A19 - Geotechnical Report.pdf
PDF 5 MB Posted
- Attached to
- GAOA Buck Hall Recreation Phase 1 Renovation
- Solicitation number
- 12445226R0008
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Geotechnical Exploration Report prepared by S&ME, Inc. for the Buck Hall Renovations project in McClellanville, South Carolina. The report documents subsurface conditions at the US Forest Service recreational area through cone penetration testing (CPT), hand-auger borings, Dynamic Cone Penetrometer (DCP) testing, and laboratory analysis conducted between October and December 2023. The exploration included 10 CPT soundings to depths of 20-48 feet, 20 hand-auger borings to 4 feet, 3 DCP tests, pavement coring at 4 locations, seasonal high water table (SHWT) evaluation, and infiltration testing. Laboratory testing included Atterberg limits, fines content analysis, natural moisture content determination, and corrosion potential testing on selected soil samples.
Key subsurface findings indicate topsoil thickness of 2-6 inches, existing asphalt pavement of 3-5 inches, and coastal plain deposits consisting of loose to medium dense sands to approximately 7-10 feet depth, followed by soft to firm clay/silt with interbedded sand lenses to 20-35 feet, and dense to very dense sand to 48 feet. Subsurface water was encountered at 1-4 feet depth, with estimated SHWT at 1.5-2 feet and measured infiltration rates of 0.2-0.6 inches per hour. The report identifies Seismic Site Class F designation due to liquefiable saturated sands to approximately 30 feet depth and recommends shallow spread footings (with liquefaction risk acceptance or mitigation), on-grade floor slabs with subgrade modulus of 180 pci, and specific pavement sections (3 inches asphaltic concrete over 8 inches base for heavy-duty flexible pavements). Recommendations address site preparation, drainage improvements, controlled fill requirements (maximum 15 percent fines), proofrolling procedures, and dewatering specifications for excavations.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Report of Geotechnical Exploration
Buck Hall Renovations
McClellanville, South Carolina
S&ME Project No. 22130193
PREPARED FOR:
Johnson, Laschober & Associates
701 East Bay Street, Suite 411
Charleston, South Carolina 29458
PREPARED BY:
S&ME, Inc.
620 Wando Park Boulevard
Mount Pleasant, South Carolina 29464
January 11, 2024
S&ME, Inc. | 620 Wando Park Boulevard | Mount Pleasant, SC 29464 | p 843.884.0005 | www.smeinc.com
January 11, 2024
Johnson, Laschober & Associates
701 East Bay Street, Suite 411
Charleston, South Carolina 29403
Attention: Mr. Herb Gillam, P.E.
Reference: Report of Geotechnical Exploration
Buck Hall Renovations
McClellanville, South Carolina
S&ME Project No. 22130193
Dear Mr. Gilliam:
We have completed our geotechnical exploration for the referenced project. Our services have been provided pursuant to S&ME Proposal No. 22130193 dated July 14, 2022. The purpose of our geotechnical services was to explore the subsurface conditions at the site, evaluate those conditions, and provide recommendations for site preparation and foundation and pavement support. This report presents our understanding of the project, the site and subsurface conditions encountered, and our conclusions and recommendations.
We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, please contact us.
Sincerely, S&ME, Inc.
Samuel W. Folmar, EIT Austin A. Cox, PE
Staff Professional II Senior Engineer
Senior Reviewed by: Gregory J. Canivan, P.E. – Technical Principal
McClellanville, South Carolina
S&ME Project No. 22130193
January 11, 2024 2
Report at a Glance
Key geotechnical findings based on our current understanding of the proposed project are presented in the table below. These findings are presented as an overview and should not be used in place of the more detailed recommendations presented in the remainder of this report.
Category Key Geotechnical Finding
Subsurface
Conditions
• Existing asphalt pavement thickness ranges from approximately 3 to 5 in.
• Topsoil thickness ranges from approximately 2 to 6 in.
• Natural coastal plain deposits encountered below surficial soils/pavements, with most test locations encountering loose to medium dense sands to depths of approximately 7 to 10 ft, followed by soft to firm clay/silt with interbedded lenses of loose sand to depths or approximately
20 to 35 ft, underlain by dense to very dense sand to the deepest explored depth of 48 ft.
• Subsurface water primarily encountered at depths ranging from 1 to 4 ft.
Site
Development
• While not encountered during the exploration, portions of the site are previously developed, and existing fill or previously disturbed soils and debris may be present.
• Near surface soils primarily consist of relatively clean (i.e., low silt and clay content) sands and silty sands, and significant undercutting or stabilization is not anticipated if moisture is managed.
Excavation
Conditions
• Encountered soils can be excavated using typical earthmoving equipment/techniques.
• Excavations deeper than 1 to 2 ft may encounter subsurface water and unstable excavation bottoms that require stabilization.
Pavements
• Pavements can be supported by existing subgrade soils provided they perform adequately under proofrolling, or on well-compacted imported controlled fill.
SHWT &
Infiltration
• SHWT depth estimated at 1½ to 2 ft below existing ground surface.
• Measured infiltration rates ranged from approximately 0.2 to 0.6 in./hr.
Seismic
Considerations
• Seismic Site Class F
• Saturated sands encountered to depths of approximately 30 ft appear liquefiable, which corresponds to a relatively high liquefaction hazard.
Foundation Type • Shallow spread footings (provided liquefaction risk is accepted or mitigated).
Slab Support • On-grade
January 11, 2024 1
Project Information
We understand renovations are planned for the US Forest Service’s Buck Hall Recreation Area in Charleston
County, South Carolina. Johnson, Laschober & Associates (JLA) is providing project management and design services.
The renovations and improvements planned as part of this project have gone through revisions since our proposal was submitted in July of 2022. The project features identified below and addressed herein are based on our most recent communications, including emails exchanged between Ms. Jillian Ready and Mr. Herb Gilliam of JLA and
Mr. Austin Cox of S&ME between the dates of October 19 and November 8, 2023, and a phone call on October
23, 2023. Included in one of the emails on October 19 was a sketch of the latest site plan that identified the currently proposed structures/features and requested test locations. This sketch is overlaid on our Test Location
Plan (Figure I-1) in Appendix I.
Based on our communication with you and the provided information, we understand the current plans include the following renovations/improvements:
• One new campground loop.
• Vehicular site circulation improvements with signage.
• New restroom, picnic shelter, event lawn, and walking paths in the day-use area.
• New bath houses (Loop A and B).
• New Concessionaire Building.
• New vault restroom building.
• New septic tank cluster.
• Improved overflow parking lot.
• New deceleration lane at the entrance on US-17.
• New kayak launch dock.
• New (replacement) bulkhead near the existing fishing pier located north of the existing boat ramp.
