A-ICRA.pdf

PDF 2 MB Posted

Attached to
36C10F24R50018 Balance of Work VAMC Manhattan, NY -- Y1DA
Solicitation number
QSE--36C10F24R50018
Issued by

About this file

This document provides details for a federal contract opportunity with the Department of Veterans Affairs to construct balance of work at the VAMC Manhattan campus in New York. The solicitation seeks to complete hurricane recovery program construction at the Manhattan VA medical center campus, with solicitation number QSE--36C10F24R50018 and opportunity name 36C10F24R50018 Balance of Work VAMC Manhattan, NY -- Y1DA. Interested parties should respond by the dates outlined to provide construction services for the balance of hurricane recovery work at the specified VA location.

View the file

Other files

File Type Posted
SolicitationCancellation.pdf PDF
SolicitationAmendment0006.pdf PDF
Manhattan VA Asbestos Survey Report 05-2021final (5-24-21).pdf PDF
Manhattan VA Revised Asbestos Survey Report 05-2021Final (Appendix H - First Half).pdf PDF
QA - Balance of Work - 05.08.2024.pdf PDF
Manhattan VA Revised Asbestos Survey Report 05-2021Final (Appendix H - 2nd half).pdf PDF
QA - Balance of Work - 05.02.2024.pdf PDF
SolicitationAmendment0005.pdf PDF
SolicitationAmendment0004.pdf PDF
QA - Balance of Work - 04.16.2024.pdf PDF
C-Mechanical- Part 2.pdf PDF
C-Electrical- Part 5.pdf PDF
B-Mechanical-Part 1.pdf PDF
P03_CDR- Sole Source JA - Access Controls - 11-16-22.pdf PDF
B-Civil.pdf PDF
C-Plumbing- Part 2.pdf PDF
P03_CDR - Sole Source JA - Public Announcement System - 11-16-22.pdf PDF
C-Electrical- Part 4.pdf PDF
A-Architecture-Part 3.pdf PDF
A-ICRA.pdf PDF
C-Architecture- Part 5.pdf PDF
A-Fire Protection-Part 2.pdf PDF
C-Electrical- Part 10.pdf PDF
P03_CDR - Sole Source JA - Triplex Pump 11-16-22.pdf PDF
C-Life Safety.pdf PDF
A-Electrical-Part 1.pdf PDF
VHA Directive 1028_D_2020-02-24.pdf PDF
B-Electrical-Part 2.pdf PDF
B-Architecture-Part 4.pdf PDF
C-Electrical- Part 12.pdf PDF
A-Electrical-Part 3.pdf PDF
C-Electrical- Part 7.pdf PDF
C-Electrical- Part 8.pdf PDF
A-Civil.pdf PDF
A-Structural.pdf PDF
A-General.pdf PDF
QSE 36C10F24R50018.pdf PDF
Amendment 0001 - Missing and Replacement Documents.pdf PDF
B-Electrical-Part 1.pdf PDF
C-Fire Protection- Part 2.pdf PDF
C-Electrical- Part 11.pdf PDF
C-Telecom.pdf PDF
A-Plumbing-Part 2.pdf PDF
C-Architecture- Part 6.pdf PDF
B-Electrical-Part 3.pdf PDF
VAMC CD Refresh IFC Vol 1 Specifications REV 2_ 9-19-23 (Part 3).pdf PDF
C-Mechanical- Part 3.pdf PDF
Shutdown Request Form.pdf PDF
B-Architecture-Part 2.pdf PDF
P03_CD Refresh - Sole Source JA - Fire Alarm System - 11-16-22.pdf PDF
Show 40 more

Latest 50 of 281 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ICRA SYMBOLS

PROJECT AREA LIMIT

ICRA CONSTRUCTION BARRIER WALL / DOOR

WALL (EXISTING / NEW)

MAT WALK-OFF MAT(2 MATS AT DOUBLE DOORS)

HEPA FILTERHE

PA

M

H

MAT

TEMPORARY POLYETHYLENE PLASTIC

CONSTRUCTION FILM BARRIER; SEE ICRA

KEYNOTES FOR REQUIREMENTS

TC##

TEMPORARY LIGHT FIXTURE.

RESTRICTED CONSTRUCTION

SEE DWG A-GI250 FOR DOOR AND

PARTITION TYPES

FEMALE

TOILET

G383

NON-STOR

1-1A

WOMEN'S

LOCKERS

G205S

REGULATED

MEDICAL

WASTE

G206S

MEN'S

LOCKERS

G204BS

GAS METER

G204AS

PAINT

SHOP

0203S0203S

PAINT

SHOP

STORAGE

0203S0203S

EMPTY

SHARPS

CONTAINERS

G204SG204S

VESTIBULE

0208S

VESTIBULE

G204CS

G207S

INTERIM

STORAGE

CORRIDOR

G297S

CORRIDOR

G201S

DN

DD

RECEIVING

0216E0216E

OFFICE

0216AE

SPECIAL

STORAGE

0218AE0218AE

STORAGE

0218E0218E

ENGINEERING

STORAGE

0233E0233E

CANTEEN

STORAGE

0234E0234E

IRM

0235E0235E

LOGISTICS

0236E0236E

LOGISTICS

INVENTORY

MANAGEMENT

OFFICES

0255E0255E

CORRIDOR

0257E0257E

OFFICE

0255AE0255AE

OFFICE

0255BE0255BE

COPY

ROOM

0255CE

OFFICE

0255DE0255DE

OFFICE

0255EE0255EE

OFFICE

0255FE0255FE

0200B

LOADING

DOCK

0200A

LOADING

DOCK

0256E0256E

IT ROOM

(TR-E)

222018

161412 23 302624

MECHANICAL

ROOM

0269N0269N

OFFICE

0264AN0264AN

MECHANICAL

ROOM

0270N0270N

EMS

OFFICES

0272N

CLEAN

LINEN

0264N0264N

EMS

STORAGE

0253N0253N

WAREHOUSE - B

0250E0250E

PROCESSING

0215E0215E

BIOMED

0212E0212E

EMPTY

CANISTERS

0210E

ENTRY

0214E0214E

TEMPORARY

HOLDING

0230AE0230AE

PROPERTY

MANAGERS

0230E0230E

NON

FLAMMABLE

GAS

0215B

COMPRESSED

GAS

0215A

BLUE

TRUCK

STAGING

0254E0254E

SUPPLY

PALLET

BREAK

DOWN

0253E0253E

EMS

EQUIPMENT

STORAGE

0251E0251E

LINEN

CHUTE

0244N0244N

WOMENS

TOILETS

SHOWER

0248N0248N

MENS

TOILETS

SHOWER

0247N

ENGINEERING

OFFICE

0262N0262N

OFFICE

0272AN0272AN

OFFICE

0272BN0272BN

COPY

ROOM

0272DN

OFFICE

0272EN

OFFICE

0272FN0272FN

OFFICE

0272GN0272GN

MECHANICAL

ROOM

0272CN

FORKLIFT

AND

PALLET

TRUCK

PARKING

0203E0203E

ENTRY

0211E

CORRIDOR

0241N0241N

CORRIDOR

0252E

STAIRWELL

0254N

CORRIDOR

0271N0271N

CORRIDOR

G245NG245N

CORRIDOR

0243N0243N

0200A

LOADING

DOCK

WAREHOUSE

SUPERVISOR

0215AE0215AE

0211AE0211AE

SPRINKLER

RISER

ROOM

BED

STORAGE

0213E

LACTATION

ROOM

G383A

18.2 20.5 22.8

18.1

22.9

Z.8

BB.5

20.5

22.8

18.1 22.9

BB.5

CORRIDOR

0257E0257E

S

S S

S S

S

S

SS

S

SSSSS

S S S S

S

S

SS

S

S S

SS

S S

S

S

S

S

S

S S

S

S

S S

S

S

S

S

S

S

S

S

S

SECURITY

CLOSET

0258E

CORRIDOR

0241N

CORRIDOR

0202S

ELECTRIC RM

0249E

WAREHOUSE - A

0250E0250E

DN

S

VESTIBULE

142A142A

S

S

S

S

S

S S S

S

S

VEST

G206AS

AC

U-

AC

U-

EX EX EX EX EX EX

DD.5

DD.5

AA.5

DD.8

DD.8

AA.5

CU

H-

PB PB

PB PB

PB

PB

PB

PBPB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

EPU

KS

KS

PB

PB

PB

PB

KS /

PB

PB

PB

PB

KS

/ PB

PB

PB

KS/

PB

PB

S S

S

S S

G245N.1

CLOSET

S

T

O

P

FEMALE

TOILET

G383

NON-STOR

1-1A

WOMEN'S

LOCKERS

G205S

REGULATED

MEDICAL

WASTE

G206S

MEN'S

LOCKERS

G204BS

GAS METER

G204AS

PAINT

SHOP

0203S0203S

PAINT

SHOP

STORAGE

0203S0203S

EMPTY

SHARPS

CONTAINERS

G204SG204S

VESTIBULE

0208S

VESTIBULE

G204CS

G207S

INTERIM

STORAGE

CORRIDOR

G297S

CORRIDOR

G201S

DN

DD

RECEIVING

0216E0216E

OFFICE

0216AE

SPECIAL

STORAGE

0218AE0218AE

STORAGE

0218E0218E

ENGINEERING

STORAGE

0233E0233E

CANTEEN

STORAGE

0234E0234E

IRM

0235E0235E

LOGISTICS

0236E0236E

LOGISTICS

INVENTORY

MANAGEMENT

OFFICES

0255E0255E

CORRIDOR

0257E0257E

OFFICE

0255AE0255AE

OFFICE

0255BE0255BE

COPY

ROOM

0255CE

OFFICE

0255DE0255DE

OFFICE

0255EE0255EE

OFFICE

0255FE0255FE

0200B

LOADING

DOCK

0200A

LOADING

DOCK

0256E0256E

IT ROOM

(TR-E)

