813509 R21 Tower San Onofre Peak Maintenance Report.pdf

PDF 4 MB Posted

Attached to
Nationwide Tower/Antenna Multiple Award Construction IDIQ Contract (TMACC)
Solicitation number
70Z08822RESDV0001
Issued by

View the file

Other files

File Type Posted
70118 Final Report FY19 PMV080.pdf PDF
Amendment 0004.pdf PDF
15261 Final Report FY19 PMV080.pdf PDF
Amendment 0003.pdf PDF
44217 Final Report FY19 PMV080.pdf PDF
A001 12 847597 TOWER- 65 SST MULTIPLE RAISED PLATFORMS.pdf PDF
Amendment 0002.pdf PDF
65 SS TOWER - MT. DIABLO - STAMPED STRUCTURAL ANALYSIS.pdf PDF
70118_Final Report_FY19_PMV080.pdf PDF
15261_Final Report_FY19_PMV080.pdf PDF
21206_Final Report_FY19_PMV080.pdf PDF
17283_Final Report_FY19_PMV080.pdf PDF
15290_Final Report_FY19_PMV080.pdf PDF
17908_Final Report_FY19_PMV080.pdf PDF
44217_Final Report_FY19_PMV080.pdf PDF
15301_Final Report_FY19_PMV080.pdf PDF
813531_R21 Tower Cambria_FY16.pdf PDF
15297_Final Report_FY19_PMV080.pdf PDF
15255_Final Report_FY19_PMV080.pdf PDF
Amendment 0001- R1.pdf PDF
15259_Final Report_FY19_PMV080.pdf PDF
TOWER 65 SST MULTIPLE RAISED PLATFORMS.pdf PDF
813559_R21 Tower Mt Jenner_FY16.pdf PDF
J.3_PAST PERFORMANCE QUESTIONAIRE.docx DOCX document
Appendix A_Seed Project_USCG District 11 Towers.pdf PDF
Request for Proposal_70Z08822RESDV0001.pdf PDF
J.8_U.S. Tower Manual_COMDTINST M11000.4.pdf PDF
J.2_EXPERIENCE INFORMATION FORM.docx DOCX document
J.5_USCG District Map.pdf PDF
CONTRACTOR REQUEST FOR CLARIFICATION.pdf PDF
J.7_U.S. Coast Guard Safety and Environmental Health Manual_COMDTINST M5100.47.pdf PDF
Appendix A_Seed Project_USCG District 13 Towers.pdf PDF
Finalized_Source Selection Plan_TMACC.pdf PDF
Enclosure 3- Appendix D_20130812_EIS Standard Protection Measures_final.pdf PDF
1.1.3_Final Specification SEED Project for National Tower Maintenance and Inspection IDIQ Contract_FY22.pdf PDF
1.10.1_DBA_Wage Determination_Seed Project.zip ZIP file
J.6_U.S. Coast Guard Asbestos Exposure Control Manual_COMDTINST M6260-16.pdf PDF
J.1_EXPERIENCE OVERVIEW SHEET.docx DOCX document
Enclosure 3- Appendix C_GTPermittingGuidelines.pdf PDF
Enclosure 3- Appendix F_Sea Turtle and Small Tooth Sawfish Construction Conditions.pdf PDF
Enclosure 3- Appendix E_Standard Manatee Conditions for In-Water Work.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICIAL USE ONLY

TOWER MAINTENANCE AND CONDITION REPORT

December 8, 2017

U.S. Coast Guard Designation:

Site Name: R21 Tower San Onofre Peak

Site Number: 813509

Engineering Firm Designation:

TEP Project Number: 81746

Site Data:

Camp Pendleton, San Diego County, CA 92055

Latitude N 33.36229°, Longitude W -117.496114°

100 Foot – Self-Support Tower

Inspection Completed By:

Tower Engineering Professionals

11/30/2017

Bryan Gilliam

Ryan Barger

Stanley J. Jarzombek, PE

Tower Engineering Professionals

Self-Support Tower Maintenance and Condition Assessment Report 12/8/2017

R21 Tower San Onofre Peak

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

Commanding Officer

Civil Engineering Unit Miami

15608 SW 117th Ave

Miami, FL 33177

General Comments:

Tower Engineering Professionals (TEP) removed the existing corroded safety climb system, installed a new safety climb system, and cleaned the A-Leg foundation and baseplate for the above referenced site. The removal and installation was performed by Bryan Gilliam and Ryan Barger of TEP during the November 30, 2017 site visit. The installation was in accordance with the Scope of Services for tower inspections, maintenance, and repairs of U.S. Coast Guard Towers dated March 2017, the U.S. Coast Guard Tower Manual CIM M11000.4A, FAA AC 70/7460-1L, TIA-322, ANSI/ASSE

A10.48, and ANSI/TIA-222-G-2005, Annex J: Maintenance and Condition Assessment (Normative), including all addendums (addendums TIA-222-G-1 2007 and TIA 222-G-2 2009).

Chronological Narrative:

TEP arrived onsite at 10:30am. We began by conducting a tail gate safety meeting with all involved and completing a job safety analysis form. Work began at 10:45am with a ground and tower base inspection. We began climbing the tower at 11:00am and removed the existing safety climb cable. During the safety climb cable removal, the baseplate was cleaned and covered with cold galvanizing compound. At 11:15am the safety climb bracket at the base of the tower was cleaned and covered with cold galvanizing compound. At 11:45am we began installing the new safety climb cable. At 12:30pm the safety climb system was fully installed. All maintenance repairs were noted and photographed.

TEP left the site at 1:00pm.

Maintenance Accomplished:

- Existing corroded safety climb cable was removed, replaced with a new safety climb cable, and all components were cleaned with a wire brush and coated with an approved cold galvanizing compound.

- A-Leg base plate was cleaned with a wire brush and coated with an approved cold galvanizing compound.

- Corroded ground bar hardware at 76-ft on the C-Face was cleaned with a wire brush and coated with an approved cold galvanizing compound.

EXECUTIVE SUMMARY

Photograph Maintenance Accomplished

Observation:

1. The existing safety climb cable was severely corroded and in need of replacement. (Photo “A”)

TEP removed the existing cable and replaced with a new safety climb cable. (Photos “B”,” C”, “D”, ”E”, “F”) TEP also wire brushed and coated base plate with (2) coats of approved cold galvanizing compound. (Photo “B”)

C

B

A

EXECUTIVE SUMMARY (Continued)

Item 1 Photos Continued:

TEP removed the existing cable and replaced with a new safety climb cable. (Photos “B”, “C”, ”D”, ”E”, “F”) TEP also wire brushed and coated base plate with (2) coats of approved cold galvanizing compound. (Photo “B”)

D

E

F

EXECUTIVE SUMMARY

Observation:

1. Corroded ground bar hardware was observed on the

C-Face at 76-ft. (Photo “A”)

TEP also wire brushed and coated base plate with (2) coats of approved cold galvanizing compound. (Photo

“B”)

EXECUTIVE SUMMARY (Continued)

Photograph Observations and Recommendations

Observation:

1. A bent step peg was observed on the A-Leg at 88-ft.

(Photo “A” and “B”)

Recommendation:

Replace bent step peg.

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

APPENDIX A:

CAPITAL EXPENDITURES TABLE

TMACC-PMV171-TO91-R21 Tower San Onofre Peak-813509_Maintenance Inspection_12.8.17 (003).pdf
R21 Tower San Onofre Peak-813509_Maintenance Inspection_12.8.17- Capital Expenditures.pdf

File details come from the government source that posted it. Updated .