813531_R21 Tower Cambria_FY16.pdf

PDF 2 MB Posted

Attached to
Nationwide Tower/Antenna Multiple Award Construction IDIQ Contract (TMACC)
Solicitation number
70Z08822RESDV0001
Issued by

View the file

Other files

File Type Posted
70118 Final Report FY19 PMV080.pdf PDF
Amendment 0004.pdf PDF
15261 Final Report FY19 PMV080.pdf PDF
Amendment 0003.pdf PDF
44217 Final Report FY19 PMV080.pdf PDF
A001 12 847597 TOWER- 65 SST MULTIPLE RAISED PLATFORMS.pdf PDF
Amendment 0002.pdf PDF
65 SS TOWER - MT. DIABLO - STAMPED STRUCTURAL ANALYSIS.pdf PDF
70118_Final Report_FY19_PMV080.pdf PDF
15261_Final Report_FY19_PMV080.pdf PDF
21206_Final Report_FY19_PMV080.pdf PDF
17283_Final Report_FY19_PMV080.pdf PDF
15290_Final Report_FY19_PMV080.pdf PDF
17908_Final Report_FY19_PMV080.pdf PDF
813509 R21 Tower San Onofre Peak Maintenance Report.pdf PDF
44217_Final Report_FY19_PMV080.pdf PDF
15301_Final Report_FY19_PMV080.pdf PDF
15297_Final Report_FY19_PMV080.pdf PDF
15255_Final Report_FY19_PMV080.pdf PDF
Amendment 0001- R1.pdf PDF
15259_Final Report_FY19_PMV080.pdf PDF
TOWER 65 SST MULTIPLE RAISED PLATFORMS.pdf PDF
813559_R21 Tower Mt Jenner_FY16.pdf PDF
J.3_PAST PERFORMANCE QUESTIONAIRE.docx DOCX document
Appendix A_Seed Project_USCG District 11 Towers.pdf PDF
Request for Proposal_70Z08822RESDV0001.pdf PDF
J.8_U.S. Tower Manual_COMDTINST M11000.4.pdf PDF
J.2_EXPERIENCE INFORMATION FORM.docx DOCX document
J.5_USCG District Map.pdf PDF
CONTRACTOR REQUEST FOR CLARIFICATION.pdf PDF
J.7_U.S. Coast Guard Safety and Environmental Health Manual_COMDTINST M5100.47.pdf PDF
Appendix A_Seed Project_USCG District 13 Towers.pdf PDF
Finalized_Source Selection Plan_TMACC.pdf PDF
Enclosure 3- Appendix D_20130812_EIS Standard Protection Measures_final.pdf PDF
1.1.3_Final Specification SEED Project for National Tower Maintenance and Inspection IDIQ Contract_FY22.pdf PDF
1.10.1_DBA_Wage Determination_Seed Project.zip ZIP file
J.6_U.S. Coast Guard Asbestos Exposure Control Manual_COMDTINST M6260-16.pdf PDF
J.1_EXPERIENCE OVERVIEW SHEET.docx DOCX document
Enclosure 3- Appendix C_GTPermittingGuidelines.pdf PDF
Enclosure 3- Appendix F_Sea Turtle and Small Tooth Sawfish Construction Conditions.pdf PDF
Enclosure 3- Appendix E_Standard Manatee Conditions for In-Water Work.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Master Inc. Proprietary & Confidential

Page | 2

II – Table of Contents

Section Page Title Page

I Title Page 1

II Table of Contents 2

III Executive Summary 3

IV Recommended Maintenance 5

V Chronological Narrative 5

Appendices Page

A Tower Inspection Photographs 6

B Tower Height Verification Form 17

C Tower Condition Assessment Form 18

D Repair Estimate(s) Sheet 19

Site Master Inc. Proprietary & Confidential

Page | 3

III - Executive Summary

i. Inspection Summary

The R21 Cambria tower located in Cambria, CA was inspected on July 28, 2016 by SiteMaster, Inc. crew members. The structure is a 100’ self supporting tower. The overall condition of the tower structure was found to be fair-to-satisfactory with a few maintenance items noted. Unrelated to the tower’s condition: there are some equipment items in the compound (generator and electrical box on shelter) which have a heavy amount of rust.

ii. Structural Members

The structural members of the tower were in good condition. There was no rust present on the tower steel. However, tower leg A’s foundation—the same leg as the safety climb—is covered in rust due to run-off from the rusty safety climb and will need to be scraped and cold galvanized. All hardware was tight and none was found to be missing.

