This document is a Bid Schedule Plan for the Buck Hall Recreation Area Reconstruction project located at 1099 Buck Hall Landing Road, McClellanville, South Carolina 29458, within the Francis Marion National Forest under the U.S. Department of Agriculture Forest Service, Southern Region (R-08). The project, with Task Order Number 12445222F0051, was issued for bid on August 9, 2024, and represents final construction documents prepared by Johnson, Laschober & Associates, P.C. (Architects, Engineers, Landscape Architects).
The project encompasses reconstruction and improvement work across multiple functional areas including a day use area, boat launch circulation and parking improvements, campground loop improvements (Loops A, B, and E), group campground facilities, overflow parking lot improvements, kayak launch facilities, fishing pier, and pedestrian trail improvements along Buck Hall Landing Road. The work is organized into two phases, with Phase 1 covering 15.1 acres of disturbance and Phase 2 (future work) designated for 4.3 acres not to be permitted under this NPDES permit. The site plan indicates multiple building locations (Buildings 100-700) and various reach designations (Reaches 1-4) for linear improvements. The bid schedule color-coding system identifies red as base bid items, green as optional bid items, yellow for campground and utility work, and blue for separate bid items. The project includes utility work coordination with a standard utility warning for underground utilities located from field survey information.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEAN HIGH WATER
ELEV. = 2.1' (NAVD88)
MEAN HIGH WATER
ELEV. = 2.1' (NAVD88)
MEAN HIGH WATER
ELEV. = 2.1' (NAVD88)
MEAN HIGH WATER
ELEV. = 2.1' (NAVD88)
MEAN HIGH WATER
ELEV. = 2.1' (NAVD88)
CO
30' Cam per Trailer
20' Car
20' Boat
30' C amper T railer
20' C ar
20' Boat
30' Cam per Trailer
20' Car
20' Boat
30' Camper Trailer
20' Car
20' Boat
30' Camper Trailer
20' Car
20' Boat
TI
E
D O
W N
LA
N
E
TI
E
D O
W N
LA
N
E
TI
E
D O
W N
LA
N
E
30' Cam per Trailer
20' Car
20' Boat 30' Camper Trailer
20' Car
20' Boat
30' Camper Trailer
20' Car
20' Boat
30' Camper Trailer20' Car 20' Boat
30' C am per Trailer
20' C ar
20' Boat
30' C am per Trailer 20' C ar 20' Boat
30' C am per Trailer 20' C ar 20' Boat
30' Cam per Trailer
20' Car
20' Boat
30' Camper Trailer
20' Car
20' Boat
' C am pe r T rai ler
' C ar
' B oa t
' C am pe r T rai ler
' C ar
' B oa t
' C am pe r T rai ler
' C ar
20' B oat
30' Camper Trailer
20' Car 20' Boat
30' C am per Trailer 20' C ar 20' Boat
30' C am per Trailer 20' C ar 20' Boat
30' Camper Trailer
20' Car
20' Boat
30' Cam per Trailer
20' Car
20' Boat
30' Camper Trailer
20' Car
20' Boat
30' Camper Trailer 20' Car 20' Boat
30' Camper Trailer
20' Car
20' Boat
30' Camper Trailer
20' Car
20' Boat
30' Camper Trailer
20' Car
20' Boat
30' Camper Trailer
20' Car
20' Boat
' C am pe r T ra ile r
' C ar
' B oa t
' C am pe r T ra ile r
' C ar
' B oa t
' C am pe r T ra ile r
' C ar
' B oa t
30' Camper Trailer 20' Car 20' Boat
30' Cam per Trailer
20' Car
20' Boat
30' Camper Trailer
20' Car
20' Boat
W
PHASE 1
PHASE 2 (FUTURE)
LIMITS OF DISTURBANCE
(AREA = 15.1 ACRES)
LIMITS OF DISTURBANCE
(AREA = 15.1 ACRES)
LIMITS OF DISTURBANCE
(AREA = 15.1 ACRES)
LIMITS OF DISTURBANCE
(AREA = 15.1 ACRES)
LIMITS OF DISTURBANCE
(AREA = 15.1 ACRES)
LIMITS OF DISTURBANCE
