This is a Schedule of Items for a construction project at Buck Hall Recreation Area in the Francis Marion and Sumter National Forests, administered by the USFS Southern Region. The document presents a comprehensive breakdown of base bid and optional bid items organized into 28 major work categories with specific line items, quantities, units of measure, and pricing structure.

The base bid encompasses 17 work categories including mobilization/demobilization, rock revetment construction across multiple reaches, boat launch improvements, bulkhead construction, parking and circulation improvements, storm drainage infrastructure, campground loop improvements, water system installation, wastewater systems, electrical utilities, fill and dump station work, signage, landscape plantings, and erosion control measures. Key base bid items include 1,350 linear feet of rock revetment construction, 5,500 square yards of heavy asphalt pavement, installation of multiple waterline sizes totaling over 6,000 linear feet, and various septic and drainage system components. The eleven optional bid items cover additional enhancements such as reach 6 rock revetment (200 linear feet), fishing pier improvements and extensions, kayak launch facilities, day use area development, overflow parking lot improvements, telecommunications systems, and four building structures (well house, bath house, toilet building, storage building, and picnic shelter). Optional items include selective tree clearing, concrete sidewalks, additional asphalt paving (3,050 square yards combined), and trail extensions. Pricing is structured with unit prices for individual line items and lump sum quantities for complex work packages, allowing for flexible bid evaluation of base work and selected optional enhancements.

View the file

Other files

File Type Posted
A18 - Bathymetric Survey.pdf PDF
A16 - Addendum No. 1.pdf PDF
A21 - CZC Concurrence.pdf PDF
A25 - USACOE Fishing Pier Letter.pdf PDF
A26 - USACOE Shoreline Protection.pdf PDF
Amendment 1 -12445226R0008.pdf PDF
A1 -rev RFP Terms and Conditions.docx DOCX document
A17 - Spec Section 314116.pdf PDF
A19 - Geotechnical Report.pdf PDF
A22 - SCDES NPDES Approval.pdf PDF
A20 - Charleston Co Stormwater Permit.pdf PDF
A23 - SCDES Wastewater Permit.pdf PDF
A24 - SCDES Well Permit.pdf PDF
RFP 12445226R0008 Buck Hall P1.pdf PDF
A13 - Past Performance Questionnaire.docx DOCX document
A1 -RFP Terms and Conditions 12445226R0008.docx DOCX document
A2 - SOW Buck Hall Reno 2.0.docx DOCX document
A12 - WD Building SC20250023 Charleston Cnty.pdf PDF
A3 - SOI Buck Hall Final.pdf PDF
A4 - Specifications Table of Contents.pdf PDF
A6 - Bldg Set pg 1-53 of 53.pdf PDF
A10 - Project Map.pdf PDF
A11 - Appendix A Pics and Illustrations.docx DOCX document
A14 - Experience Questionnaire.pdf PDF
A15 -Bid Schedule Plan.pdf PDF
A5 - Specs Manual 2026.pdf PDF
A7 - Site Set pg. 1-109 of 138.pdf PDF
A8 - Site Set p 110-116 of 138 Onsite WW Design (OSE).pdf PDF
A9 - Site Set pg. 133-138 of 138 Kayak Launch (ATM).pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item No. Description Method of Measure

Unit Quantity Unit Price TOTAL

1.00

1.01 Mobilization/Demobilization LSQ LS 1

2.00

2.01 Partial Bulkhead Demolition DQ LF 1,350

2.02 Rock Revetment Construction AQ LF 1,350

3.00

3.01 Concrete Repair LSQ LS 1

3.02 Pile Replacement LSQ EA 2

3.03 Floating Dock Repair LSQ LS 1

4.00

4.01 Partial Bulkhead Demolition DQ LF 155

4.02 Bulkhead Construction DQ LF 155

5.00

5.01 Demolition LSQ LS 1

5.02 Asphalt Pavement Heavy AQ SY 5,500

5.03 Striping LSQ LS 1

5.04 Wheel Stops AQ EA 27

5.05 Dumpster Pad LSQ LS 1

5.06 Information Kiosk LSQ EA 1

6.00

6.01 12" RCP AQ LF 270

6.02 12" HDPE (PERF.) AQ LF 704

6.03 12" HDPE AQ LF 41

6.04 15" RCP AQ LF 153

6.05 18" RCP AQ LF 34

6.06 6" HDPE AQ LF 12

6.07 Flared End Section AQ EA 4

6.08 Wier Structure AQ EA 15

6.09 Sediment Basin Construction AQ SY 6,170

7.00

7.01 Selective Tree Clearing AQ EA 65

7.02 Grading DQ AC 8

7.03 Asphalt Demolition DQ SY 7,810

Storm Drainage

Schedule of Items USFS Southern Region

Francis Marion and Sumter National Forests Buck Hall Recreation Area Renovations

AQ: ACTUAL QUANTITY, DQ: DESIGNED QUANTITY, LSQ: LUMP SUM QUANTITY

BASE BID

General Conditions

Reach 1 - Rock Revetment

Reach 2 - Boat Launch Improvements and Floating Dock Repairs

Reach 3 - Bulkhead

Boat Launch Circulation and Parking Improvements

Campground Loop A Improvements

7.04 Existing RV Site Demolition DQ EA 15

7.05

Excavation of Unsuitable Material and Replacement with Suitable Fill Material as Needed and Approved by COR

