Atch 28 AMEND_3 _ Q10.07_FX101 - BASEMENT -1st FLOOR.pdf
PDF 977 KB Posted
- Solicitation number
- 36C24926R0055
About this file
This document is a set of architectural and mechanical/electrical/plumbing (MEP) construction drawings for the Restoration of Building 35 Theater at James H. Quillen VA Medical Center in Mountain Home, Tennessee. The drawings are designated as 100% Construction Documents dated May 30, 2025, and are prepared by the consulting firm FFF Architects and Heavey Engineering as the Architect/Engineer of Record.
The drawings depict basement and first floor new work plans for a fully sprinklered theater facility. Key fire suppression and mechanical systems shown include: dry-pipe risers serving building sprinklers, wet standpipe risers serving hose stations and fire department connections (FDC), a nitrogen generator with integral air compressor (skid-mounted, PGEN-20 basis of design or equal, 20-gallon capacity, 2 PH 208VAC/3 PH 60Hz and 120VAC/1PH 60Hz electrical requirements), double check detector assemblies, fire service backflow prevention equipment, and coordinated electrical requirements referenced to Division 26. The facility includes auditorium spaces, stage areas, dressing rooms, mechanical/electrical rooms, an IT closet, and support spaces. Architectural details specify firestop materials and methods for penetrations of fire-rated membranes in accordance with Specifications Section 07 84 00. The drawings indicate that all loose components must be installed and that electrical requirements for the nitrogen plant compressor must be coordinated with Division 26 contractors.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B F
P
FS
MECH/ELEC
ROOM
ELECTRICAL
ROOM
MECH/ELEC
ROOM
MECH/ELEC
ROOM
OH
OH
OH
OH
4" UP TO FDC
1 1
UNEXCAVATEDUNEXCAVATED
A
F501
OH
003A
IT CLOSET
NP-1
DPV
F201
DRY-PIPE RISER .
SERVES SPRINKLERS BELOW
CATWALK AND STAIRS.
F201
WET STANDPIPE RISER.
SERVES HOSE STATION
AND FDV'S.
WET STANDPIPE RISER.
SERVES HOSE STATION
AND FDV'S.
S
DRY-PIPE RISER .
SERVES BUILDING SPRINKLERS.
WOMEN'S
MEN'S
BOOTH
101B
BOOTH
101D
STORAGE
CORRIDOR
TOILET
TOILET
DRESSING
ROOM
LOBBY
AUDITORIUM
STAGE
FAMILY TOILET
110A
FAMILY TOILET
111A FDC
OH
OH
OH
OH
1 1
OH
OH
7MECHANICAL
111B
MECHANICAL
110B
ORCHESTRA PIT
CORRIDOR
101C
RELOCATED
SPRINKLER
RISER
STAIRS REMOVED
FOR CLARITY
STAIRS REMOVED
FOR CLARITY
STAIRS REMOVED
FOR CLARITY
JANITOR
DRESSING
ROOM
WET STANDPIPE UP.
SERVES FDV
ABOVE CATWALK.
DRY-PIPE RISER .
DRY-PIPE RISER.
SERVES SECOND FLOOR
BACK OF HOUSE
DRY-PIPE RISER.
SERVES BELOW CATWALK,
AUDITORIUM ATTIC SPACE,
BELOW STAGE ATTIC AND
STAGE ATTIC.
STANDPIPE UP.
SERVES FDV
ABOVE CATWALK
DN
F201
F201
GENERAL NOTES
A. REFER TO SHEET F001 FOR ABBREVIATIONS, LEGEND & DESIGN NOTES.
B. UTILIZE EXISTING SPRINKLER LOCATIONS WHERE POSSIBLE IN AUDITORIUM AND LOBBY CEILINGS.
C. FOLLOW EXISTING EXPOSED BRANCH AND MAIN PIPE ROUTING IN AUDITORIUM AND LOBBY.
D. EXPOSED PIPING SHALL MATCH ADJACENT PAINTED SURFACES.
E. SPRINKLER PIPING TO BE ROUTED IN CEILING WHERE CEILING SPACE ALLOWS. ( ROOMS 110, 110A, 111, 111A,104, 105, 106, 108 & 109.)
F. UTILIZE EXISTING TEST LOCATIONS AND DRAIN ROUTING.
S
FD
S
FLOORNITROGEN PLANT
WITH INTEGRAL COMPRESSOR
COORDINATE ELECTRICAL
REQUIREMENTS WITH DIVISION 26
DRAIN LINE
AUX DRAIN
DRIP CUP ASSEMBLY
ALARM PRESSURE
WATER FLOW SWITCH
DRY PIPE VALVE
ASSEMBLY COMPLETE
WITH ALL ACCESSORIES
ALARM PRESSURE CONDUIT
AND SIGNAL WIRING TO
CENTRAL ALARM PANEL
TO DRY PIPE
SPRINKLER SYSTEM
FROM FIRE MAIN
DISCONNECT AND
STARTER
AIR MAINTENANCE
DEVICE
UTILIZE EXISTING DRAIN
ROUTING.
DISCHARGE
TO FLOOR
DRAIN OR
BASIN
AIR PRESSURE
SUPERVISORY SWITCH
LOW AIR PRESSURE CONDUIT
AND SIGNAL WIRING TO
CENTRAL ALARM PANEL
MOUNT TO
BACK WALL
TO FDC
1. PRE-MANUFACTURED DRUM DRIP ASSEMBLIES MAY BE
USED IN LIEU OF INDIVIDUAL COMPONENTS.
2. FOLLOW EXISTING DRAIN ROUTING.
NOTES
1" VALVE
2x1 CONCENTRIC
REDUCER
2x12" NIPPLE
2x1 CONCENTRIC
REDUCER
1" VALVE
1" PLUG
1" REMOVABLE PIPE
SECTION
1" UNION
END SPRINKLER
LINE
1" PIPING
1" TIE IN DRAIN
CONNECTING
3 LINES TOGETHER
DRAIN TO SUITABLE LOCATION
6" [1 m m
1" [2
5m m
6" [1 m m
INSULATE
PIPE OR DUCT
PIPE SLEEVE
WHERE SPECIFIED
FLOOR
WELD
1/4" [6.4mm]
ANCHOR ROD FOR
NEW CONSTRUCTION
FIRESTOP MATERIAL
3/4" [19mm]
APPROVED FIRESTOP
INSULATION WITH
VAPOR BARRIER
3/4" [19mm] APPROVED
FIRESTOP INSULATION WITH
VAPOR BARRIER 6"
[150mm]
MASONRY
PARTITION INSULATED
PIPE OR
DUCT
6" [150mm]
FIRESTOP
MATERIAL
DRYWALL PARTITION
PARTITION SUPPORT
FLOOR OR DECK PENETRATION
6" [150mm]
6" [150mm]
PARTITION OR CHASE PENETRATION
NOTE:
1. APPLICABLE TO PENETRATIONS OF ALL FIRE RATED MEMBRANES,IN ACCORDANCE WITH NFPA 101.
REFER TO SPECIFICATIONS SECTION 07 84 00, FIRE STOPPING SYSTEMS.
2. REFER TO ARCHITECTURAL DRAWINGS FOR RATED WALLS.
TO DRY-PIPE SYSTEM
PRESSURE GAUGE
DOUBLE CHECK DETECTOR
ASSEMBLY
STRAINER
REDUCER
6"
FLOOR DRAIN
INCREASER
AIRGAP FITTING
FLOOR
6" FIRE SERVICE
FS
SS
P
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT F
OR C
ONSTRUCTIO
N
Date:Revisions:No.
PROJECT NO.
A u to d e s k D o c s /M t H o m e V
A
R e s to ra ti o n o f B
T h e a te r/
-0
-M
E P
-C e n tr a l.
rv t
/2
/2
:0
:3
P
M
FX101
BASEMENT AND FIRST FLOOR
NEW WORK PLANS
05/30/2025 EWL RLC
RESTORATION OF BUILDING 35
HISTORIC THEATER
621-24-103
MT. HOME, TENNESSEE
100% CONSTRUCTION
DOCUMENTS 35
JAMES H.
QUILLEN VA
MEDICAL
CENTER
Approved: VAMC
2024-05141
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT F
OR C
ONSTRUCTIO
N
Date:Revisions:No.
PROJECT NO.
A u to d e s k D o c s /M t H o m e V
A
R e s to ra ti o n o f B
T h e a te r/
-0
-M
E P
-C e n tr a l.
rv t
/2
/2
:0
:3
P
M
FX101
BASEMENT AND FIRST FLOOR
NEW WORK PLANS
05/30/2025 EWL RLC
RESTORATION OF BUILDING 35
HISTORIC THEATER
621-24-103
MT. HOME, TENNESSEE
100% CONSTRUCTION
DOCUMENTS 35
JAMES H.
QUILLEN VA
MEDICAL
CENTER
Approved: VAMC
2024-05141
PLAN
NORTH
SCALE: 1/8" = 1'-0"
BASEMENT FLOOR PLAN
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN
PLAN NOTES
1. PROVIDE NEW DRY-PIPE SPRINKLER SYSTEM (SIZED PER HYDRAULIC CALCULATIONS) COMBINED WITH WET-STANDPIPE SYSTEM
(STAGE AREA ONLY) TO SERVE BUILDING.
