Attachment C - AF Form 3064.xlsx
XLSX spreadsheet 36 KB Posted
- Attached to
- Airfield Blast Shield
- Solicitation number
- FA466126R0008
About this file
This file is an Excel spreadsheet attachment (AF Form 3064) related to an Airfield Blast Shield solicitation. The document serves as a supporting attachment to solicitation FA466126R0008 issued by the Department of the Air Force Global Strike Command for the fabrication and erection of new Blast Deflector Fences for B1-B Bombers.
The project requires contractors to provide all plant, labor, equipment, materials, and services necessary to fabricate and install curved, non-perforated, galvanized, corrugated blast deflector fences with horizontal corrugations. The standard specification is the Lynnco Type GS-20-2 manufactured by Blast Deflectors, Inc, though alternate types may be considered with Contracting Officer approval. The blast fence must withstand the afterburner throttle at 30,000 lbs thrust from a B1-B Bomber engine nozzle positioned 90 feet from the deflector foundation, with extrapolated temperatures of approximately 1400 degrees and velocity at 900 MPH. All work must comply with the International Building Code, National Fire Codes, Unified Facilities Criteria, Engineering Technical Letters, and applicable Federal, State, and local regulations. Contractors must use the approved haul route (Tye Gate, Third Street, Ave E, Second Street, to Flightline) and store all equipment and materials within a designated laydown yard, which must be maintained with fencing and restored to pre-construction conditions upon project completion. The contractor must have demonstrable blast fence installation experience.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF3064 Front
| CONTRACT PROGRESS SCHEDULE | Form Approved | |||||||||||||||||||||||||||||||||
| (See Contractor's Instructions on Reverse) | OMB NO. 0704-0188 | |||||||||||||||||||||||||||||||||
| Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering maintaining the data needed, and completing and reviewing | ||||||||||||||||||||||||||||||||||
| the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department Defense of Washington Headquarters Services, Directorate for information | ||||||||||||||||||||||||||||||||||
| Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project 0704-0188. Washington DC 20503. Please DO NOT RETURN your (form questionnaire) to | ||||||||||||||||||||||||||||||||||
| either of these addresses. Send your completed (form questionnaire) to: SAF AQCO. Washington DC 20330-1000. | ||||||||||||||||||||||||||||||||||
| 1. CONTRACT NO. | 8. PROJECT TITLE | 10. APPROVAL RECOMMENDED BY: | ||||||||||||||||||||||||||||||||
| SOUTH APRON BLAST SHIELDS | DATE SIGNED | INSTALLATIONS ENGINEERS'S SIGNATURE | ||||||||||||||||||||||||||||||||
| 2. STARTING DATE | 6/1/20XX | |||||||||||||||||||||||||||||||||
| 3. COMPLETION DATE | 1/1/202x | 9. SUBMITTED BY: | enter here | |||||||||||||||||||||||||||||||
| 4. PURCHASE REQUEST NO. | n/a | DATE SIGNED | CONTRACTOR'S NAME (Last, First, Middle Initial) ADDRESS | CONTRACTOR'S SIGNATURE | 11. APPROVED BY: | |||||||||||||||||||||||||||||
| 5. PROJECT NO. FNWZ: | FNWZ 25-0166 | (Street, City, State, Zip Code) | DATE SIGNED | CONTRACTING OFFICER'S SIGNATURE | ||||||||||||||||||||||||||||||
| 6. ACTUAL STARTING DATE | ||||||||||||||||||||||||||||||||||
| 7. ACTUAL COMPLETION DATE | ||||||||||||||||||||||||||||||||||
| 2025 | 2026 | 2026 | 2026 | |||||||||||||||||||||||||||||||
| LINE NO. | WORK ELEMENTS | % Total | Oct 1-15 | Oct 16-30 | Nov 1-15 | Nov 16-31 | Dec 1-15 | Dec 16-31 | Jan 1-15 | Jan 16-30 | Feb 1-15 | Feb 16-31 | Mar 1-15 | Mar 16-30 | Apr 1-15 | Apr 16-31 | May 1-15 | May 16-31 | Jun 1-15 | Jun 16-28 | Jul 1-15 | Jul 16-31 | Aug 1-15 | Aug 16-30 | Sep 1-15 | Sept 16-30 | Oct 1-15 | Oct 16-31 | Nov 1-15 | Nov 15-30 | Dec 1-15 | line % | ||
| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | AA | AB | AC | AD | AE | AF | AG | ||
| 1 | Bonds | 1.00% | 0.83% | 0.83% |
2 Mobilization 1.00% 1.00% 1.00%
3 Design Submittals & Documents 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 5.00%
4 Construction Submittals 1.00% 0.00%
5 Demolition 1.00% 0.00%
6 Concrete Foundations & Slabs 1.00% 0.00%
7 Wall Framing 1.00% 0.00%
8 Wall Penetrations & Repair 1.00% 0.00%
9 Doors & Frames 1.00% 0.00%
10 Windows 1.00% 0.00%
11 Interior Framing & Sheathing 1.00% 0.00%
12 Electrical Rough-In 1.00% 0.00%
13 Fire Alarm / MNS Rough-In 1.00% 0.00%
14 Plumbing Rough-In 1.00% 0.00%
15 HVAC Equipment 1.00% 0.00%
16 HVAC Rough-In 1.00% 0.00%
17 Fire Suppression Rough-In 1.00% 0.00%
18 Exterior Concrete 1.00% 0.00%
19 Wall Insulation 1.00% 0.00%
20 Wall Sheathing 1.00% 0.00%
21 Tape, Float, Texture, & Paint 1.00% 0.00%
22 Ceramic & Porcelain Tile 1.00% 0.00%
23 Cabinets & Solid Surface 1.00% 0.00%
24 Electrical Fixtures 1.00% 0.00%
25 Plumbing Fixtures 1.00% 0.00%
26 Restroom / Toilet Accessories 1.00% 0.00%
27 HVAC Start-Up 1.00% 0.00%
28 Fire Alarm / MNS Testing 1.00% 0.00%
29 Fire Suppression Finishout 1.00% 0.00%
30 Interior & Exterior Signage 1.00% 0.00%
31 HVAC Commissioning (FIXED AMOUNT) 1.50% 0.00%
32 Contractor Punchlist 1.00% 0.00%