Specific structural information for the planned buildings was not provided at the time of this report, but we assume maximum column and wall loads to be 25 kips and 2 kips/ft, respectively. Grading plans were also not provided, but we assume site grading will require cut and fill heights of no more than 1 ft to reach final grades throughout the site.
Also included in your emails to us was a Septic Tank Plan and Cut Sheet (Sheet S100) that showed the dimensions of the planned septic tanks. We understand each tank will be approximately 6 ft wide, 13 ft long, and 6 ft tall, and weigh approximately 15,000 lb. We assume the tanks will be buried a few feet and bear approximately 7 to 8 ft below finished grade. Also included in this email was a link to a website related to the planned vault restroom building, which provided information on CXT buildings. The website indicated the restroom building will be approximately 15 ft long, 8½ ft wide, and 11½ ft tall, and weight approximately 28,600 lb. The underground vault portion will weigh approximately 17,400 lb, and bear approximately 4½ ft below finished grade.
January 11, 2024 2
One notable change to the project scope is that the existing seawall, which runs the entire length of the park’s waterfront border, was originally planned to be replaced with another wall; however, we now understand most of the existing wall will be replaced with a sloped revetment. As noted above, the only portion of the existing seawall that will be replaced with a new bulkhead is near the existing fixed pier, which is located north of the existing boat ramp.
The project information and assumptions presented herein should be reviewed and confirmed by the appropriate team members. Modifications to our conclusions and recommendations may be required if the actual conditions vary substantially from the project information and assumptions stated herein.
Methods of Exploration
Field Exploration
Our field exploration included a site reconnaissance by a geotechnical professional. Test locations were established in the field by S&ME personnel using a held-held GPS unit and by estimating distances and right angles from existing site features. Approximate test locations are shown on the Test Location Plan (Figure I-1) in
Appendix I.
Our field exploration included the following:
• Ten cone penetration test (CPT) soundings at the proposed structures across the site to depths ranging from approximately 20 to 48 ft below the existing ground surface. Soundings C-1, C-2, and C-3 along the waterfront encountered refusal1 within a very dense sand layer at depths ranging from approximately 37 to 48 ft.
• Kessler dynamic cone penetrometer (DCP) testing was performed at three locations: two within the planned deceleration lane off US17, and one at the Loop B bath house.
• To further evaluate the near surface soil conditions, we performed a 4-ft-deep hand-auger boring adjacent to each CPT sounding and DCP test location, and at seven locations within the parking and drive areas.
• A season-high water table (SHWT) evaluation and infiltration testing was performed at four locations. The
SHWT was evaluated within a 4-ft deep hand-auger boring by noting the depth at which mottling or other hydric soil indicators first occur. Infiltration testing was performed at depths of approximately 2 to 3 ft using a cased bore-hole method, similar to those described in ASTM D6391.
• Existing pavements were cored at four locations to determine the existing asphalt thickness.
• We collected representative soils samples from hand-auger borings performed across the site for laboratory testing.
1 In a CPT sounding, “refusal” occurs when the force required to advance the cone exceeds the maximum reaction force of the rig, or the material is dense enough that further advancement would likely result in damage to the cone. Refusal in a CPT sounding should not be taken as the top of rock as is often the case with a traditional soil test boring drill rig.
January 11, 2024 3
• Following completion of the borings and soundings, we noted the presence of subsurface water, backfilled the boreholes with the auger cuttings, and patched the pavement surface (when applicable).
A more detailed description of our field-testing procedures and the CPT sounding, hand-auger boring, and DCP logs are included in Appendix II.
Notable changes to our field exploration scope presented in our July 2022 proposal include:
• One additional CPT sounding.
• SHWT evaluation and infiltration testing at two additional locations.
• DCP testing at one additional location.
• Nine fewer hand-auger borings in parking and drive areas.
• Exclusion of four bulk soil samples.
Laboratory Testing
After field testing was complete, five soil samples were subjected to index property testing consisting of Atterberg limits, fines content testing (i.e., percent passing the No. 200 sieve), and natural moisture content testing to assist in classifying the soils and to use in concurrence with the infiltration test results. Additionally, two soil samples were subject to a series of corrosion potential testing. Laboratory testing was performed in general accordance with applicable ASTM standards. The index testing was performed by S&ME and the corrosion potential testing was performed by our subcontractor Project X Corrosion Engineering.
A summary of the laboratory testing results as well as the individual data sheets are included in Appendix III.
Details pertaining to the procedures and applicable standards used during our laboratory testing activities are outlined in the Summary of Laboratory Procedures included in Appendix III.
Site and Subsurface Conditions
Site Conditions
The project site is located in the US Forest Service’s Buck Hall Recreational Area in McClellanville, South Carolina.
The site is approximately 250-acres and accessed via Buck Hall Landing Road located to the east of Highway 17.
The site is generally bound by undeveloped wooded areas to the northeast and southwest, Highway 17 to the northwest, and the Atlantic Intracoastal Waterway (ICW) to the southeast.
At the time of exploration, the southeastern portion of the site bordering the ICW was developed with camping areas, parking lots, roads and trails, a boat landing, and docks. A cleared overflow parking area is located northwest of the developed camping area. The remaining areas of the site were primarily undeveloped and wooded with pine trees or wetland areas. A powerline easement transects across the entirety of the site generally in a southeast/northeast direction.
Based on our visual observation, the site is relatively level. Standing water was observed in drainage ditches along
Buck Hall Landing Road. Topographic information was not provided across the entire site; however, the
January 11, 2024 4 bathymetry survey data provided of the ICW indicates the existing ground surface elevation on the land side of the existing bulkhead ranges from approximately +5 to +7 ft (NAVD88). The site gently slopes and drains to the east towards the ICW.
Subsurface Conditions
Details of the subsurface conditions encountered by the soundings and hand auger borings are shown on the logs in Appendix II. The logs represent our interpretation of the subsurface conditions based upon field data.
Stratification lines on the sounding logs represent approximate boundaries between soil behavior types2; however, the actual transition may be gradual. The general subsurface conditions and their pertinent characteristics are discussed in the following paragraphs.
Pavements
The existing pavement was cored at four locations, and the asphalt thickness was determined to generally range from approximately 3 to 5 in. as summarized in Table 1. The asphalt was underlain by aggregate base course at each location.
Table 1 - Asphalt Section
Test Location Asphalt Thickness (in.)
P-1 4
P-2 4
P-3 5
P-4 3
Surficial Soils
Surface materials in the form of topsoil, root mat, and vegetative debris (leaves/pine straw) were encountered across most of the site and generally ranged from approximately 2 to 6 inches thick.
Coastal Plain Soils
Natural coastal plain soils were encountered beneath the surficial soils and pavements. The stratigraphy was relatively consistent in the soundings performed on the southeastern portion of the site (i.e., C-1 through C-9).