2. DRY-PIPE SPRINKLER SYSTEM WITH NITROGEN GENERATOR PLANT. NITROGEN PLANT SHALL COMPLY WITH NFPA STANDARDS AND BE INSTALLED PER MANUFACTURER'S INSTALLATION REQUIREMENTS. WATER TO REACH MOST REMOTE
SPRINKLER WITH-IN 30 SECONDS.
3. PROVIDE DOUBLE CHECK DETECTOR ASSEMBLY ON FIRE SERVICE.
4. ONLY SPRINKLER PIPING SERVING ROOM'S SPRINKLER(S) SHALL BE EXTEND ABOVE THIS ROOM. PIPING SHALL NOT BE LOCATED
DIRECTLY OVER ELECTRICAL EQUIPMENT.
5. PROVIDE NEW FIRE DEPARTMENT CONNECTION.
6. UNEXCAVATED SPACE - SPRINKLERS NOT REQUIRED.
7. HARD CEILING IN THIS LOCATION (GYPSUM BOARD/ PLASTER/ WOOD). REFER TO ARCHITECTURAL DRAWINGS FOR
ADDITIONAL INFORMATION.
8. PROVIDE SEMI-RECESSED SPRINKLERS IN LOBBY RESTROOMS (110, 110A, 111 & 111A)
9. PROVIDE FACTORY COLORED SPRINKLERS IN LOBBY AND AUDITORIUM (SHOP OR FIELD PAINTING IS NOT PERMITTED.). MATCH ADJACENT PAINTED SURFACES. NON-COLORED SPRINKLERS PERMITTED IN ATTIC, RAFTERS, STAGE, BACK-OF-HOUSE, MECHANICAL, ELECTRICAL AND PROJECTION ROOMS.
10. RE-USE EXISTING HOSE STATION/ FDV STANDPIPES AND FIRE RISER LOCATIONS UNLESS OTHERWISE NOTED.
11. ROUTE SPRINKLER PIPING IN CEILING AS SPACE ALLOWS.
12. EXTEND WET-PIPE BRANCHES TO HOSE STATION/ FDV RISERS. SIZED PER HYDRAULIC CALCULATIONS. AREA IS HEAVILY CONGESTED
WITH MECHANICAL EQUIPMENT.
13. DRY-PIPE SYSTEM RISER TO SERVE STAIRS AND BELOW CATWALK. AREA IS HEAVILY CONGESTED WITH MECHANICAL EQUIPMENT.
14. PROVIDE 1.5" HOSE CABINET, 100 FT OF HOSE WITH ADJUSTABLE NOZZLE.
25% SCHEMATIC DESIGN 10/31/2024
75% DESIGN DEVELOPMENT 01/29/2025
95% CONSTRUCTION DOCUMENTS 03/31/2024
100% CONSTRUCTION DOCUMENTS 05/30/2025
25% SCHEMATIC DESIGN 10/31/2024
75% DESIGN DEVELOPMENT 01/29/2025
95% CONSTRUCTION DOCUMENTS 03/31/2024
100% CONSTRUCTION DOCUMENTS 05/30/2025
NTS
A
DRY PIPE VALVE ASSEMBLY WITH NITROGEN PLANT - SCHEMATIC
GENERAL NOTES:
A. INSTALL ALL "LOOSE" COMPONENTS.
FIRE SUPPRESSION EQUIPMENT
MARK DESCRIPTION C
A
P A
C
IT
Y
HP
ELECTRICAL
(VOLTAGE -
PHASE)
WATER
CONNECTIONS
APPROX.
DIMENSIONS
S E
E N
O T
E
IN OUT W
ID
T H
D
IA
L E
N G
T H
H E
IG
H
T
NP-1 NITROGEN GENERATOR W/ AIR
COMPRESSOR, SKID MOUNTED. BASIS OF
DESIGN: PGEN-20 OR EQUAL (208VAC)
GALLON
2 PH 208VAC/3 PH, 60Hz
& 120VAC/ 1PH,
60Hz
- - 32" 40" 57"
NTS
B
DRUM DRIP DRAIN ASSEMBLY
NTS
D
PIPE/ DUCT PENETRATION OF SMOKE/ FIRE BARRIERS
NTS
C
FIRE SERVICE BACKFLOW PREVENTION - SCHEMATIC
| Sheets |
| FX101 - BASEMENT AND FIRST FLOOR NEW WORK PLANS |
File details come from the government source that posted it. Updated .