The structural steel of the tower was free of deviations and in good condition. All hardware throughout the tower was either anchor nut or double nut secured. The tower foundations appeared to be in good condition (apart from the aforementioned rust on tower leg A’s foundation) and showed no signs of cracking. The tower galvanization is still in good condition.

iii. Alignment and Twist

A visual inspection of the tower showed that it appeared to be plumb.

iv. FAA Obstruction Lighting System

Not applicable on this tower.

v. Guy System and Guy Hardware

Not applicable on this tower.

vi. Guy Anchors and Foundation

Not applicable on this tower.

vii. Insulator Systems

Not applicable on this tower.

viii. Grounding Systems

There were no noted deficiencies in the grounding system. A lightning rod is installed at the top of the tower.

Site Master Inc. Proprietary & Confidential

Page | 4

ix. OSHA Standards

The tower is equipped with climbing pegs and a safety climb cable system. The cable is rusted and will need to be replaced. There is a bent peg at 28’ needing to be replaced.

x. Maintenance Accomplished

No on-site minor maintenance was needed.

Site Master Inc. Proprietary & Confidential

Page | 5

IV – Recommendations

Within 1 Year:

1. Replace the rusted safety climb cable system.

2. Scrape the rusted tower foundation and apply cold galvanization compound.

3. Replace the bent foot peg at 28’.

V – Chronological Narrative

Date: 7/28/16

Weather Conditions: Sunny Wind: 2MPH

Time Work Performed

0800-0830 Arrived on site; safety meeting

0830-0945 Performed tower and ground inspection

0945 Left site

Site Master Inc. Proprietary & Confidential

Page | 6

Appendix A Tower Inspection Photographs

Overall View of Tower

Site Master Inc. Proprietary & Confidential

Page | 7

No. Description Photograph

1 Tower ID; written as no tag present

2 View looking up the tower; rusted safety climb

3 Tower foundation and grounding

Site Master Inc. Proprietary & Confidential

Page | 8

4 Tower foundation and grounding

5 Tower foundation and grounding

6 Overall base of tower

Site Master Inc. Proprietary & Confidential

Page | 9

7 Coax routing from shelter to tower

8 Coax routing into shelter

9 Laser reading for height verification

Site Master Inc. Proprietary & Confidential

Page | 10

10 Equipment shelter

11 Equipment shelter

12 Bent foot peg at 28’

Site Master Inc. Proprietary & Confidential

Page | 11

13 Top of tower

14 Typical good condition of tower bolt hardware

15 Typical good condition of tower bolt hardware

Site Master Inc. Proprietary & Confidential

Page | 12

16 Typical good condition of tower steel

17 R21 antenna at top of tower

18 Omni mount at 83’

Site Master Inc. Proprietary & Confidential

Page | 13

19 Omni and dipole at 83’

20 Dipole at 63’

View looking down the tower; rusted safety climb cable

Site Master Inc. Proprietary & Confidential

Page | 14

22 Coax routing on the tower

23 Rusted generator in compound

24 Rusted electrical box on shelter

Site Master Inc. Proprietary & Confidential

Page | 15

25 H-frame in compound

26 H-frame in compound

27 Overall compound

Site Master Inc. Proprietary & Confidential

Page | 16

28 Interior view of compound

29 Interior view of compound

30 Interior view of compound

Site Master Inc. Proprietary & Confidential

Page | 17

Appendix B

Site Master Inc. Proprietary & Confidential

Page | 18

Appendix C

File details come from the government source that posted it. Updated .