80JSC023R0003 USDV RFP Model Contract Amendment 6.docx
DOCX document 680 KB Posted
- Attached to
- United States Deorbit Vehicle
- Solicitation number
- 80JSC023R0003
About this file
This document provides details for a final request for proposal for the United States Deorbit Vehicle procurement opportunity with NASA/Johnson Space Center. Key details include a proposal due date of November 17, 2023, a requirement for past performance information by October 16, 2023, and questions regarding the solicitation due by October 11, 2023. A pre-proposal conference is scheduled for October 3, 2023 and a pricing pre-proposal conference is scheduled for the same day from 2:30-4:00 PM. One-on-ones will be held on October 4, 2023 both virtually and in-person. The solicitation seeks proposals for design, development, manufacture, test, integration, acceptance, delivery and sustainment of a deorbit vehicle to meet NASA's requirements for deorbiting the International Space Station at end of life.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contents
| SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS | 1 | |
| B.1 | CONTRACT TYPE | 1 |
| B.2 | SUPPLIES AND/OR SERVICES TO BE PROVIDED / ITEMS ISSUED | 1 |
| B.3 | CLIN 1 DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) THROUGH CRITICAL DESIGN REVIEW (CDR) (CORE) | 2 |
| B.4 | CLIN 2 PRODUCTION, ASSEMBLY, INTEGRATION AND TEST (CORE) | 2 |
| B.5 | CLIN 3 DWELL (IDIQ) | 3 |
| B.6 | CLIN 4 LAUNCH VEHICLE (LV) INTEGRATION AND SUSTAINING (IDIQ) | 3 |
| B.7 | CLIN 5 SPECIAL TASKS AND STUDIES (IDIQ) | 5 |
| B.8 | NFS 1852.232-81 CONTRACT FUNDING. (JUN 1990) (Applies to CPIF only) | 6 |
| B.9 | JSC PROCUREMENT INSTRUCTION (JPI) 52.216-90 IDIQ MINIMUM AND MAXIMUM ORDERING LIMITS (NOV 2018) | 6 |
| SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK | 7 | |
| 1.0 | Introduction | 8 |
| 1.1 | Overview and Objectives | 8 |
| 1.2 | Scope | 8 |
| 1.3 | SOW Organization And Structure | 9 |
| 1.4 | Technical Direction | 10 |
| 2.0 | Overall General Requirements | 11 |
| 2.1 | Program Management | 11 |
| 2.1.1 | Program Management Review (PMR) | 12 |
| 2.2 | Business Management | 12 |
| 2.2.1 | Scheduling | 12 |
| 2.2.2 | Resource Management | 13 |
| 2.2.3 | Business Other | 13 |
| 2.3 | Configuration Management | 14 |
| 2.3.1 | Configuration Status Accounting and Verification | 14 |
| 2.3.2 | Configuration Control/Change Management | 14 |
| 2.4 | Information Technology (IT) | 15 |
| 2.5 | Export Control Management | 15 |
| 2.6 | NASA Insight and Approval | 16 |
| 2.7 | Project Life-Cycle Reviews | 18 |
| 2.8 | Technical and Program Integration Meetings | 19 |
| 2.9 | Design, Development, Test, and Evaluation (DDT&E) | 19 |
| 2.9.1 | Design and Construction Standards | 19 |
| 2.9.2 | Design, Analysis, and Trades | 20 |
| 2.9.3 | Interface Management | 20 |
| 2.9.4 | Test and Verification (T&V) | 21 |
| 2.9.5 | Technical Performance Measures (TPM) | 22 |
| 2.9.6 | Test Facility Capability | 22 |
| 2.9.7 | Previously Flown Hardware | 25 |
| 2.10 | Software Management | 25 |
| 2.11 | Safety, Reliability, Quality, and Mission Assurance | 25 |
| 2.11.1 | Safety | 26 |
| 2.11.2 | Reliability | 27 |
| 2.11.3 | Probabilistic Risk Assessment (PRA) | 27 |
| 2.11.4 | Quality Assurance (QA) | 27 |
| 2.11.5 | NASA Advisories And Government Industry Data Exchange Program (GIDEP) Failure Experience Data Processing | 28 |
| 2.11.6 | Software Safety and Assurance | 28 |
| 2.11.7 | Safety and Health | 29 |
| 2.11.8 | Supplier Management | 29 |
| 2.11.9 | Anomaly Tracking and Reporting | 29 |
| 2.11.10 | Mishap | 30 |
| 2.12 | Risk Management | 30 |
| 2.13 | Launch Vehicle (LV) Integration | 31 |
| 2.14 | ISS Integration | 31 |
| 2.15 | Flight Operations | 32 |
| 3.0 | Design, Development, Test and Evaluation (DDT&E) Through Critical Design Review (CDR) (CLIN 1) | 33 |
| 3.1 | Reserved | 33 |
| 3.2 | Launch Vehicle Integration | 33 |
| 3.3 | Flight Operations Preparation | 33 |
| 3.4 | Avionics & Software Simulation and Test Preparation | 34 |
| 3.5 | Contract Kick-off | 34 |
| 3.6 | Mission Concept Review (MCR) | 36 |
| 3.7 | System Requirements Review (SRR) | 38 |
| 3.8 | System Definition Review (SDR) | 41 |
| 3.9 | Preliminary Design Review (PDR) | 43 |
| 3.10 | Critical Design Review (CDR) | 48 |
| 4.0 | Production, Assembly, Integration and Test (CLIN 2) | 54 |
| 4.1 | General Requirements | 54 |
| 4.2 | Milestone C2-2 System Integration | 56 |
| 4.2.1 | Launch Vehicle Integration | 56 |
| 4.2.2 | Flight Operations Preparation | 56 |
| 4.2.3 | Avionics & Software Simulation and Test Finalization | 56 |
| 4.2.4 | System Integration Review (SIR) | 57 |
| 4.3 | Milestone C2-3 AI&T Progress | 58 |
| 4.3.1 | Launch Vehicle Integration | 59 |
| 4.3.2 | Flight Operations Preparation | 59 |
| 4.3.3 | Assembly, Integration, and Test Progress Review (APR) | 59 |
| 4.4 | Milestone C2-4 System Acceptance | 60 |
| 4.4.1 | Launch Vehicle Integration | 61 |
| 4.4.2 | Flight Operations Preparation | 61 |
| 4.4.3 | Phase III Safety Review | 62 |
| 4.4.4 | Flight Operations Review (FOR) | 63 |
| 4.4.5 | System Acceptance Review (SAR) | 63 |
| 4.5 | Milestone C2-5 Shipment to Acceptance Destination | 67 |
| 4.5.1 | Shipment to Acceptance Destination | 67 |
| 5.0 | Dwell (CLIN 3) | 69 |
| 5.1 | Dwell Release Review (DRR) | 70 |
| 6.0 | Launch Vehicle Integration and Sustaining (CLIN 4) | 72 |
| 6.1 | General Requirements | 72 |
| 6.2 | Pre-Launch | 74 |
| 6.2.1 | Ground Segment | 74 |
| 6.2.2 | Pre-Launch Ground Processing, Integration and Test | 74 |
| 6.2.3 | Launch Operations Preparation | 75 |
| 6.2.4 | Flight Operations Preparation | 76 |
| 6.2.5 | Delta FOR | 77 |
| 6.2.6 | Post Verification Review (PVR) | 77 |
| 6.2.7 | Stage Operations Readiness Review (SORR) | 77 |
| 6.2.8 | Flight Readiness Review (FRR) | 78 |
| 6.2.9 | Launch Readiness Review (LRR) | 78 |
| 6.3 | Launch and Flight Operations | 78 |
| 6.3.1 | Launch Operations | 78 |
| 6.3.2 | Flight Operations | 79 |
| 6.3.3 | Deorbit Readiness Review (DORR) | 80 |
| 6.3.4 | Post Mission Support | 80 |
| 6.4 | Parts | 80 |
| 7.0 | Special Tasks And Studies (CLIN 5) | 80 |
| 7.1 | Special Studies (Sub-CLIN 5A) | 81 |
| 7.2 | Pre-Priced Evaluation of NASA Mission Requirements (Sub-CLIN 5B) | 81 |
| SECTION D - PACKAGING AND MARKING | 1 | |
| D.1 | CLAUSES INCORPORATED BY REFERENCE | 1 |
| D.2 | NFS 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT. (JAN 2011) | 1 |
| SECTION E - INSPECTION AND ACCEPTANCE | 1 | |
| E.1 | LISTING OF CLAUSES INCORPORATED BY REFERENCE | 1 |
| E.2 | FAR 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) | 2 |
| E.3 | NFS 1852.246-71 GOVERNMENT CONTRACT QUALITY ASSURANCE FUNCTIONS. (OCT 1988) | 2 |
| E.4 | NFS 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT. (APR 2015) | 3 |
| E.5 | PRELIMINARY INSPECTION AT SOURCE AND FINAL INSPECTION AND ACCEPTANCE AT DESTINATION | 3 |
| SECTION F - DELIVERIES OR PERFORMANCE | 1 | |
| F.1 | LISTING OF CLAUSES INCORPORATED BY REFERENCE | 1 |
| F.2 | COMPLETION OF WORK | 1 |
| F.3 | FAR 52.211-9 DESIRED AND REQUIRED TIME OF DELIVERY (JUN 1997) | 2 |
| F.4 | PLACE OF PERFORMANCE | 3 |
| F.5 | NFS 1852.247-72 ADVANCE NOTICE OF SHIPMENT. (OCT 1988) | 3 |
| F.6 | JSC 52.247-95 FLIGHT ITEM (JUN 2020) | 3 |
| F.7 | OPTION TO EXTEND | 3 |
| SECTION G - CONTRACT ADMINISTRATION DATA | 1 | |
| G.1 | LISTING OF CLAUSES INCORPORATED BY REFERENCE | 1 |
| G.2 | NFS 1852.232-80 SUBMISSION OF VOUCHERS FOR PAYMENT. (APR 2018) | 2 |
| G.3 | NFS 1852.245-71 INSTALLATION—ACCOUNTABLE GOVERNMENT PROPERTY (JUN 2018) | 3 |
| G.4 | NFS 1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY OF CONTRACTORS. (JAN 2017)(Applies to CPIF only) (Applies to FFP if Contractor has custody of $10 million dollars of Government Property) | 5 |
| G.5 | NFS 1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR 52.245-1. (JAN 2011) | 6 |
| G.6 | NFS 1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS. (SEP 2017) | 7 |
| G.7 | JSC 52.204-92 NASA SECURITY PROGRAM AND IDENTIFICATION OF EMPLOYEES (JUL 2022) | 7 |
| G.8 | SHIPPING INSTRUCTIONS | 9 |
| SECTION H - SPECIAL CONTRACT REQUIREMENTS | 1 | |
| H.1 | LISTING OF CLAUSES INCORPORATED BY REFERENCE | 1 |
| H.2 | NFS 1852.209-71 LIMITATION OF FUTURE CONTRACTING. (DEC 1988) | 2 |
| H.3 | NFS 1852.225-70 EXPORT LICENSES. (FEB 2000) (ALT I) (FEB 2000) | 3 |
| H.4 | NFS 1852.228-76 CROSS-WAIVER OF LIABILITY FOR INTERNATIONAL SPACE STATION ACTIVITES (OCT 2012) | 3 |
| H.5 | NFS 1852.232-77 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT). (MAR 1989) | 6 |
| H.6 | NFS 1852.235-71 KEY PERSONNEL AND FACILITIES (MAR 1989) | 7 |
| H.7 | NFS 1852.235-74 ADDITIONAL REPORTS OF WORK - RESEARCH AND DEVELOPMENT. (FEB 2003) | 8 |
| H.8 | UNIDENTIFIED DATA CONTAINING RESTRICTIVE OR LIMITING MARKINGS | 8 |
| H.9 | NASA INSIGHT AND APPROVAL | 9 |
| H.10 | ASSOCIATE CONTRACTOR AGREEMENTS | 10 |
| H.11 | DATA CONTAINING AN INCORRECT NOTICE | 12 |
| H.12 | INCORRECT NOTICE AND REQUIREMENTS FOR WRITTEN JUSTIFICATION OF RESTRICTED MARKINGS | 12 |
| H.13 | PAYMENTS, EVENTS, AND ACCOMPLISHMENT CRITERIA | 12 |
| H.14 | SAE AS9100 | 13 |
| H.15 | MITIGATION OF ORGANIZATIONAL CONFLICTS OF INTEREST | 13 |
| H.16 | DISCLOSURE OF ORGANIZATIONAL CONFLICTS OF INTEREST AFTER CONTRACT AWARD | 14 |
| H.17 | IDENTIFICATION AND REPRESENTATION OF LIMITED RIGHTS DATA AND RESTRICTED COMPUTER SOFTWARE AFTER AWARD | 15 |
| H.18 | TECHNICAL DATA AND COMPUTER SOFTWARE – WITHHOLDING OF PAYMENT | 15 |
| H.19 | GOVERNMENT’S RIGHT TO REMOTELY SENSED DATA | 16 |
| H.20 | CONTRACTOR ACQUIRED PROPERTY TRANSITION TO FIRM FIXED PRICE (Applies to CPIF only) | 16 |
| H.21 | SPECIAL TOOLING, SPECIAL TEST EQUIPMENT, AND MANUFACTURING AIDS FOR USDV | 16 |
| H.22 | CONTRACTOR OBJECTIVES ON USDV | 16 |
| H.23 | FOREIGN TRAVEL BY CONTRACTOR EMPLOYEES ON NASA OFFICIAL BUSINESS (JUL 2022) | 16 |
| H.24 | COUNTERINTELLIGENCE BRIEFINGS (AUG 2022) | 18 |
| H.25 | USE OF GOVERNMENT RESOURCES | 19 |
| H.26 | CONTRACTOR BUSINESS SYSTEMS (Applies to CAS covered contracts only) | 23 |
| H.27 | 52.223-94 JSC ENVIRONMENTAL COMPLIANCE (MAR 2023) (JSC PROCUREMENT INSTRUCTION) | 27 |
| H.28 | USDV COMMUNICATIONS | 29 |
| SECTION I - CONTRACT CLAUSES | 1 | |
| I.1 | LISTING OF CLAUSES INCORPORATED BY REFERENCE | 1 |
| I.2 | FAR 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS. (NOV 2021) | 7 |
| I.3 | FAR 52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION | 9 |
| I.4 | FAR 52.216-10 INCENTIVE FEE (JUNE 2011) (Applies to CPIF only) | 10 |
| I.5 | FAR 52.216-18 ORDERING. (AUG 2020) | 12 |
| I.6 | FAR 52.216-19 ORDER LIMITATIONS. (OCT 1995) | 12 |
| I.7 | FAR 52.216-22 INDEFINITE QUANTITY. (OCT 1995) | 13 |
| I.8 | FAR 52.217-7 OPTION FOR INCREASED QUANTITY - SEPARATELY PRICED LINE ITEM (CLIN 2A Critical spares) (MAR 1989) | 13 |
| I.9 | FAR 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS CONCERNS (Oct 2022) | 16 |
| I.10 | FAR 52.222-19 CHILD LABOR-COOPERATION WITH AUTHORITIES AND REMEDIES. (MAR 2022) (DEVIATION) | 16 |
| I.11 | FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS. (JUN 2020) | 18 |
| I.12 | FAR 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES. (JUN 2020) | 18 |
| I.13 | FAR 52.232-19 AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR. (APR 1984) | 18 |
| I.14 | FAR 52.232-32 PERFORMANCE-BASED PAYMENTS. (APR 2012) | 19 |
| I.15 | FAR 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (FEB 2021) (ALTERNATE I) (JUL 1995) | 22 |
| I.16 | FAR 52.227-14 RIGHTS IN DATA—GENERAL (MAY 2014) ALTERNATE II (DEC 2007) [(MODIFIED BY NFS 1852.227-14 (APR 2015)] ALTERNATE III (DEC 2007) ALTERNATE V (DEC 2007) | 24 |
| I.17 | FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS. (MAR 2023) | 32 |
| I.18 | FAR 52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES. (JUN 2023) | 33 |
| I.19 | FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE. (FEB 1998) | 35 |
| I.20 | FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES. (NOV 2020) | 35 |
| I.21 | NFS 1852.204-75 SECURITY CLASSIFICATION REQUIREMENTS (SEP 1989) | 36 |
| I.22 | NFS 1852.204-76 SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION TECHNOLOGY RESOURCES (APR 2021) (DEVIATION) | 36 |
| I.23 | NFS 1852.216-80 TASK ORDERING PROCEDURE. (OCT 1996) ALTERNATE II (APR 2018) (Applies to FFP IDIQ only) | 37 |
| I.24 | NFS 1852.225-8 DUTY-FREE ENTRY OF SPACE ARTICLES (FEB 2000). | 38 |
| I.25 | NFS 1852.225-71 RESTRICTION ON FUNDING ACTIVITY WITH CHINA (FEB 2012) (DEVIATION) | 39 |
| I.26 | NFS 1852.234-2 EARNED VALUE MANAGEMENT SYSTEM. (NOV 2015) (DEVIATION) (Applies to CPIF only) | 39 |
| I.27 | NFS 1852.239-74 INFORMATION TECHNOLOGY SYSTEM SUPPLY CHAIN RISK ASSESSMENT (JAN 2020) (DEVIATION) | 41 |
| SECTION J - LIST OF ATTACHMENTS | 1 | |
| ATTACHMENT J-01 DATA REQUIREMENTS DESCRIPTION (DRD) | 2 | |
| ATTACHMENT J-02 RESERVED | 1 | |
| ATTACHMENT J-03 ACRONYMS AND ABBREVIATIONS | 1 | |
| ATTACHMENT J-04 DEFINITIONS | 1 | |
| ATTACHMENT J-05 APPLICABLE AND REFERENCE DOCUMENTS LIST | 1 | |
| ATTACHMENT J-06 PROGRAM MANAGEMENT PLAN | 1 | |
| ATTACHMENT J-07 PROJECT LIFE-CYCLE REVIEW PLAN | 1 | |
| ATTACHMENT J-08 USDV SYSTEM ARCHITECTURE AND CONCEPT OF OPERATIONS | 1 | |
| ATTACHMENT J-09 INSIGHT MANAGEMENT PLAN | 1 | |
| ATTACHMENT J-10 ORGANIZATIONAL CONFLICTS OF INTEREST (OCI) PLAN | 1 | |
| ATTACHMENT J-11 SMALL BUSINESS SUBCONTRACTING PLAN | 1 | |
| ATTACHMENT J-12 DIVERSITY, EQUITY, INCLUSION, AND ACCESSIBILITY (DEIA) PLAN | 1 | |
| ATTACHMENT J-13 CONFIGURATION MANAGEMENT PLAN | 1 | |
| ATTACHMENT J-14 INFORMATION TECHNOLOGY SECURITY MANAGEMENT PLAN (ITSMP) | 1 | |
| ATTACHMENT J-15 EXPORT CONTROL PLAN | 1 | |
| ATTACHMENT J-16 GOVERNMENT PROPERTY MANAGEMENT PLAN | 1 | |
| ATTACHMENT J-17 SAFETY AND HEALTH PLAN | 1 | |
| ATTACHMENT J-18 RISK MANAGEMENT PLAN (RMP) | 1 | |
| ATTACHMENT J-19 SAFETY & MISSION ASSURANCE (S&MA) PLAN | 1 | |
| ATTACHMENT J-20 MISHAP PREPARDNESS AND CONTENGENCY PLAN | 1 | |
| ATTACHMENT J-21 TRL ASSESSMENT AND TECHNOLOGY MATURATION PLAN | 1 | |
| ATTACHMENT J-22 SOFTWARE MANAGEMENT PLAN | 1 | |
| ATTACHMENT J-23 DESIGN, DEVELOPMENT, TEST, AND EVALUATION (DDT&E) PLAN | 1 | |
| ATTACHMENT J-24 VERIFICATION AND VALIDATION (V&V) PLAN | 1 | |
| ATTACHMENT J-25 SYSTEM ENGINEERING MANAGEMENT PLAN (SEMP) | 1 | |
| ATTACHMENT J-26 ASSEMBLY, INTEGRATION, AND TEST (AI&T) PLAN | 1 | |
| ATTACHMENT J-27 NASA STANDARDS AND SPECIFICATIONS COMPLIANCE AND TAILORING APPROACH | 1 | |
| ATTACHMENT J-28 QUALIFICATION AND ACCEPTANCE PLAN | 1 | |
| ATTACHMENT J-29 INTEGRATED MASTER SCHEDULE | 1 | |
| ATTACHMENT J-30 WORK PLANS | 1 | |
| ATTACHMENT J-31 GOVERNMENT TASK AGREEMENTS | 1 | |
| ATTACHMENT J-32 STANDARD LABOR CATEGORIES | 1 | |
| ATTACHMENT J-33 GOVERNMENT-FURNISHED PROPERTY, FACILITIES AND DATA/INFORMATION | 1 | |
| ATTACHMENT J-34 INSTALLATION ACCOUNTABLE GOVERNMENT PROPERTY | 1 | |
| ATTACHMENT J-35 RESERVED | 1 | |
| ATTACHMENT J-36 AUTHORIZED LIMITED RIGHTS IN DATA AND RESTRICTED COMPUTER SOFTWARE | 1 | |
| ATTACHMENT J-37 INCENTIVE FEE PLAN (Applies to CPIF only) | 1 | |
| ATTACHMENT J-38 DD FORM 254, DEPARTEMENT OF DEFENSE CONTRACT SECURITY CLASSIFICATEION SPECIFICATION | 1 | |
| ATTACHMENT J-39 PROPULSION SYSTEM DEVELOPMENT APPROACH | 1 | |
| ATTACHMENT J-40 DELIVERABLE ITEM LIST | 1 | |
| SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS OR RESPONDENTS | 1 | |
| K.1 | CLAUSES INCORPORATED BY REFERENCE | 1 |
| K.2 | 52.204-3 TAXPAYER IDENTIFICATION. (OCT 1998) | 2 |
| K.3 | 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS. (MAR 2023) | 3 |
| K.4 | 52.204-20 PREDECESSOR OF OFFEROR. (AUG 2020) | 6 |
| K.5 | 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT. (NOV 2021) | 7 |
| K.6 | 52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES - REPRESENTATION. (OCT 2020) | 9 |
| K.7 | 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS. (AUG 2020) | 10 |
| K.8 | 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS. (OCT 2018) | 11 |
| K.9 | 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW. (FEB 2016) | 12 |
| K.10 | 52.209-12 CERTIFICATION REGARDING TAX MATTERS. (OCT 2020) | 13 |
| K.11 | 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS - CERTIFICATION. (NOV 2021) | 13 |
| K.12 | 52.215-6 PLACE OF PERFORMANCE. (OCT 1997) | 15 |
| K.13 | 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS. (MAR 2023) | 15 |
| K.14 | 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS ALTERNATE I (SEP 2015) | 19 |
| K.15 | 52.219-2 EQUAL LOW BIDS. (OCT 1995) | 19 |
| K.16 | 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS. (FEB 1999) | 20 |
| K.17 | 52.222-25 AFFIRMATIVE ACTION COMPLIANCE. (APR 1984) | 20 |
| K.18 | 52.225-2 BUY AMERICAN CERTIFICATE. (OCT 2022) | 20 |
| K.19 | 52.225-18 PLACE OF MANUFACTURE. (AUG 2018) | 21 |
| K.20 | 52.225-20 PROHIBITION ON CONDUCTING RESTRICTED BUSINESS OPERATIONS IN SUDAN - CERTIFICATION. (AUG 2009) | 21 |
| K.21 | 52.227-15 REPRESENTATION OF LIMITED RIGHTS DATA AND RESTRICTED COMPUTER SOFTWARE. (DEC 2007) | 22 |
| K.22 | 52.230-1 COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION. (JUN 2020) (Applies to CPIF only) | 24 |
| K.23 | 52.230-7 PROPOSAL DISCLOSURE - COST ACCOUNTING PRACTICE CHANGES. (APR 2005) (Applies to CPIF only) | 26 |
| K.24 | 1852.225-72 RESTRICTION ON FUNDING ACTIVITY WITH CHINA - REPRESENTATION (FEB 2012) (DEVIATION) | 26 |
| SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS | 1 | |
| L.1 | CLAUSE INCORPORATED BY REFERENCE | 1 |
| L.2 | FAR 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS. (JUN 1988) | 2 |
| L.3 | FAR 52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008) | 5 |
| L.4 | FAR 52.216-1 TYPE OF CONTRACT (APR 1984) | 5 |
| L.5 | FAR 52.222-56 CERTIFICATION REGARDING TRAFFICKING IN PERSONS COMPLIANCE PLAN (OCT 2020) | 5 |
| L.6 | FAR 52.232-28 INVITATION TO PROPOSE PERFORMANCE-BASED PAYMENTS (MAR 2000) (Applies to FFP only) | 6 |
| L.7 | FAR 52.233-2 SERVICE OF PROTEST (SEP 2006) | 7 |
| L.8 | FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 7 |
| L.9 | FAR 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020) | 8 |
| L.10 | NFS 1852.215-77 PREPROPOSAL/PREBID CONFERENCE (APR 2015) | 8 |
| L.11 | NFS 1852.219-73 SMALL BUSINESS SUBCONTRACTING PLAN (MAY 1999) | 9 |
| L.12 | NFS 1852.234-1 NOTICE OF EARNED VALUE MANAGEMENT SYSTEM (NOV 2006) (Applies to CPIF only) | 9 |
| L.13 | NFS 1852.239-73 REVIEW OF THE OFFEROR’S INFORMATION TECHNOLOGY SYSTEMS SUPPLY CHAIN (DEVIATION 15-03D) | 10 |
| L.14 | NFS 1852.245-80 GOVERNMENT PROPERTY MANAGEMENT INFORMATION (JAN 2011) | 12 |
| L.15 | NFS 1852.245-81 LIST OF AVAILABLE GOVERNMENT PROPERTY (JAN 2011) | 13 |
| L.16 | LIST OF AVAILABLE GOVERNMENT FACILITIES | 15 |
| L.17 | JSC 52.215-107 GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL (AUG 2018) (JSC PROCUREMENT INSTRUCTION) | 16 |
| L.18 | ELECTRONIC SUBMISSION OF PROPOSALS – PROPOSAL MARKING AND DELIVERY THROUGH NASA’S EFSS BOX | 17 |
| L.19 | JSC 52.215-123 AVAILABILITY OF SPECIFICATIONS (DEC 2019) (JSC PROCUREMENT INSTRUCTION) | 19 |
| L.20 | JSC 52.215-124 COMMUNICATIONS REGARDING THIS SOLICITATION (MAR 2023) (JSC PROCUREMENT INSTRUCTION) | 19 |
| L.21 | OFFEROR ACCEPTANCE PERIOD | 20 |
| L.22 | INSTRUCTIONS TO OFFERORS | 21 |
| L.23 | INTRODUCTION | 22 |
| L.24 | PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE DATES | 22 |
| L.25 | PROPOSAL FORMATTING INSTRUCTIONS | 28 |
| L.26 | COST AND PRICE FACTOR - VOLUME I | 29 |
| L.27 | MISSION SUITABILITY (MS) FACTOR – VOLUME II | 47 |
| L.28 | PAST PERFORMANCE - VOLUME III | 60 |
| L.29 | RESPONSIBILITY CONSIDERATIONS – VOLUME IV | 62 |
| L.30 | MODEL CONTRACT AND ADDITIONAL REQUIREMENTS - VOLUME V | 69 |
| LIST OF ATTACHMENTS | 72 | |
| ATTACHMENT L-01A USDV HYBRID COST PRICE TEMPLATE | 73 | |
| ATTACHMENT L-01B USDV FIXED PRICE TEMPLATE | 74 | |
| ATTACHMENT L-01C USDV MINOR SUBCONTRACTOR TEMPLATE | 75 | |
| ATTACHMENT L-01D USDV HYBRID COST PRICE TEMPLATES (CLIN 1 AND 2 CPIF) | 76 | |
| ATTACHMENT L-02 BASIS OF ESTIMATE (BOE) FORM | 77 | |
| ATTACHMENT L-03 TECHNICAL RESOURCES TEMPLATE (TRT) | 79 | |
| ATTACHMENT L-04A CLIN 4 – LAUNCH VEHICLE INTEGRATION AND SUSTAINING REPRESENTATIVE TASK ORDER (RTO) | 80 | |
| ATTACHMENT L-04B CLIN 4 – LAUNCH VEHICLE INTEGRATION AND SUSTAINING – LONG LEAD PARTS REPRESENTATIVE DELIVERY ORDER (RDO) | 82 | |
| ATTACHMENT L-05 STANDARD LABOR CATEGORIES (SLC) | 89 | |
| ATTACHMENT L-06 SAMPLE PAST PERFORMANCE CONSENT LETTER PAST PERFORMANCE CONSENT LETTER | 96 | |
| ATTACHMENT L-07 PAST PERFORMANCE MATRIX | 97 | |
| ATTACHMENT L-08 GOVERNMENT TASK AGREEMENT INSTRUCTIONS | 98 | |
| ATTACHMENT L-09 PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM CHECKLIST (Applies to CPIF only) | 106 | |
| ATTACHMENT L-10 PRIME/SUBCONTRACTOR IDENTIFICATION AND SOW DIVISION OF WORK LISTING | 107 | |
| SECTION M - EVALUATION FACTORS FOR AWARD | 1 | |
| M.1 | SOURCE EVALUATION BOARD EVALUATION FACTORS FOR AWARD | 1 |
| M.2 | COST AND PRICE FACTOR (VOLUME I) | 2 |
| M.3 | MISSION SUITABILITY FACTOR (VOLUME II) | 5 |
| M.4 | PAST PERFORMANCE EVALUATION -VOLUME III | 7 |
| M.5 | RESPONSIBILITY CONSIDERATIONS (VOLUME IV) | 10 |
| M.6 | MODEL CONTRACT (VOLUME V) | 13 |
| SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS | 1 | |
| B.1 | CONTRACT TYPE | 1 |
| B.2 | SUPPLIES AND/OR SERVICES TO BE PROVIDED / ITEMS ISSUED | 1 |
| B.3 | CLIN 1 DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) THROUGH CRITICAL DESIGN REVIEW (CDR) (CORE) | 2 |
| B.4 | CLIN 2 PRODUCTION, ASSEMBLY, INTEGRATION AND TEST (CORE) | 2 |
| B.5 | CLIN 3 DWELL (IDIQ) | 3 |
| B.6 | CLIN 4 LAUNCH VEHICLE (LV) INTEGRATION AND SUSTAINING (IDIQ) | 3 |
| B.7 | CLIN 5 SPECIAL TASKS AND STUDIES (IDIQ) | 5 |
| B.8 | NFS 1852.232-81 CONTRACT FUNDING. (JUN 1990) (Applies to CPIF only) | 6 |
| B.9 | JSC PROCUREMENT INSTRUCTION (JPI) 52.216-90 IDIQ MINIMUM AND MAXIMUM ORDERING LIMITS (NOV 2018) | 6 |
| SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK | 7 | |
| 1.0 | Introduction | 8 |
| 1.1 | Overview and Objectives | 8 |
| 1.2 | Scope | 8 |
| 1.3 | SOW Organization And Structure | 9 |
| 1.4 | Technical Direction | 10 |
| 2.0 | Overall General Requirements | 11 |
| 2.1 | Program Management | 11 |
| 2.1.1 | Program Management Review (PMR) | 12 |
| 2.2 | Business Management | 12 |
| 2.2.1 | Scheduling | 12 |
| 2.2.2 | Resource Management | 12 |
| 2.2.3 | Business Other | 13 |
| 2.3 | Configuration Management | 14 |
| 2.3.1 | Configuration Status Accounting and Verification | 14 |
| 2.3.2 | Configuration Control/Change Management | 14 |
| 2.4 | Information Technology (IT) | 15 |
| 2.5 | Export Control Management | 15 |
| 2.6 | NASA Insight and Approval | 16 |
| 2.7 | Project Life-Cycle Reviews | 18 |
| 2.8 | Technical and Program Integration Meetings | 18 |
| 2.9 | Design, Development, Test, and Evaluation (DDT&E) | 19 |
| 2.9.1 | Design and Construction Standards | 19 |
| 2.9.2 | Design, Analysis, and Trades | 20 |
| 2.9.3 | Interface Management | 20 |
| 2.9.4 | Test and Verification (T&V) | 21 |
| 2.9.5 | Technical Performance Measures (TPM) | 22 |
| 2.9.6 | Test Facility Capability | 22 |
| 2.9.7 | Previously Flown Hardware | 24 |
| 2.10 | Software Management | 25 |
| 2.11 | Safety, Reliability, Quality, and Mission Assurance | 25 |
| 2.11.1 | Safety | 25 |
| 2.11.2 | Reliability | 26 |
| 2.11.3 | Probabilistic Risk Assessment (PRA) | 27 |
| 2.11.4 | Quality Assurance (QA) | 27 |
| 2.11.5 | NASA Advisories And Government Industry Data Exchange Program (GIDEP) Failure Experience Data Processing | 28 |
| 2.11.6 | Software Safety and Assurance | 28 |
| 2.11.7 | Safety and Health | 28 |
| 2.11.8 | Supplier Management | 28 |
| 2.11.9 | Anomaly Tracking and Reporting | 29 |
| 2.11.10 | Mishap | 30 |
| 2.12 | Risk Management | 30 |
| 2.13 | Launch Vehicle (LV) Integration | 30 |
| 2.14 | ISS Integration | 30 |
| 2.15 | Flight Operations | 31 |
| 3.0 | Design, Development, Test and Evaluation (DDT&E) Through Critical Design Review (CDR) (CLIN 1) | 32 |
| 3.1 | Reserved | 33 |
| 3.2 | Launch Vehicle Integration | 33 |
| 3.3 | Flight Operations Preparation | 33 |
| 3.4 | Avionics & Software Simulation and Test Preparation | 33 |
| 3.5 | Contract Kick-off | 34 |
| 3.6 | Mission Concept Review (MCR) | 35 |
| 3.7 | System Requirements Review (SRR) | 37 |
| 3.8 | System Definition Review (SDR) | 41 |
| 3.9 | Preliminary Design Review (PDR) | 42 |
| 3.10 | Critical Design Review (CDR) | 48 |
| 4.0 | Production, Assembly, Integration and Test (CLIN 2) | 53 |
| 4.1 | General Requirements | 53 |
| 4.2 | Milestone C2-2 System Integration | 55 |
| 4.2.1 | Launch Vehicle Integration | 55 |
| 4.2.2 | Flight Operations Preparation | 55 |
| 4.2.3 | Avionics & Software Simulation and Test Finalization | 55 |
| 4.2.4 | System Integration Review (SIR) | 56 |
| 4.3 | Milestone C2-3 AI&T Progress | 58 |
| 4.3.1 | Launch Vehicle Integration | 58 |
| 4.3.2 | Flight Operations Preparation | 58 |
| 4.3.3 | Assembly, Integration, and Test Progress Review (APR) | 59 |
| 4.4 | Milestone C2-4 System Acceptance | 60 |
| 4.4.1 | Launch Vehicle Integration | 60 |
| 4.4.2 | Flight Operations Preparation | 60 |
| 4.4.3 | Phase III Safety Review | 62 |
| 4.4.4 | Flight Operations Review (FOR) | 62 |
| 4.4.5 | System Acceptance Review (SAR) | 63 |
| 4.5 | Milestone C2-5 Shipment to Acceptance Destination | 66 |
| 4.5.1 | Shipment to Acceptance Destination | 66 |
| 5.0 | Dwell (CLIN 3) | 69 |
| 5.1 | Dwell Release Review (DRR) | 70 |
| 6.0 | Launch Vehicle Integration and Sustaining (CLIN 4) | 71 |
| 6.1 | General Requirements | 71 |
| 6.2 | Pre-Launch | 73 |
| 6.2.1 | Ground Segment | 73 |
| 6.2.2 | Pre-Launch Ground Processing, Integration and Test | 73 |
| 6.2.3 | Launch Operations Preparation | 75 |
| 6.2.4 | Flight Operations Preparation | 76 |
| 6.2.5 | Delta FOR | 76 |
| 6.2.6 | Post Verification Review (PVR) | 76 |
| 6.2.7 | Stage Operations Readiness Review (SORR) | 77 |
| 6.2.8 | Flight Readiness Review (FRR) | 77 |
| 6.2.9 | Launch Readiness Review (LRR) | 77 |
| 6.3 | Launch and Flight Operations | 77 |
| 6.3.1 | Launch Operations | 78 |
| 6.3.2 | Flight Operations | 78 |
| 6.3.3 | Deorbit Readiness Review (DORR) | 79 |
| 6.3.4 | Post Mission Support | 80 |
| 6.4 | Parts | 80 |
| 7.0 | Special Tasks And Studies (CLIN 5) | 80 |
| 7.1 | Special Studies (Sub-CLIN 5A) | 80 |
| 7.2 | Pre-Priced Evaluation of NASA Mission Requirements (Sub-CLIN 5B) | 80 |
| SECTION D - PACKAGING AND MARKING | 1 | |
| D.1 | CLAUSES INCORPORATED BY REFERENCE | 1 |
| D.2 | NFS 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT. (JAN 2011) | 1 |
| SECTION E - INSPECTION AND ACCEPTANCE | 1 | |
| E.1 | LISTING OF CLAUSES INCORPORATED BY REFERENCE | 1 |
| E.2 | FAR 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) | 2 |
| E.3 | NFS 1852.246-71 GOVERNMENT CONTRACT QUALITY ASSURANCE FUNCTIONS. (OCT 1988) | 2 |
| E.4 | NFS 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT. (APR 2015) | 3 |
| E.5 | PRELIMINARY INSPECTION AT SOURCE AND FINAL INSPECTION AND ACCEPTANCE AT DESTINATION | 3 |
| SECTION F - DELIVERIES OR PERFORMANCE | 1 | |
| F.1 | LISTING OF CLAUSES INCORPORATED BY REFERENCE | 1 |
| F.2 | COMPLETION OF WORK | 1 |
| F.3 | FAR 52.211-9 DESIRED AND REQUIRED TIME OF DELIVERY (JUN 1997) | 2 |
| F.4 | PLACE OF PERFORMANCE | 2 |
| F.5 | NFS 1852.247-72 ADVANCE NOTICE OF SHIPMENT. (OCT 1988) | 3 |
| F.6 | JSC 52.247-95 FLIGHT ITEM (JUN 2020) | 3 |
| F.7 | OPTION TO EXTEND | 3 |
| SECTION G - CONTRACT ADMINISTRATION DATA | 1 | |
| G.1 | LISTING OF CLAUSES INCORPORATED BY REFERENCE | 1 |
| G.2 | NFS 1852.232-80 SUBMISSION OF VOUCHERS FOR PAYMENT. (APR 2018) | 2 |
| G.3 | NFS 1852.245-71 INSTALLATION—ACCOUNTABLE GOVERNMENT PROPERTY (JUN 2018) | 3 |
| G.4 | NFS 1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY OF CONTRACTORS. (JAN 2017)(Applies to CPIF only) (Applies to FFP if Contractor has custody of $10 million dollars of Government Property) | 5 |
| G.5 | NFS 1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR 52.245-1. (JAN 2011) | 6 |
| G.6 | NFS 1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS. (SEP 2017) | 7 |
| G.7 | JSC 52.204-92 NASA SECURITY PROGRAM AND IDENTIFICATION OF EMPLOYEES (JUL 2022) | 7 |
| G.8 | SHIPPING INSTRUCTIONS | 9 |
| SECTION H - SPECIAL CONTRACT REQUIREMENTS | 1 | |
| H.1 | LISTING OF CLAUSES INCORPORATED BY REFERENCE | 1 |
| H.2 | NFS 1852.209-71 LIMITATION OF FUTURE CONTRACTING. (DEC 1988) | 2 |
| H.3 | NFS 1852.225-70 EXPORT LICENSES. (FEB 2000) (ALT I) (FEB 2000) | 3 |
| H.4 | NFS 1852.228-76 CROSS-WAIVER OF LIABILITY FOR INTERNATIONAL SPACE STATION ACTIVITES (OCT 2012) | 3 |
| H.5 | NFS 1852.232-77 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT). (MAR 1989) | 6 |
| H.6 | NFS 1852.235-71 KEY PERSONNEL AND FACILITIES (MAR 1989) | 7 |
| H.7 | NFS 1852.235-74 ADDITIONAL REPORTS OF WORK - RESEARCH AND DEVELOPMENT. (FEB 2003) | 8 |
| H.8 | UNIDENTIFIED DATA CONTAINING RESTRICTIVE OR LIMITING MARKINGS | 8 |
| H.9 | NASA INSIGHT AND APPROVAL | 9 |
| H.10 | ASSOCIATE CONTRACTOR AGREEMENTS | 10 |
| H.11 | DATA CONTAINING AN INCORRECT NOTICE | 12 |
| H.12 | INCORRECT NOTICE AND REQUIREMENTS FOR WRITTEN JUSTIFICATION OF RESTRICTED MARKINGS | 12 |
| H.13 | PAYMENTS, EVENTS, AND ACCOMPLISHMENT CRITERIA | 12 |
| H.14 | SAE AS9100 | 13 |
| H.15 | MITIGATION OF ORGANIZATIONAL CONFLICTS OF INTEREST | 13 |
| H.16 | DISCLOSURE OF ORGANIZATIONAL CONFLICTS OF INTEREST AFTER CONTRACT AWARD | 14 |
| H.17 | IDENTIFICATION AND REPRESENTATION OF LIMITED RIGHTS DATA AND RESTRICTED COMPUTER SOFTWARE AFTER AWARD | 15 |
| H.18 | TECHNICAL DATA AND COMPUTER SOFTWARE – WITHHOLDING OF PAYMENT | 15 |
| H.19 | GOVERNMENT’S RIGHT TO REMOTELY SENSED DATA | 16 |
| H.20 | CONTRACTOR ACQUIRED PROPERTY TRANSITION TO FIRM FIXED PRICE (Applies to CPIF only) | 16 |
| H.21 | SPECIAL TOOLING, SPECIAL TEST EQUIPMENT, AND MANUFACTURING AIDS FOR USDV | 16 |
| H.22 | CONTRACTOR OBJECTIVES ON USDV | 16 |
| H.23 | FOREIGN TRAVEL BY CONTRACTOR EMPLOYEES ON NASA OFFICIAL BUSINESS (JUL 2022) | 16 |
| H.24 | COUNTERINTELLIGENCE BRIEFINGS (AUG 2022) | 18 |
| H.25 | USE OF GOVERNMENT RESOURCES | 19 |
| H.26 | CONTRACTOR BUSINESS SYSTEMS (Applies to CAS covered contracts only) | 23 |
| H.27 | 52.223-94 JSC ENVIRONMENTAL COMPLIANCE (MAR 2023) (JSC PROCUREMENT INSTRUCTION) | 27 |
| H.28 | USDV COMMUNICATIONS | 29 |
| SECTION I - CONTRACT CLAUSES | 1 | |
| I.1 | LISTING OF CLAUSES INCORPORATED BY REFERENCE | 1 |
| I.2 | FAR 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS. (NOV 2021) | 7 |
| I.3 | FAR 52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION | 8 |
| I.4 | FAR 52.216-10 INCENTIVE FEE (JUNE 2011) (Applies to CPIF only) | 9 |
| I.5 | FAR 52.216-18 ORDERING. (AUG 2020) | 11 |
| I.6 | FAR 52.216-19 ORDER LIMITATIONS. (OCT 1995) | 12 |
| I.7 | FAR 52.216-22 INDEFINITE QUANTITY. (OCT 1995) | 12 |
| I.8 | FAR 52.217-7 OPTION FOR INCREASED QUANTITY - SEPARATELY PRICED LINE ITEM (CLIN 2A Critical spares) (MAR 1989) | 13 |
| I.9 | FAR 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS CONCERNS (Oct 2022) | 16 |
| I.10 | FAR 52.222-19 CHILD LABOR-COOPERATION WITH AUTHORITIES AND REMEDIES. (MAR 2022) (DEVIATION) | 16 |
| I.11 | FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS. (JUN 2020) | 17 |
| I.12 | FAR 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES. (JUN 2020) | 18 |
| I.13 | FAR 52.232-19 AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR. (APR 1984) | 18 |
| I.14 | FAR 52.232-32 PERFORMANCE-BASED PAYMENTS. (APR 2012) | 18 |
| I.15 | FAR 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (FEB 2021) (ALTERNATE I) (JUL 1995) | 22 |
| I.16 | FAR 52.227-14 RIGHTS IN DATA—GENERAL (MAY 2014) ALTERNATE II (DEC 2007) [(MODIFIED BY NFS 1852.227-14 (APR 2015)] ALTERNATE III (DEC 2007) ALTERNATE V (DEC 2007) | 24 |
| I.17 | FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS. (MAR 2023) | 32 |
| I.18 | FAR 52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES. (JUN 2023) | 32 |
| I.19 | FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE. (FEB 1998) | 35 |
| I.20 | FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES. (NOV 2020) | 35 |
| I.21 | NFS 1852.204-75 SECURITY CLASSIFICATION REQUIREMENTS (SEP 1989) | 36 |
| I.22 | NFS 1852.204-76 SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION TECHNOLOGY RESOURCES (APR 2021) (DEVIATION) | 36 |
| I.23 | NFS 1852.216-80 TASK ORDERING PROCEDURE. (OCT 1996) ALTERNATE II (APR 2018) (Applies to FFP IDIQ only) | 37 |
| I.24 | NFS 1852.225-8 DUTY-FREE ENTRY OF SPACE ARTICLES (FEB 2000). | 38 |
| I.25 | NFS 1852.225-71 RESTRICTION ON FUNDING ACTIVITY WITH CHINA (FEB 2012) (DEVIATION) | 39 |
| I.26 | NFS 1852.234-2 EARNED VALUE MANAGEMENT SYSTEM. (NOV 2015) (DEVIATION) (Applies to CPIF only) | 39 |
| I.27 | NFS 1852.239-74 INFORMATION TECHNOLOGY SYSTEM SUPPLY CHAIN RISK ASSESSMENT (JAN 2020) (DEVIATION) | 41 |
| SECTION J - LIST OF ATTACHMENTS | 1 | |
| ATTACHMENT J-01 DATA REQUIREMENTS DESCRIPTION (DRD) | 2 | |
| ATTACHMENT J-02 RESERVED | 1 | |
| ATTACHMENT J-03 ACRONYMS AND ABBREVIATIONS | 1 | |
| ATTACHMENT J-04 DEFINITIONS | 1 | |
| ATTACHMENT J-05 APPLICABLE AND REFERENCE DOCUMENTS LIST | 1 | |
| ATTACHMENT J-06 PROGRAM MANAGEMENT PLAN | 1 | |
| ATTACHMENT J-07 PROJECT LIFE-CYCLE REVIEW PLAN | 1 | |
| ATTACHMENT J-08 USDV SYSTEM ARCHITECTURE AND CONCEPT OF OPERATIONS | 1 | |
| ATTACHMENT J-09 INSIGHT MANAGEMENT PLAN | 1 | |
| ATTACHMENT J-10 ORGANIZATIONAL CONFLICTS OF INTEREST (OCI) PLAN | 1 | |
