
Contractor.
C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the
Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for
Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for Contractor response, and other details deemed necessary by the Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 19 work action on behalf of the Contractor. This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the
Contractor of any of its responsibilities in conjunction with other portions of this provision.
D. Contractor’s Response to Construction Warranty Service
Requirements:
E. Following oral or written notification by the Contracting
Officer, the Contractor shall respond to construction warranty service requirements in accordance with the
“Construction Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period. Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.
1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within
4 hours, initiate work within 6 hours and work continuously to completion or relief.
2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within
8 hours, initiate work within 24 hours and work continuously to completion or relief.
3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 20
4. The “Construction Warranty Service Priority List” is as follows:
a) Code 1-Life Safety Systems
1) Fire suppression systems.
2) Fire alarm system(s).
b) Code 1-Air Conditioning Systems
1) Air conditioning leak in part of the building, if causing damage.
2) Air conditioning system not cooling properly.
c) Code 1 Doors
1) Overhead doors not operational, causing a security, fire or safety problem.
1) Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.
d) Code 3-Doors
1) Overhead doors not operational.
2) Interior/exterior personnel doors or hardware not functioning properly.
e) Code 1-Electrical
1) Power failure (entire area or any building operational after 1600 hours).
2) Security lights.
3) Smoke detectors.
f) Code 2-Electrical
1) Power failure (no power to a room or part of building). Receptacle and lights not operational (in a room or part of building).
g) Code 3-Electrical
1) Exterior lights not operational.
h) Code 1-Gas
1) Leaks and pipeline breaks.
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 21
i) Code 1-Heat
1) Power failure affecting heat.
j) Code 1-Plumbing
1) Hot water heater failure.
2) Leaking water supply pipes
k) Code 2-Plumbing
1) Flush valves not operating properly
2) Fixture drain, supply line or any water pipe leaking.
3) Toilet leaking at base.
l) Code 3- Plumbing
1) Leaky faucets.
m) Code 3-Interior
1) Floors damaged.
2) Paint chipping or peeling.
3) Casework damaged.
n) Code 1-Roof Leaks
1) Damage to property is occurring.
o) Code 2-Water (Exterior)
1) No water to facility.
p) Code 2-Water (Hot)
1) No hot water in portion of building listed.
q) Code 3
1) All work not listed above.
F. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the Contracting Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating.
Also submit two record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the project is accepted
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 22 for beneficial occupancy. Show the following information on the tag.
Warranty Tags
Type of product/material
Model number
Serial number
Contract number
Warranty period from/to
Inspector’s signature
Construction Contractor
Address
Telephone number
Warranty Contact
Address
Telephone number
Warranty response time priority code
1.15 USE OF ROADWAYS
A. For hauling, use only established public roads and roads on
Medical Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.
B. When new permanent roads are to be a part of this contract, Contractor may construct them immediately for use to facilitate building operations. These roads may be used by all who have business thereon within zone of building operations.
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 23
1.16 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:
1. Permission to use each unit or system must be given by
COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment.
2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted. Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014 Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.
3. Units shall be properly lubricated, balanced, and aligned. Vibrations must be eliminated.
4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.
11-01-21
GENERAL REQUIREMENTS
01 00 00 - 24
5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.
6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the
Government.
B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the
Government.
C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.
D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.
1.17 TEMPORARY TOILETS
A. Provide where directed, (for use of all Contractor's workers) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by COR,…