(AREA = 15.1 ACRES)
FUTURE WORK
LIMITS OF DISTURBANCE
(AREA = 4.3 ACRES)
(NOT TO BE PERMITTED
UNDER THIS NPDES PERMIT)
LIMITS OF DISTURBANCE
(AREA = 15.1 ACRES)
LIMITS OF DISTURBANCE
(AREA = 15.1 ACRES)
LIMITS OF DISTURBANCE
(AREA = 15.1 ACRES)
UNDISTURBED
AREA = 0.06 AC
UNDISTURBED
AREA = 0.13 AC
UNDISTURBED
AREA = 0.62 AC
UNDISTURBED
AREA = 0.62 AC
UNDISTURBED
AREA = 0.47 AC
UNDISTURBED
AREA = 0.14 AC
UNDISTURBED
AREA = 0.02 AC
UNDISTURBED
AREA = 0.10 AC
UNDISTURBED
AREA = 0.12 AC
UNDISTURBED
AREA = 0.10 AC
UNDISTURBED
AREA = 0.06 AC
UNDISTURBED
AREA = 0.06 AC
UNDISTURBED
AREA = 0.07 AC
UNDISTURBED
AREA = 0.05 AC
UNDISTURBED
AREA = 0.06 AC
UNDISTURBED
AREA = 0.13 AC
UNDISTURBED
AREA = 0.11 AC
UNDISTURBED
AREA = 0.06 AC
UNDISTURBED
AREA = 0.05 AC
UNDISTURBED
AREA = 0.07 AC
UNDISTURBED
AREA = 0.07 AC
UNDISTURBED
AREA = 0.10 AC
U N
D
IS
TU
R
BE
D
AR
EA
.0
AC
UNDISTURBED
AREA = 0.01 AC
UNDISTURBED
AREA = 0.41 AC
UNDISTURBED
AREA = 0.68 AC
UNDISTURBED
AREA = 0.05 AC
PHASE 1
PHASE 2 (FUTURE)
REVISION/ISSUE
NO. DATE
United States Department of Agriculture Forest Service
R-08 Southern Region
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
DATE ARCHIVE NUMBER
DESIGNER DRAWING SHEET NO.
DRAWN
CHECKED
PROJECT NO.
3094.2201
08/09/24
BUCK HALL RECREATION
AREA RECONSTRUCTION
FRANCIS MARION
NATIONAL FOREST
1099 BUCK HALL LANDING RD.,
MCCLELLANVILLE, SC, 29458
Project Issue Date: 08/09/2024 Project Status: Final Construction Documents
PREPARED BY:
/30
/20
9:
A M
JN
AN
CE
K
:\3
1\C
IV
IL
\B
ID
S
CH
ED
UL
E
PL
AN
.D W
G;
SHEET OF 137
Task Order Number: 12445222F0051
JOHNSON, LASCHOBER & ASSOCIATES, P.C.
ARCHITECTS ENGINEERS
LANDSCAPE ARCHITECTS
1296 BROAD ST., AUGUSTA, GEORGIA 30901
PHONE: (706) 724-5756 FAX: (706) 724-3955
WEBSITE: www.theJLAgroup.com
ISSUED FOR BID 08/09/24
N
SCALE: 1" = 200'
200' 400'100'200'
BID SCHEDULE
PLAN
UTILITY WARNING:
The underground utilities shown have been located from field survey information and existing drawings. The engineer makes no guarantee that the underground utilities shown comprise all such utilities in the area, either in service or abandoned. The engineer further does not warrant that the underground utilities shown are in the exact location indicated although he does certify that they are located as accurately as possible from information available. The engineer has not physically located the underground utilities.
R
Know what's below.
before you dig.Call
BID SCHEDULE PLAN
CG003
DAY USE AREA
BOAT LAUNCH CIRCULATION AND PARKING IMPROVEMENTS
CAMPGROUND LOOP A IMPROVEMENTS
REACH 4
REACH 3
REACH 2
REACH 1
KAYAK LAUNCH
BLDG. 300
BLDG. 200
BLDG. 100
BLDG. 500
GROUP CAMPGROUND
OVERFLOW PARKING LOT IMPROVEMENT
CAMPGROUND LOOP B
SEPTIC FIELD AND DUMP STATION
US 17 TURN LAND AND BUCK HALL LANDING ROAD ENTRANCE IMPROVEMENTS
BLDG. 600
BLDG. 700
BUCK HALL LANDING ROAD PEDESTRIAN TRAIL
NOTE:
1. THIS SHEET IS FOR INFORMATION PURPOSES ONLY; REFER TO SITE PLANS FOR FURTHER DETAIL
2. NO LIMITS ARE SHOWN FOR UTILITY WORK (REFER TO SITE PLANS)
3. THIS SHEET IS NOT INTENDED AS A PHASING PLAN AND IS FOR BIDDING PURPOSES ONLY
4. COLORS SHOWN BELOW MATCH THE FOLLOWING
4.1. RED (BASE BID)
4.2. GREEN (OPTIONAL BID ITEMS)
4.3. YELLOW (PHASE II)
4.4. BLUE (SEPARATE BID ITEM)
FISHING PIER
BLDG. 400
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
File details come from the government source that posted it. Updated .