These soundings generally encountered loose to medium dense sands and silty sands to depths of approximately
7 to 10 ft, underlain by soft to firm clay and silt with interbedded lenses of loose sand to depths ranging from
2 Soil Behavior Type is calculated based on empirical correlations with tip resistance, sleeve friction, and pore pressure. A CPT may define a soil based on its behavior as one type while its grain size and plasticity, the traditional basis for soil classification, may define it as a different type.
January 11, 2024 5 approximately 20 to 35 ft. The soundings then primarily encountered dense to very dense sand that continued to the deepest explored depth of approximately 48 ft.
Sounding C-10, performed near the septic tank cluster, encountered thicker sand deposits starting at the existing ground surface that were primarily medium dense and extended to the termination depth of 20 ft. Table 2 summarizes the generalized subsurface conditions encountered on the southeastern part of the site, which does not reflect the conditions encountered at sounding C-10 in the upper 20 ft.
Table 2 – Generalized Subsurface Conditions
Approx.
Depth Range
(ft)
Description Comments
0 to ½ Topsoil -
½ to 8 Loose to M. Dense Sand & Silty Sand Saturated sands are liquefiable
8 to 30 Soft to firm Clay & Silt with Lenses of Loose to M.
Dense Sand & Silty Sand
Soft silts/clays are moderately compressible. Sands are liquefiable
30 to 48 Dense to V. Dense Sand
Deepest soundings encountered refusal within this layer
Subsurface Water
Subsurface water was measured upon completion of the soundings at depths ranging from approximately 1 to 4 ft below the existing ground surface. About half of the 4-ft deep hand-auger borings performed across the site encountered subsurface water, which was generally approximately 3 to 4 ft deep. The remaining hand-auger borings did not encounter subsurface water within about 4 ft of the ground surface. Subsurface water levels at the site will fluctuate during the year due to such things as seasonal, climatic, and tidal variations and the construction activity in the area. As discussed in more detail later, we estimated the SHWT depth on the southeastern part of the site to range from aproximately 1½ to 2 ft.
Conclusions and Recommendations
The exploration indicates the site is adaptable for the proposed construction. The proposed structures may be supported on conventional shallow foundations provided our site preparation and controlled fill recommendations are followed and the risks associated with liquefaction3 are accepted or mitigated. The primary geotechnical considerations will be site preparation and subgrade and foundation evaluation during construction.
January 11, 2024 6
The following presents our geotechnical recommendations regarding site grading and structural and pavement support. During review of these recommendations, it should be kept in mind that with any previously developed site, subsurface conditions will vary between our test locations. Unexpected subsurface conditions such as deeper, and/or poorly-compacted fill deposits and buried debris may be encountered. These variable conditions can normally be handled during construction by field engineering.
Drainage Improvements
Prior to mass clearing and grading in the wooded areas, drainage improvements should be made to lower subsurface water levels, and handle rainfall runoff during construction. This will be very important in maintaining stable subgrades during the early stages of site preparation. Site drainage can be established by excavating gravity-drained ditches to divert water flow away from construction areas. Ditches should be excavated as deep as practical and as far ahead of general site work as possible. Existing ditches may be used. If enough fall is not available, ditches should be tied to sumps and pumped. Even during dry weather conditions, ditches and drainage improvements should be in place to handle any heavy rainfall that might occur during construction.
Site Preparation
Site preparation in structure and pavement areas should start with the removal of existing pavements, clearing and grubbing vegetation and roots, stripping organic-laden topsoil, and removal of unsuitable surface materials, large root systems, buried structures, debris, and subsurface utilities to be abandoned. The voids created should be cleaned and backfilled with well-compacted controlled fill. The exploration indicates the organic-laden topsoil thickness ranges from approximately 2 to 6 in. which will vary in unexplored areas.
The initial phases of the site preparation within the wooded areas will disturb the near-surface subgrade soils. The disturbed subgrade should be densified as needed. The exposed subgrade should be evaluated by proofrolling with a heavily loaded, tandem-axle dump truck or similar rubber-tired equipment under the observation of the
Geotechnical Engineer. Proofrolling will expose unstable subgrade areas. Areas that pump or rut excessively should be stabilized in place or undercut and replaced with controlled fill as recommended by the Geotechnical
Engineer. All undercutting should be observed by the Geotechnical Engineer to determine that all unsuitable materials are removed and to prevent removal of suitable materials.
The near-surface soils primarily consist of relatively clean (i.e., low silt and clay content) sands and silty sands , and widespread undercutting and replacement is not anticipated if moisture is controlled. However, while not encountered during our exploration, portions of the site have been previously developed and uncontrolled fill, previously disturbed soils, and/or debris may be present. As such, thorough subgrade evaluations will be important during construction to identify unsuitable subgrade soils, and some undercutting and replacement of existing soils may be required.
The extent and depth of undercutting or stabilization will be dependent on the final grades, the climatic conditions during construction, the aggressiveness of the earthwork schedule, site drainage, and the grading
3 Liquefaction, the loss of a soil’s shear strength due to the increase in porewater pressure resulting from seismic vibrations, is always a potential concern in coastal South Carolina.
January 11, 2024 7 contractor’s means and methods. The stabilization measures used are best determined in the field at the time of construction with joint consultation between the Grading Contractor and the Geotechnical Engineer.
Controlled Fill
Off-site borrow material should be cohesionless soil containing no more than 15% fines (material passing the No.
200 sieve) by weight and having a maximum dry density of at least 100 pcf as determined by a laboratory modified Proctor compaction test (ASTM D 1557). The soil should be relatively free of organics, deleterious matter, and elongated or flat particles susceptible to degradation.
Based on our understanding of the proposed construction, there are no large-scale excavations planned that will result in significant amounts of spoils. Regardless, the hand-auger borings performed across the site primarily encountered silty sand and relatively clean sand to depths of approximately 4 ft, which appear generally suitable for use as controlled fill with moisture adjustment.
All fill should be placed in uniform lifts of 10 in. or less (loose measure) and compacted to at least 95% of the modified Proctor maximum dry density. Fill placement should be observed by a qualified engineering technician working under the direction of the Geotechnical Engineer. In addition to this visual evaluation, the technician should perform a sufficient number of in-place field density tests to confirm the contractor’s equipment and methods are capable of achieving the required degree of compaction.
Excavations and Dewatering
Subsurface water was encountered at a depth of approximately 1 to 4 ft below the existing ground surface, but primarily at depths of 2 ft or greater at most of our test locations. Depending on conditions at the time of construction, excavations within this depth range will likely encounter subsurface water.
If encountered, water levels should be maintained at least 1 ft below excavations to help maintain bottom stability.
Water can probably be controlled at the site by pumping from sumps located within the excavation. The contractor should be responsible for determining groundwater control measures based on the site conditions encountered during construction, and the contractor is responsible for evaluating the effects of lowering groundwater levels.