33 O&M, As-Builts, & Closeout (FIXED AMOUNT) 1.50% 0.00%
| Column Total | 34.00% | 6.83% | Column Total | |||||||||||||||||||||||
| PROJECT TOTAL | 0.83% | 2.00% | 1.00% | 1.00% | 1.00% | 1.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 6.83% | Row Total | ||
| AF Form 3064, JUN 90 PREVIOUS EDITION IS OBSOLETE |
AF3064 Back
| INSTRUCTIONS TO CONTRACTORS | |
| 1. Prepare three copies of AF Form 3064, in accordance with these instructions and submit to the contracting officer at the time stated in the contract or as established | |
| by the contracting officer. |
2. Blocks 1,2, and 3. Enter the contract number, starting date, and completion date as shown on the contract.
3. Block 8. Enter the title of the project as shown on the contract.
| 4. Block 9. Enter the name and address of your firm. The three copies submitted to the contracting officer must be dated and signed by the contractor or an authorized |
| representative of the firm. |
| 5. Lines 1 through 15. Major elements of work (whether unit price or lump sum contract) such as excavation, concrete work, carpentry, engineering, installation of |
| communication electronic facilities, etc., will be shown in Column B in logical sequence and in sufficient detail to identify the element. If the contract |
| calls for more than 14 work elements, additional copies of the AF Form 3064 may be used as a continuation for the work elements. |
| 6. The percentage of each listed work element to the complete job will be shown opposite each element in Column C. As an example, if 3 work elements are shown: |
| excavation, concrete work, and backfill, and it is estimated that excavation is 50% of the total job, concrete 30%, and backfill 20%, these percentages will be shown |
| opposite each element. The total must equal 100%. |
| 7. Columns D through P will be used to show planned periodic progress, as required by the contracting officer, during the period of the contract. Only the top half of the |
| space under these columns will be used by contractors. Using the example cited above and assuming that the contract period for performance is 8 weeks, and it |
| is planned to accomplish 10% of the excavation work the 1st week and 45% each week until excavation is complete, 10 would be shown in the upper half of Line 1 |
| under Column D, 45 under Column E and 45 under Column F for a total of 100%. If it is planned to accomplish the concrete work during the 4th, 5th, and 6th weeks |
| in equal amounts, 33,33, and 34 would be enteredd under columns G, H, and I on Line 2. Assuming the backfill will be accomplished during the 7th and 8th weeks, 50 would |
| be entered under Columns J and K on Line 3. If the contract extends beyond 14 weeks, additional copies of AF Form 3064 may be used as a continuation of performance record. |
| 8. Total amount or work planned at intervals as shown in Columns D through Q will be totaled and entered in the top half of the space under the appropriate column of line 15. |
| Again, using the example cited above, the totals under Column D through K would read 10, 20, 20, 10, 10, 10, 10, 10, for a total of 100%. These totals will be |
| used to plot an overlay graph using Lines 4 through 11, beginning with Column D and extending to the right the number of columns (weeks) authorized by the contract |
| for performance time. |
| 9. In the event the contract is modified by the contracting officer under terms of the contract, changing the progress of work as originally scheduled, adding or deleting |
| work or changing the original completion date, a revised progress schedule will be prepared and submitted to the contracting officer for approval. In preparing the revised |
| schedule, the amount of work completed will be considered, together with the changed new completion date set forth in the contract modification. Considering these |
| factors, the work under the contract will be rescheduled over the new total performance time in the same manner that the original schedule was prepared. |
| The new completion date will be entered in Block 3. "First Revised Schedule," "Second Revised Schedule," etc., will be entered to the left of the form title. |
| Time of submission of the revised schedule will be determined by the contracting officer. |
| 10. At such intervals as may be established by the contracting officer, the contractor will submit to the contracting officer AF Form 3065 "Contract Progress Report," |
| indicating the percentage of work accomplished for each work element during the established reporting period. Accurate reports are of the utmost importance to the |
| contractor and th the Government, since the percentage of completion, or progress, thus reported is used in administration of the contract and maybe used in connection |
| with approval of partial payments under the contract. Care should be taken to plan the work in such manner that it can be accomplished as stated in this schedule. If for |
| any reason it becomes known that any part of the progess under this contract will be delayed, this fact should be reported to the contracting officer immediately. |
AF FORM 3064, JUN 90 (REVERSE)