| ATTACHMENT J-11 SMALL BUSINESS SUBCONTRACTING PLAN | 1 | |
| ATTACHMENT J-12 DIVERSITY, EQUITY, INCLUSION, AND ACCESSIBILITY (DEIA) PLAN | 1 | |
| ATTACHMENT J-13 CONFIGURATION MANAGEMENT PLAN | 1 | |
| ATTACHMENT J-14 INFORMATION TECHNOLOGY SECURITY MANAGEMENT PLAN (ITSMP) | 1 | |
| ATTACHMENT J-15 EXPORT CONTROL PLAN | 1 | |
| ATTACHMENT J-16 GOVERNMENT PROPERTY MANAGEMENT PLAN | 1 | |
| ATTACHMENT J-17 SAFETY AND HEALTH PLAN | 1 | |
| ATTACHMENT J-18 RISK MANAGEMENT PLAN (RMP) | 1 | |
| ATTACHMENT J-19 SAFETY & MISSION ASSURANCE (S&MA) PLAN | 1 | |
| ATTACHMENT J-20 MISHAP PREPARDNESS AND CONTENGENCY PLAN | 1 | |
| ATTACHMENT J-21 TRL ASSESSMENT AND TECHNOLOGY MATURATION PLAN | 1 | |
| ATTACHMENT J-22 SOFTWARE MANAGEMENT PLAN | 1 | |
| ATTACHMENT J-23 DESIGN, DEVELOPMENT, TEST, AND EVALUATION (DDT&E) PLAN | 1 | |
| ATTACHMENT J-24 VERIFICATION AND VALIDATION (V&V) PLAN | 1 | |
| ATTACHMENT J-25 SYSTEM ENGINEERING MANAGEMENT PLAN (SEMP) | 1 | |
| ATTACHMENT J-26 ASSEMBLY, INTEGRATION, AND TEST (AI&T) PLAN | 1 | |
| ATTACHMENT J-27 NASA STANDARDS AND SPECIFICATIONS COMPLIANCE AND TAILORING APPROACH | 1 | |
| ATTACHMENT J-28 QUALIFICATION AND ACCEPTANCE PLAN | 1 | |
| ATTACHMENT J-29 INTEGRATED MASTER SCHEDULE | 1 | |
| ATTACHMENT J-30 WORK PLANS | 1 | |
| ATTACHMENT J-31 GOVERNMENT TASK AGREEMENTS | 1 | |
| ATTACHMENT J-32 STANDARD LABOR CATEGORIES | 1 | |
| ATTACHMENT J-33 GOVERNMENT-FURNISHED PROPERTY, FACILITIES AND DATA/INFORMATION | 1 | |
| ATTACHMENT J-34 INSTALLATION ACCOUNTABLE GOVERNMENT PROPERTY | 1 | |
| ATTACHMENT J-35 RESERVED | 1 | |
| ATTACHMENT J-36 AUTHORIZED LIMITED RIGHTS IN DATA AND RESTRICTED COMPUTER SOFTWARE | 1 | |
| ATTACHMENT J-37 INCENTIVE FEE PLAN (Applies to CPIF only) | 1 | |
| ATTACHMENT J-38 DD FORM 254, DEPARTEMENT OF DEFENSE CONTRACT SECURITY CLASSIFICATEION SPECIFICATION | 1 | |
| ATTACHMENT J-39 PROPULSION SYSTEM DEVELOPMENT APPROACH | 1 | |
| ATTACHMENT J-40 DELIVERABLE ITEM LIST | 1 | |
| SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS OR RESPONDENTS | 1 | |
| K.1 | CLAUSES INCORPORATED BY REFERENCE | 1 |
| K.2 | 52.204-3 TAXPAYER IDENTIFICATION. (OCT 1998) | 2 |
| K.3 | 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS. (MAR 2023) | 3 |
| K.4 | 52.204-20 PREDECESSOR OF OFFEROR. (AUG 2020) | 6 |
| K.5 | 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT. (NOV 2021) | 7 |
| K.6 | 52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES - REPRESENTATION. (OCT 2020) | 9 |
| K.7 | 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS. (AUG 2020) | 9 |
| K.8 | 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS. (OCT 2018) | 11 |
| K.9 | 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW. (FEB 2016) | 12 |
| K.10 | 52.209-12 CERTIFICATION REGARDING TAX MATTERS. (OCT 2020) | 13 |
| K.11 | 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS - CERTIFICATION. (NOV 2021) | 13 |
| K.12 | 52.215-6 PLACE OF PERFORMANCE. (OCT 1997) | 15 |
| K.13 | 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS. (MAR 2023) | 15 |
| K.14 | 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS ALTERNATE I (SEP 2015) | 19 |
| K.15 | 52.219-2 EQUAL LOW BIDS. (OCT 1995) | 19 |
| K.16 | 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS. (FEB 1999) | 19 |
| K.17 | 52.222-25 AFFIRMATIVE ACTION COMPLIANCE. (APR 1984) | 20 |
| K.18 | 52.225-2 BUY AMERICAN CERTIFICATE. (OCT 2022) | 20 |
| K.19 | 52.225-18 PLACE OF MANUFACTURE. (AUG 2018) | 21 |
| K.20 | 52.225-20 PROHIBITION ON CONDUCTING RESTRICTED BUSINESS OPERATIONS IN SUDAN - CERTIFICATION. (AUG 2009) | 21 |
| K.21 | 52.227-15 REPRESENTATION OF LIMITED RIGHTS DATA AND RESTRICTED COMPUTER SOFTWARE. (DEC 2007) | 22 |
| K.22 | 52.230-1 COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION. (JUN 2020) (Applies to CPIF only) | 24 |
| K.23 | 52.230-7 PROPOSAL DISCLOSURE - COST ACCOUNTING PRACTICE CHANGES. (APR 2005) (Applies to CPIF only) | 26 |
| K.24 | 1852.225-72 RESTRICTION ON FUNDING ACTIVITY WITH CHINA - REPRESENTATION (FEB 2012) (DEVIATION) | 26 |
| SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS | 1 | |
| L.1 | CLAUSE INCORPORATED BY REFERENCE | 1 |
| L.2 | FAR 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS. (JUN 1988) | 2 |
| L.3 | FAR 52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008) | 5 |
| L.4 | FAR 52.216-1 TYPE OF CONTRACT (APR 1984) | 5 |
| L.5 | FAR 52.222-56 CERTIFICATION REGARDING TRAFFICKING IN PERSONS COMPLIANCE PLAN (OCT 2020) | 5 |
| L.6 | FAR 52.232-28 INVITATION TO PROPOSE PERFORMANCE-BASED PAYMENTS (MAR 2000) (Applies to FFP only) | 6 |
| L.7 | FAR 52.233-2 SERVICE OF PROTEST (SEP 2006) | 7 |
| L.8 | FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 7 |
| L.9 | FAR 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020) | 8 |
| L.10 | NFS 1852.215-77 PREPROPOSAL/PREBID CONFERENCE (APR 2015) | 8 |
| L.11 | NFS 1852.219-73 SMALL BUSINESS SUBCONTRACTING PLAN (MAY 1999) | 9 |
| L.12 | NFS 1852.234-1 NOTICE OF EARNED VALUE MANAGEMENT SYSTEM (NOV 2006) (Applies to CPIF only) | 9 |
| L.13 | NFS 1852.239-73 REVIEW OF THE OFFEROR’S INFORMATION TECHNOLOGY SYSTEMS SUPPLY CHAIN (DEVIATION 15-03D) | 10 |
| L.14 | NFS 1852.245-80 GOVERNMENT PROPERTY MANAGEMENT INFORMATION (JAN 2011) | 12 |
| L.15 | NFS 1852.245-81 LIST OF AVAILABLE GOVERNMENT PROPERTY (JAN 2011) | 13 |
| L.16 | LIST OF AVAILABLE GOVERNMENT FACILITIES | 15 |
| L.17 | JSC 52.215-107 GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL (AUG 2018) (JSC PROCUREMENT INSTRUCTION) | 16 |
| L.18 | ELECTRONIC SUBMISSION OF PROPOSALS – PROPOSAL MARKING AND DELIVERY THROUGH NASA’S EFSS BOX | 17 |
| L.19 | JSC 52.215-123 AVAILABILITY OF SPECIFICATIONS (DEC 2019) (JSC PROCUREMENT INSTRUCTION) | 19 |
| L.20 | JSC 52.215-124 COMMUNICATIONS REGARDING THIS SOLICITATION (MAR 2023) (JSC PROCUREMENT INSTRUCTION) | 19 |
| L.21 | OFFEROR ACCEPTANCE PERIOD | 20 |
| L.22 | INSTRUCTIONS TO OFFERORS | 22 |
| L.23 | INTRODUCTION | 23 |
| L.24 | PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE DATES | 23 |
| L.25 | PROPOSAL FORMATTING INSTRUCTIONS | 29 |
| L.26 | COST AND PRICE FACTOR - VOLUME I | 30 |
| L.27 | MISSION SUITABILITY (MS) FACTOR – VOLUME II | 48 |
| L.28 | PAST PERFORMANCE - VOLUME III | 61 |
| L.29 | RESPONSIBILITY CONSIDERATIONS – VOLUME IV | 63 |
| L.30 | MODEL CONTRACT AND ADDITIONAL REQUIREMENTS - VOLUME V | 71 |
| LIST OF ATTACHMENTS | 74 | |
| ATTACHMENT L-01A USDV HYBRID COST PRICE TEMPLATE | 75 | |
| ATTACHMENT L-01B USDV FIXED PRICE TEMPLATE | 76 | |
| ATTACHMENT L-01C USDV MINOR SUBCONTRACTOR TEMPLATE | 77 | |
| ATTACHMENT L-01D USDV HYBRID COST PRICE TEMPLATES (CLIN 1 AND 2 CPIF) | 78 | |
| ATTACHMENT L-02 BASIS OF ESTIMATE (BOE) FORM | 79 | |
| ATTACHMENT L-03 TECHNICAL RESOURCES TEMPLATE (TRT) | 81 | |
| ATTACHMENT L-04A CLIN 4 – LAUNCH VEHICLE INTEGRATION AND SUSTAINING REPRESENTIVE TASK ORDER (RTO) | 82 | |
| ATTACHMENT L-04B CLIN 4 – LAUNCH VEHICLE INTEGRATION AND SUSTAINING – LONG LEAD PARTS REPRESENTIVE DELIVERY ORDER (RDO) | 84 | |
| ATTACHMENT L-05 STANDARD LABOR CATEGORIES (SLC) | 90 | |
| ATTACHMENT L-06 SAMPLE PAST PERFORMANCE CONSENT LETTER PAST PERFORMANCE CONSENT LETTER | 97 | |
| ATTACHMENT L-07 PAST PERFORMANCE MATRIX | 98 | |
| ATTACHMENT L-08 GOVERNMENT TASK AGREEMENT INSTRUCTIONS | 99 | |
| ATTACHMENT L-09 PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM CHECKLIST (Applies to CPIF only) | 102 | |
| ATTACHMENT L-10 PRIME/SUBCONTRACTOR IDENTIFICATION AND SOW DIVISION OF WORK LISTING | 103 | |
| SECTION M - EVALUATION FACTORS FOR AWARD | 1 | |
| M.1 | SOURCE EVALUATION BOARD EVALUATION FACTORS FOR AWARD | 1 |
| M.2 | COST AND PRICE FACTOR (VOLUME I) | 2 |
| M.3 | MISSION SUITABILITY FACTOR (VOLUME II) | 4 |
| M.4 | PAST PERFORMANCE EVALUATION -VOLUME III | 6 |
| M.5 | RESPONSIBILITY CONSIDERATIONS (VOLUME IV) | 9 |
| M.6 | MODEL CONTRACT (VOLUME V) | 13 |
DRAFT 80JSC023R0003
SECTION A – TABLE OF CONTENTS
A-1
A-1
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
CONTRACT TYPE
The USDV contract is a Single-award Hybrid Cost Plus Incentive Fee and Firm Fixed Price core with Indefinite Delivery Indefinite Quantity (IDIQ) Firm Fixed Price (FFP) task orders. (Applicable if proposing CPIF CLIN 1 and FFP CLIN 2)
OR
The USDV contract is a Single-award Firm Fixed Price core with Indefinite Delivery Indefinite Quantity (IDIQ) Firm Fixed Price (FFP) task orders. (Applicable if proposing FFP CLIN 1 and FFP CLIN 2)
OR
The USDV contract is a Single-award Hybrid Cost Plus Incentive Fee core with Indefinite Delivery Indefinite Quantity (IDIQ) Firm Fixed Price (FFP) task orders. (Applicable if proposing CPIF CLIN 1 and CPIF CLIN 2) (End of clause)
SUPPLIES AND/OR SERVICES TO BE PROVIDED / ITEMS ISSUED
The Contractor shall provide all services, facilities and resources necessary to furnish the Contract Line Item Numbers (CLINs) in accordance with the following table and per Section C, Description/Specifications/Performance Work Statement; all task orders issued, Section J, Attachment J-01 Data Requirements Descriptions; and all other requirements specified throughout the core contract and authorized task orders, except for resources provided by the Government under Clause G.5 NFS 1852.245-76, LIST OF GOVERNMENT FURNISHED PROPERTY FURNISHED PURSUANT TO FAR 52.245-1, GOVERNMENT PROPERTY.
Table B.2: SUPPLIES AND/OR SERVICES TO BE PROVIDED AND TOTAL AMOUNT
| CLIN |
| CLIN Category |
| Contract Type |
| Title |
| Price |
| 1 |
| Core |
| OFI |
CPIF or FFP
| Design, Development, Test and Evaluation (DDT&E) Through Critical Design Review (CDR) |
| $OFI |
| 2 |
| Core |
| OFI |
CPIF or FFP
| Production, Assembly, Integration and Test |
| $OFI |
| 2A |
| Option |
| Critical Spares |
| $TBD |
| 3 |
| IDIQ |
| FFP |
| Dwell |
| $TBD |
| 4 |
| IDIQ |
| FFP |
| Launch Vehicle (LV) Integration and Sustaining |
| $TBD |
| 5 |
| IDIQ |
| FFP |
| Special Tasks and Studies |
| $TBD |
Total
$TBD
(End of clause)
CLIN 1 DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) THROUGH CRITICAL DESIGN REVIEW (CDR) (CORE) The target cost of CLIN 1 is $OFI. The target fee of CLIN 1 is $OFI. The total target cost and target fee as contemplated by the Incentive Fee clause of CLIN 1 is $OFI.
The maximum fee for CLIN 1 is $OFI.
The minimum fee for CLIN 1 is $OFI.
The cost sharing for cost underruns is: Government 60 percent; Contractor 40 percent.
The cost sharing for cost overruns is: Government 60 percent; Contractor 40 percent.
OR (Applicable if proposing FFP CLIN 1)
The CLIN 1 Core firm fixed price of this contract is $OFI.
(End of clause)
CLIN 2 PRODUCTION, ASSEMBLY, INTEGRATION AND TEST (CORE)
The CLIN 2 Core firm fixed price of this contract is $OFI.
Price for CLIN 2 Core is valid for up to one year beyond the proposed CLIN 2 Core Authority to Proceed (ATP) date.
The CLIN 2A Critical Spares firm fixed price option of this contract is $OFI.
OR (Applicable if proposing CPIF CLIN 2)
The target cost of CLIN 2 is $OFI. The target fee of CLIN 2 is $OFI. The total target cost and target fee as contemplated by the Incentive Fee clause of CLIN 2 is $OFI.
The maximum fee for CLIN 2 is $OFI.
The minimum fee for CLIN 2 is $OFI.
The cost sharing for cost underruns is: Government 60 percent; Contractor 40 percent.
The cost sharing for cost overruns is: Government 60 percent; Contractor 40 percent.
The target cost of CLIN 2A Option is $OFI. The target fee of CLIN 2A Option is $OFI. The total target cost and target fee as contemplated by the Incentive Fee clause of CLIN 2A Option is $OFI.
The maximum fee for CLIN 2A Option is $OFI.
The minimum fee for CLIN 2A Option is $OFI.
The cost sharing for cost underruns is: Government 60 percent; Contractor 40 percent.
The cost sharing for cost overruns is: Government 60 percent; Contractor 40 percent.
CLIN 3 DWELL (IDIQ)
CLIN 3 scope (SOW Section 5.0 Dwell (CLIN 3)) includes storing the USDV in the Dwell facility prior to shipment to the Launch Site Payload Processing Facility (PPF) and reporting on the Dwell status at the quarterly Program Management Review.
TABLE B.5: CLIN 3 DWELL PRICING
| Pricing Element |
| GFY 2028 |
| GFY 2029 |
| GFY 2030 |
| GFY 2031 |
| GFY 2031 |
Option Period 1
| GFY 2032 Option Period 2 |
| GFY 2033 |
Option Period 3
GFY2034
Option Period 4
GFY 2035
Option Period 5
| 10/1/2027-9/30/2028 |
| 10/1/2028-9/30/2029 |
| 10/1/2029-9/30/2030 |
| 10/1/2030-3/31/2031 |
| 4/1/2031-9/30/2031 |
| 10/1/2031-9/30/2032 |
| 10/1/2032-9/30/2033 |
| 10/1/2033-9/30/2034 |
| 10/1/2034-9/30/2035 |
| Dwelling Price Per Quarter Year |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
CLIN 4 LAUNCH VEHICLE (LV) INTEGRATION AND SUSTAINING (IDIQ)
CLIN 4 includes scope for LV integration and sustaining engineering and operations including final LV integration and testing, pre-launch preparation, flight execution preparation, launch and flight operations, and procurement of hardware.
The rates in the clause are per hour Fully Burdened Labor Rates inclusive of profit. The purpose of this clause is to set forth the rates to be utilized in the subsequent negotiation of FFP IDIQ orders in accordance with clause NFS 1852.216-80, Task Ordering Procedure. At the bottom of the table there is a row(s) that allows indirect rates to be applied to any non-labor resources, as required by task order, if applicable. Pricing of all FFP IDIQ orders shall be in accordance with the negotiated rates set forth below.