The exploration indicates that excavations below the existing ground surface will encounter low to moderate consistency soils. These soils can be excavated using typical earthmoving equipment and techniques, and we do not anticipate difficult to excavate materials will be encountered. Excavations below the groundwater table may encounter loose soils and/or unstable excavation bottoms. Unstable bottoms can be stabilized with placement of a non-woven geotextile and/or 12 to 18 in. of crushed stone. This will aid in dewatering and provide a stable working platform and bedding layer.
All excavations should be sloped or shored in accordance with local, state, and federal regulations, including
OSHA (29 CFR Part 1926) excavation trench safety standards. The contractor is solely responsible for site safety.
This information is provided only as a service, and under no circumstances should S&ME be assumed to be responsible for construction site safety.
January 11, 2024 8
Pavement Recommendations
We have evaluated new flexible (asphalt) using the South Carolina Asphalt Pavement Association’s (SCAPA)
Asphalt-Pavement Design Guide for Low-Volume Roads and Parking Lots – Third Edition4 (SCAPA Design Guide) and associated literature. Traffic loading data was not provided. Based on our experience with similar projects, we assume light-duty pavement will be subjected primarily to passenger cars and heavy-duty pavements will be subjected to light truck traffic. We recommend using a rigid pavement section in areas subjected to repeated lateral loading (turning, stopping, starting) and loading areas.
Based on the measured data and our experience with sites that have similar soils, a CBR value of 10% is appropriate for design provided the subgrade is properly prepared and passes proofroll inspection as described above, and any new fill required meets the controlled fill recommendations provided herein. Therefore, we assumed Good subgrade conditions per the SCAPA Design Guide. CBR values should be confirmed during grading by engineering evaluation and field and laboratory testing.
Based on our understanding of the proposed development, we have assumed Class 1 and 2 Traffic Class designations, as defined in the SCAPA Design Guide, for standard and heavy-duty scenarios, respectively. Traffic
Class designations should be confirmed by others. The minimum recommended pavement sections should be reevaluated if the assumed Traffic Class designations are incorrect.
Based on our understanding of the proposed development, our evaluation, and our experience in the Charleston area, the minimum recommended asphalt pavement sections are presented in Table 3.
Table 3 - Minimum Recommended Pavement Sections
Material Flexible Pavement Rigid Pavement
Heavy Duty Standard Duty Heavy Duty Standard Duty
Asphaltic Concrete Surface
Course (SCDOT Type C) 3 in. 2 in. - -
Portland Cement Concrete
(f’c=4000psi)
- - 6 in. 5 in.
Graded Aggregate Base
Course 8 in. 6 in. 6 in. 6 in.
Based on our experience, this should be adequate for the assumed traffic and a typical 15-year pavement life.
Construction traffic has not been included in our analysis, and construction traffic should be restricted from prepared subgrades and new pavements. If pavements must support construction traffic, stage construction or a thicker asphalt section will be required.
4 https://www.scasphalt.org/uploads/5/6/3/8/56382339/scapa_design_guide_3rd_edition__6-30-20_.pdf https://www.scasphalt.org/uploads/5/6/3/8/56382339/scapa_design_guide_3rd_edition__6-30-20_.pdf
January 11, 2024 9
All materials and workmanship should be in accordance with the South Carolina Department of Transportation’s
Standard Specifications for Highway Construction, 2007 Edition.
A stable subgrade is very important to pavement performance. Immediately prior to paving, the subgrade should be proofrolled, and any unstable areas should be repaired. The base course should be compacted to at least 100% of the maximum dry density as determined by SCDOT Test Procedure SC-T-140. In-place field density tests should be performed by a qualified Materials Technician, and the area should be methodically proofrolled under their evaluation to confirm that the base course has been uniformly compacted. The thickness should not be deficient in any area by more than ½ in. The asphalt pavement thickness should not be deficient by more than ¼ in. in any area.
The performance of asphalt and rigid concrete pavements will be dependent upon several factors including subgrade conditions at the time of paving, drainage, and traffic. The geometric design should provide positive drainage for the pavement surface and subgrades.
Pavement design typically has relatively low factors of safety; therefore, it will be very important that the specifications are followed closely during pavement construction. The recommended sections should typically be suitable for a 15-year design life; however, some isolated areas could require repair in a shorter period.
Seasonal-High Water Table and Infiltration Testing
Soil Survey Data
We reviewed the United States Department of Agriculture (USDA) Soil Survey of Charleston County to determine the mapped near-surface soil types at the project site. The USDA Soil Surveys provide helpful information about the near surface soils. The soil survey maps soil within 6 to 7 ft of the ground surface and provides general information. The data is not intended to replace geotechnical evaluations and testing, but it can help identify trends.
Based on the soil survey, the shallow subsurface conditions in the areas where we performed SHWT evaluations and infiltration testing consist of soils from the Chipley loamy fine sand (Cm) series. The relevant survey data for this soil series is presented in Table 4. The USDA Soil Survey is shown on the Soil Survey Map (Figure 2) in
Appendix I.
We emphasize that the soil survey data is qualitative in nature and that the evaluations are based solely on the characteristics of the shallow (<7 ft deep) soil stratigraphy. The soil survey evaluations do not consider deeper soil conditions which can control a structure’s design.
January 11, 2024 10
Table 4 – Summary of USDS Soil Survey Data
SCS Classification
Classification Drainage
Class
SHWT Depth
(ft)
Saturated
Hydraulic
Conductivity
(in./hr)
USCS AASHTO
Chipley loamy fine sand (Cm)
SC-SM, SM,
SW-SM
A-2-4
Moderately-well drained ½ - 3 6 - 20
Seasonal-High Water Table Evaluation
The SHWT evaluation was conducted by advancing a hand auger boring to a depth of 4 ft below the existing ground surface and evaluating the extracted soil for hydromorphic indicators. The hand-auger borings generally encountered relatively clean sands and silty sands. At the time of our SHWT evaluation, subsurface water was encountered at depths ranging from approximately 3 to 3½ ft.
In general, the soils encountered during our exploration appear to be natural and generally consistent with the mapped soil types. The soils encountered in the hand auger borings exhibited signs of mottling at depths as shallow as 1½ to 2 ft. Based on these observations, it is our opinion that the SHWT ranges from approximately
1½ to 2 ft below the existing ground surface at our test locations.
Infiltration Test Results
The bore-hole infiltration testing was performed at depths ranging from approximately 2 to 3 ft below the existing ground surface. The infiltration tests indicate field-measured infiltration rates (km) ranging from approximately 0.2 to 0.6 in/hr. Table 5 summarizes the measured infiltration rates and observed SHWT at each test location. We recommend a factor of safety of 2 be used with field measured infiltration rates.
