This is a Schedule of Items for a construction project at Buck Hall Recreation Area in the Francis Marion and Sumter National Forests, administered by the USFS Southern Region. The document presents a comprehensive breakdown of base bid and optional bid items organized into 28 major work categories with specific line items, quantities, units of measure, and pricing structure.
The base bid encompasses 17 work categories including mobilization/demobilization, rock revetment construction across multiple reaches, boat launch improvements, bulkhead construction, parking and circulation improvements, storm drainage infrastructure, campground loop improvements, water system installation, wastewater systems, electrical utilities, fill and dump station work, signage, landscape plantings, and erosion control measures. Key base bid items include 1,350 linear feet of rock revetment construction, 5,500 square yards of heavy asphalt pavement, installation of multiple waterline sizes totaling over 6,000 linear feet, and various septic and drainage system components. The eleven optional bid items cover additional enhancements such as reach 6 rock revetment (200 linear feet), fishing pier improvements and extensions, kayak launch facilities, day use area development, overflow parking lot improvements, telecommunications systems, and four building structures (well house, bath house, toilet building, storage building, and picnic shelter). Optional items include selective tree clearing, concrete sidewalks, additional asphalt paving (3,050 square yards combined), and trail extensions. Pricing is structured with unit prices for individual line items and lump sum quantities for complex work packages, allowing for flexible bid evaluation of base work and selected optional enhancements.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No. Description Method of Measure
Unit Quantity Unit Price TOTAL
1.00
1.01 Mobilization/Demobilization LSQ LS 1
2.00
2.01 Partial Bulkhead Demolition DQ LF 1,350
2.02 Rock Revetment Construction AQ LF 1,350
3.00
3.01 Concrete Repair LSQ LS 1
3.02 Pile Replacement LSQ EA 2
3.03 Floating Dock Repair LSQ LS 1
4.00
4.01 Partial Bulkhead Demolition DQ LF 155
4.02 Bulkhead Construction DQ LF 155
5.00
5.01 Demolition LSQ LS 1
5.02 Asphalt Pavement Heavy AQ SY 5,500
5.03 Striping LSQ LS 1
5.04 Wheel Stops AQ EA 27
5.05 Dumpster Pad LSQ LS 1
5.06 Information Kiosk LSQ EA 1
6.00
6.01 12" RCP AQ LF 270
6.02 12" HDPE (PERF.) AQ LF 704
6.03 12" HDPE AQ LF 41
6.04 15" RCP AQ LF 153
6.05 18" RCP AQ LF 34
6.06 6" HDPE AQ LF 12
6.07 Flared End Section AQ EA 4
6.08 Wier Structure AQ EA 15
6.09 Sediment Basin Construction AQ SY 6,170
7.00
7.01 Selective Tree Clearing AQ EA 65
7.02 Grading DQ AC 8
7.03 Asphalt Demolition DQ SY 7,810
Storm Drainage
Schedule of Items USFS Southern Region
Francis Marion and Sumter National Forests Buck Hall Recreation Area Renovations
AQ: ACTUAL QUANTITY, DQ: DESIGNED QUANTITY, LSQ: LUMP SUM QUANTITY
BASE BID
General Conditions
Reach 1 - Rock Revetment
Reach 2 - Boat Launch Improvements and Floating Dock Repairs
Reach 3 - Bulkhead
Boat Launch Circulation and Parking Improvements
Campground Loop A Improvements
7.04 Existing RV Site Demolition DQ EA 15
7.05
Excavation of Unsuitable Material and Replacement with Suitable Fill Material as Needed and Approved by COR
AQ CY 500
7.06 Asphalt Pavement Light AQ SY 8,390
7.07 Striping LSQ LS 1
7.08 Seeding AQ SY 13,890
7.09 RV Sites AQ EA 18
7.10 Primitive Sites AQ EA 7
7.11 Site Furnishings (picnic table) AQ EA 25
7.12 Site Furnishings (fire ring) AQ EA 25
7.13 Conc. Sidewalk AQ SY 1,585
7.14 Hose bibb AQ EA 21
7.15 RV Electrical Pedestals AQ EA 18
7.16 Host Site Sewer Connection (CO) DQ EA 1
7.17 Information Kiosk by Host Site LSQ LS 1
8.00
8.01 Well DQ EA 1
8.02 Pump DQ EA 1
8.03 2" Waterlline AQ LF 3,000
8.04 1" Waterlline AQ LF 1,080
8.05 3/4" Waterlline AQ LF 1,850
9.00
9.01 Lift Station LSQ LS 1
9.02 Septic Tanks LSQ LS 1
9.03 Distribution Boxes LSQ LS 1
9.04 Septic Field LSQ LS 1
9.05 2" Force Main AQ LF 3,304
9.06 4" PVC AQ LF 149
9.07 6" PVC AQ LF 1,826
10.00
10.01 Lump Sum LSQ LS 1
11.00
11.01 Heavy Duty Asphalt AQ SY 1,400
11.02 Dump Station DQ EA 2
11.03 Hose Bibb AQ EA 4
11.04 Wheel Stops AQ EA 12
11.05 Signage LSQ LS 1
11.06 Dumpster Pad LSQ LS 1
Water System Improvement
Wastewater System
Electrical Utilities Replacement
Fill and Dump Station
12.00
12.01 Lump Sum LSQ LS 1
13.00
13.01 Nyssa sylvatica 'Wildfire' AQ EA 3
13.02 Pinus palustris AQ EA 6
13.03 Quercus bicolor 'JFS-KW12' AQ EA 5
13.04 Quercus virginiana AQ EA 4
13.05 Sabal palmetto AQ EA 6
13.06 Serenoa repens AQ EA 26
13.07 Native seed mix DQ SY 5,030
14.00
14.01 Silt fence AQ LF 9,700
14.02 Tree protection fencing AQ LF 8,650
14.03 Construction entrance AQ EA 1
14.04 Temporary seeding AQ SY 37,920
14.05 Permanent seeding AQ SY 37,920
14.06 Inlet protection AQ EA 11
14.07 Sediment tubes AQ EA 17
14.08 Outlet stabilization structure AQ EA 3
14.09 Concrete waste management AQ EA 1
14.10 Turbidity Curtain AQ LF 1,900
15.00
15.01 Lump Sum LSQ LS 1
16.00
16.01 Lump Sum LSQ LS 1
17.00
17.01 Lump Sum LSQ LS 1
18.00
18.01 Partial Bulkhead Demolition DQ LF 200
18.02 Erosion Control AQ LF 200
18.03 Rock Revetment Construction AQ LF 200
19.00
19.01 Selective Demolition LSQ LS 1
19.02 Prepare Existing Piles & Install
Vinyl Wrap @ Tidal Zone DQ EA 20
19.03 Replacement Cross-Bracing DQ EA 6
19.04 Placement Over-Framing, &
Decking AQ SF 925
TOTAL BASE BID
Signage
Landscape
Erosion Control
Building 200 (Loop A Well House)
Building 300 (Loop A Bath House)
Building 700 (Dump Station Well House)
OPTIONAL BID ITEMS
Reach 6 - Rock Revetment
Fishing Pier Improvements
19.05 Replacement Railings (Standard &
ADA Fishing Rails) AQ LF 230
20.00
20.01 Piles AQ EA 10
20.02 Bents, Cross-Bracing, Over-
Framing, and Decking AQ SF 460
20.03 Railings (Standard & ADA Fishing
Rails) AQ LF 110
20.04 Existing Railing Modification @
Pier Extension Connection LSQ LS 1
21.00
21.01 ADA Gangway LSQ LS 1
21.02 Fixed Access Pier LSQ LS 1
21.03 Floating Dock LSQ LS 1
21.04 Asphalt Paving AQ SY 560
22.00
22.01 Selective Tree Clearing DQ EA 22
22.02 Concrete Sidewalk AQ SY 1,000
22.03 Striping LSQ LS 1
22.04 Asphalt Paving AQ SY 2,500
22.05 Wheel Stops AQ EA 41
22.06 Site Furnishings (picnic tables at
pavilion) AQ EA 6
22.07 Site Furnishings (picnic tables
along walking trail) AQ EA 2
22.08 Site Furnishings (grill stations) AQ EA 2
22.09 Information Kiosk LSQ LS 1
23.00
23.01 Gravel Driveway AQ SY 3,350
23.02 Selective Tree Clearing AQ EA 6
24.00
24.01 Lump Sum LSQ LS 1
25.00
25.01 Lump Sum LSQ LS 1
26.00
26.01 Lump Sum LSQ LS 1
27.00
27.01 Lump Sum LSQ LS 1
28.00
28.01 Selective Vegetation Removal DQ SF 3,000
28.02 Concrete Sidewalk DQ SF 1,100
TOTAL BASE BID + OPTIONAL BID ITEMS:
TOTAL OPTIONAL BID ITEMS:
Fishing Pier Extension
Kayak Launch
Day Use Area
Overflow Parking Lot Improvement
Telecommunications System
Building 100 (Day Use Toilet Building)
Building 400 (Storage Building)
Building 500 (Picnic Shelter)
Palmetto Trail Extension
Sheet1
File details come from the government source that posted it. Updated .