15297_Final Report_FY19_PMV080.pdf
PDF 2 MB Posted
- Solicitation number
- 70Z08822RESDV0001
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATERIAL APPROVAL SUBMITTAL
(See Instructions on Reverse)
TO (Contracting Officer) FROM DATE
CONTRACTING OFFICER
U.S. COAST GUARD
CIVIL ENGINEERING UNIT OAKLAND
1301 CLAY ST, 7th FLOOR, SUITE 700N
OAKLAND, CA 94612-5203
COMMDEX c/o Ory Conrad oconrad@commdex.com
(949) 546-5055
11/25/19
CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL
HSCG88-17-D-PMV090 009R3 NEW X RESUBMITTAL
PREVIOUS SUBMISSION NUMBER TASK ORDER NUMBER
70Z08819FPMV08000
TO BE COMPLETED BY CONTRACTOR
FOR GOVERNMENT USE ONLY
ITEM
NO.
SPECIFICATION SECTION /
PARA. NO. / DRAWING NO.
DESCRIPTION OF MATERIAL
(Include Type, Model Number, Catalog Number, Mfg., Etc.)
APPROVED
DIS-
APPROVED
SEE
REVERSE
INITIAL
1 15297 TCI VOBA #7 Final Report
TYPED OR PRINTED NAME SIGNATURE DATE
Ory Conrad 11/25/19
TO: (Contractor)
O Approved O Disapproval as indicated Above and Subject to Any Applicable Comments on the Reverse Side. Request Resubmittal on Disapproved Items Within __________ Days of Date Shown Below.
TYPED OR PRINTED NAME OF CONSTRUCTION MANAGER
TYPED OR PRINTED NAME OF CONTRACTING OFFICER SIGNATURE DATE
Copy of reviewed form to be provided to the Contracting Officer and Contract Specialist
Ory Conrad Digitally signed by Ory Conrad Date: 2019.11.25 20:49:48 -08'00'
COMMENTS
(Number to Correspond with Applicable Item Number on Reverse)
INSTRUCTIONS TO CONTRACTORS
1. The term “material” is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.
2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer’s Literature and Certificates and Samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 3 copies, signed, and provided to the Construction Manager with appropriate attachments.
3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form and the corresponding Submittal Register number contained in the specifications.
4. Requests submitted shall be numbered consecutively, by contract, in the space entitled “Submission No.” This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and date in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.
5. This Material Approval Submittal is not valid unless the Construction Manager signs it. This approval is required as called for under the terms of this contract.
PROPERTY OF THE UNITED STATES GOVERNMENT – FOR OFFICIAL USE ONLY
TOWER MAINTENANCE AND CONDITION REPORT
November 25, 2019
U.S. Coast Guard Designation:
Site Name: CAMS Tower (TCI VOBA #7) Site Number: 15297
Engineering Firm Designation:
TEP Project Number: 239684.308725
Site Data:
480 Mesa Rd.
Bolinas, Marin County, CA 94924 Latitude N 37.923308°, Longitude W -122.732665° 100 Foot – Guyed Tower
Inspection Completed By:
Tower Engineering Professionals 10/1/2019 Chason D. Kanow, PE, CWI Kelsey Spencer, CWI
William H. Martin, P.E, PEng, S.E., G.C., C.W.I.
Tower Engineering Professionals
Rev. Description Date 1 Added Tower Assessment Form. 11/04/2019
Guyed Tower Maintenance and Condition Assessment Report REV. 1 11/25/2019 CAMS Tower (TCI VOBA #7)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Commanding Officer Civil Engineering Unit Miami 15608 SW 117th Ave Miami, FL 33177
General Comments:
Tower Engineering Professionals (TEP) completed a periodic inspection for the above referenced site. The onsite investigation was performed by Chason D. Kanow, PE, CWI and Kelsey Spencer, CWI of TEP during the October 1, 2019 site visit. The inspection was in accordance with the Scope of Services for tower inspections, maintenance, and repairs of U.S. Coast Guard Towers dated January 2019, the U.S. Coast Guard Tower Manual CIM M11000.4A, FAA AC 70/7460-1L, TIA-322, ANSI/ASSE A10.48, and ANSI/TIA-222-G-2005, Annex J: Maintenance and Condition Assessment (Normative), including all addendums (addendums TIA-222-G-1 2007 and TIA 222-G-2 2009); the checklist is pages 4 thru 9 of this report. No United States Coast Guard Assets were within 150’-0” of the structure.
Observations and recommendations are listed herein. For this inspection, the tower legs were named alphabetically according to the position of the ladder per the U.S. Coast Guard Tower Manual CIM M11000.4A.
The overall condition of the tower is satisfactory with a few exceptions. This is detailed in the report. No unused equipment was identified on structure.
Chronological Narrative:
TEP arrived onsite at 8:00 am. We began by conducting a tail gate safety meeting with all involved and completing a job safety analysis form. Work began on this tower at 12:15 pm with a ground and tower base inspection. We began climbing the tower at 12:30 pm. The climbing inspection ended at approximately 1:30 pm. All aerial maintenance issues were noted and photographed. TEP left the site at 4:15pm.
Maintenance Accomplished:
- Minor corrosion was cleaned with hand tools and coated with an approved cold galvanizing compound.
- TEP adjusted tension, twist, and plumb in accordance with USCG specifications.
Tower Verification:
Equipment Used:
Tension Meter
Dillon Quick Check Futtura Digital Theodolite DT-5
Lighting System Inventory:
Tower Name Lighting System Lighting Level/Qty Lamp type/size/model #
Confirmation the tower is FAA compliant 15297 – CAMS Tower
(TCI VOBA #7)
N/A N/A N/A N/A
Tower Height Verification:
Tower Name Height of Foundation
Height of Base Insulator Height of Tower
Height of Highest
Appurtenance Total Height
15297 – CAMS Tower
(TCI VOBA #7)
0.1667-ft 1-ft 100-ft 100-ft 101.1667-ft
Tower Name
Site Identification/Signage
15297 – CAMS Tower (TCI VOBA #7)
Site signage was not present on site
ANSI/TIA-222-G MAINTENANCE AND CONDITION ASSESSMENT
A. STRUCTURE CONDITION
A.1. Damaged members (legs and bracing) Okay Possible Improvement Needs Repair Not Applicable
Notes:
A.2. Loose members
Okay Possible Improvement Needs Repair Not Applicable Notes:
A.3. Missing members
Okay Possible Improvement Needs Repair Not Applicable Notes:
A.4. Climbing facilities, platforms, catwalks – all secure
Okay Possible Improvement Needs Repair Not Applicable Notes:
A.5. Loose and/or missing bolts and/or nut locking devices
Okay Possible Improvement Needs Repair Not Applicable Notes:
A.6. Visible cracks in welded connections
Notes:
B. FINISH
B.1. Paint and/or galvanizing condition
Notes: See Executive Summary for details.
B.2. Rust and/or corrosion condition including mounts and accessories
Okay Possible Improvement Needs Repair Not Applicable Notes: See Executive Summary for details.
B.3. FAA or ICAO color marking conditions
Okay Possible Improvement Needs Repair Not Applicable Notes:
B.4. Water collection in members (to be remedied, e.g., unplug drain holes, etc.)
C. LIGHTING
C.1. Conduit, junction boxes, and fasteners (weather tight and secure)
Notes:
C.2. Drains and vents openings (unobstructed)
Okay Possible Improvement Needs Repair Not Applicable Notes:
C.3. Wiring Condition
Okay Possible Improvement Needs Repair Not Applicable Notes:
C.4. Light lenses
Okay Possible Improvement Needs Repair Not Applicable Notes:
C.5. Bulb condition
Okay Possible Improvement Needs Repair Not Applicable Notes:
C.6.a. Controllers functioning (Flasher)
Okay Possible Improvement Needs Repair Not Applicable Notes:
C.6.b. Controllers functioning (Photo control)
Okay Possible Improvement Needs Repair Not Applicable Notes:
C.6.c. Controllers functioning (Alarms)
D. GROUNDING
D.1. Connections
Notes: See Executive Summary for details.
D.2. Corrosion
Okay Possible Improvement Needs Repair Not Applicable Notes:
D.3. Lightning protection (secured to structure)
E. ANTENNAS AND LINES
E.1. Antenna condition
Notes:
E.2. Mount and/or ice shield condition (bent, loose, and/or missing members)
Okay Possible Improvement Needs Repair Not Applicable Notes:
E.3. Feed line condition (flanges, seals, dents, jacket damage, grounding, etc.)
Okay Possible Improvement Needs Repair Not Applicable Notes:
E.4. Hanger condition (snap-ins, bolt on, kellum grips, etc.)
Okay Possible Improvement Needs Repair Not Applicable Notes:
E.5. Secured to structure
F. OTHER APPURTENANCES (WALKWAYS, PLATFORMS, SENSORS, FLOODLIGHTS, ETC.)
F.1. Condition
Notes:
F.2. Secured to structure
G. INSULATOR CONDITION
G.1. Cracking and chipping
Notes:
G.2. Cleanliness of insulators
Okay Possible Improvement Needs Repair Not Applicable Notes:
G.3. Spark gaps set properly
Okay Possible Improvement Needs Repair Not Applicable Notes:
G.4. Isolation transformer condition
Okay Possible Improvement Needs Repair Not Applicable Notes:
G.5. Bolts and connection secure
H. GUYS
H.1. Strand condition (corrosion, breaks, nicks, kinks, etc.)
Notes:
H.2.a. Guy Hardware Conditions (Turnbuckles or equivalent (secure and safety properly applied)
Okay Possible Improvement Needs Repair Not Applicable Notes: See Executive Summary for details.
H.2.b. Guy Hardware Conditions (Cable thimbles properly in place (if required))
Okay Possible Improvement Needs Repair Not Applicable Notes:
H.2.c. Guy Hardware Conditions (Service sleeves properly in place (if required))
Okay Possible Improvement Needs Repair Not Applicable Notes:
H.2.d.i. Guy Hardware Conditions (Cable connectors (end fittings) (Cable clamps applied properly and bolts tight)
Okay Possible Improvement Needs Repair Not Applicable Notes:
H.2.d.ii. Guy Hardware Conditions (Cable connectors (end fittings) (Wire serving properly applied))
Okay Possible Improvement Needs Repair Not Applicable Notes: See Executive Summary for details.
H.2.d.iii. Guy Hardware Conditions (Cable connectors (end fittings) (No signs of slippage or damaged strands))
Okay Possible Improvement Needs Repair Not Applicable Notes:
H.2.d.iv. Guy Hardware Conditions (Cable connectors (Preformed wraps – properly applied, fully wrapped, & sleeve in place))
Okay Possible Improvement Needs Repair Not Applicable Notes: See Executive Summary for details.
H.2.d.v. Guy Hardware Conditions (Cable connectors (end fittings) (Poured sockets secure and showing no separation))
Okay Possible Improvement Needs Repair Not Applicable Notes:
H.2.d.vi. Guy Hardware Conditions (Cable connectors (Shackles, bolts, pins, and cotter pins secure and in good condition))
Okay Possible Improvement Needs Repair Not Applicable Notes: See Executive Summary for details.
H.3. Guy tensions
Okay Possible Improvement Needs Repair Not Applicable Notes:
H.4. Measure guy tensions
Okay Possible Improvement Needs Repair Not Applicable Notes:
H.5. Record temperature, wind speed and wind direction
I. CONCRETE FOUNDATIONS
I.1.a. Ground condition (Settlement, movement or earth cracks)
Notes:
I.1.b. Ground condition (Erosion)
Okay Possible Improvement Needs Repair Not Applicable Notes:
I.1.c. Ground condition (Site condition (standing water, drainage, trees, etc.))
Okay Possible Improvement Needs Repair Not Applicable Notes:
I.2.a. Anchorage condition (Nuts and/or nut locking device (tightened))
Okay Possible Improvement Needs Repair Not Applicable Notes:
I.2.b. Anchorage condition (Grout condition)
Okay Possible Improvement Needs Repair Not Applicable Notes:
I.2.c. Anchorage condition (Anchorages and/or anchor rod condition)
Okay Possible Improvement Needs Repair Not Applicable Notes:
I.3.a. Concrete condition (Cracking, spalling, or splitting)
Okay Possible Improvement Needs Repair Not Applicable Notes:
I.3.b. Concrete condition (Chipped or broken concrete)
Okay Possible Improvement Needs Repair Not Applicable Notes:
I.3.c. Concrete condition (Honeycombing)
Okay Possible Improvement Needs Repair Not Applicable Notes:
I.3.d. Concrete condition (Low spots to collect moisture)
J. GUYED MAST ANCHORS
J.1. Settlement, movement or earth cracks
Notes:
J.2. Backfill heaped over concrete for water shedding
Okay Possible Improvement Needs Repair Not Applicable Notes:
J.3. Anchor rod condition below earth (Maintain required structural capacity of anchor during exploration.)
Okay Possible Improvement Needs Repair Not Applicable Notes:
J.4. Corrosion control measures (galvanizing, coating, concrete encasement, cathodic protection systems, etc.)
Okay Possible Improvement Needs Repair Not Applicable Notes:
J.5. Anchor heads clear of earth
K. TOWER ALIGNMENT
K.1. Tower Plumb and Twist
Notes: Tower twist and plumb was within ANSI/TIA-222-G-2005 recommended limits.
EXECUTIVE SUMMARY
Photograph Observations and Recommendations
B.2. Rust and/or corrosion condition including mounts and accessories
Observation:
Surface corrosion was observed on the tower legs, guy anchor, diagonal members, and guy wire to tower connections. TEP cleaned and galvanized corrosion at the guy wire connections, splice locations, guy anchor, and hardware at splice connections. Due to the extent of surface corrosion throughout the tower on the diagonal members, TEP did not clean and galvanize the diagonal members. (Photos “A”, “B”, and “C”)
Recommendation:
Clean and coat the diagonal members exhibiting surface corrosion with an approved cold galvanizing compound. If section loss is observed during this process, contact TEP immediately. Monitor all tower members for further corrosion or section loss.
A
B
C
D.1. Connections
Observation:
A corner of the grounding plate is bent and several broken ground leads were observed around C leg. (Photos “D” and “E”)
Recommendation:
Replace broken ground leads and repair/replace grounding plate as necessary.
H.2.a. Guy Hardware Conditions (Turnbuckles or equivalent (secure and safety properly applied)
Observation:
No nut locking devices were observed on the 5/8” diameter turnbuckle bolts at all (15) locations. (Photo “F”)
Recommendation:
Install nut locking devices on turnbuckle bolts.
F
D
E
H.2.a. Guy Hardware Conditions (Turnbuckles or equivalent (secure and safety properly applied)
Observation:
Only (1) wire rope clip is present and surface corrosion was observed on the safety wire and wire rope clips of all (15) guy wire turnbuckles. (Photo “G”)
Recommendation:
Remove the existing safety wire and wire rope clip and replace with new 3/8” EHS safety wire installed in a figure 8 configuration with (2) new wire rope clips.
H.2.d.ii. Guy Hardware Conditions (Cable connectors (end fittings) (Wire serving properly applied))
Observation:
No serving was observed on the dead end of the guy wires at any of the (15) ground preforms. (Photo “H”)
Properly serve the dead ends of the guy wires.
H.2.d.iv. Guy Hardware Conditions (Cable connectors (Preformed wraps – properly applied, fully wrapped, & sleeve in place))
Observation:
No thimbles were observed on the preforms located on the ground end of the guy wires at all (15) locations. (Photo “I”)
Install the missing cable thimbles.
G
H
I
H.2.d.vi. Guy Hardware Conditions (Cable connectors (Shackles, bolts, pins, and cotter pins secure and in good condition))
Observation:
The guy lugs have pal nuts installed incorrectly. (Photo “J”)
Install pal nuts per manufacturer recommendations.
J
TOWER TENSION, PLUMB AND TWIST MEASUREMENTS
Table 1: Guy Wire Tensions
Guy Path Guy Level
Guy Size (diameter in inches) Measured
-5% of Initial
Tension (kips)
+5% of Initial Tension (kips)
Measured tension (kips) Results
Inner
A1 1 1/4 0.6325 0.6975 0.66 OK
A2 2 1/4 0.6325 0.6975 0.68 OK
B1 1 1/4 0.6325 0.6975 0.64 OK
B2 2 1/4 0.6325 0.6975 0.64 OK
C1 1 1/4 0.6325 0.6975 0.64 OK
C2 2 1/4 0.6325 0.6975 0.68 OK
Outer
AA 3 1/4 0.6325 0.6975 0.64 OK
BB 3 1/4 0.6325 0.6975 0.66 OK
CC 3 1/4 0.6325 0.6975 0.68 OK
DD 3 1/4 0.6325 0.6975 0.64 OK
EE 3 1/4 0.6325 0.6975 0.66 OK
FF 3 1/4 0.6325 0.6975 0.64 OK
GG 3 1/4 0.6325 0.6975 0.64 OK
HH 3 1/4 0.6325 0.6975 0.68 OK
II 3 1/4 0.6325 0.6975 0.64 OK
JJ 3 1/4 0.6325 0.6975 0.66 OK
KK 3 1/4 0.6325 0.6975 0.68 OK
LL 3 1/4 0.6325 0.6975 0.68 OK
TOWER TENSION, PLUMB AND TWIST MEASUREMENTS (cont.)
Table 2: Tower Twist Measurements
Reference Elevation
(above conc.)
Twist with Respect
To Base ( )
Allowable Twist with Respect
To Base ( )
Relative Twist Between Reference
Elevations ( )
Allowable Twist Between Reference
Elevations ( )
To w er T w ist
M ea su re m en ts
100-ft -0.26 ± 5.00 -0.26 ± 2.00
60-ft 0.00 ± 3.00 -0.26 ± 2.00
20-ft 0.26 ± 1.00
0.26 ± 1.00
0-ft 0.00 ± 0.00
Table 3: Lateral Deflection Measurements
Reference Elevation
(above conc.)
Resultant Deflection (in)
Allowable Resultant
Deflection (in) per TIA
Resultant Deflection Between Reference
Elevations (in)
Allowable Deflection Between Reference
Elevations (in) per TIA
To w er D ef le ct io n M ea su re m en ts
100-ft 1.79 ± 3.00
0.690 ± 1.20
60-ft 1.10 ± 1.80
0.690 ± 1.20
20-ft 0.42 ± 0.60
0.420 ± 0.60
0-ft 0.00 ± 0.00
APPENDIX A:
CAPITAL EXPENDITURES TABLE
File details come from the government source that posted it. Updated .