80GSFC24R0042 FRFP Amendment 1 - 9-18-25 Final signed.pdf
PDF 786 KB Posted
- Attached to
- Program and Analysis Control (PAAC VI) Support Services - Final Request for Propopsal (RFP) Federal contract opportunity
- Solicitation number
- 80GSFC24R0042
About this file
This document is an Amendment to a NASA/Goddard Space Flight Center Request for Proposal (RFP) 80GSFC24R0042. Key changes include: shifting the proposal due date from October 1, 2025 to October 3, 2025 at 1:00pm EST, increasing the maximum contract amount from $393.7M to $495M, and modifying past performance requirements. Specifically, the amendment reduces the minimum average annual cost/fee threshold for prime contractors from $10M to $3M and for significant subcontractors from $10M to $6.5M. Additionally, payment information was updated in Blocks 23 and 25 of the solicitation, and the Statement of Work was revised to align terminology related to "Workforce" reporting. The amendment is signed by the Contracting Officer on 09/18/2025 and applies to all potential offerors.
View the file
Other files for this federal contract opportunity
Show all 50
Program and Analysis Control (PAAC VI) Support Services - Final Request for Propopsal (RFP) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to he hour and date specified in the solicitation or as amended, by one of the following me hods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of he document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible )
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Sherry Barbour, Contracting Officer
The purpose of this amendment is to make changes to RFP 80GSFC24R0042 accordingly.
See page 2 through 4.
NASA/Goddard Space Flight Center 8800 Greenbelt Road Greenbelt, MD 20771
To All Offerors
80GSFC24R0042
1 4
See Block 16C
09/02/2025
09/18/2025
Final RFP 80GSFC24R0042 Amendment 1
1. The SF33 is revised as follows:
• The proposal due date is revised from October 1, 2025 by 1:00pm EST, to October 3, 2025 by 1:00pm EST in Block 9.
• Removed the NSSC payment information in Block 16.
• Added payment information in Block 23 and 25.
2. The following paragraph of clause GSFC 52.216-90 MINIMUM/MAXIMUM
AMOUNT OF SUPPLIES OR SERVICES (COST REIMBURSEMENT)(MAR
2022), is revised as indicated by the red font:
FROM:
(a) The minimum amount of supplies or services that shall be ordered during the effective period of this contract is $1,000,000. The maximum amount of supplies or services that may be ordered during the effective period of this contract is $393.7M. All orders placed under this contract will be applied to the minimum and maximum specified in this paragraph.
TO:
(a) The minimum amount of supplies or services that shall be ordered during the effective period of this contract is $1,000,000. The maximum amount of supplies or services that may be ordered during the effective period of this contract is $495M. All orders placed under this contract will be applied to the minimum and maximum specified in this paragraph.
3. The following paragraphs of clause GSFC 52.215-230 PAST PERFORMANCE VOLUME (FEB 2025), is revised as indicated by the red font:
FROM:
Prime Offerors shall furnish the information requested below for all of your most recent contracts (completed and ongoing) for similar efforts with a minimum average annual cost/fee incurred of $10M that your company has had within the last 5 years of the RFP release date.
Joint Venture (JV) prime Offerors should provide at least one of the past performance referenced contracts required above in the name of the JV. If the JV is newly established and cannot provide past performance referenced contracts in the name of the JV, then past performance referenced contracts from individual prime partners of the JV should be submitted for consideration, with at least one of the JV past performance references from each JV partner. For the purposes of the Past Performance Volume, a protégé prime partner proposed as part of a mentor protégé prime JV, shall follow the instructions for a significant subcontractor in this provision.
A proposed significant subcontractor for the past performance volume is defined as any proposed subcontractor that is estimated to meet/exceed an average annual cost/fee of $10M. Note, the definition of significant subcontractor for the past performance evaluation may be different than for the cost evaluation. The Offeror shall provide the information requested below for any significant subcontractor(s) for those similar efforts within the last 5 years of the RFP release date with a minimum average annual cost/fee incurred of at least 10% of the estimated average annual dollar value of the proposed significant subcontract.
TO:
Prime Offerors shall furnish the information requested below for all of your most recent contracts (completed and ongoing) for similar efforts with a minimum average annual cost/fee incurred of $3M that your company has had within the last 5 years of the RFP release date.
Joint Venture (JV) prime Offerors should provide at least one of the past performance referenced contracts required above in the name of the JV. If the JV is newly established and cannot provide past performance referenced contracts in the name of the JV, then past performance referenced contracts from individual prime partners of the JV should be submitted for consideration, with at least one of the JV past performance references from each JV partner. For the purposes of the Past Performance Volume, a protégé prime partner proposed as part of a mentor protégé prime JV, shall follow the instructions for a significant subcontractor in this provision.
A proposed significant subcontractor for the past performance volume is defined as any proposed subcontractor that is estimated to meet/exceed an average annual cost/fee of $6.5M. Note, the definition of significant subcontractor for the past performance evaluation may be different than for the cost evaluation. The Offeror shall provide the information requested below for any significant subcontractor(s) for those similar efforts within the last 5 years of the RFP release date with a minimum average annual cost/fee incurred of at least 10% of the estimated average annual dollar value of the proposed significant subcontract.
4. The following paragraphs of clause GSFC 52.215-330 PAST PERFORMANCE EVALUATION FACTOR (SERVICES). (FEB 2025), is revised as indicated by the red font:
FROM:
For a prime contractor’s contract reference(s) to be considered at least minimally “relevant”, it must meet/exceed an average annual cost/fee incurred of at least $10M.
A proposed significant subcontractor for this procurement is defined as any proposed subcontractor that is estimated to meet/exceed an average annual cost/fee of $10M. Note, the definition of significant subcontractor for the past performance evaluation may be different than for the cost evaluation.
TO:
For a prime contractor’s contract reference(s) to be considered at least minimally “relevant”, it must meet/exceed an average annual cost/fee incurred of at least $3M.
A proposed significant subcontractor for this procurement is defined as any proposed subcontractor that is estimated to meet/exceed an average annual cost/fee of $6.5M. Note, the definition of significant subcontractor for the past performance evaluation may be different than for the cost evaluation.
5. Attachment A – Statement of Work was revised to align the use of the term “Workforce” with Section 4.10.14, Workforce Reports.
(End of Amendment 1)
| 2025-09-18T14:02:37-0400 | |
| SHERRY BARBOUR |
File details come from the government source that posted it. Updated .