Table 5 - Infiltration and Test Results
Test
Location
Observed
Subsurface Water
Deptha (ft)
SHWT Deptha
(ft)
Infiltration Test
Deptha Range (ft)
Field Measured
Infiltration Rate, km (in./hr)
I-1 3 2 2½ - 3 0.6
I-2 3 1½ 2 – 2½ 0.5
I-3 3¼ 1½ 2 – 2½ 0.4
I-4 3½ 2 2½ - 3 0.2 a Depth references the depth below the existing ground surface at the time of our 2023 exploration.
Seismic Considerations
Based on the measured CPT data, the subsurface soils appear consistent with the stiff soil designation for determining Seismic Site Class based on Table 20.3-1 in ASCE 7-16. However, before assigning a site class, the
2021 edition of the International Building Code (IBC 2021) requires consideration of liquefiable soils, which could
January 11, 2024 11 result in a Site Class F designation. Based on the measured data and our experience the saturated sands encountered to depths of approximately 30 ft at the site appear liquefiable, which triggers a Seismic Site Class F designation. The CPT data suggests a relatively high liquefaction hazard associated with surface manifestation and possible foundation damage.
Shallow Foundation Recommendations
The proposed structures may be supported on conventional shallow foundations designed for a maximum allowable soil bearing pressure of 2,500 psf, provided our site preparation and fill placement and compaction recommendations are completed as recommended and the risks associated with liquefaction are accepted or mitigated. Foundations should bear at least 12 in. below finished grade, and wall and column footings should be a minimum of 18 and 24 in. wide, respectively.
Our analysis indicates post-construction, static (not seismically-induced) settlement due to the assumed building loads (i.e. 25 kip columns and 2 kips/ft walls) and up to 1 ft of permanent fill will be approximately 1 in. or less.
Differential settlement is typically assumed to be about half of the total settlement. If actual structural loads will be greater than those assumed in this report or more than 1 ft of fill will be required for grading, we should be provided with this information so that we can reevaluate settlement. This is important because higher structural loads or more fill will cause additional settlement.
Based on the provided information, we anticipate the new vault restroom building and septic tanks will bear approximately 7 to 8 ft and 4 to 5 ft below finished grade, respectively. Considering the weight of the structures and the weight of the in-situ soils that will be excavated during installation, we anticipate the net stress change at the bearing depths will be small and that any settlement (if any) will be within an acceptable range.
All foundation excavation bottoms must be evaluated by a representative of the Geotechnical Engineer prior to steel and concrete placement. This evaluation may include probing, hand-auger borings, and dynamic cone penetrometer (DCP) testing, as deemed appropriate. This evaluation will help determine if individual footings are directly underlain by suitable bearing material and is considered part of the geotechnical design. Any loose or soft material should be properly compacted or undercut and replaced with well-compacted controlled fill, crushed aggregate such as No. 57 stone, or crushed concrete meeting SCDOT gradation requirements. If practical, concrete placement should be completed the same day as the footing excavation. Slag is not recommended as backfill due to its potentially expansive nature.
Floor Slabs
Floor slabs may be soil-supported provided our site preparation and fill placement and compaction recommendations are followed. A subgrade modulus (k) of 180 pci is available for design. This recommended modulus is representative of a 30-in. diameter plate load test and is only applicable for light point loads. This modulus must be reduced for wide-area loads.
Based on the results of our exploration, the floor slab will not be subjected to hydrostatic pressure from groundwater. However, water vapor transmission through the slab is still a design consideration. Evaluating the need for and design of a vapor retarder or vapor barrier for moisture control is outside our scope of services and
January 11, 2024 12 should be determined by the project architect/structural engineer based on the planned floor coverings and the corresponding design constraints, as outlined in ACI 302.1R-04 Guide for Concrete Floor and Slab Construction.
Soil Parameters for Bulkhead and Dock Design
Tables 6 and 7 present soil parameters based on the CPT data that can be used to design the new replacement bulkhead and kayak launch dock, respectively. The parameters are based on published correlations and our local experience in similar soils. The soil parameters are representative of those soils encountered in the CPT soundings and no factor of safety or similar reduction in the parameters has been considered.
The new bulkhead will need to resist lateral earth pressures that will be imposed on it. To determine the total lateral pressure, the design should consider the development of hydrostatic pressure behind the retaining structure and lateral earth pressures arising from surcharge loading (i.e., soil surcharge, construction equipment, traffic, etc.) or any slopes above the structure.
Table 6 - Soil Parameters for Bulkhead Design (C-4)
Approx.
Deptha
Interval
(ft)
Approx. El.
Interval
(ft-NAVD88)
Soil Description
Unit
Weight
(pcf)
Undrained
Shear
Strength, Su (psf)
Effective
Friction
Angle, ’
(deg)
Wall
Adhesion
(psf)
Wall
Friction
Angle
(deg)
0 to 8 +6 to -2 Loose to M. Dense
Sand 110 0 34 0 17
8 to 12 -2 to -6 V. Soft to Soft
Clay/Silt 95 400 0 200 0
12 to 22 -6 to -16 Soft to Firm Clay/Silt 100 1,000 0 500 0
22 to 30 -16 to -24 Loose to M. Dense
Sand 110 0 34 0 17
30 to 45 -24 to -39 Dense to V. Dense
Sand 120 0 36 0 18 a Depth references the existing ground surface at the time of our 2023 exploration.
January 11, 2024 13
Table 7 - Soil Parameters for Kayak Launch Dock Design (C-3)
Approx.
Deptha
Interval (ft)
Approx. El.
Interval
(ft-NAVD88)
Soil Description
Unit
Weight
(pcf)
Undrained
Shear
Strength, Su
(psf)
Effective
Friction
Angle, ’
(deg)
0 to 8 +6 to 2 Loose to M. Dense Sand 110 0 34
8 to 12 -2 to -6 V. Soft to Soft Clay/Silt 95 400 0
12 to 22 -6 to -16 Soft to Firm Clay/Silt 100 1,000 0
22 to 25 -16 to -19 Dense to V. Dense Sand 120 0 36
25 to 29 -19 to -23 Firm Clay/Silt 105 1,000 0
29 to 48 -23 to -42 Dense to V. Dense Sand 120 0 36 a Depth references the existing ground surface at the time of our 2023 exploration.
Limitations of Report
This report has been prepared in accordance with generally accepted geotechnical engineering practice for specific application to this project. The conclusions and recommendations contained in this report are based upon applicable standards of our practice in this geographic area at the time this report was prepared. No other representation or warranty either express or implied, is made.
We relied on project information given to us to develop our conclusions and recommendations. If project information described in this report is not accurate, or if it changes during project development, we should be notified of the changes so that we can modify our recommendations based on this additional information if necessary.
Our conclusions and recommendations are based on limited data from a field exploration program. Subsurface conditions can vary widely between explored areas. Some variations may not become evident until construction. If conditions are encountered which appear different than those described in our report, we should be notified. This report should not be construed to represent subsurface conditions for the entire site.
