This is a template for AF Form 3064 and Form 66, which are Air Force progress schedule and contract material submittal forms used for construction project tracking and documentation.

The template includes two primary sections: AF Form 3064 for contract progress scheduling, containing fields for contract number (FA441725F0267), project title (Replace 25 IS HVAC), starting and completion dates, purchase requisition number, project number, and actual start/completion dates. The form includes line items for work elements with columns for tracking percentages and weekly/cumulative progress totals across multiple time periods. The second section is Form 66, a Schedule of Material Submittals form, which documents required submittals for project CP 1026752 (Repair Command Post Bldg 90208, Contract FA441720C0002). This form tracks various submittal types including shop drawings, manufacturer's data, samples, certifications, performance test reports, delivery tickets, warranties, O&M manuals, installation procedures, and schedules/plans. The form includes columns for line item descriptions, submittal types, date received, approval status (approved/disapproved), contractor resubmittal requirements, and remarks. Line items listed cover standard construction elements such as backfill, aggregate base course, Portland cement base, asphaltic concrete paving, site water lines, sodding, landscape planting, concrete work, and expansion joints. The template is designed for use by project engineers and contract administrators to monitor contractor progress and material submissions throughout a construction project lifecycle.

View the file

Other versions and copies of AF Form 3064

File Revision Posted Attached to
Attachment C - AF Form 3064.xlsx Revision not stated Airfield Blast Shield
AF Form 3064.xlsx Revision not stated Demo B5276 & B8129 Amendment 0001
Attachment F BLANK SAMPLE AF Form 3064.xlsx Revision not stated Robins AFB Paving Multi-Award IDIQ
SOW App 002 AF IMT 3064 Progress Schedule.pdf Revision not stated Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
FNWZ 17-0021A - Att E - AF Form 3064.xlsx Revision not stated Demo B6142
FNWZ 21-0071 - Att E - AF Form 3064.xlsx Revision not stated Demo B6119
Attachment 16 - AF FORM 3064 Contract Progress Schedule.xlsx Revision not stated SABER IDIQ - Dover AFB
SOW Attach 9 - AF Form 3064 PSFB.xlsx Revision not stated Peterson SFB Bldg 3 Soil Erosion Repair
Attachment 3_AF IMT 3064_2003091_VI_Progress Schedule.pdf Revision not stated Hazardous Materials Abatement Contract - IDIQ
Attachment 9 - BLANK SAMPLE AF Form 3064.xlsx Revision not stated Dismantling of Modular Facility & Storage Racks
Attachment 2.7 - AF Form 3064 Schedule Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 12 - AF Form 3064 Contract Progress Schedule - Sample.xlsx Revision not stated Civil Works IDIQ 2024 - Hurlburt Field, FL
Attachment 12 - Af Form 3064 Contract Progress Schedule-Sample.xlsx Revision not stated Civil Works IDIQ 2024 - Hurlburt Field, FL
Attah 15 - AF Form 3064.xlsx Revision not stated SABER IDIQ - Hurlburt Field FL
ATCH L4 - Contract Progress Schedule_AF Form 3064 - Fillable.xlsx Revision not stated ADDITION TO CDC WEST BLDG 90306, CP1024656
Attachment 1k Mini-MACC SOW AF IMT 3064 Progress Schedule.pdf Revision not stated JBER Mini-MACC
BLANK SAMPLE AF Form 3064.xlsx Revision not stated Civil Engineering Multiple Award Construction Contract III, IDIQ
Atch BLANK SAMPLE AF Form 3064.xlsx Revision not stated Design/Build ANG ACS Weapons Facility
17. AF Form 3064 Contract Progress Schedule (3 pages) - EXAMPLE.pdf Revision not stated Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Attachment 07 - AF Form 3064.pdf Revision not stated Construct/Repair LOX Canopies
Show all 20

Who attaches AF Form 3064

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form Approved
OMB No. 0704-0188
Public reporting for the collection of informationis estimated to average 15 minutes per response, inlcuding the time for reviewing instructions, searching exisiting data sources, gathering the data, completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of the collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services. Directorate for Information, Operations and Reports, 1215 Jefferson Davis Highway Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget Paperwork Reduction Project 0704-0188, Washington, DC 20503. Please DO NOT RETURN your (form questionnaire) to either of these addresses. Send your completed (form questionnaire) to: SAF AQCO Washington, DC 20330-1000.
1. Contract No.:8. Project Title10. Approval Recommended by:
FA441725F0267Replace 25 IS HVAC
2. Starting Date:
3. Completion Date:9. Submitted by:11. Approved By:
4. Purchase Req No.:Date SignedContractor's SignatureDate SignedContracting Officer's Signature
5. Project No.:
6. Actual Starting Date:
7. Actual Completion Date:
Line No.Work Elements%
ABC
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Item Totals0%
Weeky Total- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Cumulative Total- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Line No.Work Elements%
ABC
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Weeky Total- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Cumulative Total- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0

CONTRACT PROGRESS SCHEDULE

Form 66

PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT #
SCHEDULE OF MATERIAL SUBMITTALSCP 1026752Repair Command Post Bldg 90208FA441720C0002
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALSHOP DRAWINGSMANUFACTURER'S DATASAMPLESCERTIFICATE/CERTIFICATIONPERF. TEST REPORTSSAMPLE FOR TESTINGDELIVERY TICKETSWARRANTY FORM/FORMSMIX DESIGNINSTALLATION PROCEDURESEXTRA STOCKO & M MANUAL & LEGAL REQ'SSCHEDULES & PLANSMANF. / INSTALLER QUAL.DATE RECEIVEDDATE TO CIVIL ENGINEERINGSUBMITTAL NUMBERAPPROVEDDISAPPROVEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
01010 DD Form 1354
01010 Photos1 digital copy on CD
01010 AF Form 3064 Schedule
01540 Green Procurement44444
01560 Environment Protection44444
01570 Traffic Regulation44
01700 Contract Closeout4
02223 Backfill14
02231 Aggregate Base Course144
02238 Portland Cement Base1444
02510 Asphaltic Conc Paving444
02667 Site Water Lines441
02938 Sodding1444
02950 Landscape Planting444
03100 Concrete Formwork4
03200 Concrete Reinforcement44
03251 Expansion Joints14
03300 Concrete444
03370 Concrete Curing44