222018

161412 23 302624

MECHANICAL

ROOM

0269N0269N

OFFICE

0264AN0264AN

MECHANICAL

ROOM

0270N0270N

EMS

OFFICES

0272N

CLEAN

LINEN

0264N0264N

EMS

STORAGE

0253N0253N

WAREHOUSE - B

0250E0250E

PROCESSING

0215E0215E

BIOMED

0212E0212E

EMPTY

CANISTERS

0210E

ENTRY

0214E0214E

TEMPORARY

HOLDING

0230AE0230AE

PROPERTY

MANAGERS

0230E0230E

NON

FLAMMABLE

GAS

0215B

COMPRESSED

GAS

0215A

BLUE

TRUCK

STAGING

0254E0254E

SUPPLY

PALLET

BREAK

DOWN

0253E0253E

EMS

EQUIPMENT

STORAGE

0251E0251E

LINEN

CHUTE

0244N0244N

WOMENS

TOILETS

SHOWER

0248N0248N

MENS

TOILETS

SHOWER

0247N

ENGINEERING

OFFICE

0262N0262N

OFFICE

0272AN0272AN

OFFICE

0272BN0272BN

COPY

ROOM

0272DN

OFFICE

0272EN

OFFICE

0272FN0272FN

OFFICE

0272GN0272GN

MECHANICAL

ROOM

0272CN

FORKLIFT

AND

PALLET

TRUCK

PARKING

0203E0203E

ENTRY

0211E

CORRIDOR

0241N0241N

CORRIDOR

0252E

STAIRWELL

0254N

CORRIDOR

0271N0271N

CORRIDOR

G245NG245N

CORRIDOR

0243N0243N

0200A

LOADING

DOCK

WAREHOUSE

SUPERVISOR

0215AE0215AE

0211AE0211AE

SPRINKLER

RISER

ROOM

BED

STORAGE

0213E

LACTATION

ROOM

G383A

18.2 20.5 22.8

18.1

22.9

Z.8

BB.5

20.5

22.8

18.1 22.9

BB.5

CORRIDOR

0257E0257E

S

S S

S S

S

S

SS

S

SSSSS

S S S S

S

S

SS

S

S S

SS

S S

S

S

S

S

S

S S

S

S

S S

S

S

S

S

S

S

S

S

S

SECURITY

CLOSET

0258E

CORRIDOR

0241N

CORRIDOR

0202S

ELECTRIC RM

0249E

WAREHOUSE - A

0250E0250E

DN

S

VESTIBULE

142A142A

S

S

S

S

S

S S S

S

S

VEST

G206AS

AC

U-

AC

U-

EX EX EX EX EX EX

DD.5

DD.5

AA.5

DD.8

DD.8

AA.5

CU

H-

PB PB

PB PB

PB

PB

PB

PBPB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

EPU

KS

KS

PB

PB

PB

PB

KS /

PB

PB

PB

PB

KS

/ PB

PB

PB

KS/

PB

PB

S S

S

S S

G245N.1

CLOSET

S

T

O

P

EE

Z

S

U

T

S

U

Y

R

T

V

DN

RAMP

161412

V

W W

X

Z

AA

BB

2 3 4 5 7 9

U U

323028

DD

EE

CC

DD

Z

AA

BB

Y

EE

BB

AA

DD

EE

DD

BB

22 23 24 26

V

W

X

RAMP DN

EX

EX

EX

EX

EX EX

EX

EX

EX

EX

EX

EX

EX

EX

AA

EX

HH

X

C1S

C1S

M M

2'- 6"

4 4

C1S

C1S

1 1

HEPAHEPA HEPA HEPA HEPA

HEPA

TA03

TA02

A-GI250

B1

A-GI250

B2

C1S

HEPA

M

M M

M

A-GI250

B4

A-GI250

B6

C1S

M

M

TA09

TA05

TA04

C1S

M M

TA10

M M

5'-0

CLR

HEPA

HEPA

HEPA HEPA

HEPA

HE

PA HE

PA

HE

PA

9'-0"

2'-6"

H H

5 55

C1S

2'- 6"

H5

A-GI250

B8

M

M

M

M

MMATMAT MAT MAT

MM

M

7 7

M M

C1S

3 3

TYP

TYP

TYP

TYP

TYP

TYP

TYP TYP

TYP

1. REFER TO A-AE001 FOR TYPICAL PLAN LEGENDS AND SYMBOLS. REFER TO A-AE002 FOR GENERAL NOTES.

2. ICRA CONSTRUCTION BARRIERS SHALL BE PROVIDED AT ENTRY POINTS AT ALL LOCATIONS

OF ACTIVE CONSTRUCTION. ALL ICRA CONSTRUCTION BARRIERS SHALL BE A MINIMUM OF 1-HOUR FIRE RATED

AND PREVENT CONTAMINATION OF ADJACENT OCCUPIED SPACES AT ALL TIMES.

6. BASED ON THE PROJECT SCOPE, OFF-HOUR / WEEKEND ICRA CONSTRUCTION BARRIER ERECTION AND DEMO / NEW WORK CONSTRUCTION WILL BE REQUIRED. COORDINATE OFF-HOURS / WEEKEND WORK WITH THE VA CFM OFFICE IN ADVANCE. OFF-HOURS / WEEKEND WORK SHALL BE INCLUSIVE OF THE CONTRACTOR AND HIS

SUB-CONTRACTORS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA.

7. MAINTAIN NEGATIVE PRESSURE AT SPACES WHERE CONSTRUCTION IS OCCURRING BASED UPON ICRA POLICY / PERMIT. THE ABILITY TO ACHIEVE THE REQUIRED NEGATIVE AIR PRESSURE WILL BE DETERMINED

BASED ON SITE CONDITIONS.

8. REFER TO SHEETS A-GI201 AND A-GI250 FOR ADDITIONAL TEMPORARY WALL DIMENSIONS AND

EXTENTS OF ICRA CONSTRUCTION BARRIERS.

MODIFY/REMOVE EXISTING CEILING CONSTRUCTION AS REQUIRED TO ACCOMMODATE

ICRA CONSTRUCTION BARRIERS. STORE ALL ACOUSTICAL CEILING PANELS, GRID, LIGHT FIXTURES AND CEILING ACCESSORIES AS DIRECTED BY THE VA. WHERE NEW CEILINGS ARE NOT SCHEDULED, EXISTING CEILINGS ARE TO BE RESTORED TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION BARRIERS.

10. MODIFY EXISTING MEP/FP (INCLUDING BUT NOT LIMITED TO; DIFFUSERS AND REGISTERS, LIGHT FIXTURES SPRINKLER HEADS) AS REQUIRED TO MAINTAIN APPROPRIATE

COVERAGE/LIGHTING/SERVICE TO ALL OCCUPIED SPACES DURING CONSTRUCTION ACTIVITIES.

RESTORE ALL INFRASTRUCTURE TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION

BARRIERS.

11. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL PUBLIC SPACES

AT AREAS OF CONSTRUCTION. CONTRACTOR SHALL PATCH, REPAIR, PAINT, RESTORE,

REPLACE CONSTRUCTION DAMAGED MATERIALS IN PUBLIC SPACES TO MATCH EXISTING

CONDITIONS AS A PART OF THE PROJECTS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL

COST TO THE PROJECT/GOVERNMENT.

3. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER AREAS OF WORK FOR THIS PACKAGE ONLY. COORDINATE WITH / REFER TO OTHER SETS / PACKAGES OF DRAWINGS FOR ADDITIONAL ICRA PLANS

AND THEIR REQUIREMENTS.

4. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER MAJOR AREAS OF WORK ONLY.

INCIDENTAL ICRA PLANS WILL BE REQUIRED AND SHALL BE PREPARED AND EXECUTED AS BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA. CONTRACTOR SHALL SUBMIT ICRA PLANS TO THE VA CFM OFFICE

FOR REVIEW AND APPROVAL PRIOR TO START OF WORK.

5. SET UP ICRA CONSTRUCTION BARRIER TO ENCLOSE AREA OF WORK BEING DONE ACCORDING TO PHASING.

9. COORDINATE WITH REFLECTED CEILING PLANS / FINISH SCHEDULE WHERE CEILINGS ARE

SCHEDULED TO BE MODIFIED OR REPLACED.

13. ALL HARDWARE FOR TEMPORARY DOORS ON ICRA PLANS IS AS FOLLOWS, UNLESS NOTED

OTHERWISE.

EACH DOOR TO HAVE

HINGES QUANTITY AND TYPE AS REQUIRED

1 PUSH-BUTTON COMBINATION LOCK ENTRY x KEY OVERIDE x LEVER

1 CLOSER C02011/C02021

1 WALL STOP (AT INSWING DOORS) L02101 CONVEX

1 SET SELF-ADHESIVE SEALS R0E154

COST TO THE PROJECT/GOVERNMENT.

12. REFER TO E4/A-GI250 FOR SCHEDULE FOR ALL ICRA TEMPORARY DOORS AND FRAMES, U.O.N.

1 KICK PLATE J102

1 AUTO DOOR BOTTOM ROY346 - HEAVY DUTY

EACH PAIR TO HAVE

HINGES QUANTITY AND TYPE AS REQUIRED

1 SET AUTO FLUSH BOLTS TYPE 25 LESS BOTTOM BOLT

1 PUSH-BUTTON COMBINATION LOCK F07 x KEYLESS ENTRY / KEYPAD x LEVER

1 OVERLAPPING STEEL ASTRAGAL

WITH SELF ADHESIVE SEAL

R0Y634 x ROY154 x THRU-BOLTS (INACTIVE LEAF)

1 TYPE 21A

2 AUTO DOOR BOTTOMS ROY346 - HEAVY DUTY

CLOSERS

KICK PLATES

WALL STOPS

SET SELF ADHESIVE SEALS

COORDINATOR

C02011 / C02021 J102 L02101

ROY154

14. CONTRACTOR TO IMMEDIATELY REPLACE CEILING TILE IF REPLACED / DISPLACED.

15. SEAL JUNCTION BOXES, OUTLETS, PANEL BOARDS ETC. DURING CONSTRUCTION TO PREVENT / REDUCE

AMOUNT OF FINAL CLEANUP REQUIRED.

