e 1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0003 June 27, 2022 51281PR220022649
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
Contracting Officer
USCG CEU Oakland
1301 Clay Street 7th Floor, Suite 700N
Oakland, CA 94612-5203
Same as Block 6
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) 9A AMENDMENT OF SOLICITATION NO.
ALL PROSPECTIVE OFFERORS
X 70Z08822RESDV0001
9B. DATE (SEE ITEM 11)
May 19, 2022
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE
RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
70Z08822RESDV0001 - Nationwide Tower/Antenna Multiple Award Construction Contract - IDIQ-TMACC
The purpose of this amendment is for the following:
A. Respond to questions from prospective contractors.
B. Include Three (3) additional final inspection reports, provide drawing A001-12 - 847597 - TOWER- 65'
(SST) - MULTIPLE RAISED PLATFORMS
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TRAVIS COHEN
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
6/27/2022 (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
Request For Proposal Number: 70Z08822RESDV0001
Amendment 0003
June 27, 2022
QUESTIONS GOVERNMENT RESPONSE
1.
Tower #15261
This site requires wooden poles to support one end of antenna curtain. There is no detail on the wood pole grade. Can you tell us the grade of pole required?
Match existing wood pole grade. RPUID 156621
Previous Inspection Report attached.
2.
Tower #44217
This tower is not currently climbable as noted in the most recent report which noted the poor condition of the wood poles.
The report does not provide enough detail on the grade of pole required. Can you tell us the grade of pole required?
Previous drawings are unavailable. Match existing wood pole grade.
3.
Tower #847597
There are no details on how the tower leg upgrade is anchoring to existing tower leg foundations or base plates. Can you provide us with the details of how this additional steel is anchoring to the tower foundations or base plates?
Drawing A001-12 – 847597 attached.
4.
Tower #70118
There are no details on the wood pole grade. Can you tell us the grade of pole required?
Match existing wood pole grade. RPUID 70118
Previous Inspection Report attached
Match existing wood pole grade. RPUID 70118
Previous Inspection Report attached
5.
Past Performance Questionnaire Submission. If the past performance is not in CPARS, offerors shall submit completed the Attachment-Past
Performance submitted directly to the Contracting
Officers via email to
There is contradictory information on the Customer/Reference Questionaire we believe the intent per solicitation is to send to CO but the client is confused.
Past Performance Questionnaire must be submitted directly to the following two email addresses: This is submitted by the Client
Travis.Cohen@uscg.mil
Denver.L.Johnson@uscg.mil mailto:Travis.Cohen@uscg.mil mailto:Denver.L.Johnson@uscg.mil
Request For Proposal Number: 70Z08822RESDV0001
Amendment 0003
June 27, 2022
6.
Has the submission date of the Performance
Questionnaire Submission remained the same seeing as though there has been an extension? Our customers are still preparing their responses
Performance Questionnaire Submission must email to: Travis.Cohen@uscg.mil and
Denver.L.Johnson@uscg.mil by COB July 28, 2022
7.
Pre-Climb Safety. Pre-mobilization planning;
Prior to any work on an elevated structure the following shall be evaluated by the supervisor: 1.
The skill and experience of each member of the crew assigned to perform the work. 2. Any special equipment that will need to be acquired and any special training or training reviews that must be performed before work begins. 3. The type of equipment that will be required and the individual worker's training and skill with that equipment. 4.
Any special fabrication required for safety before work begins.
Who will the be responsible for this sign-off , the
CG ? or is the contractor's certifications and daily safety meeting prior to any tower work sufficient to meet this requirement
The contractor is responsible for and shall comply with the safety standards listed under Section 1.3
SAFETY of the specifications.
8.
Will ohm readings be required for new ground? In accordance with TIA-222-H, the measured ground resistance of a grounding system to earth shall not exceed 10 ohms.
9.
Is it Possible to schedule same work window for towers in the same location?
Yes, it is possible to schedule the same work window for towers in the same location.
10.
What kind of specifications for the poles
Is there a pre-approved list for structural inspections- either the CG or private or is contractor to hire their own 3rd party?
There is no pre-approved list of vendors for structural inspections.
11.
Access & Contact
Replacing preform - Will special inspection be required and by what approved vendor.
Will photos be required during all phases of construction?
There is no pre-approved list of vendors for structural inspections. Photos are as required in the specifications for the draft and final reports.
12.
Need POC of the towers? Point Of Contact (POC) will be provided to the
Contractor receiving the Award.
13.
Will need maintenance window. High VHF antenna
Maintenance can be conducted at any time with coordination with COR and POC.
END.