AQ CY 500

7.06 Asphalt Pavement Light AQ SY 8,390

7.07 Striping LSQ LS 1

7.08 Seeding AQ SY 13,890

7.09 RV Sites AQ EA 18

7.10 Primitive Sites AQ EA 7

7.11 Site Furnishings (picnic table) AQ EA 25

7.12 Site Furnishings (fire ring) AQ EA 25

7.13 Conc. Sidewalk AQ SY 1,585

7.14 Hose bibb AQ EA 21

7.15 RV Electrical Pedestals AQ EA 18

7.16 Host Site Sewer Connection (CO) DQ EA 1

7.17 Information Kiosk by Host Site LSQ LS 1

8.00

8.01 Well DQ EA 1

8.02 Pump DQ EA 1

8.03 2" Waterlline AQ LF 3,000

8.04 1" Waterlline AQ LF 1,080

8.05 3/4" Waterlline AQ LF 1,850

9.00

9.01 Lift Station LSQ LS 1

9.02 Septic Tanks LSQ LS 1

9.03 Distribution Boxes LSQ LS 1

9.04 Septic Field LSQ LS 1

9.05 2" Force Main AQ LF 3,304

9.06 4" PVC AQ LF 149

9.07 6" PVC AQ LF 1,826

10.00

10.01 Lump Sum LSQ LS 1

11.00

11.01 Heavy Duty Asphalt AQ SY 1,400

11.02 Dump Station DQ EA 2

11.03 Hose Bibb AQ EA 4

11.04 Wheel Stops AQ EA 12

11.05 Signage LSQ LS 1

11.06 Dumpster Pad LSQ LS 1

Water System Improvement

Wastewater System

Electrical Utilities Replacement

Fill and Dump Station

12.00

12.01 Lump Sum LSQ LS 1

13.00

13.01 Nyssa sylvatica 'Wildfire' AQ EA 3

13.02 Pinus palustris AQ EA 6

13.03 Quercus bicolor 'JFS-KW12' AQ EA 5

13.04 Quercus virginiana AQ EA 4

13.05 Sabal palmetto AQ EA 6

13.06 Serenoa repens AQ EA 26

13.07 Native seed mix DQ SY 5,030

14.00

14.01 Silt fence AQ LF 9,700

14.02 Tree protection fencing AQ LF 8,650

14.03 Construction entrance AQ EA 1

14.04 Temporary seeding AQ SY 37,920

14.05 Permanent seeding AQ SY 37,920

14.06 Inlet protection AQ EA 11

14.07 Sediment tubes AQ EA 17

14.08 Outlet stabilization structure AQ EA 3

14.09 Concrete waste management AQ EA 1

14.10 Turbidity Curtain AQ LF 1,900

15.00

15.01 Lump Sum LSQ LS 1

16.00

16.01 Lump Sum LSQ LS 1

17.00

17.01 Lump Sum LSQ LS 1

18.00

18.01 Partial Bulkhead Demolition DQ LF 200

18.02 Erosion Control AQ LF 200

18.03 Rock Revetment Construction AQ LF 200

19.00

19.01 Selective Demolition LSQ LS 1

19.02 Prepare Existing Piles & Install

Vinyl Wrap @ Tidal Zone DQ EA 20

19.03 Replacement Cross-Bracing DQ EA 6

19.04 Placement Over-Framing, &

Decking AQ SF 925

TOTAL BASE BID

Signage

Landscape

Erosion Control

Building 200 (Loop A Well House)

Building 300 (Loop A Bath House)

Building 700 (Dump Station Well House)

OPTIONAL BID ITEMS

Reach 6 - Rock Revetment

Fishing Pier Improvements

19.05 Replacement Railings (Standard &

ADA Fishing Rails) AQ LF 230

20.00

20.01 Piles AQ EA 10

20.02 Bents, Cross-Bracing, Over-

Framing, and Decking AQ SF 460

20.03 Railings (Standard & ADA Fishing

Rails) AQ LF 110

20.04 Existing Railing Modification @

Pier Extension Connection LSQ LS 1

21.00

21.01 ADA Gangway LSQ LS 1

21.02 Fixed Access Pier LSQ LS 1

21.03 Floating Dock LSQ LS 1

21.04 Asphalt Paving AQ SY 560

22.00

22.01 Selective Tree Clearing DQ EA 22

22.02 Concrete Sidewalk AQ SY 1,000

22.03 Striping LSQ LS 1

22.04 Asphalt Paving AQ SY 2,500

22.05 Wheel Stops AQ EA 41

22.06 Site Furnishings (picnic tables at

pavilion) AQ EA 6

22.07 Site Furnishings (picnic tables

along walking trail) AQ EA 2

22.08 Site Furnishings (grill stations) AQ EA 2

22.09 Information Kiosk LSQ LS 1

23.00

23.01 Gravel Driveway AQ SY 3,350

23.02 Selective Tree Clearing AQ EA 6

24.00

24.01 Lump Sum LSQ LS 1

25.00

25.01 Lump Sum LSQ LS 1

26.00

26.01 Lump Sum LSQ LS 1

27.00

27.01 Lump Sum LSQ LS 1

28.00

28.01 Selective Vegetation Removal DQ SF 3,000

28.02 Concrete Sidewalk DQ SF 1,100

TOTAL BASE BID + OPTIONAL BID ITEMS:

TOTAL OPTIONAL BID ITEMS:

Fishing Pier Extension

Kayak Launch

Day Use Area

Overflow Parking Lot Improvement

Telecommunications System

Building 100 (Day Use Toilet Building)

Building 400 (Storage Building)

Building 500 (Picnic Shelter)

Palmetto Trail Extension