Unless specifically noted otherwise, our field exploration program did not include an assessment of regulatory compliance, environmental conditions or pollutants or presence of any biological materials (mold, fungi, bacteria).
If there is a concern about these items, other studies should be performed. S&ME can provide a proposal and perform these services if requested.
S&ME should be retained to review the final plans and specifications to confirm that earthwork, foundation, and other recommendations are properly interpreted and implemented. The recommendations in this report are contingent on S&ME’s review of final plans and specifications followed by observation and monitoring of earthwork and foundation construction activities.
Appendix I - Figures
Test Location Plan – Figure I‐1
Soil Survey Map – Figure I‐2
SCALE:
DATE:
PROJECT NUMBER:
FIGURE NO.
I‑1 Not to Scale
12/1/23
22130193
Buck Hall Renovations McClellanville,, South Carolina
TEST LOCATION PLAN
NOTE:
This conceptual site plan was provided by Johnson, Laschober & Associates and adapted by S&ME. The test Locations shown are considered approximate. This Test Location Plan is for reference only and should not be used for estimating distances or quantities.
LEGEND:
CPT Sounding / Hand-Auger Boring
Hand-Auger Boring
DCP / Hand-Auger Boring
Infiltration Test / SHWT
Pavement Core
P-1
H-7
D-2
I-1
I-2
I-3
I-4
C-4
C-3
C-2
C-1
C-5
C-6
C-7
C-10
C-8
C-9
H-6
H-5
H-2
H-3
H-4
H-1
P-2
P-3
P-4
D-1
D-3
ACox Polygon Line
ACox Callout Deceleration Lane
ACox Callout Septic Tank Cluster
ACox Callout Loop B Bath house
ACox Callout Concessionaire Building
ACox Callout Vault Toilet Building
ACox Callout Picnic Shelter
ACox Callout Day-Use Restroom
ACox Callout Loop A Bath house
ACox Callout Kayak Launch Dock
ACox Callout Bulkhead
SCALE:
PROJECT NUMBER
FIGURE NO.
I‑2 Not to Scale
DATE:
1/3/2023
23130193
Buck Hall Renovations McClellanville, South Carolina
Soil Survey Map
LEGEND:
CPT Sounding Locations Hand Auger Boring Location
NOTE:
Base map sourced from USDA Natural Conservation Service. This plan is for general reference only and should not be used for estimating distances or quantities
Appendix II – Field Data
CPT Soundings
Hand-Auger Boring Logs
DCP Logs
Test Methods and Procedures
Sands-Clean Sand to Silty Sand
Sands-Clean Sand to Silty Sand
Silt Mixtures-Clay Silt to Silty Clay
Silt Mixtures-Clay Silt to Silty Clay
Sands-Clean Sand to Silty Sand
Gravelly Sand to Sand
Electronic Filename: C-01.DAT
Depth (ft)
Tip Resistance qt
(tsf)
80 160 240 320
Cone Size: 1.75
2.5 ft
SBTFr
MAI = 5
Sleeve Friction fs
(tsf)
1 2 3 4 0 4 8 12 u0
Pore Pressure u2
(tsf)
0 4 8 12
Friction Ratio Rf
2 4 6 8
40.8 ft Maximum Reaction Force
Buck Hall Renovations McClellanville, South Carolina S&ME Project No: 22130193
Total Depth:
Termination Criteria:
Date:
Estimated Water Depth:
Rig/Operator:
Oct. 11, 2022
Skid Steer/MW | TW
C P
T R
E P
O R
T
S T
A N
D A
R D
S
B T
F R
C P
T .G
P J
\ S
M E
.G D
T
/1
6/
Depth (ft)
101 100
Equivalent N60
80604020 qt
(tsf)
Cone Penetration Test
Sounding ID: C-01
Sands-Clean Sand to Silty Sand
Silt Mixtures-Clay Silt to Silty Clay
Silt Mixtures-Clay Silt to Silty Clay
Silt Mixtures-Clay Silt to Silty Clay
Sands-Clean Sand to Silty Sand
Gravelly Sand to Sand
Electronic Filename: C-02.DAT
Depth (ft)
Tip Resistance qt
(tsf)
80 160 240 320
Cone Size: 1.75
1.5 ft
SBTFr
MAI = 5
Sleeve Friction fs
(tsf)
1 2 3 4 0 4 8 12 u0
Pore Pressure u2
(tsf)
0 4 8 12
Friction Ratio Rf
2 4 6 8
37.3 ft Maximum Reaction Force
Buck Hall Renovations McClellanville, South Carolina S&ME Project No: 22130193
Total Depth:
Termination Criteria:
Date:
Estimated Water Depth:
Rig/Operator:
Oct. 11, 2022
Skid Steer/MW | TW
C P
T R
E P
O R
T
S T
A N
D A
R D
S
B T
F R
C P
T .G
P J
\ S
M E
.G D
T
/1
6/
Depth (ft)
101 100
Equivalent N60
80604020 qt
(tsf)
Sounding ID: C-02
Sands-Clean Sand to Silty Sand
Silt Mixtures-Clay Silt to Silty Clay
Silt Mixtures-Clay Silt to Silty Clay
Gravelly Sand to Sand
Gravelly Sand to Sand
Sands-Clean Sand to Silty Sand
Gravelly Sand to Sand
Sands-Clean Sand to Silty Sand
Sands-Clean Sand to Silty Sand
Gravelly Sand to Sand
Electronic Filename: C-03.DAT
Depth (ft)
Tip Resistance qt
(tsf)
80 160 240 320
Cone Size: 1.75 2 ft
SBTFr
MAI = 5
Sleeve Friction fs
(tsf)
1 2 3 4 0 4 8 12 u0
Pore Pressure u2
(tsf)
0 4 8 12
Friction Ratio Rf
2 4 6 8
47.7 ft Maximum Reaction Force
Buck Hall Renovations McClellanville, South Carolina S&ME Project No: 22130193
Total Depth:
Termination Criteria:
Date:
Estimated Water Depth:
Rig/Operator:
Oct. 11, 2022
Skid Steer/MW | TW
C P
T R
E P
O R
T
S T
A N
D A
R D
S
B T
F R
C P
T .G
P J
\ S
M E
.G D
T
/1
6/
Depth (ft)
101 100
Equivalent N60
80604020 qt
(tsf)
Sounding ID: C-03
Silt Mixtures-Clay Silt to Silty Clay
Silt Mixtures-Clay Silt to Silty Clay
Silt Mixtures-Clay Silt to Silty Clay
Sands-Clean Sand to Silty Sand
Sands-Clean Sand to Silty Sand
Sands-Clean Sand to Silty Sand
Electronic Filename: C-04.DAT
Depth (ft)
Tip Resistance qt
(tsf)
80 160 240 320
Cone Size: 1.75 2 ft
SBTFr
MAI = 5
Sleeve Friction fs
(tsf)
1 2 3 4 0 4 8 12 u0
Pore Pressure u2
(tsf)
0 4 8 12
Friction Ratio Rf
2 4 6 8
45.0 ft Target Depth
Buck Hall Renovations McClellanville, South Carolina S&ME Project No: 22130193
Total Depth:
Termination Criteria:
Date:
Estimated Water Depth:
Rig/Operator:
Oct. 11, 2022
Skid Steer/MW | TW
C P
T R
E P
O R
T
S T
A N
D A
R D
S
B T
F R
C P
T .G
P J
\ S
M E
.G D
T
/1
6/
Depth (ft)
101 100
Equivalent N60
80604020 qt
(tsf)
Sounding ID: C-04
Silt Mixtures-Clay Silt to Silty Clay
Silt Mixtures-Clay Silt to Silty Clay
Sand Mixtures-Silty Sand to Sandy Silt
Electronic Filename: C-05.DAT
Depth (ft)
Tip Resistance qt
(tsf)
80 160 240 320
Cone Size: 1.75 3 ft
SBTFr
MAI = 5
Sleeve Friction fs
(tsf)
1 2 3 4 0 4 8 12 u0
Pore Pressure u2
(tsf)
0 4 8 12
Friction Ratio Rf
2 4 6 8
25.1 ft Target Depth
Buck Hall Renovations McClellanville, South Carolina S&ME Project No: 22130193
Total Depth:
Termination Criteria:
Date:
Estimated Water Depth:
Rig/Operator:
Oct. 11, 2022
Skid Steer/MW | TW
C P
T R
E P
O R
T
S T
A N
D A
R D
S
B T
F R
C P
T .G
P J
\ S
M E
.G D
T
/1
6/
Depth (ft)
101 100
Equivalent N60
80604020 qt
(tsf)
Sounding ID: C-05
Gravelly Sand to Sand
Silt Mixtures-Clay Silt to Silty Clay
Silt Mixtures-Clay Silt to Silty Clay
Electronic Filename: C-06.DAT
Depth (ft)
Tip Resistance qt
(tsf)
80 160 240 320
Cone Size: 1.75 2 ft
SBTFr
MAI = 5
Sleeve Friction fs
(tsf)
1 2 3 4 0 4 8 12 u0
Pore Pressure u2
(tsf)
0 4 8 12
Friction Ratio Rf
2 4 6 8
25.1 ft Target Depth
Buck Hall Renovations McClellanville, South Carolina S&ME Project No: 22130193
Total Depth:
Termination Criteria:
Date:
Estimated Water Depth:
Rig/Operator:
Oct. 11, 2022
Skid Steer/MW | TW
C P
T R
E P
O R
T
S T
A N
D A
R D
S
B T
F R
C P
T .G
P J
\ S
M E
.G D
T
/1
6/
Depth (ft)
101 100
Equivalent N60
80604020 qt
(tsf)
Sounding ID: C-06
Silt Mixtures-Clay Silt to Silty Clay
Silt Mixtures-Clay Silt to Silty Clay
Silt Mixtures-Clay Silt to Silty Clay
Clays-Clay to Silty Clay
Electronic Filename: C-07.DAT
Depth (ft)
Tip Resistance qt
(tsf)
80 160 240 320
Cone Size: 1.75
2.5 ft
SBTFr
MAI = 5
Sleeve Friction fs
(tsf)
1 2 3 4 0 4 8 12 u0
Pore Pressure u2
(tsf)
0 4 8 12
Friction Ratio Rf
2 4 6 8
25.0 ft Target Depth
Buck Hall Renovations McClellanville, South Carolina S&ME Project No: 22130193
Total Depth:
Termination Criteria:
Date:
Estimated Water Depth:
Rig/Operator:
Oct. 11, 2022
Skid Steer/MW | TW
C P
T R
E P
O R
T
S T
A N
D A
R D
S
B T
F R
C P
T .G
P J
\ S
M E
.G D
T
/1
6/
Depth (ft)
101 100
Equivalent N60
80604020 qt
(tsf)
Sounding ID: C-07
Sands-Clean Sand to Silty Sand
Gravelly Sand to Sand
Sands-Clean Sand to Silty Sand
Clays-Clay to Silty Clay
Clays-Clay to Silty Clay
Clays-Clay to Silty Clay
Clays-Clay to Silty Clay
Electronic Filename: C-08 (mod).DAT
Depth (ft)
Tip Resistance qt
(tsf) 80 160 240 320
Cone Size: 1.75 4 ft
SBTFr
MAI = 5
Sleeve Friction fs
(tsf) 1 2 3 4 0 4 8 12 u0
Pore Pressure u2
(tsf) 0 4 8 12
Friction Ratio Rf
2 4 6 8
31.0 ft Target Depth
Buck Hall Renovations McClellanville, South Carolina S&ME Project No: 22130193
Total Depth:
Termination Criteria:
Date:
Estimated Water Depth:
Rig/Operator:
Dec. 7, 2023
Skid Steer/BJones | LGreene
C P
T R
E P
O R
T
S T
A N
D A
R D
S
B T
F R
C P
T .G
P J
\ S
M E
.G D
T
1/ 3/
Depth (ft)
101 100
Equivalent N60
80604020 qt
(tsf)
Sounding ID: C-08
Sand
Gravelly Sand to Sand
Clays-Clay to Silty Clay
Clays-Clay to Silty Clay
Sands-Clean Sand to Silty Sand
Clays-Clay to Silty Clay
Clays-Clay to Silty Clay
Electronic Filename: C-09.DAT
Depth (ft)
Tip Resistance qt
(tsf) 80 160 240 320
Cone Size: 1.75 4 ft
SBTFr
MAI = 5
Sleeve Friction fs
(tsf) 1 2 3 4 0 4 8 12 u0
Pore Pressure u2
(tsf) 0 4 8 12
Friction Ratio Rf
2 4 6 8
36.0 ft Target Depth
Buck Hall Renovations McClellanville, South Carolina S&ME Project No: 22130193
Total Depth:
Termination Criteria:
Date:
Estimated Water Depth:
Rig/Operator:
Dec. 7, 2023
Skid Steer/BJones | LGreene
C P
T R
E P
O R
T
S T
A N
D A
R D
S
B T
F R
C P
T .G
P J
\ S
M E
.G D
T
1/ 3/
Depth (ft)
101 100
Equivalent N60
80604020 qt
(tsf)
Sounding ID: C-09
Sand
Gravelly Sand to Sand
Sands-Clean Sand to Silty Sand
Electronic Filename: C-10.DAT
Depth (ft)
Tip Resistance qt
(tsf) 80 160 240 320
Cone Size: 1.75 1 ft
SBTFr
MAI = 5
Sleeve Friction fs
(tsf) 1 2 3 4 0 4 8 12 u0
Pore Pressure u2
(tsf) 0 4 8 12
Friction Ratio Rf
2 4 6 8
20.1 ft Target Depth
Buck Hall Renovations McClellanville, South Carolina S&ME Project No: 22130193
Total Depth:
Termination Criteria:
Date:
Estimated Water Depth:
Rig/Operator:
Dec. 7, 2023
Skid Steer/BJones | LGreene
C P
T R
E P
O R
T
S T
A N
D A
R D
S
B T
F R
C P
T .G
P J
\ S
M E
.G D
T
1/ 3/
Depth (ft)
101 100
Equivalent N60
80604020 qt
(tsf)
Sounding ID: C-10
De pt h (fe et
NOTES
0.2
1.5
4.0
DE
PO
SI
TI
O N
AL
EN
VI
RO
N M
EN
T
Co as ta l P la in
G
RA
PH
IC
SAMPLE NO.
(RECOVERY) MATERIAL DESCRIPTION
TOPSOIL
POORLY GRADED SAND WITH SILT
(SP-SM), orange and tan, Įne to medium grained, moist
POORLY GRADED SAND (SP), tan, Įne to medium grained, moist
Bore Hole terminated at 4.0 feet.
DCP BLOW
COUNTS
EL
EV
AT
IO
N
PROJECT: Buck Hall RenovaƟons McClellanville
S&ME Project No. 22130193
HAND AUGER LOG: C-1
Sheet 1 of 1
DATE: 11/13/2023 ELEVATION:
EQUIPMENT: Hand Auger DATUM: NGVD29
OPERATOR: Samuel Folmar DEPTH: 4.0 Ō
HAMMER TYPE: n/a CLOSURE: Cuƫngs DRILLING METHOD: LOGGED BY: Samuel Folmar
NOTES:
LATITUDE: 33.036742 LONGITUDE: -79.563142
SAMPLING METHOD: PROJECT COORDINATE SYSTEM - NAD 1983 StatePlane South Carolina FIPS 3900 Feet
GROUNDWATER DATE DEPTH
(FT) REMARKS
ATD 11/10/2023 Not encountered
END OF DRILLING
AFTER DRILLING
AFTER DRILLING
GROUNDWATER DEPTHS ARE NOT EXACT AND MAY VARY SUBSTANTIALLY FROM THOSE INDICATED. ATD = AT TIME OF DRILLING LL=Liquid Limit, PL = PlasƟc Limit, NMC = Natural Moisture Content, PPV = Pocket Penetrometer (tsf), PTV = Pocket Torvane (tsf)
% Fines
NMC
PL---LL
20 40 60 80 h (fe et
NOTES
0.3
1.0
4.0
DE
PO
SI
TI
O N
AL
EN
VI
RO
N M
EN
T
Co as ta l P la in
G
RA
PH
IC
SAMPLE NO.
(RECOVERY) MATERIAL DESCRIPTION
TOPSOIL
SILTY SAND (SM), liƩle silt, gray, Įne to medium grained, moist
POORLY GRADED SAND (SP), trace Įnes, tan to orange, Įne to medium grained, moist
Bore Hole terminated at 4.0 feet.
DCP BLOW
COUNTS
EL
EV
AT
IO
N
PROJECT: Buck Hall RenovaƟons McClellanville
S&ME Project No. 22130193
HAND AUGER LOG: C-2
Sheet 1 of 1
DATE: 11/13/2023 ELEVATION:
EQUIPMENT: Hand Auger DATUM: NGVD29
OPERATOR: Samuel Folmar DEPTH: 4.0 Ō
HAMMER TYPE: n/a CLOSURE: Cuƫngs DRILLING METHOD: LOGGED BY: Samuel Folmar
NOTES:
LATITUDE: 33.037525 LONGITUDE: -79.562269
SAMPLING METHOD: PROJECT COORDINATE SYSTEM - NAD 1983 StatePlane South Carolina FIPS 3900 Feet
GROUNDWATER DATE DEPTH
(FT) REMARKS
ATD 11/10/2023 Not encountered
END OF DRILLING
AFTER DRILLING
AFTER DRILLING
GROUNDWATER DEPTHS ARE NOT EXACT AND MAY VARY SUBSTANTIALLY FROM THOSE INDICATED. ATD = AT TIME OF DRILLING LL=Liquid Limit, PL = PlasƟc Limit, NMC = Natural Moisture Content, PPV = Pocket Penetrometer (tsf), PTV = Pocket Torvane (tsf)
% Fines
NMC
h (fe et
NOTES
0.2
1.5
4.0
DE
PO
SI
TI
O N
AL
EN
VI
RO
N M
EN
T
Co as ta l P la in
G
RA
PH
IC
SAMPLE NO.
(RECOVERY) MATERIAL DESCRIPTION
TOPSOIL
SILTY SAND (SM), liƩle silt, tan and brown, Įne to medium grained, moist
POORLY GRADED SAND (SP), trace Įnes, tan to orange brown, Įne to medium grained, moist
Bore Hole terminated at 4.0 feet.
DCP BLOW
COUNTS
EL
EV
AT
IO
N
PROJECT: Buck Hall RenovaƟons McClellanville
S&ME Project No. 22130193
HAND AUGER LOG: C-3
Sheet 1 of 1
DATE: 11/13/2023 ELEVATION:
EQUIPMENT: Hand Auger DATUM: NGVD29
OPERATOR: Samuel Folmar DEPTH: 4.0 Ō
HAMMER TYPE: n/a CLOSURE: Cuƫngs DRILLING METHOD: LOGGED BY: Samuel Folmar
NOTES:
LATITUDE: 33.038202 LONGITUDE: -79.561391
SAMPLING METHOD: PROJECT COORDINATE SYSTEM - NAD 1983 StatePlane South Carolina FIPS 3900 Feet
GROUNDWATER DATE DEPTH
(FT) REMARKS
ATD 11/10/2023 Not encountered
END OF DRILLING
AFTER DRILLING
AFTER DRILLING
GROUNDWATER DEPTHS ARE NOT EXACT AND MAY VARY SUBSTANTIALLY FROM THOSE INDICATED. ATD = AT TIME OF DRILLING LL=Liquid Limit, PL = PlasƟc Limit, NMC = Natural Moisture Content, PPV = Pocket Penetrometer (tsf), PTV = Pocket Torvane (tsf)
% Fines
NMC
h (fe et
NOTES
0.3
2.0
4.0
DE
PO
SI
TI
O N
AL
EN
VI
RO
N M
EN
T
Co as ta l P la in
G
RA
PH
IC
SAMPLE NO.
(RECOVERY)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .