Atch 30 AMEND_3 _ 10.08_FX102 - BALCONY 2nd FLOOR - CEILING.pdf

PDF 774 KB Posted

Attached to
Y1QA--Project 621-24-103 Restoration of B35 Theater
Solicitation number
36C24926R0055
Issued by

About this file

This is an architectural drawing set for the U.S. Department of Veterans Affairs James H. Quillen VA Medical Center. The document consists of three detailed mechanical, electrical, and plumbing (MEP) plans for the restoration of Building 35 Theater at the Mountain Home, Tennessee facility.

The drawings include: (1) a Balcony and Second Floor Plan at 1/8" = 1'-0" scale showing lobby, mech/elec room, balcony, dressing rooms, toilets, corridors, and projector booth with fire suppression systems including FDV standpipes and dry-pipe risers serving various zones; (2) a Projector Booth Plan at the same scale detailing mechanical and electrical infrastructure in that space; and (3) a Ceiling and Catwalk New Work Plan showing overhead distribution systems and support infrastructure. The plans are marked "NOT FOR CONSTRUCTION" and labeled as 100% Construction Documents dated 05/30/2025, representing the final phase of a multi-stage design process that began with 25% Schematic Design on 10/31/2024. The project is designated VAMC 2024-05141, with the consulting firm being FFE and the architect/engineer of record being Heapy. All plans are fully sprinklered and show comprehensive fire suppression system routing throughout the theater spaces and support areas.

View the file

Other files

File Type Posted
Atch 40 AMEND_4 SCA WD 2015-4641.pdf PDF
Atch 39 AMEND_4 Davis-Bacon WD TN20260191.pdf PDF
S02 AMEND_36C24926R0055 0004 B35.pdf PDF
Atch 26 AMEND_3 _10.06_FS100 - SITE PLAN.pdf PDF
Atch 23 AMEND_3 _ 10_32 17 23 - PAVEMENT MARKINGS.pdf PDF
Atch 21 AMEND_3 _09 93 00 Staining - Transparent Finish.pdf PDF
Atch 31 AMEND_3 _ 10.09_FX103 - AUDITORIUM ATTIC- STAGE NEW WORK.pdf PDF
Atch 22 AMEND_3 _ 10_32 12 16 - ASPHALT PAVING.pdf PDF
Atch 20 AMEND_3 _ 09 01 90.52 - Maintenance Repainting.pdf PDF
S02 AMEND_36C24926R0055 0003 B35.pdf PDF
Atch 35 AMEND_3 Worksheet - S ENG AUTOCAD AUTOCADPUBLIC PDC PROJ 7.xlsx XLSX spreadsheet
Atch 36 AMEND_3 Section 01 45 00 Quality Control.docx DOCX document
Atch 17 AMEND_3 Updated Solicitation 36C24926R0055.pdf PDF
Atch 33 AMEND_3 QUES 186 _doc11604520260625102926.pdf PDF
Atch 34 AMEND_3 Section 01 45 35 Schedule of Special Inspections.docx DOCX document
Atch 38 AMEND_3 VA Mtn Home El Walkway_Geotech Rpt.pdf PDF
Atch 24 AMEND_3 _ 10-10_32 90 00 PLANTING.pdf PDF
Atch 28 AMEND_3 _ Q10.07_FX101 - BASEMENT -1st FLOOR.pdf PDF
Atch 19 AMEND_3 _ 00 01 10 - SPECS - Table Of Contents.pdf PDF
Atch 29 AMEND_3 _ 10.07_FX101 - BASEMENT- 1st FLOOR NEW WORK PLAN.pdf PDF
Atch 32 AMEND_3 _ 210.05_FD901-WET-PIPE FIRE SUPPRESSION ISOMETRIC.pdf PDF
Atch 25 AMEND_3 _ Limited HazMat Report.pdf PDF
Atch 27 AMEND_3_10.06_FS100 - FIRE SUPPRESSION SITE PLAN.pdf PDF
Atch 37 AMEND_3 Past Performance Questionnaire -PPQ Template.docx DOCX document
Atch 18 AMEND_3 FINISH REVISIONS_ Rev 2 06-30-2026.pdf PDF
S02 AMEND_36C24926R0055 0002 B35.pdf PDF
Atch AMEND_1 Site Visit Attendance Sheet of 621-24-103.pdf PDF
S02 AMEND_36C24926R0055 0001 B35.pdf PDF
S02 SOL 36C24926R0055_1 B35 _ R2.pdf PDF
Atch 16 WD TN20260191 01.02.2026.docx DOCX document
Atch 5_BID SPEC ENG_4288 SUBMITTAL REG.pdf PDF
Atch 14 General Conditions Breakout.xlsx XLSX spreadsheet
36C24926R0055_1.docx DOCX document
Atch 3_BID SPEC App1_B35 HazMat Report.pdf PDF
Atch 12 Calc. of Self Performed Work.xlsx XLSX spreadsheet
Atch 9_621-24-103 Drawing part 4 of 6.pdf PDF
Atch 2_BID MAppE_B35 Existing Conditions.pdf PDF
Atch 1_BID SPECIFICATIONS-1.pdf PDF
Atch 4_BID SPEC App2_B35 Historic SHPO.pdf PDF
Atch 13 Contractor EMR Certification Form.docx DOCX document
Atch 6_621-24-103 drawing part 1 of 6.pdf PDF
Atch 11_621-24-103 Drawing part 6 of 6.pdf PDF
Atch 8_621-24-103 drawing part 3 of 6.pdf PDF
Atch 15 WD TN20260191 01.02.2026.docx DOCX document
Atch 7_621-24-103 drawing part 2 of 6.pdf PDF
Atch 10_621-24-103 Drawing part 5 of 6.pdf PDF
Atch 15 Price Breakout Schedule.xlsx XLSX spreadsheet
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOBBY

MECH/ELEC

BALCONY

DRESSING

ROOM

TOILET

TOILET

CORRIDOR

DRESSING

ROOM

OH

OH

OH

4 1

OPEN TO ABOVE & BELOWOPEN TO AUDITORIUM BELOW

FDV STANDPIPE UP.

SERVES FDV

ABOVE CATWALK.

DRY-PIPE RISER.

SERVES AUDITORIUM

ATTIC SPACE.

FDV STANDPIPE UP.

SERVES FDV

ABOVE CATWALK.

DS DN

F201

F201

DRY-PIPE RISER .

SERVES SPRINKLERS

BELOW CATWALK

DRY-PIPE RISER.

SERVES BELOW CATWALK,

AUDITORIUM ATTIC SPACE,

BELOW STAGE ATTIC AND

STAGE ATTIC.

GENERAL NOTES

A. REFER TO SHEET F001 FOR ABBREVIATIONS, LEGEND & DESIGN NOTES.

B. UTILIZE EXISTING SPRINKLER LOCATIONS WHERE POSSIBLE IN AUDITORIUM AND LOBBY CEILINGS.

C. FOLLOW EXISTING EXPOSED BRANCH AND MAIN PIPE ROUTING IN AUDITORIUM AND LOBBY.

D. EXPOSED PIPING SHALL MATCH ADJACENT PAINTED SURFACES.

E. SPRINKLER PIPING TO BE ROUTED IN CEILING WHERE CEILING SPACE ALLOWS. ( ROOMS 110, 110A, 111, 111A,104, 105, 106, 108 & 109.)

F. UTILIZE EXISTING TEST LOCATIONS AND DRAIN ROUTING.

PROJECTOR

BOOTH

OH

LOBBY

DN

DN

DN

DN

DN

OPEN TO ABOVE & BELOW

FDV STANDPIPE

FDV STANDPIPE

FDV

FDV

CATWALK

CATWALK

UP

DNUP

DRY-PIPE RISER UP.

SERVES AUDITORIUM

ATTIC SPACE.

F201

F201

DRY-PIPE RISER.

SERVES BELOW STAGE ATTIC

AND STAGE ATTIC SPACE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT F

OR C

ONSTRUCTIO

N

Date:Revisions:No.

PROJECT NO.

