813559_R21 Tower Mt Jenner_FY16.pdf

PDF 3 MB Posted

Attached to
Nationwide Tower/Antenna Multiple Award Construction IDIQ Contract (TMACC)
Solicitation number
70Z08822RESDV0001
Issued by

View the file

Other files

File Type Posted
70118 Final Report FY19 PMV080.pdf PDF
Amendment 0004.pdf PDF
15261 Final Report FY19 PMV080.pdf PDF
Amendment 0003.pdf PDF
44217 Final Report FY19 PMV080.pdf PDF
A001 12 847597 TOWER- 65 SST MULTIPLE RAISED PLATFORMS.pdf PDF
Amendment 0002.pdf PDF
65 SS TOWER - MT. DIABLO - STAMPED STRUCTURAL ANALYSIS.pdf PDF
70118_Final Report_FY19_PMV080.pdf PDF
15261_Final Report_FY19_PMV080.pdf PDF
21206_Final Report_FY19_PMV080.pdf PDF
17283_Final Report_FY19_PMV080.pdf PDF
15290_Final Report_FY19_PMV080.pdf PDF
17908_Final Report_FY19_PMV080.pdf PDF
813509 R21 Tower San Onofre Peak Maintenance Report.pdf PDF
44217_Final Report_FY19_PMV080.pdf PDF
15301_Final Report_FY19_PMV080.pdf PDF
813531_R21 Tower Cambria_FY16.pdf PDF
15297_Final Report_FY19_PMV080.pdf PDF
15255_Final Report_FY19_PMV080.pdf PDF
Amendment 0001- R1.pdf PDF
15259_Final Report_FY19_PMV080.pdf PDF
TOWER 65 SST MULTIPLE RAISED PLATFORMS.pdf PDF
J.3_PAST PERFORMANCE QUESTIONAIRE.docx DOCX document
Appendix A_Seed Project_USCG District 11 Towers.pdf PDF
Request for Proposal_70Z08822RESDV0001.pdf PDF
J.8_U.S. Tower Manual_COMDTINST M11000.4.pdf PDF
J.2_EXPERIENCE INFORMATION FORM.docx DOCX document
J.5_USCG District Map.pdf PDF
CONTRACTOR REQUEST FOR CLARIFICATION.pdf PDF
J.7_U.S. Coast Guard Safety and Environmental Health Manual_COMDTINST M5100.47.pdf PDF
Appendix A_Seed Project_USCG District 13 Towers.pdf PDF
Finalized_Source Selection Plan_TMACC.pdf PDF
Enclosure 3- Appendix D_20130812_EIS Standard Protection Measures_final.pdf PDF
1.1.3_Final Specification SEED Project for National Tower Maintenance and Inspection IDIQ Contract_FY22.pdf PDF
1.10.1_DBA_Wage Determination_Seed Project.zip ZIP file
J.6_U.S. Coast Guard Asbestos Exposure Control Manual_COMDTINST M6260-16.pdf PDF
J.1_EXPERIENCE OVERVIEW SHEET.docx DOCX document
Enclosure 3- Appendix C_GTPermittingGuidelines.pdf PDF
Enclosure 3- Appendix F_Sea Turtle and Small Tooth Sawfish Construction Conditions.pdf PDF
Enclosure 3- Appendix E_Standard Manatee Conditions for In-Water Work.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Master Inc. Proprietary & Confidential

Page | 2

II – Table of Contents

Section Page Title Page

I Title Page 1

II Table of Contents 2

III Executive Summary 3

IV Recommended Maintenance 4

V Chronological Narrative 4

Appendices Page

A Tower Inspection Photographs 5

B Tower Height Verification Form 17

C Tower Condition Assessment Form 18

D Repair Estimate(s) Sheet 19

Site Master Inc. Proprietary & Confidential

Page | 3

III - Executive Summary

i. Inspection Summary

The R21 Mt Jenner tower located in Jenner, CA was inspected on August 2, 2016 by SiteMaster, Inc. crew members. The structure is an 80’ self supporting tower. The overall condition of the tower structure was found to be satisfactory with one maintenance item noted.

ii. Structural Members

The tower structure is in good condition with no instances of rust or bends/deflections in the tower members. The tower hardware is all intact and in good condition. The tower foundation is satisfactory with no cracks or spalling. The tower’s galvanization is still in satisfactory condition.

iii. Alignment and Twist

A visual inspection of the tower showed that it appeared to be plumb.

iv. FAA Obstruction Lighting System

Not applicable to this tower.

v. Guy System and Guy Hardware

Not applicable to this tower.

vi. Guy Anchors and Foundation

Not applicable to this tower.

vii. Insulator Systems

Not applicable to this tower.

viii. Grounding Systems

The tower base is grounded. However, there is no lightning rod installed; we recommend one be added.

ix. OSHA Standards

The tower is equipped with climbing foot pegs and a safety climb cable system. The safety climb cable system is in good condition.

x. Maintenance Accomplished

No on-site maintenance was needed.

Site Master Inc. Proprietary & Confidential

Page | 4

IV – Recommendations

Within 2 Years:

1. Install a lightning rod on the tower.

V – Chronological Narrative

Date: 8/2/16

Weather Conditions: Cloudy Wind: 4MPH

Time Work Performed

0800-0900 Arrived on site; safety meeting

0900-1100 Performed tower and ground inspection

1100 Left site

Site Master Inc. Proprietary & Confidential

Page | 5

Appendix A Tower Inspection Photographs

Overall View of Tower

Site Master Inc. Proprietary & Confidential

Page | 6

No. Description Photograph

Tower ID; written on sign previously, not by

SiteMaster crew

2 View looking up the tower; safety climb visible

3 Overall compound view

Site Master Inc. Proprietary & Confidential

Page | 7

No. Description Photograph

4 Tower foundation; grounding

5 Tower foundation; grounding

6 Tower foundation; grounding

Site Master Inc. Proprietary & Confidential

Page | 8

7 Laser reading for height verification

8 Interior compound view

9 Interior compound view

Site Master Inc. Proprietary & Confidential

Page | 9

10 Tower face; coax routing on tower

11 Tower face; coax routing on tower

12 Coax routing into shelter A

Site Master Inc. Proprietary & Confidential

Page | 10

13 Coax routing into shelter B

14 Coax routing from shelter A to tower

15 Coax routing from shelter B to tower

Site Master Inc. Proprietary & Confidential

Page | 11

16 Typical good condition of tower bolt hardware

17 Typical good condition of tower bolt hardware

18 Typical good condition of tower bolt hardware

Site Master Inc. Proprietary & Confidential

Page | 12

No. Description Photograph

R21 antenna at 93’4”

Dipole at 80’

Omni at 75’6”

Dish at 64’

Dipole at 46’8”

21 Close-up of R21 antenna

Site Master Inc. Proprietary & Confidential

Page | 13

22 Close-up of omni

23 Close-up of dish

24 View looking down tower

Site Master Inc. Proprietary & Confidential

Page | 14

25 View looking down tower

26 H-frame inside compound

27 Shelter A inside compound

Site Master Inc. Proprietary & Confidential

Page | 15

28 Shelter A inside compound

29 Shelter B inside compound

30 Shelter B inside compound

Site Master Inc. Proprietary & Confidential

Page | 16

31 Top of safety climb cable system

32 Coax routing up into R21 antenna

33 Access route to site

Site Master Inc. Proprietary & Confidential

Page | 17

Appendix B

Site Master Inc. Proprietary & Confidential

Page | 18

Appendix C

File details come from the government source that posted it. Updated .