This solicitation requests proposals for the United States Deorbit Vehicle program. Offerors must provide design, development, test and evaluation through critical design review under CLIN 1. Production, assembly, integration and test are required under CLIN 2. Optional CLINs include dwell under CLIN 3, launch vehicle integration and sustaining engineering under CLIN 4, and special tasks and studies under CLIN 5. Proposals are due in two parts, with Volume III due by January 19, 2024 and Volumes I, II, IV and V due by February 12, 2024. The solicitation is issued by the National Aeronautics and Space Administration Johnson Space Center and seeks a solution to safely deorbit spacecraft at the end of their missions.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
Ashley H. Chaves
See continuation sheet on following page.
NASA
Johnson Space Center 2101 NASA Parkway Houston TX 77058-3696
80JSC023R0003
09/18/2023
1 13
See Block 16C
X 1
X
80JSC023R0003 Amendment 5 Change Page
The purpose of Amendment 5 to the United States Deorbit Vehicle Request for Proposal, posted September 18, 2023, is to:
1. Update B.6 CLIN 4 LAUNCH VEHICLE (LV) INTEGRATION AND SUSTAINING (IDIQ) to the following (See Change Page B-3 - B-4):
B.6 CLIN 4 LAUNCH VEHICLE (LV) INTEGRATION AND SUSTAINING (IDIQ)
CLIN 4 includes scope for LV integration and sustaining engineering and operations including final LV integration and testing, pre-launch preparation, flight execution preparation, launch and flight operations, and procurement of hardware.
The rates in the clause are per hour Fully Burdened Labor Rates inclusive of profit. The purpose of this clause is to set forth the rates to be utilized in the subsequent negotiation of FFP IDIQ orders in accordance with clause NFS 1852.216-80, Task Ordering Procedure. At the bottom of the table there is a row(s) that allows indirect rates to be applied to any non-labor resources, as required by task order, if applicable. Pricing of all FFP IDIQ orders shall be in accordance with the negotiated rates set forth below.
TABLE B.6: CLIN 4 LAUNCH VEHICLE (LV) INTEGRATION AND
SUSTAINING PRICING ($/HR)
Pricing Elements
GFY
GFY
GFY
GFY
GFY
GFY
GFY
GFY
GFY
Option Period 1
GFY
Option Period 2
GFY
Option Period 3
GFY
Option Period 4
GFY
Option Period 5
06/25/2024 -9/30/2024
10/1/2024- 9/30/2025-
10/1/2025- 9/30/2026
10/1/2026- 9/30/2027
10/1/2027- 9/30/2028
10/1/2028- 9/30/2029
10/1/2029- 9/30/2030
10/1/2030- 3/31/2031
4/1/2031- 9/30/2031
10/1/2031- 9/30/2032
10/1/2032- 9/30/2033
10/1/2033- 9/30/2034
10/1/2034- 9/30/2035
Program Manage OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Engineer OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Technician OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Business OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Administrative OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Non-Labor Resources (%)
Maximum percentage
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
(End of clause)
2. Update B.7 CLIN 5 SPECIAL TASKS AND STUDIES (IDIQ) to the following (See Change Page B-5 - B-6):
B.7 CLIN 5 SPECIAL TASKS AND STUDIES (IDIQ)
The overall Objective of CLIN 5 is the performance of special tasks and studies necessary to perform activities that may be requested by NASA.
The Contractor shall perform special studies and analyses, risk reduction activities, provide materials, and/or fabricate incidental hardware in support of this contract, as required. Each task will be initiated by written direction from the NASA Contracting Officer (CO). These tasks include advance planning and feasibility studies in support of future contemplated requirements;
development, fabrication, and test of hardware/software to support planning studies or special tests, mission unique studies, material provision, and implementation of changes required due to changes in requirements.
B.7.1 SUBCLIN 5A SPECIAL TASKS AND STUDIES ($/HR or %)
Pricing Elements
Technical/ Admin
GFY
GFY
GFY
GFY
GFY
GFY
GFY
GFY
GFY
Option Period 1
GFY
Option Period 2
GFY
Option Period 3
GFY
Option Period 4
GFY
Option Period 5
06/25/2024- 9/30/2024
10/1/2024- 9/30/2025-
10/1/2025- 9/30/2026
10/1/2026- 9/30/2027
10/1/2027- 9/30/2028
10/1/2028- 9/30/2029
10/1/2029- 9/30/2030
10/1/2030- 3/31/2031
4/1/2031- 9/30/2031
10/1/2031- 9/30/2032
10/1/2032- 9/30/2033
10/1/2033- 9/30/2034
10/1/2034- 9/30/2035
Level 1 (90/10)
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Level 2 (75/25)
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Level 3 (50/50)
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Level 4 (25/75)
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Non-Labor Resources
Maximum percentage
B.7.2 SUBCLIN 5B SPECIAL TASKS AND STUDIES ($)
Elements
GFY
GFY
GFY
GFY
GFY
GFY
GFY
GFY
GFY
Option Period 1
GFY
Option Period 2
GFY
Option Period 3
GFY
Option Period 4
GFY
Option Period 5
06/25/2024 9/30/2024
10/1/2024- 9/30/2025-
10/1/2025- 9/30/2026
10/1/2026- 9/30/2027
10/1/2027- 9/30/2028
10/1/2028- 9/30/2029
10/1/2029- 9/30/2030
10/1/2030- 3/31/2031
4/1/2031- 9/30/2031
10/1/2032- 9/30/2033
10/1/2032- 9/30/2033
10/1/2033- 9/30/2034
10/1/2034- 9/30/2035
Tier I
(125 hrs.)
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Tier II
(250 hrs.)
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Tier III (500 hrs.)
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Tier IV (750 hrs.)
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Tier V (1000 hrs.
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
3. Update L.24 PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE DATES to the following (See Change Page L-23):
L.24 PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE
DATES
(a) Proposal Volume III, Past Performance, is due by 2/9/2024 at 1:30 p.m.
Central Time.
Proposal Volumes I, II, IV and V is due by 3/4/2024 at 1:30 p.m. Central Time.
The delivery location is specified in:
L.18 Electronic Submission of Proposals – Proposal Marking and Delivery Through NASA’s EFSS Box (NOV 2021)
(b) Offerors shall arrange their proposals as set forth below in Table L-24-1 Overview of Proposal Volumes, Page Limitations, Copies, and Format. Proposal sections excluded from the page limit shall be placed at the end of each volume.
4. Update ATTACHMENT L-08 GOVERNMENT TASK AGREEMENT INSTRUCTIONS to read (See Change Page L-101):
“Offerors shall submit all complete final GTA request form via email to the NASA/ISS Program Transportation Integration Office representative, Kristi Duplichen, no later than 21 calendar days after RFP Amendment 5 release to allow the Government to submit a timely response.”