A u to d e s k D o c s /M t H o m e V

A

R e s to ra ti o n o f B

T h e a te r/

-0

-M

E P

-C e n tr a l.

rv t

/2

/2

:0

:4

P

M

FX102

BALCONY, SECOND FLOOR AND

CEILING NEW WORK PLANS

05/30/2025 EWL RLC

RESTORATION OF BUILDING 35

HISTORIC THEATER

621-24-103

MT. HOME, TENNESSEE

100% CONSTRUCTION

DOCUMENTS 35

JAMES H.

QUILLEN VA

MEDICAL

CENTER

Approved: VAMC

2024-05141

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT F

OR C

ONSTRUCTIO

N

Date:Revisions:No.

PROJECT NO.

A u to d e s k D o c s /M t H o m e V

A

R e s to ra ti o n o f B

T h e a te r/

-0

-M

E P

-C e n tr a l.

rv t

/2

/2

:0

:4

P

M

FX102

BALCONY, SECOND FLOOR AND

CEILING NEW WORK PLANS

05/30/2025 EWL RLC

RESTORATION OF BUILDING 35

HISTORIC THEATER

621-24-103

MT. HOME, TENNESSEE

100% CONSTRUCTION

DOCUMENTS 35

JAMES H.

QUILLEN VA

MEDICAL

CENTER

Approved: VAMC

2024-05141

SCALE: 1/8" = 1'-0"

BALCONY AND SECOND FLOOR PLAN

PLAN NOTES

SCALE: 1/8" = 1'-0"

PROJECTOR BOOTH PLAN

1. PROVIDE NEW DRY-PIPE SPRINKLER SYSTEM (SIZED PER HYDRAULIC CALCULATIONS) COMBINED WITH WET-STANDPIPE SYSTEM

(STAGE AREA ONLY) TO SERVE BUILDING.

2. ONLY SPRINKLER PIPING SERVING ROOM'S SPRINKLER(S) SHALL BE EXTEND ABOVE THIS ROOM. PIPING

SHALL NOT BE LOCATED DIRECTLY OVER ELECTRICAL EQUIPMENT.

3. HARD CEILING IN THIS LOCATION (GYPSUM BOARD/ PLASTER/ WOOD). REFER TO ARCHITECTURAL

DRAWINGS FOR ADDITIONAL INFORMATION.

4. PROVIDE FACTORY COLORED SPRINKLERS IN LOBBY AND AUDITORIUM (SHOP OR FIELD PAINTING IS NOT PERMITTED.). MATCH ADJACENT PAINTED SURFACES. NON-COLORED SPRINKLERS PERMITTED IN ATTIC, RAFTERS, STAGE, BACK OF HOUSE, MECHANICAL, ELECTRICAL, CRAWLS SPACE AND PROJECTION ROOMS.

5. RE-USE AS MANY EXISTING SPRINKLER LOCATIONS IN AUDITORIUM AND LOBBY AS POSSIBLE. RUN PIPING EXPOSED UTILIZING THE EXISTING ROUTING WHERE POSSIBLE. RE-USE EXISTING FDV STANDPIPE LOCATIONS UNLESS OTHERWISE NOTED.

6. RE-USE EXISTING FDV STANDPIPE LOCATIONS UNLESS OTHERWISE NOTED.

7. ROUTE SPRINKLER PIPE EXPOSED.

8. PROJECTION BOOTH ABOVE. REFER 2/FX102.

SCALE: 1/8" = 1'-0"

CEILING AND CATWALK NEW WORK PLAN

25% SCHEMATIC DESIGN 10/31/2024

75% DESIGN DEVELOPMENT 01/29/2025

95% CONSTRUCTION DOCUMENTS 03/31/2024

100% CONSTRUCTION DOCUMENTS 05/30/2025

25% SCHEMATIC DESIGN 10/31/2024

75% DESIGN DEVELOPMENT 01/29/2025

95% CONSTRUCTION DOCUMENTS 03/31/2024

100% CONSTRUCTION DOCUMENTS 05/30/2025

Sheets
FX102 - BALCONY, SECOND FLOOR AND CEILING NEW WORK PLANS

File details come from the government source that posted it. Updated .