15301_Final Report_FY19_PMV080.pdf
PDF 3 MB Posted
- Solicitation number
- 70Z08822RESDV0001
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATERIAL APPROVAL SUBMITTAL
(See Instructions on Reverse)
TO (Contracting Officer) FROM DATE
CONTRACTING OFFICER
U.S. COAST GUARD
CIVIL ENGINEERING UNIT OAKLAND
1301 CLAY ST, 7th FLOOR, SUITE 700N
OAKLAND, CA 94612-5203
COMMDEX c/o Ory Conrad oconrad@commdex.com
(949) 546-5055
11/26/19
CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL
HSCG88-17-D-PMV090 010R3 NEW X RESUBMITTAL
PREVIOUS SUBMISSION NUMBER TASK ORDER NUMBER
70Z08819FPMV08000
TO BE COMPLETED BY CONTRACTOR
FOR GOVERNMENT USE ONLY
ITEM
NO.
SPECIFICATION SECTION /
PARA. NO. / DRAWING NO.
DESCRIPTION OF MATERIAL
(Include Type, Model Number, Catalog Number, Mfg., Etc.)
APPROVED
DIS-
APPROVED
SEE
REVERSE
INITIAL
1 15301 CAMS Tower (API VOBA #3) Final Report
TYPED OR PRINTED NAME SIGNATURE DATE
Ory Conrad 11/26/19
TO: (Contractor)
O Approved O Disapproval as indicated Above and Subject to Any Applicable Comments on the Reverse Side. Request Resubmittal on Disapproved Items Within __________ Days of Date Shown Below.
TYPED OR PRINTED NAME OF CONSTRUCTION MANAGER
TYPED OR PRINTED NAME OF CONTRACTING OFFICER SIGNATURE DATE
Copy of reviewed form to be provided to the Contracting Officer and Contract Specialist
Ory Conrad Digitally signed by Ory Conrad Date: 2019.11.26 15:59:37 -08'00'
COMMENTS
(Number to Correspond with Applicable Item Number on Reverse)
INSTRUCTIONS TO CONTRACTORS
1. The term “material” is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.
2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer’s Literature and Certificates and Samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 3 copies, signed, and provided to the Construction Manager with appropriate attachments.
3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form and the corresponding Submittal Register number contained in the specifications.
4. Requests submitted shall be numbered consecutively, by contract, in the space entitled “Submission No.” This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and date in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.
5. This Material Approval Submittal is not valid unless the Construction Manager signs it. This approval is required as called for under the terms of this contract.
PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICIAL USE ONLY
TOWER MAINTENANCE AND CONDITION REPORT
November 25, 2019
U.S. Coast Guard Designation:
Site Name: CAMS Tower (API VOBA #3) Site Number: 15301
Engineering Firm Designation:
TEP Project Number: 239686.308727
Site Data:
480 Mesa Road Bolinas, Marin County, CA 94924 Latitude N 37.92399°, Longitude W -122.729178° 84 Foot – Guyed Tower & (6) Support Poles
Inspection Completed By:
Tower Engineering Professionals 10/3/2019 Chason D. Kanow, P.E., C.W.I.
Kelsey Spencer, C.W.I.
William H. Martin, P.E., PEng, S.E., G.C., C.W.I.
Tower Engineering Professionals
Rev. Description Date 1 Corrected site data, tower height, and cost estimate worksheet. 10/22/2019 2 Added Tower Assessment Form. 11/04/2019
Guyed Tower and Wood Pole Maintenance and Condition Assessment Report 11/25/2019 CAMS Tower (API VOBA #3)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Commanding Officer Civil Engineering Unit Miami 15608 SW 117th Ave Miami, FL 33177
General Comments:
Tower Engineering Professionals (TEP) completed a periodic inspection for the above referenced site. The onsite investigation was performed by Chason D. Kanow, P.E., C.W.I. and Kelsey Spencer, C.W.I. of TEP during the October 3, 2019 site visit. The inspection was in accordance with the Scope of Services for tower inspections, maintenance, and repairs of U.S. Coast Guard Towers dated January 2019, the U.S. Coast Guard Tower Manual CIM M11000.4A, FAA AC 70/7460-1L, TIA-322, ANSI/ASSE A10.48, and ANSI/TIA-222-G-2005, Annex J: Maintenance and Condition Assessment (Normative), including all addendums (addendums TIA-222-G-1 2007 and TIA 222-G-2 2009); the checklist is pages 4 thru 9 of this report. No United States Coast Guard Assets were within 150’-0” of the structure.
Observations and recommendations are listed herein. For this inspection, the tower legs were named alphabetically according to the position of the ladder per the U.S. Coast Guard Tower Manual CIM M11000.4A.
The overall condition of the tower is satisfactory with a few exceptions. This is detailed in the report. No unused equipment was identified on the structure.
Chronological Narrative:
TEP arrived onsite at 9:30 am. We began by conducting a tail gate safety meeting with all involved and completing a job safety analysis form. Work began at 9:45 am with a ground and tower base inspection. We began climbing the tower at 10:00 am. The climbing inspection ended at approximately 11:15 am. All aerial maintenance issues were noted and photographed. TEP left the site at 2:00 pm.
Maintenance Accomplished:
- Minor corrosion was cleaned with hand tools and coated with an approved cold galvanizing compound.
- TEP adjusted tension, twist, and plumb in accordance with USCG specifications.
Tower Verification:
Equipment Used:
Equipment Used Dillon Quick Check Nikon Forestry Pro Futtura Digital Theodolite DT-5
Lighting System Inventory:
Tower Name Lighting System Lighting Level/Qty Lamp type/size/model #
Confirmation the tower is FAA compliant CAMS Tower (API VOBA #3)
- 15301
N/A N/A N/A N/A
Tower Height Verification:
Tower Name Height of Foundation
Height of Base Insulator
Height of Tower
Height of Highest
Appurtenance Total Height
CAMS Tower (API VOBA #3) - 15301
0-ft 2-ft 84-ft 84-ft 86-ft
Tower Name
Site Identification/Signage
15301 – CAMS Tower (API VOBA #3)
Site signage was not present on site
ANSI/TIA-222-G MAINTENANCE AND CONDITION ASSESSMENT
A. STRUCTURE CONDITION
A.1. Damaged members (legs and bracing) Okay Possible Improvement Needs Repair Not Applicable
Notes:
A.2. Loose members
Okay Possible Improvement Needs Repair Not Applicable Notes:
A.3. Missing members
Okay Possible Improvement Needs Repair Not Applicable Notes:
A.4. Climbing facilities, platforms, catwalks – all secure
Okay Possible Improvement Needs Repair Not Applicable Notes: See Executive Summary for details.
A.5. Loose and/or missing bolts and/or nut locking devices
Okay Possible Improvement Needs Repair Not Applicable Notes:
A.6. Visible cracks in welded connections
Notes:
B. FINISH
B.1. Paint and/or galvanizing condition
Notes:
B.2. Rust and/or corrosion condition including mounts and accessories
Okay Possible Improvement Needs Repair Not Applicable Notes: See Executive Summary for details.
B.3. FAA or ICAO color marking conditions
Okay Possible Improvement Needs Repair Not Applicable Notes:
B.4. Water collection in members (to be remedied, e.g., unplug drain holes, etc.)
C. LIGHTING
C.1. Conduit, junction boxes, and fasteners (weather tight and secure)
Notes:
C.2. Drains and vents openings (unobstructed)
Okay Possible Improvement Needs Repair Not Applicable Notes:
C.3. Wiring Condition
Okay Possible Improvement Needs Repair Not Applicable Notes:
C.4. Light lenses
Okay Possible Improvement Needs Repair Not Applicable Notes:
C.5. Bulb condition
Okay Possible Improvement Needs Repair Not Applicable Notes:
C.6.a. Controllers functioning (Flasher)
Okay Possible Improvement Needs Repair Not Applicable Notes:
C.6.b. Controllers functioning (Photo control)
Okay Possible Improvement Needs Repair Not Applicable Notes:
C.6.c. Controllers functioning (Alarms)
D. GROUNDING
D.1. Connections
Notes: See Executive Summary for details.