5. Update ATTACHMENT L-08 GOVERNMENT TASK AGREEMENT INSTRUCTIONS to remove (See Change Page L-101):
“To assist with internal tracking purposes, a list of all the submitted GTA request titles, and submission date shall be submitted to the NASA/ISS Program Transportation Integration Office representative within 22 calendar days of the issue of the initial RFP.”
6. Update M.3 MISSION SUITABILITY FACTOR (VOLUME II) Paragraph (b) to read
(See Change Page M-4 – M-5):
“To be considered by the Government, GTAs must be submitted to the NASA/ISS Program Transportation Integration Office representative, Kristi Duplichen no later than 21 calendar days after RFP Amendment 5 release.”
7. Replace the Model Contract in its entirety
8. Replace the following templates in their entirety:
Attachment L-01A USDV Hybrid Cost Price Template Attachment L-01B USDV Fixed Price Template Attachment L-01C Minor Subcontractor Template Attachment L-01D USDV Hybrid Cost Price Template (CLIN 1 and 2 CPIF)
80JSC023R0003 Amendment 5
PART I – THE SCHEDULE
B-3
B.5 CLIN 3 DWELL (IDIQ)
CLIN 3 scope (SOW Section 5.0 Dwell (CLIN 3)) includes storing the USDV in the Dwell facility prior to shipment to the Launch Site Payload Processing Facility (PPF) and reporting on the Dwell status at the quarterly Program Management Review.
TABLE B.5: CLIN 3 DWELL PRICING
Element
GFY 2028 GFY 2029 GFY 2030 GFY 2031 GFY 2031
Option
Period 1
GFY 2032
Option
Period 2
GFY 2033
Option
Period 3
GFY2034
Option
Period 4
GFY 2035
Option
Period 5
10/1/2027-
9/30/2028
10/1/2028-
9/30/2029
10/1/2029-
9/30/2030
10/1/2030-
3/31/2031
4/1/2031-
9/30/2031
10/1/2031-
9/30/2032
10/1/2032-
9/30/2033
10/1/2033-
9/30/2034
10/1/2034-
9/30/2035
Dwelling
Price Per
Quarter
Year
OFI OFI OFI OFI OFI OFI OFI OFI OFI
B.6 CLIN 4 LAUNCH VEHICLE (LV) INTEGRATION AND SUSTAINING (IDIQ)
CLIN 4 includes scope for LV integration and sustaining engineering and operations including final LV integration and testing, pre-launch preparation, flight execution preparation, launch and flight operations, and procurement of hardware.
The rates in the clause are per hour Fully Burdened Labor Rates inclusive of profit. The purpose of this clause is to set forth the rates to be utilized in the subsequent negotiation of FFP IDIQ orders in accordance with clause NFS 1852.216-80, Task Ordering Procedure. At the bottom of the table there is a row(s) that allows indirect rates to be applied to any non-labor resources, as required by task order, if applicable. Pricing of all FFP IDIQ orders shall be in accordance with the negotiated rates set forth below.
B-4
TABLE B.6: CLIN 4 LAUNCH VEHICLE (LV) INTEGRATION AND SUSTAINING
PRICING ($/HR)
Pricing
Elements
GFY
GFY
GFY
GFY
GFY
GFY
GFY
GFY
GFY
Option
Period 1
GFY
Option
Period 2
GFY
Option
Period 3
GFY
Option
Period 4
GFY
Option
Period 5
06/25/2024-
9/30/2024
10/1/2024-
9/30/2025-
10/1/2025-
9/30/2026
10/1/2026-
9/30/2027
10/1/2027-
9/30/2028
10/1/2028-
9/30/2029
10/1/2029-
9/30/2030
10/1/2030-
3/31/2031
4/1/2031-
9/30/2031
10/1/2031-
9/30/2032
10/1/2032-
9/30/2033
10/1/2033-
9/30/2034
10/1/2034-
9/30/2035
Program
Manager
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Engineer OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Technician OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI Business OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Administrative OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Non-Labor
Resources
Maximum percentage
B-5
B.7 CLIN 5 SPECIAL TASKS AND STUDIES (IDIQ)
The overall Objective of CLIN 5 is the performance of special tasks and studies necessary to perform activities that may be requested by NASA.
The Contractor shall perform special studies and analyses, risk reduction activities, provide materials, and/or fabricate incidental hardware in support of this contract, as required. Each task will be initiated by written direction from the NASA Contracting Officer (CO). These tasks include advance planning and feasibility studies in support of future contemplated requirements;
development, fabrication, and test of hardware/software to support planning studies or special tests, mission unique studies, material provision, and implementation of changes required due to changes in requirements.
B.7.1 SUBCLIN 5A SPECIAL TASKS AND STUDIES ($/HR or %)
Elements
Technical/
Admin
GFY
GFY
GFY
GFY
GFY
GFY
GFY
GFY
GFY
Option
Period 1
GFY
Option
Period 2
GFY
Option
Period 3
GFY
Option
Period 5
06/25/2024-
9/30/2024
10/1/2024-
9/30/2025-
10/1/2025-
9/30/2026
10/1/2026-
9/30/2027
10/1/2027-
9/30/2028
10/1/2028-
9/30/2029
10/1/2029-
9/30/2030
10/1/2030-
3/31/2031
4/1/2031-
9/30/2031
10/1/2031-
9/30/2032
10/1/2032-
9/30/2033
10/1/2033-
9/30/2034
10/1/2034-
9/30/2035
Level 1
(90/10)
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Level 2
(75/25)
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Level 3
(50/50)
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Level 4
(25/75)
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Non-Labor
Resources
Maximum percentage
B-6
B.7.2 SUBCLIN 5B SPECIAL TASKS AND STUDIES ($)
Pricing
Elements
GFY
GFY
GFY
GFY
GFY
GFY
GFY
GFY
GFY
Option
Period 1
GFY
Option
Period 2
GFY
Option
Period 3
GFY
Option
Period 5
06/25/2024-
9/30/2024
10/1/2024-
9/30/2025-
10/1/2025-
9/30/2026
10/1/2026-
9/30/2027
10/1/2027-
9/30/2028
10/1/2028-
9/30/2029
10/1/2029-
9/30/2030
10/1/2030-
3/31/2031
4/1/2031-
9/30/2031
10/1/2032-
9/30/2033
10/1/2032-
9/30/2033
10/1/2033-
9/30/2034
10/1/2034-
9/30/2035
Tier I
(125 hrs.)
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Tier II
(250 hrs.)
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Tier III
(500 hrs.)
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Tier IV
(750 hrs.)
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
Tier V
(1000 hrs.)
OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI OFI
(End of clause)
B.8 NFS 1852.232-81 CONTRACT FUNDING. (JUN 1990) (Applies to CPIF only)
(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is $TBD. This allotment is for
TBD and covers the following estimated period of performance: $TBD.
(b) An additional amount of $TBD is obligated under this contract for payment of fee.
B.9 JSC PROCUREMENT INSTRUCTION (JPI) 52.216-90 IDIQ MINIMUM AND
MAXIMUM ORDERING LIMITS (NOV 2018)
In accordance with FAR 52.216-22, Indefinite Quantity, the contract guaranteed minimum amount* to be ordered under this contract is $100,000 and the contract Not to Exceed (NTE) amount* which may be ordered under this contract is $302,000,000. The Government is not obligated to order more than the minimum specified, but may order up to the NTE amount. The
Contractor is obligated to fulfill orders issued, up to the NTE amount within the limits specified in FAR 52.216-19 Order Limitations.
* These values are based on “dollars”.
[END OF SECTION]
PART IV - REPRESENTATIONS AND INSTRUCTIONS
L-23
L.23 INTRODUCTION
The proposal volumes shall fully demonstrate that the Offeror understands and can successfully perform the requirements of the solicitation. The Offeror’s proposed approach to Mission
Suitability and Cost / Price should be specific, detailed, and contain sufficient information to clearly and fully demonstrate the Offeror’s understanding of the requirements and the inherent risks associated with the objective of this procurement. Stating that the Offeror understands and shall comply with the requirements or paraphrasing the requirements is inadequate, as are phrases such as “Standard procedures shall be employed” and “Well-known techniques shall be used”. The Offeror shall provide an assessment of the risks associated with the proposed approach, including the identification of impacts and mitigation recommendations in the appropriate Mission Suitability proposal volume. Information previously submitted, if any, shall be considered only to the extent it is resubmitted; it should not be incorporated by reference.
L.24 PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE
DATES
(a) Proposal Volume III, Past Performance, is due by 1/19/2024 at 1:30 p.m. Central Time.
Proposal Volumes I, II, IV and V is due by 2/12/2024 at 1:30 p.m. Central Time.
The delivery location is specified in:
L.18 Electronic Submission of Proposals – Proposal Marking and Delivery Through
NASA’s EFSS Box (NOV 2021)
(b) Offerors shall arrange their proposals as set forth below in Table L-24-1 Overview of
Proposal Volumes, Page Limitations, Copies, and Format. Proposal sections excluded from the page limit shall be placed at the end of each volume.
L-101
Offerors shall submit all complete final GTA request form via email to the NASA/ISS Program
Transportation Integration Office representative, Kristi Duplichen, no later than 21 calendar days after RFP Amendment 5 release to allow the Government to submit a timely response. Please include the following information in the subject line of the email: Offeror Name – USDV GTA
Request. NASA will disposition all GTA requests received by the deadline no later than 7 calendar days prior to USDV proposal (Volumes I, II, IV and V) due date.
How to Inquire About NASA On-Site Resources
To inquire about relevant, unique on-site resources at NASA Centers that may be available, Offerors shall contact the NASA/ISS Program Transportation Integration Office representative, Kristi
Duplichen at kristi.m.duplichen@nasa.gov. The NASA/ISS Program Transportation Integration
Office representative will coordinate all requests for GTAs with the corresponding NASA Centers.
The Offeror or Contractor shall only request NASA facilities, assets, services, or other specialized resources that are unique and not reasonably available commercially. The Government has the right to refuse any GTA request for any reason.
During any blackout period in which the Offeror is drafting a contract proposal, communications with any government representative (i.e., NASA/ISS Program Transportation Integration Office representative and NASA Performing Organization representatives) must be limited to sharing information about the specific GTA requested. The Government POC communications with the
Offerors will not include any assistance in preparing the Offeror’s proposal, advice, or opinions on the Offeror’s proposed design solution or approach for performing the work requested by the USDV solicitation or any information regarding the USDV competition or its technical requirements.
Data Rights
All technical data (TD), computer software (CS), and computer software documentation (CSD) developed pursuant to a GTA shall be delivered to NASA with unlimited rights, as defined in contract clause I.16 FAR 52.227-14 RIGHTS IN DATA—GENERAL (MAY 2014) ALTERNATE
II (DEC 2007) [(MODIFIED BY NFS 1852.227-14 (APR 2015)] ALTERNATE III (DEC 2007)
ALTERNATE V (DEC 2007). Assertions provided by the Offeror on its Identification and
Representation, pursuant to Clause H.17, Identification and Representation Data with Restrictive or
Limiting Markings, that propose to deliver TD/CS/CSD developed pursuant to a GTA with less than unlimited rights will be rejected by NASA and will not be incorporated into the contract at or after award.
Data Delivery
At no additional cost to NASA, the contractor shall deliver, to a NASA Program authorized repository defined by the Contracting Officer, all technical data, computer software, and computer software documentation developed under work performed pursuant to a GTA no later than sixty (60) calendar days after performance of the GTA has concluded.
Cost Information mailto:kristi.m.duplichen@nasa.gov
M-4
(f) In addition, the Government will include an analysis of the CLINs for unbalanced pricing as referenced in FAR 15.404-1(g). A determination of unbalanced pricing may lead to the rejection of the offer as permitted in FAR 15.404-1(g)(3).
(g) For evaluation purposes the total evaluated cost and price information in the model contract will prevail and take precedence in the event that the model contract differs from proposed price details as provided in Attachments L-01A, L-01B, or L-01D.
(h) To conduct a meaningful comparison in this competition on an equal and common basis, the proposed total evaluated price and the results of the Government’s analysis will be presented to the Source Selection Authority (SSA) for consideration in making a source selection decision.
(i) Offerors should refer to FAR 2.101(b) for a definition of “cost realism” and to FAR 15.404-
1(d) and NFS 1815.305(a)(1) regarding “cost realism analysis” and “probable cost.”
(Applicable to CPIF/Attachment L-01A and Attachment L-01D only)
(End of Provision)
M.3 MISSION SUITABILITY FACTOR (VOLUME II)
(a) The Mission Suitability factor and associated subfactors are used to assess the ability of the offeror to provide and administer the requirements of the SOW. The Mission Suitability subfactors and its corresponding weights reflecting relative importance are listed below.
These weights are intended to be used as a guideline in the source selection decision-making process.
(b) The Government will evaluate the Offeror’s GTAs as part of its evaluation of both the
Technical Approach and Management Approach. The GTAs will be evaluated by assessing the demonstrated understanding, reasonableness, feasibility, completeness, and effectiveness and any ensuing impacts and risks to the Government of the approach. While NASA believes that it has unique resources it is making available to Offerors that may aid the Contractor(s) in ensuring performance success, Offerors are advised that proposing to use Government resources will not, in and of itself, provide a basis for NASA to positively or negatively evaluate a proposal, and may provide a basis for NASA negatively evaluating a proposal if the proposed use of resources does not demonstrate an otherwise well-thought out, thoroughly-explained approach to development that is likely to reduce the risk of unsuccessful contract performance. To be considered by the Government, GTAs must be submitted to the NASA/ISS Program
Transportation Integration Office representative, Kristi Duplichen no later than 21 calendar days
SUBFACTOR WEIGHT
Technical Approach 650 points
Management Approach 200 points
Small Business Utilization 150 points
TOTAL 1000 points
M-5
PART IV - REPRESENTATIONS AND INSTRUCTIONS
after RFP Amendment 5 release. NASA will respond to all requests and notify Offerors within 7 days prior to proposal due date. NASA does not guarantee a response to GTA requests received after the due date.
(c) Proposals will be evaluated and scored numerically based upon the subfactors set forth below.
The Government will interpret failure to provide sufficient detail and rationale, use of ambiguous terms, or inconsistencies noted during the evaluation of proposal information, as a lack of understanding on the part of the offeror and the offeror is notified that this may affect its Mission Suitability score.
M.3.1 Technical Approach (TA) - Mission Suitability Subfactor 1
The Offeror’s Technical Approach will be evaluated for overall demonstrated understanding, reasonableness, feasibility, completeness, and effectiveness and any ensuing impacts and risk to the Government.
M.3.2 Management Approach (MA) - Mission Suitability Subfactor 2
The Offeror’s Management Approach will be evaluated for overall demonstrated understanding, reasonableness, feasibility, completeness, and effectiveness and any ensuing impacts and risk to the Government.
M.3.3 Small Business Utilization (SBU) - Mission Suitability Subfactor 3
The evaluation of Small Business Subcontracting and Commitment to the Small Business Program applies to all offerors, except that Small Businesses are not required to submit a Small Business Subcontracting Plan.
SBU1. Small Business Subcontracting
(a) The Small Business Subcontracting Plan and Reports (DRD USDV-11), will be evaluated in terms of completeness, reasonableness and soundness of the offeror’s independent assessment to achieve the proposed subcontracting goals. The offeror's Small Business
Subcontracting Plan will be evaluated in terms of meeting the requirements of FAR 19.704, Subcontracting Plan Requirements. The evaluation of the goals in the Small Business
Subcontracting Plan will be on the basis of total contract value. The information provided in the Small Business Subcontracting Tables in DRD USDV-11 Small Business
Subcontracting Plan and Reports submission will be evaluated in addition to the supplied narrative.
(b) Small businesses are not required to submit subcontracting plans. The Government will only evaluate the amount of work proposed to be performed by the small business prime and any small business at the first-tier subcontract level. The proposed amount of work to be done by the prime small business and first tier small business subcontractors will be evaluated against the Contracting Officer’s assessment of the overall subcontracting goal for this procurement.
Individual subcontracting goals by small business categories will not be evaluated for small business primes and their first-tier subcontractors.
| b.6 CLIN 4 LAUNCH VEHICLE (LV) INTEGRATION AND SUSTAINING (IDIQ) |
| 2. Update b.7 CLIN 5 SPECIAL TASKS AND STUDIES (IDIQ) to the following: |
| 3. Update L.24 PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE DATES |
| L.24 PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE DATES |
| Amendment 5 Change Page A.pdf |
| b.6 CLIN 4 LAUNCH VEHICLE (LV) INTEGRATION AND SUSTAINING (IDIQ) |
| 2. Update b.7 CLIN 5 SPECIAL TASKS AND STUDIES (IDIQ) to the following (See Change Page B-5 -B-6: |
| 3. Update L.24 PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE DATES to the following (See Change Page L-23): |
| L.24 PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE DATES |
| Amendment 5 Change Page A.pdf |
| b.6 CLIN 4 LAUNCH VEHICLE (LV) INTEGRATION AND SUSTAINING (IDIQ) |
| 2. Update b.7 CLIN 5 SPECIAL TASKS AND STUDIES (IDIQ) to the following (See Change Page B-5 -B-6): |
| 3. Update L.24 PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE DATES to the following (See Change Page L-23): |
| L.24 PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE DATES |
| SF30.pdf |
| 80JSC023R0003 USDV RFP.pdf |
| SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK |
| SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS |
| B.1 CONTRACT TYPE |
| B.2 SUPPLIES AND/OR SERVICES TO BE PROVIDED / ITEMS ISSUED |
| B.3 CLIN 1 DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) THROUGH CRITICAL DESIGN REVIEW (CDR) (CORE) |
| B.4 CLIN 2 PRODUCTION, ASSEMBLY, INTEGRATION AND TEST (CORE) |
| B.5 CLIN 3 DWELL (IDIQ) |
| B.6 CLIN 4 LAUNCH VEHICLE (LV) INTEGRATION AND SUSTAINING (IDIQ) |
| B.7 CLIN 5 SPECIAL TASKS AND STUDIES (IDIQ) |
| B.8 NFS 1852.232-81 CONTRACT FUNDING. (JUN 1990) (Applies to CPIF only) |
| B.9 JSC PROCUREMENT INSTRUCTION (JPI) 52.216-90 IDIQ MINIMUM AND MAXIMUM ORDERING LIMITS (NOV 2018) |
| SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK |
| 1.0 Introduction |
| 1.1 Overview and Objectives |
| 1.2 Scope |
| 1.3 SOW Organization And Structure |
| 1.4 Technical Direction |
| 2.0 Overall General Requirements |
| 2.1 Program Management |
| 2.1.1 Program Management Review (PMR) |
| 2.2 Business Management |
| 2.2.1 Scheduling |
| 2.2.2 Business Other |
| 2.3 Configuration Management |
| 2.3.1 Configuration Status Accounting and Verification |
| 2.3.2 Configuration Control/Change Management |
| 2.4 Information Technology (IT) |
| 2.5 Export Control Management |
| 2.6 NASA Insight and Approval |
| 2.7 Project Life-Cycle Reviews |
| 2.8 Technical and Program Integration Meetings |
| 2.9 Design, Development, Test, and Evaluation (DDT&E) |
| 2.9.1 Design and Construction Standards |
| 2.9.2 Design, Analysis, and Trades |
| 2.9.3 Interface Management |
| 2.9.4 Test and Verification (T&V) |
| 2.9.5 Technical Performance Measures (TPM) |
| 2.9.6 Test Facility Capability |
| 2.9.7 Previously Flown Hardware |
| 2.10 Software Management |
| 2.11 Safety, Reliability, Quality, and Mission Assurance |
| 2.11.1 Safety |
| 2.11.2 Reliability |
| 2.11.3 Probabilistic Risk Assessment (PRA) |
| 2.11.4 Quality Assurance (QA) |
| 2.11.5 NASA Advisories And Government Industry Data Exchange Program (GIDEP) Failure Experience Data Processing |
| 2.11.6 Software Safety and Assurance |
| 2.11.7 Safety and Health |
| 2.11.8 Supplier Management |
| 2.11.9 Anomaly Tracking and Reporting |
| 2.11.10 Mishap |
| 2.12 Risk Management |
| 2.13 Launch Vehicle (LV) Integration |
| 2.14 ISS Integration |
| 2.15 Flight Operations |
| 3.0 Design, Development, Test and Evaluation (DDT&E) Through Critical Design Review (CDR) (CLIN 1) |
| 3.1 Resource Management |
| 3.2 Launch Vehicle Integration |
| 3.3 Flight Operations Preparation |
| 3.4 Avionics & Software Simulation and Test Preparation |
| 3.5 Contract Kick-off |
| 3.6 Mission Concept Review (MCR) |
| 3.7 System Requirements Review (SRR) |
| 3.8 System Definition Review (SDR) |
| 3.9 Preliminary Design Review (PDR) |
| 3.10 Critical Design Review (CDR) |
| 4.0 Production, Assembly, Integration and Test (CLIN 2) |
| 4.1 General Requirements |
| 4.2 Milestone C2-2 System Integration |
| 4.2.1 Launch Vehicle Integration |
| 4.2.2 Flight Operations Preparation |
| 4.2.3 Avionics & Software Simulation and Test Finalization |
| 4.2.4 System Integration Review (SIR) |
| 4.3 Milestone C2-3 AI&T Progress |
| 4.3.1 Launch Vehicle Integration |
| 4.3.2 Flight Operations Preparation |
| 4.3.3 Assembly, Integration, and Test Progress Review (APR) |
| 4.4 Milestone C2-4 System Acceptance |
| 4.4.1 Launch Vehicle Integration |
| 4.4.2 Flight Operations Preparation |
| 4.4.3 Phase III Safety Review |
| 4.4.4 Flight Operations Review (FOR) |
| 4.4.5 System Acceptance Review (SAR) |
| 4.5 Milestone C2-5 Shipment to Acceptance Destination |
| 4.5.1 Shipment to Acceptance Destination |
| 5.0 Dwell (CLIN 3) |
| 5.1 Dwell Release Review (DRR) |
| 6.0 Launch Vehicle Integration and Sustaining (CLIN 4) |
| 6.1 General Requirements |
| 6.2 Pre-Launch |
| 6.2.1 Ground Segment |
| 6.2.2 Pre-Launch Ground Processing, Integration and Test |
| 6.2.3 Launch Operations Preparation |
| 6.2.4 Flight Operations Preparation |
| 6.2.5 Delta FOR |
| 6.2.6 Post Verification Review (PVR) |
| 6.2.7 Stage Operations Readiness Review (SORR) |
| 6.2.8 Flight Readiness Review (FRR) |
| 6.2.9 Launch Readiness Review (LRR) |
| 6.3 Launch and Flight Operations |
| 6.3.1 Launch Operations |
| 6.3.2 Flight Operations |
| 6.3.3 Deorbit Readiness Review (DORR) |
| 6.3.4 Post Mission Support |
6.4 Parts
| 7.0 Special Tasks And Studies (CLIN 5) |
| 7.1 Special Studies (Sub-CLIN 5A) |
| 7.2 Pre-Priced Evaluation of NASA Mission Requirements (Sub-CLIN 5B) |
| SECTION D - PACKAGING AND MARKING |
| D.1 CLAUSES INCORPORATED BY REFERENCE |
| D.2 NFS 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT. (JAN 2011) |
| SECTION E - INSPECTION AND ACCEPTANCE |
| E.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE |
| E.2 FAR 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) |
| E.3 NFS 1852.246-71 GOVERNMENT CONTRACT QUALITY ASSURANCE FUNCTIONS. (OCT 1988) |
| E.4 NFS 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT. (APR 2015) |
| E.5 PRELIMINARY INSPECTION AT SOURCE AND FINAL INSPECTION AND ACCEPTANCE AT DESTINATION |
| SECTION F - DELIVERIES OR PERFORMANCE |
| F.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE |
| F.2 COMPLETION OF WORK |
| F.3 FAR 52.211-8 TIME OF DELIVERY (JUN 1997) |
| F.4 PLACE OF PERFORMANCE |
| F.5 NFS 1852.247-72 ADVANCE NOTICE OF SHIPMENT. (OCT 1988) |
| F.6 JSC 52.247-95 FLIGHT ITEM (JUN 2020) |
| F.7 OPTION TO EXTEND |
| SECTION G - CONTRACT ADMINISTRATION DATA |
| G.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE |
| G.2 NFS 1852.232-80 SUBMISSION OF VOUCHERS FOR PAYMENT. (APR 2018) |
| G.3 NFS 1852.245-71 INSTALLATION—ACCOUNTABLE GOVERNMENT PROPERTY (JUN 2018) |
| G.4 NFS 1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY OF CONTRACTORS. (JAN 2017)(Applies to CPIF only) (Applies to FFP if Contractor has custody of $10 million dollars of Government Property) |
| G.5 NFS 1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR 52.245-1. (JAN 2011) |
| G.6 NFS 1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS. (SEP 2017) |
| G.7 JSC 52.204-92 NASA SECURITY PROGRAM AND IDENTIFICATION OF EMPLOYEES (JUL 2022) |
| G.8 SHIPPING INSTRUCTIONS |
| SECTION H - SPECIAL CONTRACT REQUIREMENTS |
| H.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE |
| H.2 NFS 1852.209-71 LIMITATION OF FUTURE CONTRACTING. (DEC 1988) |
| H.3 NFS 1852.225-70 EXPORT LICENSES. (FEB 2000) (ALT I) (FEB 2000) |
| H.4 NFS 1852.228-76 CROSS-WAIVER OF LIABILITY FOR INTERNATIONAL SPACE STATION ACTIVITES (OCT 2012) |
| H.5 NFS 1852.232-77 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT). (MAR 1989) |
| H.6 NFS 1852.235-71 KEY PERSONNEL AND FACILITIES (MAR 1989) |
| H.7 NFS 1852.235-74 ADDITIONAL REPORTS OF WORK - RESEARCH AND DEVELOPMENT. (FEB 2003) |
| H.8 UNIDENTIFIED DATA CONTAINING RESTRICTIVE OR LIMITING MARKINGS |
| H.9 NASA INSIGHT AND APPROVAL |
| H.10 ASSOCIATE CONTRACTOR AGREEMENTS |
| H.11 DATA CONTAINING AN INCORRECT NOTICE |
| H.12 INCORRECT NOTICE AND REQUIREMENTS FOR WRITTEN JUSTIFICATION OF RESTRICTED MARKINGS |
| H.13 PAYMENTS, EVENTS, AND ACCOMPLISHMENT CRITERIA |
| H.14 SAE AS9100 |
| H.15 MITIGATION OF ORGANIZATIONAL CONFLICTS OF INTEREST |
| H.16 DISCLOSURE OF ORGANIZATIONAL CONFLICTS OF INTEREST AFTER CONTRACT AWARD |
| H.17 IDENTIFICATION AND REPRESENTATION OF LIMITED RIGHTS DATA AND RESTRICTED COMPUTER SOFTWARE AFTER AWARD |
| H.18 TECHNICAL DATA AND COMPUTER SOFTWARE – WITHHOLDING OF PAYMENT |
| H.19 GOVERNMENT’S RIGHT TO REMOTELY SENSED DATA |
| H.20 CONTRACTOR ACQUIRED PROPERTY TRANSITION TO FIRM FIXED PRICE (Applies to CPIF only) |
| H.21 SPECIAL TOOLING, SPECIAL TEST EQUIPMENT, AND MANUFACTURING AIDS FOR USDV |
| H.22 CONTRACTOR OBJECTIVES ON USDV |
| H.23 FOREIGN TRAVEL BY CONTRACTOR EMPLOYEES ON NASA OFFICIAL BUSINESS (JUL 2022) |
| H.24 COUNTERINTELLIGENCE BRIEFINGS (AUG 2022) |
| H.25 USE OF GOVERNMENT RESOURCES |
| H.26 CONTRACTOR BUSINESS SYSTEMS (Applies to CAS covered contracts only) |
| H.27 52.223-94 JSC ENVIRONMENTAL COMPLIANCE (MAR 2023) (JSC PROCUREMENT INSTRUCTION) |
| H.28 USDV COMMUNICATIONS |
| SECTION I - CONTRACT CLAUSES |
| I.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE |
| I.2 FAR 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS. (NOV 2021) |
| I.3 FAR 52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION |
| I.4 FAR 52.216-10 INCENTIVE FEE (JUNE 2011) (Applies to CPIF only) |
| I.5 FAR 52.216-18 ORDERING. (AUG 2020) |
| I.6 FAR 52.216-19 ORDER LIMITATIONS. (OCT 1995) |
| I.7 FAR 52.216-22 INDEFINITE QUANTITY. (OCT 1995) |
| I.8 FAR 52.217-7 OPTION FOR INCREASED QUANTITY - SEPARATELY PRICED LINE ITEM (CLIN 2A Critical spares) (MAR 1989) |
| I.9 FAR 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS CONCERNS (Oct 2022) |
| I.10 FAR 52.222-19 CHILD LABOR-COOPERATION WITH AUTHORITIES AND REMEDIES. (MAR 2022) (DEVIATION) |
| I.11 FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS. (JUN 2020) |
| I.12 FAR 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES. (JUN 2020) |
| I.13 FAR 52.232-19 AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR. (APR 1984) |
| I.14 FAR 52.232-32 PERFORMANCE-BASED PAYMENTS. (APR 2012) |
| I.15 FAR 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (FEB 2021) (ALTERNATE I) (JUL 1995) |
| I.16 FAR 52.227-14 RIGHTS IN DATA—GENERAL (MAY 2014) ALTERNATE II (DEC 2007) [(MODIFIED BY NFS 1852.227-14 (APR 2015)] ALTERNATE III (DEC 2007) ALTERNATE V (DEC 2007) |
| I.17 FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS. (MAR 2023) |
| I.18 FAR 52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES. (JUN 2023) |
| I.19 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE. (FEB 1998) |
| I.20 FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES. (NOV 2020) |
| I.21 NFS 1852.204-75 SECURITY CLASSIFICATION REQUIREMENTS (SEP 1989) |
| I.22 NFS 1852.204-76 SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION TECHNOLOGY RESOURCES (APR 2021) (DEVIATION) |
| I.23 NFS 1852.216-80 TASK ORDERING PROCEDURE. (OCT 1996) ALTERNATE II (APR 2018) (Applies to FFP IDIQ only) |
| I.24 NFS 1852.225-8 DUTY-FREE ENTRY OF SPACE ARTICLES (FEB 2000). |
| I.25 NFS 1852.225-71 RESTRICTION ON FUNDING ACTIVITY WITH CHINA (FEB 2012) (DEVIATION) |
| I.26 NFS 1852.234-2 EARNED VALUE MANAGEMENT SYSTEM. (NOV 2015) (DEVIATION) (Applies to CPIF only) |
| I.27 NFS 1852.239-74 INFORMATION TECHNOLOGY SYSTEM SUPPLY CHAIN RISK ASSESSMENT (JAN 2020) (DEVIATION) |
| SECTION J - LIST OF ATTACHMENTS |
| ATTACHMENT J-01 DATA REQUIREMENTS DESCRIPTION (DRD) |
| ATTACHMENT J-02 RESERVED |
| ATTACHMENT J-03 ACRONYMS AND ABBREVIATIONS |
| ATTACHMENT J-04 DEFINITIONS |
| ATTACHMENT J-05 APPLICABLE AND REFERENCE DOCUMENTS LIST |
| ATTACHMENT J-06 PROGRAM MANAGEMENT PLAN |
| ATTACHMENT J-07 PROJECT LIFE-CYCLE REVIEW PLAN |
| ATTACHMENT J-08 USDV SYSTEM ARCHITECTURE AND CONCEPT OF OPERATIONS |
| ATTACHMENT J-09 INSIGHT MANAGEMENT PLAN |
| ATTACHMENT J-10 ORGANIZATIONAL CONFLICTS OF INTEREST (OCI) PLAN |
| ATTACHMENT J-11 SMALL BUSINESS SUBCONTRACTING PLAN |
| ATTACHMENT J-12 DIVERSITY, EQUITY, INCLUSION, AND ACCESSIBILITY (DEIA) PLAN |
| ATTACHMENT J-13 CONFIGURATION MANAGEMENT PLAN |
| ATTACHMENT J-14 INFORMATION TECHNOLOGY SECURITY MANAGEMENT PLAN (ITSMP) |
| ATTACHMENT J-15 EXPORT CONTROL PLAN |
| ATTACHMENT J-16 GOVERNMENT PROPERTY MANAGEMENT PLAN |
| ATTACHMENT J-17 SAFETY AND HEALTH PLAN |
| ATTACHMENT J-18 RISK MANAGEMENT PLAN (RMP) |
| ATTACHMENT J-19 SAFETY & MISSION ASSURANCE (S&MA) PLAN |
| ATTACHMENT J-20 MISHAP PREPARDNESS AND CONTENGENCY PLAN |
| ATTACHMENT J-21 TRL ASSESSMENT AND TECHNOLOGY MATURATION PLAN |
| ATTACHMENT J-22 SOFTWARE MANAGEMENT PLAN |
| ATTACHMENT J-23 DESIGN, DEVELOPMENT, TEST, AND EVALUATION (DDT&E) PLAN |
| ATTACHMENT J-24 VERIFICATION AND VALIDATION (V&V) PLAN |
| ATTACHMENT J-25 SYSTEM ENGINEERING MANAGEMENT PLAN (SEMP) |
| ATTACHMENT J-26 ASSEMBLY, INTEGRATION, AND TEST (AI&T) PLAN |
| ATTACHMENT J-27 NASA STANDARDS AND SPECIFICATIONS COMPLIANCE AND TAILORING APPROACH |
| ATTACHMENT J-28 QUALIFICATION AND ACCEPTANCE PLAN |
| ATTACHMENT J-29 INTEGRATED MASTER SCHEDULE |
| ATTACHMENT J-30 WORK PLANS |
| ATTACHMENT J-31 GOVERNMENT TASK AGREEMENTS |
| ATTACHMENT J-32 STANDARD LABOR CATEGORIES |
| ATTACHMENT J-33 GOVERNMENT-FURNISHED PROPERTY, FACILITIES AND DATA/INFORMATION |
| ATTACHMENT J-34 INSTALLATION ACCOUNTABLE GOVERNMENT PROPERTY |
| ATTACHMENT J-35 RESERVED |
| ATTACHMENT J-36 AUTHORIZED LIMITED RIGHTS IN DATA AND RESTRICTED COMPUTER SOFTWARE |
| ATTACHMENT J-37 INCENTIVE FEE PLAN (Applies to CPIF only) |
| 1.0 INTRODUCTION |
| 2.0 INCENTIVE FEE PLAN |
| 3.0 INCENTIVE FEE PROVISIONS |
| 4.0 INCENTIVE FEE ARRANGEMENT (CLIN 1) |
| ATTACHMENT J-38 DD FORM 254, DEPARTEMENT OF DEFENSE CONTRACT SECURITY CLASSIFICATEION SPECIFICATION |
| ATTACHMENT J-39 PROPULSION SYSTEM DEVELOPMENT APPROACH |
| ATTACHMENT J-40 DELIVERABLE ITEM LIST |
| SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS OR RESPONDENTS |
| K.1 CLAUSES INCORPORATED BY REFERENCE |
| K.2 52.204-3 TAXPAYER IDENTIFICATION. (OCT 1998) |
| K.3 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS. (MAR 2023) |
| K.4 52.204-20 PREDECESSOR OF OFFEROR. (AUG 2020) |
| K.5 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT. (NOV 2021) |
| K.6 52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES - REPRESENTATION. (OCT 2020) |
| K.7 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS. (AUG 2020) |
| K.8 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS. (OCT 2018) |
| K.9 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW. (FEB 2016) |
| K.10 52.209-12 CERTIFICATION REGARDING TAX MATTERS. (OCT 2020) |
| K.11 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS - CERTIFICATION. (NOV 2021) |
| K.12 52.215-6 PLACE OF PERFORMANCE. (OCT 1997) |
| K.13 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS. (MAR 2023) |
| K.14 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS ALTERNATE I (SEP 2015) |
| K.15 52.219-2 EQUAL LOW BIDS. (OCT 1995) |
| K.16 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS. (FEB 1999) |
| K.17 52.222-25 AFFIRMATIVE ACTION COMPLIANCE. (APR 1984) |
| K.18 52.225-2 BUY AMERICAN CERTIFICATE. (OCT 2022) |
| K.19 52.225-18 PLACE OF MANUFACTURE. (AUG 2018) |
| K.20 52.225-20 PROHIBITION ON CONDUCTING RESTRICTED BUSINESS OPERATIONS IN SUDAN - CERTIFICATION. (AUG 2009) |
| K.21 52.227-15 REPRESENTATION OF LIMITED RIGHTS DATA AND RESTRICTED COMPUTER SOFTWARE. (DEC 2007) |
| K.22 52.230-1 COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION. (JUN 2020) (Applies to CPIF only) |
| K.23 52.230-7 PROPOSAL DISCLOSURE - COST ACCOUNTING PRACTICE CHANGES. (APR 2005) (Applies to CPIF only) |
| K.24 1852.225-72 RESTRICTION ON FUNDING ACTIVITY WITH CHINA - REPRESENTATION (FEB 2012) (DEVIATION) |
| SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS |
| L.1 CLAUSE INCORPORATED BY REFERENCE |
| L.2 FAR 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS. (JUN 1988) |
| L.3 FAR 52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008) |
| L.4 FAR 52.216-1 TYPE OF CONTRACT (APR 1984) |
| L.5 FAR 52.222-56 CERTIFICATION REGARDING TRAFFICKING IN PERSONS COMPLIANCE PLAN (OCT 2020) |
| L.6 FAR 52.232-28 INVITATION TO PROPOSE PERFORMANCE-BASED PAYMENTS (MAR 2000) |
| L.7 FAR 52.233-2 SERVICE OF PROTEST (SEP 2006) |
| L.8 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) |
| L.9 FAR 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020) |
| L.10 NFS 1852.215-77 PREPROPOSAL/PREBID CONFERENCE (APR 2015) |
| L.11 NFS 1852.219-73 SMALL BUSINESS SUBCONTRACTING PLAN (MAY 1999) |
| L.12 NFS 1852.234-1 NOTICE OF EARNED VALUE MANAGEMENT SYSTEM (NOV 2006) (Applies to CPIF only) |
| L.13 NFS 1852.239-73 REVIEW OF THE OFFEROR’S INFORMATION TECHNOLOGY SYSTEMS SUPPLY CHAIN (DEVIATION 15-03D) |
| L.14 NFS 1852.245-80 GOVERNMENT PROPERTY MANAGEMENT INFORMATION (JAN 2011) |
| L.15 NFS 1852.245-81 LIST OF AVAILABLE GOVERNMENT PROPERTY (JAN 2011) |
| L.16 LIST OF AVAILABLE GOVERNMENT FACILITIES |
| L.17 JSC 52.215-107 GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL (AUG 2018) (JSC PROCUREMENT INSTRUCTION) |
| L.18 ELECTRONIC SUBMISSION OF PROPOSALS – PROPOSAL MARKING AND DELIVERY THROUGH NASA’S EFSS BOX |
| L.19 JSC 52.215-123 AVAILABILITY OF SPECIFICATIONS (DEC 2019) (JSC PROCUREMENT INSTRUCTION) |
| L.20 JSC 52.215-124 COMMUNICATIONS REGARDING THIS SOLICITATION (MAR 2023) (JSC PROCUREMENT INSTRUCTION) |
| L.21 OFFEROR ACCEPTANCE PERIOD |
| L.22 INSTRUCTIONS TO OFFERORS |
| L.23 INTRODUCTION |
| L.24 PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE DATES |
| L.25 PROPOSAL FORMATTING INSTRUCTIONS |
| L.26 COST AND PRICE FACTOR - VOLUME I |
| L.26.1 GENERAL COST AND PRICE INSTRUCTIONS |
| L.26.2 SPECIFIC COST INSTRUCTIONS |
| L.27 MISSION SUITABILITY (MS) FACTOR – VOLUME II |
| L.27.1 TECHNICAL APPROACH (TA) - MISSION SUITABILITY SUBFACTOR 1 |
| L.27.2 MANAGEMENT APPROACH (MA) - MISSION SUITABILITY SUBFACTOR 2 |
| L.27.3 SMALL BUSINESS UTILIZATION (SBU) - MISSION SUITABILITY SUBFACTOR 3 |
| L.28 PAST PERFORMANCE - VOLUME III |
| L.29 RESPONSIBILITY CONSIDERATIONS – VOLUME IV |
| L.30 MODEL CONTRACT AND ADDITIONAL REQUIREMENTS - VOLUME V |
| LIST OF ATTACHMENTS |
| ATTACHMENT L-01A USDV HYBRID COST PRICE TEMPLATE |
| ATTACHMENT L-01B USDV FIXED PRICE TEMPLATE |
| ATTACHMENT L-01C USDV MINOR SUBCONTRACTOR TEMPLATE |
| ATTACHMENT L-02 BASIS OF ESTIMATE (BOE) FORM |
| ATTACHMENT L-03 TECHNICAL RESOURCES TEMPLATE (TRT) |
| ATTACHMENT L-04A CLIN 4 – LAUNCH VEHICLE INTEGRATION AND SUSTAINING REPRESENTIVE TASK ORDER (RTO) |
| ATTACHMENT L-04B CLIN 4 – LAUNCH VEHICLE INTEGRATION AND SUSTAINING – LONG LEAD PARTS REPRESENTIVE DELIVERY ORDER (RDO) |
| ATTACHMENT L-05 STANDARD LABOR CATEGORIES (SLC) |
| ATTACHMENT L-06 SAMPLE PAST PERFORMANCE CONSENT LETTER PAST PERFORMANCE CONSENT LETTER |
| ATTACHMENT L-07 PAST PERFORMANCE MATRIX |
| ATTACHMENT L-08 GOVERNMENT TASK AGREEMENT INSTRUCTIONS |
| ATTACHMENT L-09 PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM CHECKLIST (Applies to CPIF only) |
| ATTACHMENT L-10 PRIME/SUBCONTRACTOR IDENTIFICATION AND SOW DIVISION OF WORK LISTING |
| SECTION M - EVALUATION FACTORS FOR AWARD |
| M.1 SOURCE EVALUATION BOARD EVALUATION FACTORS FOR AWARD |
| M.2 COST AND PRICE FACTOR (VOLUME I) |
| M.3 MISSION SUITABILITY FACTOR (VOLUME II) |
| M.4 PAST PERFORMANCE EVALUATION -VOLUME III |
| M.5 RESPONSIBILITY CONSIDERATIONS (VOLUME IV) |
| M.6 MODEL CONTRACT (VOLUME V) |
| Attachment J-01 - Data Requirements Deliverable Amend 2.pdf |
| Definitions |
| Cost Elements |
| TABLE DRD USDV-11-03: LIST OF SMALL BUSINESS SUBCONTRACTORS |
| Applicable Documents: SSP 30695, Acceptance Data Package Requirements Specification, NFS Subpart 1846.6, Material Inspection and Receiving Reports |
| 80JSC023R0003 USDV RFP Change page.pdf |
| L.23 INTRODUCTION |
| L.24 PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE DATES |
| 80JSC023R0003 USDV RFP Change page.pdf |
| L.23 INTRODUCTION |
| L.24 PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE DATES |
| Amendment 5 Change Page b.pdf |
| b.6 CLIN 4 LAUNCH VEHICLE (LV) INTEGRATION AND SUSTAINING (IDIQ) |
| 2. Update b.7 CLIN 5 SPECIAL TASKS AND STUDIES (IDIQ) to the following (See Change Page B-5 - B-6): |
| 3. Update L.24 PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE DATES to the following (See Change Page L-23): |
| L.24 PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE DATES |
Accessibility Report
Filename:
80JSC023R0003 Amendment 5.pdf
Report created by:
Organization:
[Enter personal and organization information through the Preferences > Identity dialog.]
Summary
The checker found problems which may prevent the document from being fully accessible.
Needs manual check: 1
Passed manually: 1
Failed manually: 0
Skipped: 4
Passed: 24
Failed: 2
Detailed Report
Document
Rule Name Status Description
Accessibility permission flag Passed Accessibility permission flag must be set
Image-only PDF Passed Document is not image-only PDF
Tagged PDF Passed Document is tagged PDF
Logical Reading Order Passed manually Document structure provides a logical reading order
Primary language Passed Text language is specified
Title Passed Document title is showing in title bar
Bookmarks Passed Bookmarks are present in large documents
Color contrast Needs manual check Document has appropriate color contrast
Page Content
Rule Name Status Description
Tagged content Skipped All page content is tagged
Tagged annotations Skipped All annotations are tagged
Tab order Passed Tab order is consistent with structure order
Character encoding Passed Reliable character encoding is provided
Tagged multimedia Passed All multimedia objects are tagged
Screen flicker Passed Page will not cause screen flicker
Scripts Passed No inaccessible scripts
Timed responses Passed Page does not require timed responses
Navigation links Passed Navigation links are not repetitive
Forms
Rule Name Status Description
Tagged form fields Passed All form fields are tagged
Field descriptions Passed All form fields have description
Alternate Text
Rule Name Status Description
Figures alternate text Passed Figures require alternate text
Nested alternate text Passed Alternate text that will never be read
Associated with content Passed Alternate text must be associated with some content
Hides annotation Passed Alternate text should not hide annotation
Other elements alternate text Passed Other elements that require alternate text
Tables
Rule Name Status Description
Rows Passed TR must be a child of Table, THead, TBody, or TFoot
TH and TD Passed TH and TD must be children of TR
Headers Failed Tables should have headers
Regularity Passed Tables must contain the same number of columns in each row and rows in each column
Summary Skipped Tables must have a summary
Lists
Rule Name Status Description
List items Skipped LI must be a child of L
Lbl and LBody Passed Lbl and LBody must be children of LI
Headings
Rule Name Status Description
Appropriate nesting Failed Appropriate nesting
Back to Top
| 2023-12-14T19:14:27-0600 | |
| Ashley Chaves |
File details come from the government source that posted it. Updated .