1. IMPLEMENT THE REQUIREMENTS OF VAMC'S INFECTION CONTROL RISK ASSESSMENT (ICRA) TEAM.

2. ESTABLISH AND MAINTAIN A DUST CONTROL PROGRAM AS PART OF THE CONTRACTOR'S INFECTION PREVENTIVE MEASURES IN ACCORDANCE WITH THE GUIDELINES PROVIDED BY ICRA GROUP. PRIOR TO START OF WORK, PREPARE A PLAN DETAILING PROJECT- SPECIFIC DUST PROTECTION MEASURES, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT TO RESIDENT ENGINEER AND FACILITY ICRA

TEAM FOR REVIEW FOR COMPLIANCE WITH CONTRACT REQUIREMENTS.

3. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION OR RENOVATION ACTIVITY SHALL BE EDUCATED

AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE MEDICAL CENTER.

4. DO NOT PERFORM DUST PRODUCING TASKS WITHIN OCCUPIED AREAS OR EXTERIOR AREAS WITHIN

PROXIMITY OF OUTSIDE AIR INTAKES WITHOUT THE APPROVAL OF THE RESIDENT ENGINEER.

5. FOR CONSTRUCTION IN ANY AREAS THAT WILL REMAIN JOINTLY OCCUPIED BY THE MEDICAL CENTER

AND CONTRACTOR'S WORKERS, THE CONTRACTOR SHALL:

a. PROVIDE DUST PROOF ONE-HOUR FIRE RATED ICRA CONSTRUCTION BARRIERS TO COMPLETELY

SEPARATE CONSTRUCTION FROM THE OPERATIONAL AREAS OF THE MEDICAL CENTER IN ORDER

TO CONTAIN DIRT DEBRIS AND DUST.

b. HEPA FILTRATION IS REQUIRED WHERE THE EXHAUST DUST MAY REENTER THE BREATHING

ZONE.

c. ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE

CONSTRUCTION AREA TO OCCUPIED MEDICAL CENTER AREAS. ADHESIVE WALK-OFF MATS SHALL

BE CHANGED ON A DAILY BASIS.

d. VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED

MEDICAL CENTER AT THE END OF THE WORK DAY.

e. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE RESIDENT ENGINEER AND THE MEDICAL CENTER.

f. USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER AND VACUUM CEILING TILES PRIOR TO

REPLACEMENT.

g. THERE SHALL BE NO STANDING WATER DURING CONSTRUCTION. THIS INCLUDES WATER IN

EQUIPMENT DRIP PANS AND OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS.

h. AT COMPLETION, CAREFULLY REMOVE ICRA CONSTRUCTION BARRIERS AND CEILING PROTECTION

OUTSIDE OF NORMAL WORK HOURS. VACUUM AND CLEAN ALL SURFACES FREE OF DUST AFTER

THE REMOVAL.

6. FINAL CLEANUP:

a. UPON COMPLETION OF PROJECT, OR AS WORK PROGRESSES, REMOVE ALL CONSTRUCTION

DEBRIS FROM ABOVE CEILING, VERTICAL SHAFTS AND UTILITY CHASES THAT HAVE BEEN PART OF

THE CONSTRUCTION.

b. PERFORM HEPA VACUUM CLEANING OF ALL SURFACES IN THE CONSTRUCTION AREA. THIS INCLUDES WALLS, CEILINGS, CABINETS, FURNITURE (BUILT-IN OR FREE STANDING), PARTITIONS, FLOORING, ETC.

7. REFER TO SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS AND SECTION 01 35 26 -

SAFETY REQUIREMENTS FOR MAJOR PROJECTS FOR ADDITIONAL INFORMATION.

2 DOORS AND EXTERIOR OPENINGS TO BE PROTECTED FROM UNAUTHORIZED ACCESS DURING ALL PHASES OF 2A CONSTRUCTION ACTIVITIES. DOOR

PROTECTION TO PERMIT EGRESSING / INTERIUM LIFE SAFETY OF OCCUPANTS IN WORK AREA.

EXISTING WALL TO ACT AS 1 HR ICRA CONSTRUCTION BARRIER. FIRESTOP ANY OPENINGS IN WALL TO MAINTAIN INTEGRITY OF CONSTRUCTION BARRIER REQUIREMENTS. EXTEND WALL CONSTRUCTION TO DECK. PROVIDE HEAD OF WALL FIRESTOP TERMINATIONS SIMILAR TO DETAIL D1 / A-GI250.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

Key Plan

Balance of Work

9/12/2022

MODIFY EXISTING CEILING AND LIGHTS AS REQUIRED TO ACCOMMODATE TEMPORARY WALL INSTALLATION. CEILING ASSEMBLY AT PUBLIC SIDE TO BE

RESTORED AFTER ICRA CONSTRUCTION BARRIER INSTALLATION.

3 DOOR / WINDOW OPENING TO BE PROTECTED FROM UNAUTHORIZED ACCESS DURING ALL PHASES OF 2A DEMOLITION OR CONSTRUCTION ACTIVITIES.

A-GI201

PARTIAL GROUND FLOOR ICRA

PLAN

DZ JH / DZ

SCALE: 1/16" = 1'-0"

8'4'0 16'

PLAN

NORTH

PARTIAL GROUND FLOOR ICRA PLAN

D2

6 MIL THICK, FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / TEMPORARY ICRA BARRIER WITH POLE SUPPORTS AND SELF-ADHESIVE ZIPPER ENTRY. TEMPORARY ICRA CONSTRUCTION FILM BARRIER SHALL BE SEALED TO CEILING /FLOOR / WALLS FOR DUST AND DEBRIS CONTAINMENT. TEMPORARY ICRA CONSTRUCTION FILM BARRIER SHALL BE USED ONLY WHERE THE ERECTION OF TEMPORARY GWB ICRA WALLS FOR CONSTRUCTION ACTIVITIES WILL IMPEDE VAMC OPERATIONS. TEMPORARY ICRA CONSTRUCTION FILM BARRIERS FOR CONSTRUCTION ACTIVITIES OUTSIDE VAMC OPERATION HOURS SHALL BE ERECTED AND REMOVED DAILY OUTSIDE VAMC OPERATION HOURS AND SHALL HAVE NO IMPACT ON VAMC OPERATIONS. OBTAIN APPROVAL / COORDINATE / FACILITATE ILSM WITH VA CFM OFFICE PRIOR TO CONSTRUCTION ACTIVITIES AND ERECTION OF

TEMPORARY ICRA CONSTRUCTION FILM BARRIERS.

ICRA NOTES (CONTINUED)ICRA NOTESINFECTIOUS DISEASE CONTROL REQUIREMENTSICRA SYMBOLS

6 INSTALL 2 HR ICRA CONSTRUCTION BARRIER ALTERNATE (CS2 ALT; DETAIL F1 / A-GI250) IMMEDIATELY AFTER PHASED REMOVAL OF ELEVATOR DOOR FOR NEW DOOR SKINS. COORDINATE / COMPLY WITH THE REQUIREMENTS OF SPECIFICATION SECTIONS 14 27 16 "CUSTOM ELEVATOR DOORS AND FRAMES" AND

09 91 00 "PAINTING".

ICRA KEYNOTES:

7 PROVIDE CONNECTION FOR TEMPORARY LIGHTING FROM ELECTRICAL PANEL IN ROOM 0242N. INSTALL ADDITIONAL BRANCH BREAKERS AS REQUIRED AND MATCH IN FIELD FOR CORRECT MANUFACTURER. QUANTITY OF LIGHTING SHALL BE DICTATED BY CONSTRUCTION CONDITIONS. ADJUST/ MODIFY TEMPORARY LIGHTS AS REQUIRED BY THE PROGRESSION OF "NEW" CONSTRUCTION. PROVIDE ADDITIONAL TEMPORARY LIGHT FIXTURES (NOT SHOWN) WITHIN THE WORK AREAS AS REQUIRED BY LIFE SAFETY/ SPECIFICATIONS. REMOVE ALL TEMPORARY LIGHTS/ CONDUCTORS IN THEIR ENTIRETY BACK TO

THE PANEL AT THE COMPLETION OF THE PROJECT.

(SPECIFIC TO THIS

DRAWING ONLY)

8 PROVIDE / COORDINATE THE ERECTION OF A 1 HR ICRA CONSTRUCTION BARRIER PRIOR TO THE INSTALLATION OF THE INTERIM COOLER / FREEZER THAT WILL BE PROVIDED AND INSTALLED BY THE GOVERNMENT. CONTRACTOR SHALL COORDINATE THE DEMOLITION AND AND NEW WORK ACTIVITIES WITH THE VA CFM OFFICE FOR THIS AREA. AFTER THE COMPLETION AND GOVERNMENT'S ACCEPTANCE OF THE PERMANENT COOLER / FREEZERS ON THE THIRD FLOOR KITCHEN / FOOD SERVICE AREA, THE INTERIM COOLER / FREEZER WILL BE REMOVED BY THE GOVERNMENT AND THE CONSTRUCTION BARRIER SHALL BE REMOVED OR ADAPTED AS REQUIRED FOR THE NEXT PHASE OF WORK BY THE CONTRACTOR. SEE DETAIL F1 / A-AE102 FOR PROPOSED GOVERNMENT

COOLER / FREEZER LAYOUT. ALSO SEE DETAIL D6/A-GI250 PARTITION TYPE C1S.

AutoCAD SHX Text

CSSSD

AutoCAD SHX Text G580

AutoCAD SHX Text

ELEC

AutoCAD SHX Text 0165S

AutoCAD SHX Text

LOCKERS

AutoCAD SHX Text 0168S

AutoCAD SHX Text

CHAPLAIN STORAGE

AutoCAD SHX Text 0173S

AutoCAD SHX Text

ELEC

AutoCAD SHX Text 0167S

AutoCAD SHX Text G191S

AutoCAD SHX Text

SECURITY RM.

AutoCAD SHX Text 0202S

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text 0147S

AutoCAD SHX Text

SPECIMEN CLOS

AutoCAD SHX Text 0170S

AutoCAD SHX Text

SPECIMEN STORAGE

AutoCAD SHX Text 0171S

AutoCAD SHX Text

AUTOPSY

AutoCAD SHX Text 0169S

AutoCAD SHX Text

REFR. MORTUARY

AutoCAD SHX Text 0168S

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

VEST

AutoCAD SHX Text 0166S

AutoCAD SHX Text

SHR

AutoCAD SHX Text G193S

AutoCAD SHX Text

TOILET

AutoCAD SHX Text G190S

AutoCAD SHX Text

VEST

AutoCAD SHX Text 0199S

AutoCAD SHX Text

CLERGY

AutoCAD SHX Text 0163S

AutoCAD SHX Text

ALTAR

AutoCAD SHX Text 0162S

AutoCAD SHX Text

ELEV.MACH. RM.

AutoCAD SHX Text

0203AS

AutoCAD SHX Text

STAFF TOILET

AutoCAD SHX Text

0202BS

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 0202S

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

0202AS

AutoCAD SHX Text

STAIR

AutoCAD SHX Text 1-2

AutoCAD SHX Text

PLUMBING EQUIP RM

AutoCAD SHX Text G583

AutoCAD SHX Text

SECURE STORAGE

AutoCAD SHX Text G586

AutoCAD SHX Text G582

AutoCAD SHX Text

BREAKDOWN

AutoCAD SHX Text G590

AutoCAD SHX Text

EQUIP HOLDING / DISPATCH

AutoCAD SHX Text G595

AutoCAD SHX Text

SOILED RECEIVING

AutoCAD SHX Text G591

AutoCAD SHX Text

MECH RM

AutoCAD SHX Text G703

AutoCAD SHX Text

JAN.

AutoCAD SHX Text G598

AutoCAD SHX Text

MALE TOILET

AutoCAD SHX Text G382

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

ELEV LOBBY

AutoCAD SHX Text G001

AutoCAD SHX Text G004

AutoCAD SHX Text

IT (TR-D)

AutoCAD SHX Text

0209SA

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 0209S

AutoCAD SHX Text

LAUNDRY

AutoCAD SHX Text 0184S

AutoCAD SHX Text

PUMPS

AutoCAD SHX Text 0166S

AutoCAD SHX Text

PUMP ROOM

AutoCAD SHX Text 0175S

AutoCAD SHX Text

STAIR

AutoCAD SHX Text 1-1

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

PE #5

AutoCAD SHX Text

PE #6

AutoCAD SHX Text

PE #7

AutoCAD SHX Text

PE #8

AutoCAD SHX Text

SE #12

AutoCAD SHX Text

SE #11

AutoCAD SHX Text

SE #10

AutoCAD SHX Text

SE #9

AutoCAD SHX Text

SE #13

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

STAIRS #3

AutoCAD SHX Text G2189S

AutoCAD SHX Text Open

AutoCAD SHX Text to Above

AutoCAD SHX Text to Above

AutoCAD SHX Text Open

AutoCAD SHX Text

DN

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

DOCK LEVELER

AutoCAD SHX Text #1

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

DOCK LEVELER

AutoCAD SHX Text #2

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

DOCK LEVELER

AutoCAD SHX Text #3

AutoCAD SHX Text

DN

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

0163SA

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 0166S

AutoCAD SHX Text

EMBALMING

AutoCAD SHX Text 0167S

AutoCAD SHX Text

UP

AutoCAD SHX Text

SECURITY CONTROL

AutoCAD SHX Text

RM. (POST 7)

AutoCAD SHX Text 0200S

AutoCAD SHX Text F I R S T A V E N U E

AutoCAD SHX Text A S S E R L E V Y P L A C E

AutoCAD SHX Text E A S T 2 3 r d. S T R E E T

AutoCAD SHX Text

BLDG 3

AutoCAD SHX Text

BLDG 2

AutoCAD SHX Text

BLDG 4 / 5

AutoCAD SHX Text

E A S T 25 TH STREET

AutoCAD SHX Text

BLDG 1

AutoCAD SHX Text N

AutoCAD SHX Text

BLDG 6

ICRA CONSTRUCTION BARRIER WALL / DOOR

WALL (EXISTING / NEW)

MAT WALK-OFF MAT(2 MATS AT DOUBLE DOORS)

HEPA FILTERHE

PA

M

H

MAT

TEMPORARY POLYETHYLENE PLASTIC

CONSTRUCTION FILM BARRIER; SEE ICRA

KEYNOTES FOR REQUIREMENTS

TC##

TEMPORARY LIGHT FIXTURE.

RESTRICTED CONSTRUCTION

CIRCULATION PATH

SEE DWG A-GI250 FOR DOOR AND

PARTITION TYPES

REFR 3

3070C

DN

V

W

X

Z

U

Z

Y

Y

TA14

C1S

C1S

C1S

C L R

7'-0"

MM

A L I G

N

CONSTRUCTION AREA #2

4 4

4 9

MAT

MAT

MAT

MAT

MAIN KITCHEN

3086E

MAIN KITCHEN

3086E

1. REFER TO A-AE001 FOR TYPICAL PLAN LEGENDS AND SYMBOLS. REFER TO A-AE002 FOR GENERAL NOTES.

2. ICRA CONSTRUCTION BARRIERS SHALL BE PROVIDED AT ENTRY POINTS AT ALL LOCATIONS

OF ACTIVE CONSTRUCTION. ALL ICRA CONSTRUCTION BARRIERS SHALL BE A MINIMUM OF 1-HOUR FIRE RATED

AND PREVENT CONTAMINATION OF ADJACENT OCCUPIED SPACES AT ALL TIMES.

6. BASED ON THE PROJECT SCOPE, OFF-HOUR / WEEKEND ICRA CONSTRUCTION BARRIER ERECTION AND DEMO / NEW WORK CONSTRUCTION WILL BE REQUIRED. COORDINATE OFF-HOURS / WEEKEND WORK WITH THE VA CFM OFFICE IN ADVANCE. OFF-HOURS / WEEKEND WORK SHALL BE INCLUSIVE OF THE CONTRACTOR AND HIS

SUB-CONTRACTORS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA.

7. MAINTAIN NEGATIVE PRESSURE AT SPACES WHERE CONSTRUCTION IS OCCURRING BASED UPON ICRA POLICY / PERMIT. THE ABILITY TO ACHIEVE THE REQUIRED NEGATIVE AIR PRESSURE WILL BE DETERMINED

BASED ON SITE CONDITIONS.

8. REFER TO SHEETS A-GI201 AND A-GI250 FOR ADDITIONAL TEMPORARY WALL DIMENSIONS AND

EXTENTS OF ICRA CONSTRUCTION BARRIERS.

MODIFY/REMOVE EXISTING CEILING CONSTRUCTION AS REQUIRED TO ACCOMMODATE

ICRA CONSTRUCTION BARRIERS. STORE ALL ACOUSTICAL CEILING PANELS, GRID, LIGHT FIXTURES AND CEILING ACCESSORIES AS DIRECTED BY THE VA. WHERE NEW CEILINGS ARE NOT SCHEDULED, EXISTING CEILINGS ARE TO BE RESTORED TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION BARRIERS.

10. MODIFY EXISTING MEP/FP (INCLUDING BUT NOT LIMITED TO; DIFFUSERS AND REGISTERS, LIGHT FIXTURES SPRINKLER HEADS) AS REQUIRED TO MAINTAIN APPROPRIATE

COVERAGE/LIGHTING/SERVICE TO ALL OCCUPIED SPACES DURING CONSTRUCTION ACTIVITIES.

RESTORE ALL INFRASTRUCTURE TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION

BARRIERS.

11. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL PUBLIC SPACES

AT AREAS OF CONSTRUCTION. CONTRACTOR SHALL PATCH, REPAIR, PAINT, RESTORE,

REPLACE CONSTRUCTION DAMAGED MATERIALS IN PUBLIC SPACES TO MATCH EXISTING

CONDITIONS AS A PART OF THE PROJECTS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL

COST TO THE PROJECT/GOVERNMENT.

3. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER AREAS OF WORK FOR THIS PACKAGE ONLY. COORDINATE WITH / REFER TO OTHER SETS / PACKAGES OF DRAWINGS FOR ADDITIONAL ICRA PLANS

AND THEIR REQUIREMENTS.

4. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER MAJOR AREAS OF WORK ONLY.

INCIDENTAL ICRA PLANS WILL BE REQUIRED AND SHALL BE PREPARED AND EXECUTED AS BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA. CONTRACTOR SHALL SUBMIT ICRA PLANS TO THE VA CFM OFFICE

FOR REVIEW AND APPROVAL PRIOR TO START OF WORK.

5. SET UP ICRA CONSTRUCTION BARRIER TO ENCLOSE AREA OF WORK BEING DONE ACCORDING TO PHASING.

9. COORDINATE WITH REFLECTED CEILING PLANS / FINISH SCHEDULE WHERE CEILINGS ARE

SCHEDULED TO BE MODIFIED OR REPLACED.

13. ALL HARDWARE FOR TEMPORARY DOORS ON ICRA PLANS IS AS FOLLOWS, UNLESS NOTED

OTHERWISE.

EACH DOOR TO HAVE

HINGES QUANTITY AND TYPE AS REQUIRED

1 PUSH-BUTTON COMBINATION LOCK ENTRY x KEY OVERIDE x LEVER

1 CLOSER C02011/C02021

1 WALL STOP (AT INSWING DOORS) L02101 CONVEX

1 SET SELF-ADHESIVE SEALS R0E154

COST TO THE PROJECT/GOVERNMENT.

12. REFER TO E4/A-GI250 FOR SCHEDULE FOR ALL ICRA TEMPORARY DOORS AND FRAMES, U.O.N.

1 KICK PLATE J102

1 AUTO DOOR BOTTOM ROY346 - HEAVY DUTY

EACH PAIR TO HAVE

HINGES QUANTITY AND TYPE AS REQUIRED

1 SET AUTO FLUSH BOLTS TYPE 25 LESS BOTTOM BOLT

1 PUSH-BUTTON COMBINATION LOCK F07 x KEYLESS ENTRY / KEYPAD x LEVER

1 OVERLAPPING STEEL ASTRAGAL

WITH SELF ADHESIVE SEAL

R0Y634 x ROY154 x THRU-BOLTS (INACTIVE LEAF)

1 TYPE 21A

2 AUTO DOOR BOTTOMS ROY346 - HEAVY DUTY

CLOSERS

KICK PLATES

WALL STOPS

SET SELF ADHESIVE SEALS

COORDINATOR

C02011 / C02021 J102 L02101

ROY154

14. CONTRACTOR TO IMMEDIATELY REPLACE CEILING TILE IF REPLACED / DISPLACED.

15. SEAL JUNCTION BOXES, OUTLETS, PANEL BOARDS ETC. DURING CONSTRUCTION TO PREVENT / REDUCE

AMOUNT OF FINAL CLEANUP REQUIRED.

1. IMPLEMENT THE REQUIREMENTS OF VAMC'S INFECTION CONTROL RISK ASSESSMENT (ICRA) TEAM.

2. ESTABLISH AND MAINTAIN A DUST CONTROL PROGRAM AS PART OF THE CONTRACTOR'S INFECTION PREVENTIVE MEASURES IN ACCORDANCE WITH THE GUIDELINES PROVIDED BY ICRA GROUP. PRIOR TO START OF WORK, PREPARE A PLAN DETAILING PROJECT- SPECIFIC DUST PROTECTION MEASURES, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT TO RESIDENT ENGINEER AND FACILITY ICRA

TEAM FOR REVIEW FOR COMPLIANCE WITH CONTRACT REQUIREMENTS.

3. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION OR RENOVATION ACTIVITY SHALL BE EDUCATED

AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE MEDICAL CENTER.

4. DO NOT PERFORM DUST PRODUCING TASKS WITHIN OCCUPIED AREAS OR EXTERIOR AREAS WITHIN

PROXIMITY OF OUTSIDE AIR INTAKES WITHOUT THE APPROVAL OF THE RESIDENT ENGINEER.

5. FOR CONSTRUCTION IN ANY AREAS THAT WILL REMAIN JOINTLY OCCUPIED BY THE MEDICAL CENTER

AND CONTRACTOR'S WORKERS, THE CONTRACTOR SHALL:

a. PROVIDE DUST PROOF ONE-HOUR FIRE RATED ICRA CONSTRUCTION BARRIERS TO COMPLETELY

SEPARATE CONSTRUCTION FROM THE OPERATIONAL AREAS OF THE MEDICAL CENTER IN ORDER

TO CONTAIN DIRT DEBRIS AND DUST.

b. HEPA FILTRATION IS REQUIRED WHERE THE EXHAUST DUST MAY REENTER THE BREATHING

ZONE.

c. ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE

CONSTRUCTION AREA TO OCCUPIED MEDICAL CENTER AREAS. ADHESIVE WALK-OFF MATS SHALL

BE CHANGED ON A DAILY BASIS.

d. VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED

MEDICAL CENTER AT THE END OF THE WORK DAY.

e. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE RESIDENT ENGINEER AND THE MEDICAL CENTER.

f. USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER AND VACUUM CEILING TILES PRIOR TO

REPLACEMENT.

g. THERE SHALL BE NO STANDING WATER DURING CONSTRUCTION. THIS INCLUDES WATER IN

EQUIPMENT DRIP PANS AND OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS.

h. AT COMPLETION, CAREFULLY REMOVE ICRA CONSTRUCTION BARRIERS AND CEILING PROTECTION

OUTSIDE OF NORMAL WORK HOURS. VACUUM AND CLEAN ALL SURFACES FREE OF DUST AFTER

THE REMOVAL.

6. FINAL CLEANUP:

a. UPON COMPLETION OF PROJECT, OR AS WORK PROGRESSES, REMOVE ALL CONSTRUCTION

DEBRIS FROM ABOVE CEILING, VERTICAL SHAFTS AND UTILITY CHASES THAT HAVE BEEN PART OF

THE CONSTRUCTION.

b. PERFORM HEPA VACUUM CLEANING OF ALL SURFACES IN THE CONSTRUCTION AREA. THIS INCLUDES WALLS, CEILINGS, CABINETS, FURNITURE (BUILT-IN OR FREE STANDING), PARTITIONS, FLOORING, ETC.

7. REFER TO SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS AND SECTION 01 35 26 -

SAFETY REQUIREMENTS FOR MAJOR PROJECTS FOR ADDITIONAL INFORMATION.

FREEZER 1

3093E

FREEZER 2

3096E

REFRIGERATOR 1

3092E

REFRIGERATOR 2

3095E

DN DN

18161412

CC

DD

EE

HH

C1S

C1S

TA12

TA13

M I N

C

L R

MM

MM

2'-0"

A L I G

N

M M

CONSTRUCTION AREA #11

3 4

54 4

MAIN KITCHEN

3086E

MAIN KITCHEN

3086E

22 2723 2624

2 SERVICE ELEVATORS #10, #11 AND #12 ARE TO BE USED FOR THE MOVEMENT OF DEMOLITION AND "NEW" MATERIALS TO AND FROM CONSTRUCTION AREA #2. CONSTRUCTION PERSONNEL ARE REQUIRED TO USE SERVICE ELEVATORS #10, #11 AND #12 FOR DAILY ACCESS TO THE CONSTRUCTION AREA #2.

MATERIAL TRANSPORT IN SERVICE ELEVATORS IS RESTRICTED TO THE HOURS OF 4:00 PM AND 5:00 AM DAILY. ALL TRANSPORTED MATERIALS SHALL BE ENCLOSED / COVERED. COORDINATE WEIGHT LIMITATIONS OF SERVICE ELEVATORS WITH VAMC FACILITIES / ENGINEERING DEPT. BEFORE WORK ACTIVITIES.

SERVICE ELEVATOR #13 IS TO BE USED FOR THE MOVEMENT OF DEMOLITION AND "NEW" MATERIALS TO AND FROM CONSTRUCTION AREA #1.

CONSTRUCTION PERSONNEL ARE REQUIRED TO USE STAIR 1-1 FOR ACCESS TO CONSTRUCTION AREA #1. MATERIAL TRANSPORT IN SERVICE ELEVATOR IS RESTRICTED TO THE HOURS OF 4:00 PM AND 5:00 AM DAILY. ALL TRANSPORTED MATERIALS SHALL BE ENCLOSED / COVERED. COORDINATE WEIGHT LIMITATIONS OF SERVICE ELEVATORS WITH VAMC FACILITIES / ENGINEERING DEPT. BEFORE WORK ACTIVITIES.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

Key Plan

Balance of Work

9/12/2022

CONSTRUCTION PERSONNEL CROSS CIRCULATION THROUGH KITCHEN IS LIMITED / RESTRICTED. CROSS CIRCULATION IS NOT PERMITTED DURING THE

HOURS OF 6:00 AM AND 7:15 PM DAILY.

DZ JH / DZ

#ICRA NOTES (CONTINUED)ICRA NOTESINFECTIOUS DISEASE CONTROL REQUIREMENTSICRA SYMBOLS

ICRA KEYNOTES

(SPECIFIC TO THIS

DRAWING ONLY)

1/8" = 1'-0"D2 PARTIAL THIRD FLOOR ICRA PLAN

0 4'-0" 8'-0" 16'-0"

PLAN

NORTH

CIRCULATION PATHS / FLOOR AREAS TO AND FROM WORK AREAS SHALL BE CLEANED AND SANITIZED BY THE CONTRACTOR ON A DAILY BASIS WHEN CONSTRUCTION IS IN PROGRESS. CONTRACTOR SHALL CLEAN / SANITIZE ELEVATORS USED PRIOR TO KITCHEN RE-OPENING AT 5:00 AM.

3 SERVICE ELEVATORS #10, #11, #12 AND #13 SHALL BE CLEANED AND SANITIZED BY THE CONTRACTOR ON A DAILY BASIS WHEN THIRD FLOOR CONSTRUCTION IS IN PROGRESS. CONTRACTOR SHALL CLEAN / SANITIZE ELEVATORS USED PRIOR TO KITCHEN RE-OPENING AT 5:00 AM

6 THE ICRA CONSTRUCTION BARRIER WILL BE REQUIRED CONSTRUCTED TO BE BEHIND A TEMPORARY 6 MIL THICK FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / ICRA BARRIER WITH POLE SUPPORTS AND SELF-ADHESIVE ZIPPER ENTRY. TEMPORARY ICRA CONSTRUCTION BARRIER SHALL BE SEALED TO CEILING / FLOOR / WALLS FOR DUST AND DEBRIS CONTAINMENT. THE INSTALLATION OF THE TEMPORARY POLYETHYLENE CONSTRUCTION FILM BARRIER SHALL BE DONE OUTSIDE THE VAMC KITCHEN HOURS OF 6:00 AM AND 7:15 PM DAILY. THE GWB ICRA CONSTRUCTION BARRIER CONSTRUCTION ACTIVITIES SHALL BE EXPEDITED ( ONE WEEK DURATION TOTAL / MAX.) TO LIMIT THE AMOUNT OF TIME THAT THE TEMPORARY POLYETHYLENE ICRA CONSTRUCTION BARRIER IS ERECTED. THE ERECTION OF TEMPORARY POLYETHYLENE OR GWB ICRA WALLS FOR CONSTRUCTION ACTIVITIES SHALL NOT IMPEDE VAMC KITCHEN OPERATIONS. OBTAIN APPROVAL / COORDINATE / FACILITATE ISLM WITH VA CFM OFFICE

PRIOR TO CONSTRUCTION ACTIVITIES AND THE ERECTION OF THE CONSTRUCTION BARRIERS.

7 MODIFY EXISTING CEILING TO ACCOMMODATE ICRA CONSTRUCTION BARRIER. CEILING TO BE RESTORED TO MATCH EXISTING CONDITIONS AFTER REMOVAL

OF THE TEMPORARY CONSTRUCTION BARRIER.

8 EXISTING WALL TO ACT AS ICRA CONSTRUCTION BARRIER. SEAL / FIRESTOP ANY OPENING IN WALL TO MAINTAIN INTEGRITY OF I HR CONSTRUCTION

BARRIER REQUIREMENTS.

9 6 MIL THICK FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / TEMPORARY ICRA BARRIER WITH POLE SUPPORTS AND SELF-ADHESIVE ZIPPER ENTRY. TEMPORARY ICRA CONSTRUCTION BARRIER SHALL BE SEALED TO CEILING / FLOOR / WALLS FOR DUST AND DEBRIS CONTAINMENT. DEMOLITION / CONSTRUCTION ACTIVITIES SHALL BE EXPEDITED ( THREE WEEK DURATION TOTAL / MAX.) TO LIMIT THE AMOUNT OF TIME THAT THE TEMPORARY ICRA CONSTRUCTION BARRIER IS ERECTED. THE ERECTION OF TEMPORARY GWB ICRA WALLS FOR CONSTRUCTION ACTIVITIES SHALL NOT IMPEDE VAMC OPERATIONS. OBTAIN APPROVAL / COORDINATE / FACILITATE ISLM WITH VA CFM OFFICE PRIOR TO CONSTRUCTION ACTIVITIES

AND THE ERECTION OF TEMPORARY ICRA CONSTRUCTION FILM BARRIERS.

A-GI230

PARTIAL THIRD FLOOR ICRA

PLAN

AutoCAD SHX Text

SALAD PREP

AutoCAD SHX Text 0380C

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 3102E

AutoCAD SHX Text 3081S

AutoCAD SHX Text

PATIENT SERVICES

AutoCAD SHX Text 3083E

AutoCAD SHX Text

SPECIAL DIET KITCH

AutoCAD SHX Text

3061AE

AutoCAD SHX Text

FILE STORAGE

AutoCAD SHX Text 3077C

AutoCAD SHX Text

DISTR

AutoCAD SHX Text 3076C

AutoCAD SHX Text

SERVICE LOBBY

AutoCAD SHX Text

3108AE

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

3110AN

AutoCAD SHX Text

DIET COMM CENTER

AutoCAD SHX Text 3100E

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text 3101C

AutoCAD SHX Text

STORAGE ROOM

AutoCAD SHX Text 3102C

AutoCAD SHX Text

LC

AutoCAD SHX Text 3103C

AutoCAD SHX Text

JC

AutoCAD SHX Text 3105C

AutoCAD SHX Text

DISH WASHERS

AutoCAD SHX Text 3107N

AutoCAD SHX Text

KITCH & DISH WASHING

AutoCAD SHX Text 3075S

AutoCAD SHX Text

SEC ACNS

AutoCAD SHX Text

EDUCATION

AutoCAD SHX Text 3075S

AutoCAD SHX Text

NURSE RECRUITER

AutoCAD SHX Text 3044S

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

3044AS

AutoCAD SHX Text

NURSING

AutoCAD SHX Text 3043S

AutoCAD SHX Text

PATIENT SERVICES

AutoCAD SHX Text 3042S

AutoCAD SHX Text

PATIENT SERVICES

AutoCAD SHX Text 3040S

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

ELEV SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV SHAFT

AutoCAD SHX Text 3039C

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 3097E

AutoCAD SHX Text

PAPER PRODUCTS

AutoCAD SHX Text 3123N

AutoCAD SHX Text

SEC TO CHIEF

AutoCAD SHX Text

3123CN

AutoCAD SHX Text

PROG CLERK

AutoCAD SHX Text 3123N

AutoCAD SHX Text

SITE MANAGER

AutoCAD SHX Text

3123EN

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

3123DN

AutoCAD SHX Text

TOILET

AutoCAD SHX Text 3120N

AutoCAD SHX Text

SEC/CLERK

AutoCAD SHX Text 3118E

AutoCAD SHX Text

DIETICIAN

AutoCAD SHX Text 3117N

AutoCAD SHX Text

TRAINING RM

AutoCAD SHX Text 3116N

AutoCAD SHX Text

MENS TLT

AutoCAD SHX Text 3115N

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 3112N

AutoCAD SHX Text

EL CL

AutoCAD SHX Text 3124N

AutoCAD SHX Text

EL CL

AutoCAD SHX Text 3109N

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

3110AN

AutoCAD SHX Text

DIET COMM CENTER

AutoCAD SHX Text 3125N

AutoCAD SHX Text

STAIR #4

AutoCAD SHX Text 3097E

AutoCAD SHX Text

PAPER PRODUCTS

AutoCAD SHX Text 3110N

AutoCAD SHX Text

PATIENTS CLOTHING

AutoCAD SHX Text 3081E

AutoCAD SHX Text

DIET VOLUNTEER

AutoCAD SHX Text 3085E

AutoCAD SHX Text

DIETETICS OFFICE

AutoCAD SHX Text 3078C

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

PAPER

AutoCAD SHX Text

PRODUCTS

AutoCAD SHX Text 3097E

AutoCAD SHX Text 3090E

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 3091E

AutoCAD SHX Text

STAIR 1-1

AutoCAD SHX Text 3098E

AutoCAD SHX Text

COOKS

AutoCAD SHX Text

SE #13

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

REFRIGERATOR

AutoCAD SHX Text F I R S T A V E N U E

AutoCAD SHX Text A S S E R L E V Y P L A C E

AutoCAD SHX Text E A S T 2 3 r d. S T R E E T

AutoCAD SHX Text

BLDG 3

AutoCAD SHX Text

BLDG 2

AutoCAD SHX Text

BLDG 4 / 5

AutoCAD SHX Text

E A S T 25 TH STREET

AutoCAD SHX Text

BLDG 1

AutoCAD SHX Text N

AutoCAD SHX Text

BLDG 6

Haselby, John Stamp

ICRA CONSTRUCTION BARRIER WALL / DOOR

WALL (EXISTING / NEW)

MAT WALK-OFF MAT(2 MATS AT DOUBLE DOORS)

HEPA FILTERHE

PA

M

H

MAT

TEMPORARY POLYETHYLENE PLASTIC

CONSTRUCTION FILM BARRIER; SEE ICRA

KEYNOTES FOR REQUIREMENTS

TC##

TEMPORARY LIGHT FIXTURE.

SEE DWG A-GI250 FOR DOOR AND

PARTITION TYPES

TA01

M

M

C1S

HE

PA

C1S 3'- 0"

5'- 0"

TA11

M

M

C2S HEPA

C2S 3'- 0"

5'- 8"

FLOOR LINE

5/8" TYPE "X" GWB BOTH SIDES

(1 LAYER - 1HOUR; 2 LAYERS - 2

HOUR (EACH SIDE)

SOUND ATTENUATION BATTS

(SAB) PER SCHEDULE.

CEILING LINE; REMOVE AND

MODIFY EXISTING CEILING TO

REMAIN AS REQUIRED TO

CONSTRUCT TEMP PARTITION

METAL STUDS, SIZE PER

SCHEDULE

3/4" FIRE RETARDANT TREATED

PLYWOOD AT ALL PARTITIONS

ADJACENT TO AREAS WHERE

CONSTRUCTION ACTIVITIES WILL

IMPACT

NOTE: ALL THRU WALL

PENETRATIONS SHALL HAVE A

FIRESTOP ASSEMBLY EQUAL TO

THE HOURLY RATING OF THE

PARTITION THAT IT PENETRATES

PUBLIC SIDE CONSTRUCTION SIDE

PAINT (SEMI GLOSS - WHITE)

SEALANT EACH SIDE

NOTE: SEE D1/A-GI250 FOR HEAD OF

WALL CONDITIONS AT DIFFERENT

LOCATIONS IN THE BUILDING

CAULK ALL

AROUND (BOTH SIDES)

HM FRAME (WELDED)

3 5/8" 5/8" 5/8"

5/8" GWB ( 1 LAYER - 1 HR; 2

LAYERS - 2 HR (EA SIDE)

2"

RETURN ON

FRAME

2" 5/8

1/2"

1. REFER TO A-AE001 FOR TYPICAL PLAN LEGENDS AND SYMBOLS. REFER TO A-AE002 FOR GENERAL NOTES.

2. ICRA CONSTRUCTION BARRIERS SHALL BE PROVIDED AT ENTRY POINTS AT ALL LOCATIONS

OF ACTIVE CONSTRUCTION. ALL ICRA CONSTRUCTION BARRIERS SHALL BE A MINIMUM OF 1-HOUR FIRE RATED

AND PREVENT CONTAMINATION OF ADJACENT OCCUPIED SPACES AT ALL TIMES.

6. BASED ON THE PROJECT SCOPE, OFF-HOUR / WEEKEND ICRA CONSTRUCTION BARRIER ERECTION AND DEMO / NEW WORK CONSTRUCTION WILL BE REQUIRED. COORDINATE OFF-HOURS / WEEKEND WORK WITH THE VA CFM OFFICE IN ADVANCE. OFF-HOURS / WEEKEND WORK SHALL BE INCLUSIVE OF THE CONTRACTOR AND HIS

SUB-CONTRACTORS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA.

7. MAINTAIN NEGATIVE PRESSURE AT SPACES WHERE CONSTRUCTION IS OCCURRING BASED UPON ICRA POLICY / PERMIT. THE ABILITY TO ACHIEVE THE REQUIRED NEGATIVE AIR PRESSURE WILL BE DETERMINED

BASED ON SITE CONDITIONS.

8. REFER TO SHEETS A-GI201 AND A-GI250 FOR ADDITIONAL TEMPORARY WALL DIMENSIONS AND

EXTENTS OF ICRA CONSTRUCTION BARRIERS.

MODIFY/REMOVE EXISTING CEILING CONSTRUCTION AS REQUIRED TO ACCOMMODATE

ICRA CONSTRUCTION BARRIERS. STORE ALL ACOUSTICAL CEILING PANELS, GRID, LIGHT FIXTURES AND CEILING ACCESSORIES AS DIRECTED BY THE VA. WHERE NEW CEILINGS ARE NOT SCHEDULED, EXISTING CEILINGS ARE TO BE RESTORED TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION BARRIERS.

10. MODIFY EXISTING MEP/FP (INCLUDING BUT NOT LIMITED TO; DIFFUSERS AND REGISTERS, LIGHT FIXTURES SPRINKLER HEADS) AS REQUIRED TO MAINTAIN APPROPRIATE

COVERAGE/LIGHTING/SERVICE TO ALL OCCUPIED SPACES DURING CONSTRUCTION ACTIVITIES.

RESTORE ALL INFRASTRUCTURE TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION

BARRIERS.

13. ALL HARDWARE FOR TEMPORARY DOORS ON ICRA PLANS IS AS FOLLOWS, UNLESS NOTED

OTHERWISE.

EACH DOOR TO HAVE

HINGES QUANTITY AND TYPE AS REQUIRED

1 PUSH-BUTTON COMBINATION LOCK ENTRY x KEY OVERIDE x LEVER

1 CLOSER C02011/C02021

1 WALL STOP (AT INSWING DOORS) L02101 CONVEX

1 SET SELF-ADHESIVE SEALS R0E154

ICRA NOTES:

11. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL PUBLIC SPACES

AT AREAS OF CONSTRUCTION. CONTRACTOR SHALL PATCH, REPAIR, PAINT, RESTORE,

REPLACE CONSTRUCTION DAMAGED MATERIALS IN PUBLIC SPACES TO MATCH EXISTING

CONDITIONS AS A PART OF THE PROJECTS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL

COST TO THE PROJECT/GOVERNMENT.

3. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER AREAS OF WORK FOR THIS PACKAGE ONLY. COORDINATE WITH / REFER TO OTHER SETS / PACKAGES OF DRAWINGS FOR ADDITIONAL ICRA PLANS

AND THEIR REQUIREMENTS.

4. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER MAJOR AREAS OF WORK ONLY.

INCIDENTAL ICRA PLANS WILL BE REQUIRED AND SHALL BE PREPARED AND EXECUTED AS BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA. CONTRACTOR SHALL SUBMIT ICRA PLANS TO THE VA CFM OFFICE

FOR REVIEW AND APPROVAL PRIOR TO START OF WORK.

5. SET UP ICRA CONSTRUCTION BARRIER TO ENCLOSE AREA OF WORK BEING DONE ACCORDING TO PHASING.

9. COORDINATE WITH REFLECTED CEILING PLANS / FINISH SCHEDULE WHERE CEILINGS ARE

SCHEDULED TO BE MODIFIED OR REPLACED.

12. REFER TO E4/A-GI250 FOR SCHEDULE FOR ALL ICRA TEMPORARY DOORS AND FRAMES, U.O.N.

1 KICK PLATE J102

1 AUTO DOOR BOTTOM ROY346 - HEAVY DUTY

EACH PAIR TO HAVE

HINGES QUANTITY AND TYPE AS REQUIRED

1 SET AUTO FLUSH BOLTS TYPE 25 LESS BOTTOM BOLT

1 PUSH-BUTTON COMBINATION LOCK F07 x KEYLESS ENTRY / KEYPAD x LEVER

1 OVERLAPPING STEEL ASTRAGAL

WITH SELF ADHESIVE SEAL

R0Y634 x ROY154 x THRU-BOLTS (INACTIVE LEAF)

1 TYPE 21A

2 AUTO DOOR BOTTOMS ROY346 - HEAVY DUTY

CLOSERS

KICK PLATES

WALL STOPS

SET SELF ADHESIVE SEALS

COORDINATOR

C02011 / C02021 J102 L02101

ROY154

14. CONTRACTOR TO IMMEDIATELY REPLACE CEILING TILE IF REPLACED / DISPLACED.

15. SEAL JUNCTION BOXES, OUTLETS, PANEL BOARDS ETC. DURING CONSTRUCTION TO PREVENT / REDUCE

AMOUNT OF FINAL CLEANUP REQUIRED.

100 SQ. IN. MAX

4" X 25"

FIRE

RESISTANT

(FR-1)

3'- 6"

9" 2

A

2"

2"

AS SCHEDULED

DETAIL D1 - "FIRE-RATED WALLS"- ADDITIONAL NOTES:

1. CONDITIONS INDICATED TO SHOW DESIGN INTENT. THEY ARE NOT INTENDED TO BE PROPRIETARY. CONTRACTOR MAY EMPLOY SIMILAR UL-APPROVED TOP-OF-WALL DESIGNS THAT ARE APPROPRIATE FOR CONDITIONS. OBTAIN VA APPROVAL PRIOR TO INSTALLATION.

2. REFER TO FIRESTOPPING SPECS FOR ADDITIONAL REQUIREMENTS REGARDING HEAD-OF-WALL CONDITION FOR FIRE-RATED WALLS.

SLOTTED TOP TRACK

STUD

DESIGN BASIS: UL-HW-D-0042

METAL DECK

(PERPENDICULAR TO FLUTES)

DESIGN BASIS: UL-HW-D-0264

METAL DECK

(PARALLEL TO FLUTES)

1" 1" 2"x20 GA STRAPS @ 16" O.C.

DESIGN BASIS: UL-HW-D-0259

STEEL BEAM

20 GA Z-BARS TO

ACCOMMODATE

SFRM

SPRAY-APPLIED

FIRE-RESISTIVE

MATERIAL (SFRM) - 2HR

PATCH AND REPAIR AS

REQUIRED

SAB

1 OR 2 LAYERS OF GWB; SEE

WALL TYPE

FIRE STOP JOINT SPRAY

MINERAL WOOL FORMING

MATERIAL

5/8

5/8

FIRE STOP JOINT SPRAY

SLOTTED TOP TRACK

STUD

SAB

1 OR 2 LAYERS OF GWB; SEE

WALL TYPE

5/8

MINERAL WOOL FORMING

MATERIAL

SLOTTED TOP TRACK

STUD

DESIGN BASIS: UL-HW-D-0209

CONCRETE SLAB DECK

SAB

1 OR 2 LAYERS OF GWB; SEE

WALL TYPE

FIRE STOP JOINT SPRAY

MA

X

3 4" / M

IN

5 8"

S

PB

TA06

M

M C1S

TA07

M

M

C1S

AL

IG

N

AL

IG

N 3'- 0"

5'- 6"

OFFICE

PB

PB

HEPA

TA08

M

M C1S

AL

IG

N 2'- 6"

C1S

6'- 0"

1'- 2 3

/4"

PUBLIC SIDE CONSTRUCTION SIDE

CEILING-REMOVE AND REPLACE

WHEN DISTURBED BY

CONSTRUCTION ACTIVITIES

TAPE AND SPACKLE

CONTINUOUS

INTUMESCENT SEALANT

OR FIRE RATED TAPE

NOTE: ALL THRU-WALL PENETRATIONS SHALL HAVE A FIRESTOP

ASSEMBLY EQUAL TO THE HOURLY RATING OF THE PARTITION

THAT IT PENETRATES

7'- 4"

M

IN

C

LE

AR

C-H STUDS @ 24" O.C.

8"TYPE 'X' GWB

8" TYPE 'X' GWB

(1 LAYER-1 HR

2 LAYER-2HR)

FIRE RESISTANCE

TEST AER-0903B

RATED TEMPORARY WALL PER DETAIL

D6/B-GI203 AND ICRA PLANS

EXISTING 6" CMU WALL OR GWB

PARTITION

FLOOR LINE

NOTES:

1. U.O.N., THIS ALTERNATE 1-HR ICRA CONSTRUCTION BARRIER SHALL ONLY BE USED WHEN

THE PLENUM AREA WILL NOT PERMIT A FULL HEIGHT 1-HR BARRIER TYPE D6/A-GI250 TO BE

BUILT. APPROVAL TO CONSTRUCT THIS ALTERNATE SHALL BE BY THE VA CFM OFFICE.

2. ALL OPENINGS IN THE EXISTING PARTITION NOT CONTAINED WITHIN THE ALTERNATE

1-HOUR ICRA CONSTRUCTION BARRIER SHALL BE UPGRADED TO A MINIMUM 45 MINUTE

RATING.

3. THIS ALTERNATE AS A 2-HR BARRIER SHALL BE USED AT THE CORRIDOR 0243N (SERVICE

ELEVATOR LOBBY) C2S

ALT

STEEL RUNNER

1" GWB LINER PANEL

INTUMESCENT

SEALANT

NOTE: SEE D1/A-GI250 FOR HEAD OF

WALL CONDITIONS AT DIFFERENT

LOCATIONS IN THE BUILDING

FASTENER PER UL ASSEMBLY

U U

V

V

V

U

1. IMPLEMENT THE REQUIREMENTS OF VAMC'S INFECTION CONTROL RISK ASSESSMENT (ICRA) TEAM.

2. ESTABLISH AND MAINTAIN A DUST CONTROL PROGRAM AS PART OF THE CONTRACTOR'S INFECTION PREVENTIVE MEASURES IN ACCORDANCE WITH THE GUIDELINES PROVIDED BY ICRA GROUP. PRIOR TO START OF WORK, PREPARE A PLAN DETAILING PROJECT- SPECIFIC DUST PROTECTION MEASURES, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT TO RESIDENT ENGINEER AND FACILITY ICRA

TEAM FOR REVIEW FOR COMPLIANCE WITH CONTRACT REQUIREMENTS.

3. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION OR RENOVATION ACTIVITY SHALL BE EDUCATED

AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE MEDICAL CENTER.

4. DO NOT PERFORM DUST PRODUCING TASKS WITHIN OCCUPIED AREAS OR EXTERIOR AREAS WITHIN

PROXIMITY OF OUTSIDE AIR INTAKES WITHOUT THE APPROVAL OF THE RESIDENT ENGINEER.

5. FOR CONSTRUCTION IN ANY AREAS THAT WILL REMAIN JOINTLY OCCUPIED BY THE MEDICAL CENTER

AND CONTRACTOR'S WORKERS, THE CONTRACTOR SHALL:

a. PROVIDE DUST PROOF ONE-HOUR FIRE RATED ICRA CONSTRUCTION BARRIERS TO COMPLETELY

SEPARATE CONSTRUCTION FROM THE OPERATIONAL AREAS OF THE MEDICAL CENTER IN ORDER

TO CONTAIN DIRT DEBRIS AND DUST.

b. HEPA FILTRATION IS REQUIRED WHERE THE EXHAUST DUST MAY REENTER THE BREATHING

ZONE.

c. ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE

CONSTRUCTION AREA TO OCCUPIED MEDICAL CENTER AREAS. ADHESIVE WALK-OFF MATS SHALL

BE CHANGED ON A DAILY BASIS.

d. VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED

MEDICAL CENTER AT THE END OF THE WORK DAY.

e. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE RESIDENT ENGINEER AND THE MEDICAL CENTER.

f. USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER AND VACUUM CEILING TILES PRIOR TO

REPLACEMENT.

g. THERE SHALL BE NO STANDING WATER DURING CONSTRUCTION. THIS INCLUDES WATER IN

EQUIPMENT DRIP PANS AND OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS.

h. AT COMPLETION, CAREFULLY REMOVE ICRA CONSTRUCTION BARRIERS AND CEILING PROTECTION

OUTSIDE OF NORMAL WORK HOURS. VACUUM AND CLEAN ALL SURFACES FREE OF DUST AFTER

THE REMOVAL.

6. FINAL CLEANUP:

a. UPON COMPLETION OF PROJECT, OR AS WORK PROGRESSES, REMOVE ALL CONSTRUCTION

DEBRIS FROM ABOVE CEILING, VERTICAL SHAFTS AND UTILITY CHASES THAT HAVE BEEN PART OF

THE CONSTRUCTION.

b. PERFORM HEPA VACUUM CLEANING OF ALL SURFACES IN THE CONSTRUCTION AREA. THIS INCLUDES WALLS, CEILINGS, CABINETS, FURNITURE (BUILT-IN OR FREE STANDING), PARTITIONS, FLOORING, ETC.

7. REFER TO SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS AND SECTION 01 35 26 -

SAFETY REQUIREMENTS FOR MAJOR PROJECTS FOR ADDITIONAL INFORMATION.

INFECTIOUS DISEASE CONTROL REQUIREMENTS

CORRIDOR

0243N0243N

0211AE0211AE

SPRINKLER

RISER

ROOM

S

S S S S

S

G245N.1

CLOSET

6'-0"

2'- 0"

5'-4"

C2S

ALT

C2S

ALT

C2S

ALT

C2S

ALT

'-0

V

MARK

STUD

SIZE

FIRE

RATING

FIRE-RESISTANCE

SOUND ATTENUATION

TEST SAB STC TEST

C1S 3 5/8" 1 HR / SMK U465, U450 3 1/2" 49 TL-93-325

C2S 3 5/8" 2 HR / SMK U419 3 1/2" 49 TL-93-325

ICRA DOOR AND FRAME SCHEDULE

IDENTIFICATION DIMENSIONS PANEL FRAME

FIRE

RATING HARDWARE GROUP NOTESDOOR NO ROOM NO ROOM NAME

WIDTH

H TYPE MATERIAL TYPE MATERIAL

DETAILS

W1 HEAD JAMB

TA01 0202S CORRIDOR 3' - 0" 7' - 0" 6 HM A HM F7/A-GI250 45 REFER TO ICRA NOTES

TA02 G297S CORRIDOR 3' - 0" 7' - 0" 2 HM A HM 45 REFER TO ICRA NOTES

TA03 G297S CORRIDOR 3' - 0" 7' - 0" 2 HM A HM 45 REFER TO ICRA NOTES

TA04 0243N CORRIDOR 3' - 0" 7' - 0" 2 HM A HM 45 REFER TO ICRA NOTES

TA05 0243N CORRIDOR 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES

TA06 0241N CORRIDOR 3' - 0" 7' - 0" 2 HM A HM 45 REFER TO ICRA NOTES

TA07 0241N CORRIDOR 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES

TA08 0241N CORRIDOR 3' - 0" 7' - 0" 2 HM A HM 45 REFER TO ICRA NOTES

TA09

1-1 STAIR 3' - 0" 7' - 0" 2 HM A HM 90 REFER TO ICRA NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

Key Plan

Balance of Work

9/12/2022

A-GI250

ENLARGED ICRA PLANS, DETAILS

& REQUIREMENTS

DZ JH / DZ

ENLARGED ICRA PLAN

B1

PLAN

NORTH

ENLARGED ICRA PLAN

B2

PLAN

NORTH

ENLARGED ICRA PLAN

B4

PLAN

NORTH

ENLARGED ICRA PLAN

B6

PLAN

NORTH

ICRA HEAD OF WALL CONDITION DETAILS

D1 SCALE: NTS

ICRA CONSTRUCTION BARRIER

D6 SCALE: NTS

ICRA DOOR AND FRAME SCHEDULE

E4 SCALE: NTS

ICRA DOOR FRAME TYPE

F4 SCALE: NTS

ICRA SIDE HINGED DOOR TYPES

F5 SCALE: NTS

ICRA DOOR FRAMES

F7 SCALE: NTS

W2

F7/A-GI250

1-HR / 2-HR ICRA CONSTRUCTION BARRIER

F1 SCALE: NTS

F7/A-GI250 F7/A-GI250

F7/A-GI250 F7/A-GI250

F7/A-GI250 F7/A-GI250

F7/A-GI250 F7/A-GI250

F7/A-GI250 F7/A-GI250

F7/A-GI250 F7/A-GI250

F7/A-GI250 F7/A-GI250

F7/A-GI250 F7/A-GI250

SCALE: 1/4" = 1'-0"

0 2' 4' 8'

SCALE: 1/4" = 1'-0"

0 2' 4' 8' SCALE: 1/4" = 1'-0"

0 2' 4' 8'

SCALE: 1/4" = 1'-0"

0 2' 4' 8'

TA11

0241N CORRIDOR 3' - 0" 7' - 0" 2 HM A HM 45 REFER TO ICRA NOTES- F7/A-GI250 F7/A-GI250 G245N CORRIDOR 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES- F7/A-GI250 F7/A-GI250TA10

LEVEL

ENLARGED ICRA PLAN

B8

PLAN

NORTH

SCALE: 1/4" = 1'-0"

0 2' 4' 8'

DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.

DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.

DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.

DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.

DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.

DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.

DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.

DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.

DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.

DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.

3090E CORRIDOR 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES- F7/A-GI250 F7/A-GI250TA12 3

3080C SALAD PREP 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES- F7/A-GI250 F7/A-GI250TA14 3

DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.

DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.

3097E PAPER PRODUCTS 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES- F7/A-GI250 F7/A-GI250TA13 3 DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.

AutoCAD SHX Text to Above

AutoCAD SHX Text Open

AutoCAD SHX Text

UP

AutoCAD SHX Text

SE #12

AutoCAD SHX Text

SE #11

AutoCAD SHX Text

SE #10

AutoCAD SHX Text

SE #9

Sheets and Views
A-GI201 PARTIAL GROUND FLOOR ICRA PLAN
Sheets and Views
A-GI250 ENLARGED ICRA PLANS, DETAILS & REQUIREMENTS
Sheets and Views
PARTIAL THIRD FLOOR ICRA PLAN

File details come from the government source that posted it. Updated .