D.2. Corrosion
Okay Possible Improvement Needs Repair Not Applicable Notes:
D.3. Lightning protection (secured to structure)
E. ANTENNAS AND LINES
E.1. Antenna condition
Notes:
E.2. Mount and/or ice shield condition (bent, loose, and/or missing members)
Okay Possible Improvement Needs Repair Not Applicable Notes:
E.3. Feed line condition (flanges, seals, dents, jacket damage, grounding, etc.)
Okay Possible Improvement Needs Repair Not Applicable Notes:
E.4. Hanger condition (snap-ins, bolt on, kellum grips, etc.)
Okay Possible Improvement Needs Repair Not Applicable Notes:
E.5. Secured to structure
F. OTHER APPURTENANCES (WALKWAYS, PLATFORMS, SENSORS, FLOODLIGHTS, ETC.)
F.1. Condition
Notes:
F.2. Secured to structure
G. INSULATOR CONDITION
G.1. Cracking and chipping
Notes:
G.2. Cleanliness of insulators
Okay Possible Improvement Needs Repair Not Applicable Notes:
G.3. Spark gaps set properly
Okay Possible Improvement Needs Repair Not Applicable Notes:
G.4. Isolation transformer condition
Okay Possible Improvement Needs Repair Not Applicable Notes:
G.5. Bolts and connection secure
H. GUYS
H.1. Strand condition (corrosion, breaks, nicks, kinks, etc.)
Notes: See Executive Summary for details.
H.2.a. Guy Hardware Conditions (Turnbuckles or equivalent (secure and safety properly applied)
Okay Possible Improvement Needs Repair Not Applicable Notes: See Executive Summary for details.
H.2.b. Guy Hardware Conditions (Cable thimbles properly in place (if required))
Okay Possible Improvement Needs Repair Not Applicable Notes: See Executive Summary for details.
H.2.c. Guy Hardware Conditions (Service sleeves properly in place (if required))
Okay Possible Improvement Needs Repair Not Applicable Notes:
H.2.d.i. Guy Hardware Conditions (Cable connectors (end fittings) (Cable clamps applied properly and bolts tight)
Okay Possible Improvement Needs Repair Not Applicable Notes:
H.2.d.ii. Guy Hardware Conditions (Cable connectors (end fittings) (Wire serving properly applied))
Okay Possible Improvement Needs Repair Not Applicable Notes: See Executive Summary for details.
H.2.d.iii. Guy Hardware Conditions (Cable connectors (end fittings) (No signs of slippage or damaged strands))
Okay Possible Improvement Needs Repair Not Applicable Notes:
H.2.d.iv. Guy Hardware Conditions (Cable connectors (Preformed wraps – properly applied, fully wrapped, & sleeve in place))
Okay Possible Improvement Needs Repair Not Applicable Notes:
H.2.d.v. Guy Hardware Conditions (Cable connectors (end fittings) (Poured sockets secure and showing no separation))
Okay Possible Improvement Needs Repair Not Applicable Notes:
H.2.d.vi. Guy Hardware Conditions (Cable connectors (Shackles, bolts, pins, and cotter pins secure and in good condition))
Okay Possible Improvement Needs Repair Not Applicable Notes:
H.3. Guy tensions
Okay Possible Improvement Needs Repair Not Applicable Notes: See Executive Summary for details.
H.4. Measure guy tensions
Okay Possible Improvement Needs Repair Not Applicable Notes:
H.5. Record temperature, wind speed and wind direction
I. CONCRETE FOUNDATIONS
I.1.a. Ground condition (Settlement, movement or earth cracks)
Notes:
I.1.b. Ground condition (Erosion)
Okay Possible Improvement Needs Repair Not Applicable Notes: See Executive Summary for details.
I.1.c. Ground condition (Site condition (standing water, drainage, trees, etc.))
Okay Possible Improvement Needs Repair Not Applicable Notes:
I.2.a. Anchorage condition (Nuts and/or nut locking device (tightened))
Okay Possible Improvement Needs Repair Not Applicable Notes:
I.2.b. Anchorage condition (Grout condition)
Okay Possible Improvement Needs Repair Not Applicable Notes:
I.2.c. Anchorage condition (Anchorages and/or anchor rod condition)
Okay Possible Improvement Needs Repair Not Applicable Notes:
I.3.a. Concrete condition (Cracking, spalling, or splitting)
Okay Possible Improvement Needs Repair Not Applicable Notes:
I.3.b. Concrete condition (Chipped or broken concrete)
Okay Possible Improvement Needs Repair Not Applicable Notes:
I.3.c. Concrete condition (Honeycombing)
Okay Possible Improvement Needs Repair Not Applicable Notes:
I.3.d. Concrete condition (Low spots to collect moisture)
J. GUYED MAST ANCHORS
J.1. Settlement, movement or earth cracks
Notes: See Executive Summary for details.
J.2. Backfill heaped over concrete for water shedding
Okay Possible Improvement Needs Repair Not Applicable Notes:
J.3. Anchor rod condition below earth (Maintain required structural capacity of anchor during exploration.)
Okay Possible Improvement Needs Repair Not Applicable Notes:
J.4. Corrosion control measures (galvanizing, coating, concrete encasement, cathodic protection systems, etc.)
Okay Possible Improvement Needs Repair Not Applicable Notes:
J.5. Anchor heads clear of earth
Notes: See Executive Summary for details.
K. TOWER ALIGNMENT
K.1. Tower Plumb and Twist
Notes: Tower twist and plumb was within ANSI/TIA-222-G-2005 recommended limits.
EXECUTIVE SUMMARY
Photograph Observations and Recommendations
A.4. Climbing facilities, platforms, catwalks – all secure
Observation:
All safety climb cables and safety climb hardware, including the inside of the safety climb assemblies, on the wooden support poles exhibit surface corrosion. (Photo “A”)
Recommendation:
Replace safety climb assemblies.
B.2. Rust and/or corrosion condition including mounts and accessories
Observation:
Surface corrosion was observed on hardware on all flanges.
Moderate corrosion was observed on hardware on the flange at elevation 40’ and on the collars of all (6) wooden support poles. TEP cleaned and galvanized areas where corrosion was present. (Photos “B”, “C”, “D”, and “E”)
Replace hardware affected by moderate corrosion.
A
B
C accessories (cont.)
accessories
Observation:
Corrosion and section loss were observed on the 5/8” diameter x 12” bent threaded rods on wood poles 1, 2, 5, and
6. (Photos “F”, “G”, and “H”)
Replace the threaded rods.
F
D
E accessories (cont.)
D.1. Connections
Observation:
At least (30) broken ground leads were observed. (Photo “I”)
Replace broken ground leads.
I
G
H
H.1. Strand condition (corrosion, breaks, nicks, kinks, etc.)
Observation:
Surface corrosion was observed on the guy wire strand connecting to the tower at elevation 40’. (Photo “J”)
Properly clean and galvanize the affected area.
H.2.a. Guy Hardware Conditions (Turnbuckles or equivalent (secure and safety properly applied)
Observation:
All safety wires in the guy wire turnbuckles are corroded and have only (1) wire rope clip installed. (Photo “K”)
Recommendation:
Remove the existing safety wire and wire rope clip and replace with new 3/8” EHS safety wire installed in a figure 8 configuration with (2) new wire rope clips.
H.2.a. Guy Hardware Conditions (Turnbuckles or equivalent (secure and safety properly applied)
Observation:
Outer guy anchor #6 has a bent 3/4” x 12” turnbuckle, not allowing for the turnbuckle to be adjusted. (Photo “L”)
Replace the damaged turnbuckle.
L
J
K
H.2.b. Guy Hardware Conditions (Cable thimbles properly in place (if required))
Observation:
Bent thimbles were observed at outside anchors 1 and 5.
(Photo “M”)
Recommendation:
Replace the bent thimbles.
H.2.d.ii. Guy Hardware Conditions (Cable connectors (end fittings) (Wire serving properly applied))
Observation:
No wire serving was observed at inside anchor 1 and outside anchors 2, 3, 5, and 8. (Photo “N”)
Recommendation:
Properly serve the ends of the guy wires.
H.3. Guy tensions
Observation:
The tension in outer guy wire 10 measures 1.84 kips, a value 8.7% out of range above the target tension value. The turnbuckle is fully extended, and tension cannot be lowered.
(Photo “O”)
Recommendation:
Install a preform that allows for the wire to be properly tensioned.
M
O
N
I.1.b. Ground condition (Erosion)
Observation:
Erosion was observed around the tower mast with exposed geofabric. (Photo “P”)
Lay down additional gravel to prevent further erosion.
J.1. Settlement, movement or earth cracks
Observation:
Earth cracking was observed around outside anchors 10 and
12. (Photos “Q”, “R”, and “S”)
Recommendation:
The EOR or structural engineer shall review the condition for acceptability.
P
Q
R
J.1. Settlement, movement or earth cracks (cont.)
S
TOWER TENSION, PLUMB AND TWIST MEASUREMENTS
Table 1: Guy Wire Tensions
Guy Path Guy Level
Guy Size (diameter in inches) Measured
-10% of Initial Tension (kips)
+10% of Initial Tension (kips)
Measured tension (kips) Results
Inner
1 1 3/8 1.39 1.69 1.58 OK
2 1 3/8 1.39 1.69 1.56 OK
3 1 3/8 1.39 1.69 1.48 OK
Outer
1 2 3/8 1.39 1.69 1.60 OK
2 2 3/8 1.39 1.69 1.60 OK
3 2 3/8 1.39 1.69 1.50 OK
4 2 3/8 1.39 1.69 1.58 OK
5 2 3/8 1.39 1.69 1.62 OK
6 2 3/8 1.39 1.69 1.56 OK
7 2 3/8 1.39 1.69 1.52 OK
8 2 3/8 1.39 1.69 1.48 OK
9 2 3/8 1.39 1.69 1.62 OK
10 2 3/8 1.39 1.69 1.82 HIGH
11 2 3/8 1.39 1.69 1.48 OK
12 2 3/8 1.39 1.69 1.62 OK
TOWER TENSION, PLUMB AND TWIST MEASUREMENTS (cont.)
Table 2: Tower Twist Measurements
Reference Elevation
(above conc.)
Twist with Respect
To Base ( )
Allowable Twist with Respect
To Base ( )
Relative Twist Between Reference
Elevations ( )
Allowable Twist Between Reference
Elevations ( )
To w er T w ist
M ea su re m en ts
80-ft 0.00 ± 4.00
0.26 ± 2.00
40-ft -0.26 ± 2.00 -0.26 ± 2.00
0-ft 0.00 ± 0.00
Table 3: Lateral Deflection Measurements
Reference Elevation
(above conc.)
Resultant Deflection (in)
Allowable Resultant
Deflection (in) per TIA
Resultant Deflection Between Reference
Elevations (in)
Allowable Deflection Between Reference
Elevations (in) per TIA
To w er D ef le ct io n M ea su re m en ts
80-ft 1.10 ± 2.40
0.690 ± 1.20
40-ft 0.42 ± 1.20
0.419 ± 1.20
0-ft 0.00 ± 0.00
APPENDIX A: