This document is a Schedule of Items for a federal construction contract for the Buck Hall Recreation Area Renovations project managed by the USFS Southern Region for the Francis Marion and Sumter National Forests.
The base bid encompasses comprehensive renovation work organized into 17 sections: General Conditions (mobilization, supervision, bonds, and insurance); Reach 1 Rock Revetment (1,350 linear feet of bulkhead demolition and rock revetment construction); Reach 2 Boat Launch Improvements and Floating Dock Repairs (concrete repair, pile replacement, and dock repair); Reach 3 Bulkhead (155 linear feet of demolition and new construction); Boat Launch Circulation and Parking Improvements (5,500 square yards of asphalt pavement, striping, wheel stops, dumpster pad, and information kiosk); Storm Drainage (various pipe installations totaling 1,214 linear feet, weir structures, and sediment basin construction); and Campground Loop A Improvements (grading, asphalt demolition and paving, seeding, RV sites, primitive sites, site furnishings, concrete sidewalks, utilities, and electrical pedestals). Additional base sections include Water System Improvement (wells, pumps, and 5,930 linear feet of waterlines), Wastewater System (lift station, septic tanks, and distribution systems), Electrical Utilities Replacement, Fill and Dump Station, Signage, Landscape (native plantings and seed mix), and Erosion Control (silt fence, tree protection fencing, seeding, inlet protection, and turbidity curtain). The optional bid items comprise five additional project elements: Reach 4 Rock Revetment, Fishing Pier Improvements, Kayak Launch, Day Use Area, Fishing Pier Extension, Overflow Parking Lot Improvement, and five building structures (Well House, Bath House, Dump Station Well House, Storage Building, Toilet Building, and Picnic Shelter). Pricing terms use unit prices for actual quantity items, designed quantity items, and lump sum quantities across various measurement units including linear feet, square yards, each, acres, and lump sums.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No. Description Method of Measure
Unit Quantity Unit Price TOTAL
1.00
1.01 Mobilization/Demobilization LSQ LS 1
1.02 Supervision and Management DQ MOS 18
1.03 Site Office DQ MOS 18
1.04 Bonds and Insurance LSQ LS 1
2.00
2.01 Partial Bulkhead Demolition DQ LF 1,350
2.02 Rock Revetment Construction AQ LF 1,350
3.00
3.01 Concrete Repair LSQ LS 1
3.02 Pile Replacement LSQ EA 8
3.03 Floating Dock Repair LSQ LS 1
4.00
4.01 Partial Bulkhead Demolition DQ LF 155
4.02 Bulkhead Construction DQ LF 155
5.00
5.01 Demolition LSQ LS 1
5.02 Asphalt Pavement Heavy AQ SY 5,500
5.03 Striping LSQ LS 1
5.04 Wheel Stops AQ EA 27
5.05 Dumpster Pad and Dumpster LSQ LS 1
5.06 Information Kiosk LSQ EA 1
6.00
6.01 12" RCP AQ LF 270
6.02 12" HDPE (PERF.) AQ LF 704
6.03 12" HDPE AQ LF 41
6.04 15" RCP AQ LF 153
6.05 18" RCP AQ LF 34
6.06 6" HDPE AQ LF 12
6.07 Flared End Section AQ EA 4
6.08 Wier Structure AQ EA 15
6.09 Sediment Basin Construction AQ SY 6,170
7.00
7.01 Selective Tree Clearing AQ EA 65
Reach 1 - Rock Revetment
Reach 2 - Boat Launch Improvements and Floating Dock Repairs
Reach 3 - Bulkhead
Boat Launch Circulation and Parking Improvements
Campground Loop A Improvements
General Conditions
Schedule of Items USFS Southern Region
Francis Marion and Sumter National Forests Buck Hall Recreation Area Renovations
AQ: ACTUAL QUANTITY, DQ: DESIGNED QUANTITY, LSQ: LUMP SUM QUANTITY
Storm Drainage
BASE BID
7.02 Grading DQ AC 8
7.03 Asphalt Demolition DQ SY 7,810
7.04 Existing RV Site Demolition DQ EA 15
7.05 Asphalt Pavement Light AQ SY 8,390
7.06 Striping LSQ LS 1
7.07 Seeding AQ SY 13,890
7.08 RV Sites AQ EA 18
7.09 Primitive Sites AQ EA 7
7.10 Site Furnishings (picnic table) AQ EA 25
7.11 Site Furnishings (fire ring) AQ EA 25
7.12 Conc. Sidewalk AQ SY 1,585
7.13 Hose bibb AQ EA 21
7.14 RV Electrical Pedestals AQ EA 18
7.15 Host Site Sewer Connection (CO) DQ EA 1
7.16 Information Kiosk by Host Site LSQ LS 1
8.00
8.01 Well DQ EA 2
8.02 Pump DQ EA 2
8.03 2" Waterlline AQ LF 3,000
8.04 1" Waterlline AQ LF 1,080
8.05 3/4" Waterlline AQ LF 1,850
9.00
9.01 Lift Station LSQ LS 1
9.02 Septic Tanks LSQ LS 1
9.03 Distribution Boxes LSQ LS 1
9.04 Septic Field LSQ LS 1
9.05 2" Force Main AQ LF 3,304
9.06 4" PVC AQ LF 149
9.07 6" PVC AQ LF 1,826
10.00
10.01 Lump Sum LSQ LS 1
11.00
11.01 Heavy Duty Asphalt AQ SY 1,400
11.02 Dump Station DQ EA 2
11.03 Hose Bibb AQ EA 4
11.04 Wheel Stops AQ EA 12
11.05 Signage LSQ LS 1
11.06 Dumpster Pad and Dumpster LSQ LS 1
12.00
12.01 Lump Sum LSQ LS 1
13.00
13.01 Nyssa sylvatica 'Wildfire' AQ EA 3
13.02 Pinus palustris AQ EA 3
13.03 Quercus bicolor 'JFS-KW12' AQ EA 5
Water System Improvement
Wastewater System
Electrical Utilities Replacement
Fill and Dump Station
Signage
Landscape
13.04 Quercus virginiana AQ EA 4
13.05 Sabal palmetto AQ EA 6
13.06 Serenoa repens AQ EA 26
13.07 Native seed mix DQ SY 5,030
14.00
14.01 Silt fence AQ LF 9,700
14.02 Tree protection fencing AQ LF 8,650
14.03 Construction entrance AQ EA 1
14.04 Temporary seeding AQ SY 37,920
14.05 Permanent seeding AQ SY 37,920
14.06 Inlet protection AQ EA 11
14.07 Sediment tubes AQ EA 17
14.08 Outlet stabilization structure AQ EA 3
14.09 Concrete waste management AQ EA 1
14.10 Turbidity curtain AQ LF 1,900
15.00
15.01 Lump Sum LSQ LS 1
16.00
16.01 Lump Sum LSQ LS 1
17.00
17.01 Lump Sum LSQ LS 1
18.00
18.01 Partial Bulkhead Demolition DQ LF 200
18.02 Erosion Control AQ LF 200
18.03 Rock Revetment Construction AQ LF 200
19.00
19.01 Selective Demolition LSQ LS 1
19.02 Prepare Existing Piles & Install Vinyl Wrap @ Tidal Zone DQ EA 20
19.03 Replacement Cross-Bracing DQ EA 6
19.04 Placement Over-Framing, & Decking AQ SF 925
19.05 Replacement Railings (Standard & ADA Fishing Rails) AQ LF 230
20.00
20.01 Piles AQ EA 10
20.02 Bents, Cross-Bracing, Over-Framing, and Decking AQ SF 460
20.03 Railings (Standard & ADA Fishing Rails) AQ LF 110
20.04 Existing Railing Modification @ Pier Extension Connection LSQ LS 1
21.00
21.01 ADA Gangway LSQ LS 1
21.02 Fixed Access Pier LSQ LS 1
21.03 Floating Dock LSQ LS 1
21.04 Asphalt Paving AQ SY 560
22.00
Erosion Control
TOTAL BASE BID
OPTIONAL BID ITEMS
Building 200 (Loop A Well House)
Building 300 (Loop A Bath House)
Building 700 (Dump Station Well House)
Reach 4 - Rock Revetment
Fishing Pier Improvements
Kayak Launch
Day Use Area
Fishing Pier Extension
22.01 Selective Tree Clearing DQ EA 22
22.02 Concrete Sidewalk AQ SY 1,000
22.03 Striping LSQ LS 1
22.04 Asphalt Paving AQ SY 2,500
22.05 Wheel Stops AQ EA 41
22.06 Site Furnishings (picnic tables at pavilion) AQ EA 6
22.07 Site Furnishings (picnic tables along walking trail) AQ EA 2
22.08 Site Furnishings (grill stations) AQ EA 2
22.09 Information Kiosk LSQ LS 1
23.00
23.01 Gravel Driveway AQ SY 3,350
23.02 Selective Tree Clearing AQ EA 6
24.00
24.01 Lump Sum LSQ LS 1
25.00
25.01 Lump Sum LSQ LS 1
26.00
26.01 Lump Sum LSQ LS 1
27.00
27.01 Lump Sum LSQ LS 1
TOTAL OPTIONAL BID ITEMS
Building 400 (Storage Building)
Telecommunications System
Building 100 (Day Use Toilet Building)
Building 500 (Picnic Shelter)
Overflow Parking Lot Improvement
TOTAL BASE BID + OPTION ITEMS