TABLE B.6: CLIN 4 LAUNCH VEHICLE (LV) INTEGRATION AND SUSTAINING PRICING ($/HR)
| Pricing Elements |
| GFY |
| GFY 2025 |
| GFY 2026 |
| GFY 2027 |
| GFY 2028 |
| GFY 2029 |
| GFY 2030 |
| GFY 2031 |
| GFY 2031 |
Option Period 1
GFY 2032 Option Period 2
GFY 2033 Option Period 3
GFY 2034 Option Period 4
GFY 2035 Option Period 5
| 06/25/2024-9/30/2024 |
| 10/1/2024-9/30/2025- |
| 10/1/2025-9/30/2026 |
| 10/1/2026-9/30/2027 |
| 10/1/2027-9/30/2028 |
| 10/1/2028-9/30/2029 |
| 10/1/2029-9/30/2030 |
| 10/1/2030-3/31/2031 |
| 4/1/2031-9/30/2031 |
| 10/1/2031-9/30/2032 |
| 10/1/2032-9/30/2033 |
| 10/1/2033-9/30/2034 |
| 10/1/2034-9/30/2035 |
| Program Manager |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| Engineer |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| Technician |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| Business |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| Administrative |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
Non-Labor Resources (%) Maximum percentage
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
CLIN 5 SPECIAL TASKS AND STUDIES (IDIQ)
The overall Objective of CLIN 5 is the performance of special tasks and studies necessary to perform activities that may be requested by NASA.
The Contractor shall perform special studies and analyses, risk reduction activities, provide materials, and/or fabricate incidental hardware in support of this contract, as required. Each task will be initiated by written direction from the NASA Contracting Officer (CO). These tasks include advance planning and feasibility studies in support of future contemplated requirements; development, fabrication, and test of hardware/software to support planning studies or special tests, mission unique studies, material provision, and implementation of changes required due to changes in requirements.
B.7.1 SUBCLIN 5A SPECIAL TASKS AND STUDIES ($/HR or %)
Pricing Elements Technical/Admin
GFY
| GFY 2025 |
| GFY 2026 |
| GFY 2027 |
| GFY 2028 |
| GFY 2029 |
| GFY 2030 |
| GFY 2031 |
| GFY 2031 Option Period 1 |
GFY 2032 Option Period 2
GFY 2033 Option Period 3
GFY 2034 Option Period 4
GFY 2034 Option Period 5
| 06/25/2024-9/30/2024 |
| 10/1/2024-9/30/2025- |
| 10/1/2025-9/30/2026 |
| 10/1/2026-9/30/2027 |
| 10/1/2027-9/30/2028 |
| 10/1/2028-9/30/2029 |
| 10/1/2029-9/30/2030 |
| 10/1/2030-3/31/2031 |
| 4/1/2031-9/30/2031 |
| 10/1/2031-9/30/2032 |
| 10/1/2032-9/30/2033 |
| 10/1/2033-9/30/2034 |
| 10/1/2034-9/30/2035 |
| Level 1 (90/10) |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| Level 2 (75/25) |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| Level 3 (50/50) |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| Level 4 (25/75) |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
Non-Labor Resources (%) Maximum percentage
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
B.7.2 SUBCLIN 5B SPECIAL TASKS AND STUDIES ($)
| Pricing Elements |
| GFY |
| GFY 2025 |
| GFY 2026 |
| GFY 2027 |
| GFY 2028 |
| GFY 2029 |
| GFY 2030 |
| GFY 2031 |
| GFY 2031 Option Period 1 |
GFY 2032 Option Period 2
GFY 2033 Option Period 3
GFY 2034 Option Period 4
GFY 2034 Option Period 5
| 06/25/2024-9/30/2024 |
| 10/1/2024-9/30/2025- |
| 10/1/2025-9/30/2026 |
| 10/1/2026-9/30/2027 |
| 10/1/2027-9/30/2028 |
| 10/1/2028-9/30/2029 |
| 10/1/2029-9/30/2030 |
| 10/1/2030-3/31/2031 |
| 4/1/2031-9/30/2031 |
| 10/1/2032-9/30/2033 |
| 10/1/2032-9/30/2033 |
| 10/1/2033-9/30/2034 |
| 10/1/2034-9/30/2035 |
Tier I (125 hrs.)
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
Tier II (250 hrs.)
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| Tier III (500 hrs.) |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| Tier IV (750 hrs.) |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| Tier V (1000 hrs.) |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
| OFI |
NFS 1852.232-81 CONTRACT FUNDING. (JUN 1990) (Applies to CPIF only)
(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is $TBD. This allotment is for TBD and covers the following estimated period of performance: $TBD.
(b) An additional amount of $TBD is obligated under this contract for payment of fee.
(End of clause)
JSC PROCUREMENT INSTRUCTION (JPI) 52.216-90 IDIQ MINIMUM AND MAXIMUM ORDERING LIMITS (NOV 2018) In accordance with FAR 52.216-22, Indefinite Quantity, the contract guaranteed minimum amount* to be ordered under this contract is $100,000 and the contract Not to Exceed (NTE) amount* which may be ordered under this contract is $302,000,000. The Government is not obligated to order more than the minimum specified, but may order up to the NTE amount. The Contractor is obligated to fulfill orders issued, up to the NTE amount within the limits specified in FAR 52.216-19 Order Limitations.
* These values are based on “dollars”.
(End of clause) 80JSC023R0003 Amendment 6
PART I – THE SCHEDULE
[END OF SECTION]
B-1
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
STATEMENT OF WORK
FOR THE INTERNATIONAL SPACE STATION
UNITED STATES DEORBIT VEHICLE
| 1.0 | Introduction |
| 1.1 | Overview and Objectives |
The primary objective of this contract is to procure a safe, reliable, and cost-effective deorbit vehicle to meet NASA’s International Space Station (ISS) end-of-life deorbit mission requirements. This will require the Contractor to design, develop, manufacture, test, integrate, achieve NASA acceptance, deliver, and sustain its United States Deorbit Vehicle (USDV) such that the USDV can perform the final deorbit of the ISS.
1.2 Scope
This Statement of Work (SOW) and all applicable documents clauses, and Data Requirements Documents (DRDs) referenced herein define the requirements for the Contractor to meet NASA and Government safety, functional, performance, and interface requirements, deliver to NASA, and sustain the USDV. This includes but is not limited to the scope for completion of the design, development, test, evaluation, production, assembly, integration, acceptance, delivery, and sustaining of a USDV capable of free flight, rendezvous, and docking with the ISS. The USDV shall perform ISS attitude control, ISS translational maneuvers, and the final ISS orbit shaping and reentry burns, while meeting all mission objectives as specified in this contract. The USDV contractor shall plan and perform all activities required to integrate the USDV with the launch vehicle (LV). The USDV contactor shall provide sustaining engineering from NASA acceptance through the end of mission operations. In addition, the Contractor shall provide special tasks and studies to the extent ordered under Contract Line Item (CLIN) 5, Special Tasks and Studies – Fixed Price of this contract.
The Contractor shall provide all the necessary management, personnel, facilities, equipment, materials, and supplies to deliver the products and services defined in this SOW. Government Task Agreements (GTAs) are available for selected functions to meet this intent in accordance with the Contract.
The scope of CLIN 1 Design, Development, Test and Evaluation (DDT&E) Through Critical Design Review includes both SOW Section 3.0 Overall General Requirements and the required elements of SOW Section 2.0, Overall General Requirements to perform the CLIN 1 activities. The scope of CLIN1 will concludes when Review Item Discrepancy/Request for Action (RID/RFAs) from CDR and previous reviews are jointly dispositioned and forward actions are jointly identified and agreed to.
The scope of CLIN 2, Production, Assembly, Integration and Test includes both SOW Section 4.0 Production, Assembly, Integration and Test (CLIN 2) and the required elements of SOW Section 2.0, Overall General Requirements to perform the CLIN 2 activities, completion of the design, and includes the completion of forward actions identified in CLIN 1. The scope of CLIN 2 includes acceptance and delivery of the full USDV design and hardware/software, including final assembly, integration, and test performed during Dwell that supports the Government’s L-12 month call up for launch. The scope of CLIN 2 will concludes following completion of Milestone C2-4 System Acceptance and Milestone C2-5 Shipment to Acceptance Destination, including completion of System Acceptance Review (SAR), the shipment of the USDV System to the Acceptance Destination, and corrective actions and mitigations to address issues identified during shipment have been completed.
The scope of CLIN3, Dwell, includes both SOW Section 5.0 Dwell (CLIN 3) and the required elements of SOW Section 2.0 General Requirements to perform the CLIN3 activities while the USDV is in Dwell. Any final assembly, integration, and test in support of the USDV acceptance and delivery performed during Dwell to support the L-12 month call up for launch will be included in CLIN 2, not CLIN 3. The scope of CLIN3 will concludes following completing of the final Dwell Release Review (DRR) and corrective actions and mitigations to address issues identified during dwell have been completed.
The scope of CLIN4, Launch Vehicle Integration and Sustaining includes both SOW Section 6.0 Launch Vehicle Integration and Sustaining (CLIN4) and the required elements of SOW Section 2.0 Overall General Requirements to perform the CLIN4 Launch Vehicle Integration and Sustaining activities. The scope of CLIN4 will conclude following the completion of the USDV mission and USDV contract closeout activities.
The scope of CLIN5, Special Tasks and Studies includes both SOW Section 7.0 Special Tasks and Studies (CLIN 5) and the required elements of SOW Section 2.0 Overall General Requirements to perform the CLIN5 activities through the duration of the USDV contract. The scope of CLIN5 will conclude following the completion of the USDV mission and USDV contract closeout activities.
Due to the nature of the USDV contract, the Contractor shall ensure that no tasks performed under one CLIN be replicated,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .