Amendment 0001- R1.pdf

PDF 292 KB Posted

Attached to
Nationwide Tower/Antenna Multiple Award Construction IDIQ Contract (TMACC)
Solicitation number
70Z08822RESDV0001
Issued by

View the file

Other files

File Type Posted
70118 Final Report FY19 PMV080.pdf PDF
Amendment 0004.pdf PDF
15261 Final Report FY19 PMV080.pdf PDF
Amendment 0003.pdf PDF
44217 Final Report FY19 PMV080.pdf PDF
A001 12 847597 TOWER- 65 SST MULTIPLE RAISED PLATFORMS.pdf PDF
Amendment 0002.pdf PDF
65 SS TOWER - MT. DIABLO - STAMPED STRUCTURAL ANALYSIS.pdf PDF
70118_Final Report_FY19_PMV080.pdf PDF
15261_Final Report_FY19_PMV080.pdf PDF
21206_Final Report_FY19_PMV080.pdf PDF
17283_Final Report_FY19_PMV080.pdf PDF
15290_Final Report_FY19_PMV080.pdf PDF
17908_Final Report_FY19_PMV080.pdf PDF
813509 R21 Tower San Onofre Peak Maintenance Report.pdf PDF
44217_Final Report_FY19_PMV080.pdf PDF
15301_Final Report_FY19_PMV080.pdf PDF
813531_R21 Tower Cambria_FY16.pdf PDF
15297_Final Report_FY19_PMV080.pdf PDF
15255_Final Report_FY19_PMV080.pdf PDF
15259_Final Report_FY19_PMV080.pdf PDF
TOWER 65 SST MULTIPLE RAISED PLATFORMS.pdf PDF
813559_R21 Tower Mt Jenner_FY16.pdf PDF
J.3_PAST PERFORMANCE QUESTIONAIRE.docx DOCX document
Appendix A_Seed Project_USCG District 11 Towers.pdf PDF
Request for Proposal_70Z08822RESDV0001.pdf PDF
J.8_U.S. Tower Manual_COMDTINST M11000.4.pdf PDF
J.2_EXPERIENCE INFORMATION FORM.docx DOCX document
J.5_USCG District Map.pdf PDF
CONTRACTOR REQUEST FOR CLARIFICATION.pdf PDF
J.7_U.S. Coast Guard Safety and Environmental Health Manual_COMDTINST M5100.47.pdf PDF
Appendix A_Seed Project_USCG District 13 Towers.pdf PDF
Finalized_Source Selection Plan_TMACC.pdf PDF
Enclosure 3- Appendix D_20130812_EIS Standard Protection Measures_final.pdf PDF
1.1.3_Final Specification SEED Project for National Tower Maintenance and Inspection IDIQ Contract_FY22.pdf PDF
1.10.1_DBA_Wage Determination_Seed Project.zip ZIP file
J.6_U.S. Coast Guard Asbestos Exposure Control Manual_COMDTINST M6260-16.pdf PDF
J.1_EXPERIENCE OVERVIEW SHEET.docx DOCX document
Enclosure 3- Appendix C_GTPermittingGuidelines.pdf PDF
Enclosure 3- Appendix F_Sea Turtle and Small Tooth Sawfish Construction Conditions.pdf PDF
Enclosure 3- Appendix E_Standard Manatee Conditions for In-Water Work.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 1

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0001 June 10, 2022 51281PR220022649

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

Contracting Officer

USCG CEU Oakland

1301 Clay Street 7th Floor, Suite 700N

Oakland, CA 94612-5203

Same as Block 6

8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) 9A AMENDMENT OF SOLICITATION NO.

ALL PROSPECTIVE OFFERORS

X 70Z08822RESDV0001

9B. DATE (SEE ITEM 11)

May 19, 2022

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE

RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)

SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority).

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

70Z08822RESDV0001 - Nationwide Tower/Antenna Multiple Award Construction Contract - IDIQ-TMACC

The purpose of this amendment is for the following:

A. Extend the Request for Proposal due date to 1700 PST Wednesday, June 29, 2022

B. Respond to Requests for Information from prospective contractors

C. Provide previous inspection reports.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TRAVIS COHEN

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

6/10/2022 (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS

EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243

Request For Proposal Number: 70Z08822RESDV0001

Amendment 0001

June 10, 2022

QUESTIONS GOVERNMENT RESPONSE

1.

Are escorts required for any of the tower locations for the

Seed project? If so, can the Government please provide a list of these locations?

A USCG POC is required to access the tower locations at all locations. The POC is listed under Appendix A, Columns Local POC 1, 2, and 3.

2.

Are any of the towers for the Seed Project energized towers

(it is difficult to tell based on the pictures provided)? If so, can the Government please list out which towers are energized?

Energized towers will be noted on the most recent Tower

Inspection Report. Also the POCs should be able to identify which towers are energized.

3.

Is there any documentation that can be provided by the

Government that provides additional information for each of the towers required for the Seed Project (i.e. make/model, # of anchors, size and number of guy wires) such as a

Structural Analysis?

The most recent Tower Inspection Report available for each tower will be provided.

4.

Can the Government please provide foundation designs or reports for each of the towers required for the Seed Project that details the depth of the anchor blocks and the length of the anchor rods?

The depth of anchor blocks and the lengths of the anchor rods will be noted on the most recent Tower Inspection

Report.

5.

Can the Government please provide the heights of the wooden support poles?

The heights of the wooden support poles will be noted on the most recent Tower Inspection Report.

6.

What size ground conductors are existing for those that are broken and need to be repaired/replaced?

The ground conductor sizes will be noted on the most recent

Tower Inspection Report.

7.

Does the term "nut locking devices on turnbuckles" refer to a jam nut installed on each outside end of the turnbuckle?

The term nut locking devices on turnbuckles refers to a jam nut.

8.

What is the thread size on the turnbuckles for the required

Seed Project towers?

The thread size for the respective turnbuckles will be noted on the most recent Tower Inspection Report.

9.

Does the term "locking devices for the shackles" on the guy wire refer to the cotter pins?

The term locking devices for the shackles refers to the cotter pins.

10.

Can the Government please provide information on the current lighting systems for each of the required Seed Project towers?

The current lightning systems will be noted on the most recent Tower Inspection Report.

11.

Where it is stated in Appendix A to provide pricing for replacement of wooden support poles, is the expectation to replace existing wood poles with new wood poles or poles of a different type/composition?

Replace existing wood poles with new wood poles.

12.

On page 5 of Appendix A for District 11, there is a pdf file named \\D07MS-ZCEU\Public\BMBSPublic\CEU Public\.

We are unable to access this file. Can the Government please provide another copy of this document?

PDF file will be sent, titled: A001-12 - 847597 - TOWER-

65' (SST) - MULTIPLE RAISED PLATFORMS

13.

In RFP Paragraph L.6, the deadline for receipt of the proposal is June 20, 2022 NLT 17:00 pm. However, June

20th is the Juneteenth federal holiday.

Can the government extend the deadline so that it does not fall on a holiday?

The proposal due date is extended to: 1700 PST Wednesday, June 29, 2022

14.

In RFP Paragraph L.2, instructions are provided for submission of questions to the Government. However, no deadline was given for receipt of questions.

Can the government provide a deadline for the receipt of questions?

Section L.2 of RFP “L.2 INSTRUCTION FOR

SUBMITTING QUESTIONS REGARDING

SOLICITATION” shall read as follows:

“Offerors are requested to review this solicitation as soon as possible upon receipt. If an offeror has any questions regarding the solicitation which require an answer from the issuing office, these questions shall be submitted, in writing via e-mail by 1700 PST, June 24, 2022 to:

Denver.L.Johnson@uscg.mil & Travis.Cohen@uscg.mil.”

15.

In the Request for Proposal document on page 95, Section III part i, there is a requirement, “Proof of license shall be submitted with each RFP response showing years of experience directly related to the antenna/tower construction and maintenance disciplines”. We are not aware of such a license from a national organization that meets this criterion.

Does the Government want the Offerors to self-certify by including a certified statement noting the years of experience of the firm in doing antenna/tower construction?

Submit a certified statement noting the years of experience.

Also, submit any qualifications that may be associated with Antenna/Tower construction and maintenance including tower climbing if applicable.

16.

Are escorts required for any of the tower locations for the

Seed project? If so, can the Government please provide a list of these locations?

A USCG POC is required to access the tower locations at all locations. The POC is listed under Appendix A, Columns

Local POC 1, 2, and 3.

17.

Are any of the towers for the Seed Project energized towers

(it is difficult to tell based on the pictures provided)?

If so, can the Government please list out which towers are energized?

Energized towers will be noted on the most recent Tower

Inspection Report. Also the POCs should be able to identify which towers are energized.

18.

Is there any documentation that can be provided by the

Government that provides additional information for each of the towers required for the Seed Project (i.e. make/model, # of anchors, size and number of guy wires) such as a

Structural Analysis?

The most recent Tower Inspection Report available for each tower will be provided.

19.

Can the Government please provide information on the current lighting systems for each of the required Seed Project towers?

The current lighting systems will be noted on the most recent

Tower Inspection Report.

20.

On page 5 of Appendix A for District 11, there is a pdf file named \\D07MS-ZCEU\Public\BMBSPublic\CEU Public\.

We are unable to access this file. Can the Government please provide another copy of this document?

PDF file will be sent, titled: A001-12 - 847597 - TOWER-

65' (SST) - MULTIPLE RAISED PLATFORMS

21.

RFP-page 100, 1.2.a.2, Past Performance Questionnaire Submission states that offerors should complete the

PPQ, but then states that PPQ's should be submitted directly to contracting officers via email. PPQ instructions on attachment J3, Past Performance

Questionnaire state that the client completes the PPQ and submits back to the offeror, who will then submit the completed PPQ with their proposal. Please clarify if we are supposed to put them in our proposal, or if the client is to submit them directly to the contracting officer.

PPQ's should be submitted directly to contracting officers via email by the client.

Denver.L.Johnson@uscg.mil &

Travis.Cohen@uscg.mil.”

22.

REFERENCE SPECIFICATION NO: Section 3.1.6.3 and Section 3.4.13 of the Scope Document – Tower

Inspection, Maintenance and Repair of U.S. Coast

Guard Towers at Various Sites in CG District Eleven (California) and District Thirteen

(Oregon/Washington).

QUESTION/CLARIFICATION: Section 3.1.6.3 states that subsurface investigations of guy anchors are part of the seed project scope. 3.4.13 asks for a detailed cost

The cost estimation described in Section 3.4 is for an estimation of future costs based on the current condition found during the inspection of the tower. So in this case

Section 3.1.6.3 requires an inspection of guy anchors and foundations and Section 3.4.13 requires a cost estimate in the final report to make any repairs based on the condition found.

mailto:Denver.L.Johnson@uscg.mil mailto:Travis.Cohen@uscg.mil estimate for subsurface investigation as part of the final report.

Please clarify which specification is applicable?

23.

Please provide recent inspection reports for the following towers.

CAMS Tower (RX Multimode) 15259

CAMS Tower (RX Omni) 15261

CAMS Tower (TCI VOBA #3) 15290 CAMS Tower (TCI VOBA #7) 15297

CAMS Tower (API VOBA #3) 15301

Tower 55' (GT) 17283 Microwave Tower #2 21206

CAMS Tower (TX#25) 70118

Tower 65' (SST) 847597 Tower 128' (GT) Winchester Hill 17908

CAMS Tower 35' (GT) 44217

The following inspection reports are available and will be provided: 15255, 15259, 15261, 15290,15297, 15301, 17283, 21206, 70118, 813509, 813531, 813559, 17908, and

44217. No other towers have inspection reports available.

24.

Rates are applicable to all service and maintenance work to be performed and are in effect at the time of issuance of a task order.” Section H.16 (Item 2.a.)

states “The requirements of the solicitation, in descending order or precedence: a) Standard Form 1442, Price Schedule, and Davis-Bacon Wage Rates.”

A Davis-Bacon wage determination was included in the

RFQ to be used in pricing the Seed projects.

It appears that the Seed Task scope is maintenance related, implying that the Service Contract Act wage determination is applicable, not the Davis Bacon wage determination. Per section H.16, it appears that the government is applying the Davis Bacon wage determination to the Seed Task. Please confirm that offerors are to use the Davis Bacon wage determination on the Seed Task. If the government determines that the Service Contract Act is applicable for the Seed Task pricing, please provide a copy of the Service Contract

Act wage determination?

Please use Davis Bacon Wage Determination provided with the Request for Proposal.

25. Would you please clarify the bid bond requirement? A bid Bond is not required. Bonding will only be required for individual task orders.

END.