Amendment 0003.pdf

PDF 463 KB Posted

Attached to
Nationwide Tower/Antenna Multiple Award Construction IDIQ Contract (TMACC)
Solicitation number
70Z08822RESDV0001
Issued by

View the file

Other files

File Type Posted
70118 Final Report FY19 PMV080.pdf PDF
Amendment 0004.pdf PDF
15261 Final Report FY19 PMV080.pdf PDF
44217 Final Report FY19 PMV080.pdf PDF
A001 12 847597 TOWER- 65 SST MULTIPLE RAISED PLATFORMS.pdf PDF
Amendment 0002.pdf PDF
65 SS TOWER - MT. DIABLO - STAMPED STRUCTURAL ANALYSIS.pdf PDF
70118_Final Report_FY19_PMV080.pdf PDF
15261_Final Report_FY19_PMV080.pdf PDF
21206_Final Report_FY19_PMV080.pdf PDF
17283_Final Report_FY19_PMV080.pdf PDF
15290_Final Report_FY19_PMV080.pdf PDF
17908_Final Report_FY19_PMV080.pdf PDF
813509 R21 Tower San Onofre Peak Maintenance Report.pdf PDF
44217_Final Report_FY19_PMV080.pdf PDF
15301_Final Report_FY19_PMV080.pdf PDF
813531_R21 Tower Cambria_FY16.pdf PDF
15297_Final Report_FY19_PMV080.pdf PDF
15255_Final Report_FY19_PMV080.pdf PDF
Amendment 0001- R1.pdf PDF
15259_Final Report_FY19_PMV080.pdf PDF
TOWER 65 SST MULTIPLE RAISED PLATFORMS.pdf PDF
813559_R21 Tower Mt Jenner_FY16.pdf PDF
J.3_PAST PERFORMANCE QUESTIONAIRE.docx DOCX document
Appendix A_Seed Project_USCG District 11 Towers.pdf PDF
Request for Proposal_70Z08822RESDV0001.pdf PDF
J.8_U.S. Tower Manual_COMDTINST M11000.4.pdf PDF
J.2_EXPERIENCE INFORMATION FORM.docx DOCX document
J.5_USCG District Map.pdf PDF
CONTRACTOR REQUEST FOR CLARIFICATION.pdf PDF
J.7_U.S. Coast Guard Safety and Environmental Health Manual_COMDTINST M5100.47.pdf PDF
Appendix A_Seed Project_USCG District 13 Towers.pdf PDF
Finalized_Source Selection Plan_TMACC.pdf PDF
Enclosure 3- Appendix D_20130812_EIS Standard Protection Measures_final.pdf PDF
1.1.3_Final Specification SEED Project for National Tower Maintenance and Inspection IDIQ Contract_FY22.pdf PDF
1.10.1_DBA_Wage Determination_Seed Project.zip ZIP file
J.6_U.S. Coast Guard Asbestos Exposure Control Manual_COMDTINST M6260-16.pdf PDF
J.1_EXPERIENCE OVERVIEW SHEET.docx DOCX document
Enclosure 3- Appendix C_GTPermittingGuidelines.pdf PDF
Enclosure 3- Appendix F_Sea Turtle and Small Tooth Sawfish Construction Conditions.pdf PDF
Enclosure 3- Appendix E_Standard Manatee Conditions for In-Water Work.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

e 1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0003 June 27, 2022 51281PR220022649

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

Contracting Officer

USCG CEU Oakland

1301 Clay Street 7th Floor, Suite 700N

Oakland, CA 94612-5203

Same as Block 6

8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) 9A AMENDMENT OF SOLICITATION NO.

ALL PROSPECTIVE OFFERORS

X 70Z08822RESDV0001

9B. DATE (SEE ITEM 11)

May 19, 2022

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE

RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)

SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority).

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

70Z08822RESDV0001 - Nationwide Tower/Antenna Multiple Award Construction Contract - IDIQ-TMACC

The purpose of this amendment is for the following:

A. Respond to questions from prospective contractors.

B. Include Three (3) additional final inspection reports, provide drawing A001-12 - 847597 - TOWER- 65'

(SST) - MULTIPLE RAISED PLATFORMS

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TRAVIS COHEN

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

6/27/2022 (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS

EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243

Request For Proposal Number: 70Z08822RESDV0001

Amendment 0003

June 27, 2022

QUESTIONS GOVERNMENT RESPONSE

1.

Tower #15261

This site requires wooden poles to support one end of antenna curtain. There is no detail on the wood pole grade. Can you tell us the grade of pole required?

Match existing wood pole grade. RPUID 156621

Previous Inspection Report attached.

2.

Tower #44217

This tower is not currently climbable as noted in the most recent report which noted the poor condition of the wood poles.

The report does not provide enough detail on the grade of pole required. Can you tell us the grade of pole required?

Previous drawings are unavailable. Match existing wood pole grade.

3.

Tower #847597

There are no details on how the tower leg upgrade is anchoring to existing tower leg foundations or base plates. Can you provide us with the details of how this additional steel is anchoring to the tower foundations or base plates?

Drawing A001-12 – 847597 attached.

4.

Tower #70118

There are no details on the wood pole grade. Can you tell us the grade of pole required?

Match existing wood pole grade. RPUID 70118

Previous Inspection Report attached

Match existing wood pole grade. RPUID 70118

Previous Inspection Report attached

5.

Past Performance Questionnaire Submission. If the past performance is not in CPARS, offerors shall submit completed the Attachment-Past

Performance submitted directly to the Contracting

Officers via email to

There is contradictory information on the Customer/Reference Questionaire we believe the intent per solicitation is to send to CO but the client is confused.

Past Performance Questionnaire must be submitted directly to the following two email addresses: This is submitted by the Client

Travis.Cohen@uscg.mil

Denver.L.Johnson@uscg.mil mailto:Travis.Cohen@uscg.mil mailto:Denver.L.Johnson@uscg.mil

Request For Proposal Number: 70Z08822RESDV0001

Amendment 0003

June 27, 2022

6.

Has the submission date of the Performance

Questionnaire Submission remained the same seeing as though there has been an extension? Our customers are still preparing their responses

Performance Questionnaire Submission must email to: Travis.Cohen@uscg.mil and

Denver.L.Johnson@uscg.mil by COB July 28, 2022

7.

Pre-Climb Safety. Pre-mobilization planning;

Prior to any work on an elevated structure the following shall be evaluated by the supervisor: 1.

The skill and experience of each member of the crew assigned to perform the work. 2. Any special equipment that will need to be acquired and any special training or training reviews that must be performed before work begins. 3. The type of equipment that will be required and the individual worker's training and skill with that equipment. 4.

Any special fabrication required for safety before work begins.

Who will the be responsible for this sign-off , the

CG ? or is the contractor's certifications and daily safety meeting prior to any tower work sufficient to meet this requirement

The contractor is responsible for and shall comply with the safety standards listed under Section 1.3

SAFETY of the specifications.

8.

Will ohm readings be required for new ground? In accordance with TIA-222-H, the measured ground resistance of a grounding system to earth shall not exceed 10 ohms.

9.

Is it Possible to schedule same work window for towers in the same location?

Yes, it is possible to schedule the same work window for towers in the same location.

10.

What kind of specifications for the poles

Is there a pre-approved list for structural inspections- either the CG or private or is contractor to hire their own 3rd party?

There is no pre-approved list of vendors for structural inspections.

11.

Access & Contact

Replacing preform - Will special inspection be required and by what approved vendor.

Will photos be required during all phases of construction?

There is no pre-approved list of vendors for structural inspections. Photos are as required in the specifications for the draft and final reports.

12.

Need POC of the towers? Point Of Contact (POC) will be provided to the

Contractor receiving the Award.

13.

Will need maintenance window. High VHF antenna

Maintenance can be conducted at any time with coordination with COR and POC.